Loading...
HomeMy WebLinkAboutPinneyHardfill_SWPPP_Report Storm Water Pollution Prevention Plan for O'tooles Contractor Yard Town of Lansing Lansing, New York September 2026 Prepared by: Timothy C. Buhl, PE NYSPE#: 053134 For: Scott Pinney 70 Oak Hill Moravia, NY 13118 TABLE OF CONTENTS 1.0 EXECUTIVE SUMMARY .................................................................................. 1 2.0 INTRODUCTION...............................................................................................5 3.0 PROJECT DESCRIPTION...............................................................................8 4.0 RUNOFF REDUCTION VOLUME ..................................................................8 5.0 STORM WATER POLLUTION PREVENTION MEASURES AND CONTROLS.......................................................................................................10 6.0 LOCAL PLANS.................................................................................................13 7.0 STATE HISTORIC PRESERVATION.......................................................... 14 8.0 ENVIRONMENTAL MAPPING..................................................................... 15 9.0 INSPECTIONS AND SYSTEM MAINTENANCE .......................................15 10.0 POST CONSTRUCTION INSPECTION, OPERATION AND MAINTENANCE................. ...........................................................................17 ATTACHMENTS Attachment A: Notice of Intent, (NOI) and MS4 Acceptance Form (if applicable) Attachment B: Notice of Termination, (NOT) Attachment C: Certification Forms Attachment D: State Historic Preservation Mapping Attachment E: Environmental Mapping Attachment F: Inspection Report (Sample Form) Attachment G: Record of Stabilization and Construction Activity Dates Attachment H: Vegetative and Structural Measures for Erosion and Sediment Control New York State Standards & Specifications for Erosion and Sediment Control Attachment I: NYSDEC Stormwater Controls Construction Checklist Attachment J: NYSDEC Controls Operation & Maintenance Check List Attachment K: Stormwater Management Summary 1.0 EXECUTIVE SUMMARY The engineer, owner and all contractors involved with construction activity that disturb site soil or who implement pollutant control measures identified in the Storm Water Pollution Prevention Plan (SWPPP) are responsible for complying with the requirements set forth in the New York State Department of Environmental Conservations SPDES General Permit from Construction Activity Permit No. GP-0-25-001 and any local and/or state governing agencies having jurisdiction with regards to erosion and sediment control. The requirements of the SPDES Permit are as follows: A. Owner: Scott Pinney 70 Oak Hill Road Moravia, NY 13118 (607) 227-9698 Project Site: Tax Parcel#30.-1-28.212 Peruville and Scofield Roads Lansing, NY 14882 This contractor yard is subject to the requirements of a regulated, traditional land use control MS4. Therefore, the following requirements must be met before continued construction activity is authorized to discharge stormwater. 1. An owner or operator that is subject to the requirements of a regulated, traditional land use control MS4, must have its SWPPP reviewed and accepted by the regulated MS4 prior to submitting the NOI to the Department. The owner or operator shall then have the "MS4 SWPPP Acceptance Form," as provided in Attachment A, authorized by the MS4 and submitted to the Department along with the NOI for approval. 2. Complete the Notice of Intent (NOI) provided in Attachment A and forward to the recipients following this section. Five (5) business days from the date the Department receives a complete electronic version of the NOI (eNOI) for construction activities with a SWPPP that has been preopared in conformance with the design criteria in the technical standard referenced in Part III.B.1. of the SPDES General Permit and the performance cirteria in the technical standard referenced in Parts III.B., 2 or 3 of the SPDES general permit, for construction activities that require post-construction stormwater management practices pursuant to Part III.C. of the SPDES General Permit; or Stormwater Pollution Prevention Plan O'tooles Contractor Yard (T)Lansing,NY 3. Sixty (60) business days from the date the Department receives a complete NOI (electronic or paper version) for construction activities with a SWPPP that has not been prepared in conformance with the design criteria in technical standard referenced in Part III.B.1. or, for construction activities that require post-construction stormwater management practices pursuant to Part III.C., the performance criteria in the technical standard referenced in Parts III.B., 2 or 3, or; 4. Ten (10) business days from the date the Department receives a complete paper version of the NOI for construction activities with a SWPPP that has not been prepared in conformance with the design criteria in technical standard referenced in Part III.B.1. or, for construction activities that require post-construction stormwater. NYS Department of Environmental Conservation (DEC) Division