HomeMy WebLinkAboutPinney Otooles Engineers Report 09_18_26
ENGINEER’S REPORT - September 2026
O’tooles Contractor Yard, 430 Peruville Road, Lansing, NY 14882
Owner, Scott Pinney
6 Otti Road
Lansing, NY 14882
Land Use
An existing contactor’s work yard located at the intersection of Scofield and
Peruville Roads in the Town of Lansing has been owned and operated by Mr.
Scott Pinney since 2011. In 2016, the owner proposed a large townhome
development just to the west of the site and a subsequent Full Stormwater
Pollution Prevention Plan was approved by the Town of Lansing soon after.
As a condition of approval, the Town required Mr. Pinney to prepare a
temporary erosion and sediment control plan for the work yard which
included the installation of a sedimentation basin to capture and treat runoff.
Constraints were also placed on the project to limit the breath and scope of
future activity to ensure the protection of planned development below.
In 2020, the townhome portion of the land was sold off, and the project was
never realized under its new ownership. Mr. Pinney is desirous in obtaining
approval to expand the work yard and developing permanent runoff
management.
Soil and Site Conditions
The area is comprised of A & C type soils over brush and scrub type land.
The bulk of the site is an existing contractor work yard with hard packed
dirt.
Site Soils: The predominant soil types throughout the site are Palmyra,
gravely loams (PaC) in the hydrologic soil group A and Kendaia and Conesus
(KnA, CfB) gravely loams in the hydrologic soil group C. Data indicates that
the A type matrices have moderately high to high permeability rate between
0.57 to 5.95 in/hr and the C matrices at a moderately low to moderately high
permeability rate between 0.01 – 1.42 in/hr.
Soils data was obtained from the USDA Web Soil Survey. Site Topography:
The site as a whole has a flat uniform slope of between 1-3% primarily
moving downhill from northeast to southwest. Site Watershed: Of the 10.32-
acre watershed, the area of disturbance will be approximately 4.93-AC.
Transportation
1. There will be no highway dedication associated with this project.
2. There will be no additional driveways or modification to existing
driveways.
3. Existing driveway entrances allow for even circulation for existing
activity.
4. There is no anticipated increase in vehicular activity or traffic from
activity that has occurred on and off over the past 15 years.
Public Services
There is no need for additional public services or change from current
activity.
Utility Services
There is no change to existing utilities.
Flood Hazard
All buildings are well above the 100 year flood plain.
Agriculture
This property is not part of an Ag District. The existing activity is well
removed from any agriculture or horse rearing activities. There should be no
conflict of noise or odors.
Lighting
There are no lighting changes to the property.
Sewerage
There is no change to existing sewer.
Water System
There is no change to existing water
Stormwater Quality & Quantity
A Full Stormwater Pollution Prevention Plan (SWPPP) was prepared to
address any runoff concerns. There is no significant flow for the 1 or 10 years
storm. A sedimentation basin captures and treats 100% of the WQv and
attenuates runoff to less than existing conditions.
A hydraulic and hydrologic runoff model was prepared to compare 2020
activity with that of planned work in 2026. Recommendations were made to
increase the volume of the sedimentation basin so that the project meets the
1, 10, and 100 yr storms since the site had expanded through the years from
roughly 2.8-AC to 4.93-AC.