of Water 625 Broadway, 4th Floor Albany, New York 12233-3505 Town of Lansing Town Hall 29 Auburn Road Lansing, New York 14882 (607) 533-4142 All notifications shall be sent via certified mail with return receipt. Copies of mailing receipts shall be kept on record at the project site with the SWPPP and shall be considered part of the contract documents. The Town's representative shall be included on all correspondence involving changes to the operation or SWPPP. Copies of the SWPPP must be provided to the Town of Lansing once all signatures and attachments are complete. B. A copy of the General Construction Permit (GP-0-25-001), Notice of Intent (NOI), NOI acknowledgement letter received by the DEC, and MS4 Acceptance Form (if applicable), shall be posted in a prominent place for public viewing at the project site. C. A complete copy of the SWPPP, NOI, NOI Acknowledgement letter, MS4 Acceptance form (if applicable), including copies of all inspection reports, plan revisions, etc., must be retained at the project site at all times during working hours and kept as part of the permanent project records for a duration of no less than five (5) years following submission of the Notice of Termination (NOT). 2 1 P a g e Stormwater Pollution Prevention Plan O'tooles Contractor Yard (T)Lansing,NY D. The site development contractors must provide names and addresses of all subcontractors working on the project who will be involved with the major construction activities that will result in soil disturbance. The Owner shall ensure that each contracting firm identifies one trained individual who will be responsible for implementation of the SWPPP. The owner shall also ensure that at least one trained individual is on site daily when soil disturbance activities are being performed. This information must be retained as part of the SWPPP. E. The site development contractor(s) and all subcontractors involved with the major work yard activities that disturb site soil must sign a copy of the appropriate certification statement included in Attachment C along with the identity of the appropriate trained individual as described in paragraph D of this section. F. Regular inspections must be made to determine effectiveness of the SWPPP. It would be modified as needed to prevent pollutants from discharging from the site. The inspector must be a person familiar with the site, the nature of the major construction activities, and qualified to evaluate both overall system performance and individual component performance. Additionally, the inspector must either be someone empowered to implement modifications to the SWPPP and the pollutant control devices, if needed, in order to increase effectiveness to an acceptable level, or someone with the authority to cause such events to happen. G. This SWPPP must be updated each time there is a significant modification to the pollutant prevention system or a change of contractors working on the project who may disturb site soil. The site development contractor must notify the governing agency(s) as soon as these modifications are implemented. H. Discharge of oil or other hazardous substances into the storm water is subject to reporting and cleanup requirements. Refer to Part I.B.l.d of the SPDES General Permit for additional information. Copies of the SPDES General Permit and the Notice of Intent Forms may be found on-line. I. Notice of Termination (NOT) - Once the site reaches final stabilization upon completion or closure of the operation, Scott Pinney, as Owner, may terminate coverage of SPDES permit coverage by submitting a Notice of Termination, Form (included in Attachment B), when one or more of the following conditions are met: 1. Total Project Completion - All construction activity identified in the SWPPP has been completed; and all disturbance have achieved final 3 1 P a g e Stormwater Pollution Prevention Plan O'tooles Contractor Yard (T)Lansing,NY stabilization and all temporary, structural erosion and sediment control measures have been removed, and all post-construction stormwater management practices have been constructed in conformance with the SWPPP and are operational. 2. Planned shutdown with partial project completion — All soil disturbance activities have ceased; and all areas disturbed as of the project shut down date have achieved final stabilization, and all temporary, structural erosion and sediment control measures have been removed, and all post- construction stormwater management practices have been constructed in conformance with the SWPPP and are operational. 3. A new owner or operator has obtained coverage under the General SPDES Permit in accordance with Part II.E. 4. The owner or operator obtains coverage under an alternative SPDES General Permit or individual SPDES permit. For construction activities meeting 1.0.I above, the owner or operator shall have a qualified inspector perform a final site inspection prior to submitting the NOT. The qualified inspector shall, by signing the "final stabilization" and "Post-Construction Stormwater Management Practice certification statements on the NOT, certify that all requirements of the SPDES General Permit have been met. Further, construction activities subject to the requirements of a regulated, transitional land use control MS4, must have the MS4 sign the "MS4 acceptance" statement on the NOT, indicating that the project has been constructed in accordance SPDES General Permit requirements. Lastly, for construction activities that require post-construction stormwater management practices, the owner or operator must, prior to submitting the NOT, ensure one of the following: 1. The post-construction stormwater management practices and any right of ways needed to maintain such practices have been deeded to the municipality in which the practice is located. 2. An executed maintenance agreement is in place with the municipality that will maintain the post-construction stormwater management practices. 3. If the post-constructed management practices are privately owned, the owner or operator must have a mechanism in place that requires operation and maintenance of the practices in accordance with the 4 1 P a g e Stormwater Pollution Prevention Plan O'tooles Contractor Yard (T)Lansing,NY operation and maintenance plan, such as a deed covenant in the owner or operator's deed of record. 4. If the post-constructed practices are owned by a public or private institution, government agency or authority, or public utility, the owner or operator has policy and procedure in place that ensures operation and maintenance of the practices in accordance with the operation and maintenance plan. J. This SWPPP intends to control water-borne and liquid pollutant discharges by some combination of interception, filtration, and containment. The general contractor and subcontractors implementing this SWPPP must remain alert to the need to periodically refine and update the SWPPP in order to accomplish the intended goals. K. This SWPPP must be amended as necessary during the course of operations in order to keep it current with the pollutant control measures utilized at the site. Amending the SWPPP does not mean that it has to be reprinted. It is acceptable to add addenda, sketches, new sections, and/or revised drawings. L. A record of the dates when major grading activities occur, when construction activities temporarily or permanently cease on a portion of the site, and when stabilization measures are initiated must be maintained until the NOT is filed. A log for keeping such records is included in Attachment G. A different form for the log may be substituted if it is found to be more useful. 2.0 INTRODUCTION This SWPPP has been prepared for major activities associated with the ongoing operation of a contractor work yard in the Town of Lansing. The production originally started in 2011 which was allowed use by right through the Town. In 2016, a full site plan review process was conducted for a conceptual apartment complex located downslope from the facility which included an approved SWPPP. As part of the storm plan, the work yard was allowed continued use by right but several restrictions were placed on the property limiting the size and scope of the work zone while also requiring the installation of a stormwater management sump practice to provide runoff mitigation and attenuation. Because the apartment complex was never realized, the 2016 restrictions became null and void with the exception that the operation would now be required to carry its SWPPP. The O'tooles Contractor Work Yard is located in the Town of Lansing, New York at Tax Parcel #30.-1-28.212 at the intersection of Peruville and Scofield Roads. The property sits within a drainage area of approximately 10.32-AC of which, the cumulative on-going land disturbance is approximately 4.93 acres. The entire site 5 1 P a g e Stormwater Pollution Prevention Plan O'tooles Contractor Yard (T)Lansing,NY is assumed to be impervious given the fact that it is hard packed dirt due to typical work yard activity. The original 2016 project called for a 1' sump to capture and treat on-going runoff from the operation. The modified plan adds an additional 1' of depth to the practice to meet attenuation requirements but the footprint largely remains the same. Reference the Project Plans for the permanent stormwater management facilities planned. This SWPPP includes the elements necessary to comply with the SPDES General Permit for Stormwater Discharges GP-0-25-001 administered by the New York State Department of Environmental Protection, the U.S. Environmental Protection Agency (EPA) under the National Pollutant Discharge Elimination System (NPDES) program and all local governing agency requirements. This SWPPP must be implemented at the start of construction. Construction phase pollutant sources anticipated at the site are disturbed (bare) soil, vehicle fuels and lubricants, chemicals associated with various stockpiled materials (asphalt), and general debris. Without adequate control there is the potential for each type of pollutant to be transported by storm water. Aside from the commercial work site, an asphalt driveway apron, landscape screening, storage bunkers, and a hoop building are on the property. There are no utilities including water, sewer, or electric. Permanent stormwater management facilities are in place including one (1) dry sump. The pond will provide any water quality volume treatment and satisfy requirements for quantity attenuation necessary to control runoff to less than pre-developed conditions as required by the NYSDEC General SPDES Permit. Please see Attachment K for this information. A. Purpose The major goal of pollution prevention efforts during operations is to control the migration of soil and pollutants that originate on-site and prevent them from impacting surface waters and the environment. The purpose of this SWPPP is to provide guidelines for achieving that goal. A successful pollution prevention program also relies upon careful inspection and adjustments during the construction process in order to enhance its effectiveness. B. Scope This SWPPP must be implemented at all times while operations and soil disturbances are active on-site. It primarily addresses the impact of storm rainfall and runoff in areas of the ground surface disturbed during the work yard. This SWPPP will terminate when disturbed areas are stabilized, construction type activities covered herein have ceased, and a completed 6 1 P a g e Stormwater Pollution Prevention Plan O'tooles Contractor Yard (T)Lansing,NY Notice of Termination (NOT) is mailed to the governing agency requiring the NOT. See Section 1.0.I for specific NOT eligibility requirements. Particular forms are included which are necessary for implementing the SWPPP. The SPDES General Permit for Storm Water Discharges from Construction Activities prohibits most non-storm water discharges during the construction phase. Allowable non-storm water discharges that could occur during construction on this project, which would therefore be covered by the General Permit, include: 1. Discharges from fire fighting activities; 2. Fire hydrant flushing; 3. Waters to which cleansers or other components have not been added that are used to wash vehicles or control dust; 4. Routine external building washdown which does not use detergents; 5. Irrigation drainage; 6. Uncontaminated discharges from construction site de-watering operations; 7. External building wash down which does not use detergents; 8. Runoff from pavement wash down where spills or leaks of toxic or hazardous materials have not occurred (unless all spilled material has been removed) and where detergents have not been used; 9. Springs and uncontaminated groundwater; and 10. Foundation or footing drains where flows are not contaminated with process materials such as solvents. The techniques described in this SWPPP focus on providing control of pollutant discharges with practical approaches that utilize readily available expertise, materials, and equipment. The Owner/Developer referred to in this SWPPP is Scott Pinney who will be responsible for full development and build-out of the subject parcel. 7 1 P a g e Stormwater Pollution Prevention Plan O'tooles Contractor Yard (T)Lansing,NY 3.0 PROJECT DESCRIPTION Described below are the major construction activities that are subject to this SWPPP. The Owner shall not disturb greater than five (5) acres of soil at an, one time without prior written authorization from the DEC, or, in areas under the jurisdiction of a regulated MS4, authorization by that municipality. They are presented in the order (or sequence) they are expected to begin, but each activity will not necessarily be completed before the next begins. Install erosion and sediment control measures as shown on Drainage, Sediment and Erosion Control Plans, down slope from construction activities that disturb site soil before disturbance of soil; CONTRACTOR YARD — REQUIRED FOR ON-GOING OPERATIONS A. Increase volume of existing dry pond (sump) by establishing another foot in depth with side slope of 4:1 and as shown on plan sheets S-1 and S-2. Note: Sediment barriers such as silt fencing, proper seeding and mulching will be utilized as required to bind the down slope side of the pond and soil stockpiles shall be established as needed; B. Remove any accumulated sedimentation from the pond as accumulations increase by at least 6" 4.0 RUNOFF REDUCTION VOLUME This project follows guidelines set forth by the DEC for runoff reduction. Chapter 3 of the New York State Stormwater Management Design Manual requires a five step planning process to document compliance with required processes. However, as this is a contractor yard with operations that have already been in place for the past 15 years, much of this section is exempt from consideration. Step 1 — Protect natural resources and utilize site hydrology This planning step is designed to preserve area natural resources by protecting areas, avoiding sensitive locations, and minimizing grading and soil disturbances. There were no erodible soils, critical areas, wetlands, riparian buffer areas, or locally listed protected areas. Another component of the planning process is an evaluation of all green infrastructure practices that might be acceptable for runoff reduction on site. This project will utilize filter strips. The selection process is described as follows: 8 1 P a g e Stormwater Pollution Prevention Plan O'tooles Contractor Yard (T)Lansing,NY o Conservation of natural areas — Pre-development hydrology and water quality characteristics of undisturbed natural areas remains unaltered. o Sheetflow to riparian buffers o Vegetated open swales — Site runoff will be collected and directed to specific treatment practices using the site's existing slope to direct sheet flow. o Tree planting/tree box o Disconnection of rooftop runoff o Stream daylighting for redevelopment projects o Bioswale o Green roof o Stormwater planters o Rain cistern o Porous pavement Step 2 — Determine Overall Water Quality Treatment Volume (WQvv) See Attachment K for the calculation summary. Step 3 — Runoff reduction by pplyin green infrastructure technology and standard SMPs. Runoff reduction was calculated as required. Flow is directed into a dry pond sump which acts as an infiltration practice. 100% of the site water quality volume is captured. As shown in Attachment K, minimum requirements for runoff reduction volume were met. Step 4 — Provide standard practices to address remaining water quality volume A dry pond captures 100% of the water quality volume. Reference Attachment K for the overall treatment calculations. 9 1 P a g e Stormwater Pollution Prevention Plan O'tooles Contractor Yard (T)Lansing,NY Step 5 —Apply volume and peak rate control practices if still required Peak rate control is met using one dry pond. The pond reduces runoff from the operation to less than pre-developed conditions. See modeling report output for further information. 5.0 STORM WATER POLLUTION PREVENTION MEASURES AND CONTROLS Various erosion and sediment control measures have been incorporated into the design of the project, Reference Stormwater, Sediment and Erosion Control Plans accompanying this SWPPP. These measures will be implemented during operations to minimize soil erosion and to protect the character and integrity of downstream receiving waters. A single dry pond (sump) is used to control the quality and quantity of storm water runoff from the work yard site. The site owner shall take all appropriate precautions to prevent soil erosion and discharge of sediment and other pollutants to receiving water bodies and wetlands. Specific measures are outlined in this plan. In general, disturbance areas shall be limited to the smallest practical areas at any given time, and the areas are to be reseeded as soon as possible. During construction the measures outlined in this document and shown on the plans are to be installed as described. Additional measures may be warranted or required by site and climatic conditions. Specific erosion control measures, designed to minimize soil loss, and sediment control measures devised to retain eroded soil and prevent it from reaching water bodies or adjoining properties have been developed in accordance with the New York State Stormwater Management Design Manual, 2015, NYSDEC and New York Standards & Specifications for Erosion and Sedimentation Control, November 2016. Reference Attachment H for copy of Vegetative and Structural, Measures for Erosion and Sediment Control, New York State Standards & Specifications for Erosion and Sedimentation Control. (Vegetative; November 2016, Structural; August 2005) A variety of storm water pollutant controls are recommended for this project. Some controls are intended to function temporarily and will be used as needed for pollutant control during the operations. These include sediment and erosion control measures as shown on the plans and permanent stormwater facilities including, a dry pond. For all disturbed areas, permanent stabilization will be accomplished by covering the disturbed soil with vegetation, pavement, or commercial structures. A. Erosion and Sediment Controls 1. Soil Stabilization — The purpose of soil stabilization is to prevent soil from leaving the site. In the natural condition, soil is stabilized by 101Page Stormwater Pollution Prevention Plan O'tooles Contractor Yard (T)Lansing,NY native vegetation. The primary technique to be used under this project for stabilizing site soil will be to provide a protective cover of turf grass, pavement, or building structure. a. Temporary Seeding - Where land disturbance is necessary, temporary seeding with fast-germinating temporary seed and a protection of mulch must be used on areas which will be exposed for more than 14 days. b. Permanent Seeding — All areas at final grade must be seeded and mulched within 7 days after completion of the major activity. c. Structural Controls — The storm water will be managed on site utilizing proposed site grading and a dry. Their design is shown on the Project Site Stormwater Plan S-1 and S-2. Final site stabilization is achieved when there is a uniform 80 percent density of permanent vegetation on all previously disturbed soil surfaces, exclusive of areas that have been paved. B. Other Pollutant Controls Control of sediments has been described previously. Other aspects of this SWPPP are listed below: 1. Dust Control — Construction traffic must enter and exit the site at the stabilized work yard/driveway entrance. The purpose is to trap dust and mud that would otherwise be carried off-site by construction traffic. Dust control must be provided by the owner, and in compliance with applicable local and state dust control regulations. After operations are complete, the site will be stabilized (as described elsewhere), which will reduce the potential for dust generation. 2. Solid Waste Disposal — No solid materials are allowed to be discharged from the site with storm water. All solid waste, including disposable materials incidental to the major work yard activities, must be collected and placed in containers. The containers will be emptied periodically by a contract trash disposal service and hauled away from the site. Substances that have the potential for polluting surface and/or groundwater must be controlled by whatever means necessary in order 111Page Stormwater Pollution Prevention Plan O'tooles Contractor Yard (T)Lansing,NY to ensure that they do not discharge from the site. As an example, special care must be exercised during equipment fueling and servicing operations. If a spill occurs, it must be contained and disposed so that it will not flow from the site or enter groundwater, even if this requires removal, treatment, and disposal of soil. In this regard, potentially polluting substances should be handled in a manner consistent with the impact they represent. 3. Sanitary Facilities —There are no sanitary facilities on-site. 4. Water Source — There are no water sources provided on-site. 5. Long-Term Pollutant Controls — Storm water pollutant control measures installed during construction that will also provide benefits during operations, include one (1) dry pond. Those sediment barriers, such as check dams (if required), that do not interfere with normal operations and appear to provide long-term benefits can be left in place after once operations are completed. All silt fencing must be removed once the site has received proper stabilization. C. Construction Phase "Best Management Practices" During the construction phase, the general contractor will implement the following measures: 1. Permanent traffic corridors shall be established and "routes of convenience" shall be avoided; 2. Preservation of existing vegetation as much as possible. Following the completion or closure of work yard operations and activities in any portion of the site permanent vegetation shall be established an all exposed soils; 3. Site preparation activities shall be planned to minimize the area and duration of soil disruption; 4. Minimizing soil erosion and sedimentation by stabilization of disturbed areas and by removing sediment from site discharges; 5. Material resulting from any clearing and grubbing operation will be stockpiled up slope from adequate sedimentation controls. 121Page Stormwater Pollution Prevention Plan O'tooles Contractor Yard (T)Lansing,NY 6. The owner will designate areas for equipment, maintenance, and stockpiling. The areas will be protected by a temporary perimeter berm. 7. Use of detergents for large scale washing is prohibited (i.e., vehicles, buildings, pavement surfaces, etc.) 8. Chemicals, paints, solvents, fertilizers, and other toxic material must be stored in waterproof containers. Except during application, the contents must be kept in trucks or within storage facilities. Runoff containing such material must be collected, removed from the site, treated and disposed at an approved solid waste or chemical disposal facility. 6.0 LOCAL PLANS In addition to this SWPPP, work yard activities associated with this project must comply with any guidelines set forth by local and state regulatory agencies. Reference Project Plans and the Stormwater Management Design Summary (Attachment K) prepared to meet Local and State requirements for post- development stormwater quantity & quality. 7.0 NYSHPO A search was conducted on the New York State Parks, Recreation and Historic Preservation Office website to identify whether the subject parcel is listed under natural or historic places registration, or if the area resides within an archaeologically sensitive location. Attachment D, includes a "grey map" indicating that the property is not within a sensitive area. 8.0 ENVIRONMENTAL MAPPING A search was conducted on the Tompkins County, New York State, and Federal Inventory websites to identify any areas with known wetlands, protected plants or animal species, or any significant environmental concerns that could be impacted by this project. No issues or concerns were noted. Please see Attachment E for screen prints of this review. 9.0 INSPECTIONS AND SYSTEM MAINTENANCE Between the time this SWPPP is implemented and final site stabilization is achieved, all disturbed areas and pollutant controls must be inspected at least once every seven calendar days by a licensed professional or Qualified Inspector, as identified by the SPDES General Permit. The purpose of site inspections is to 131Page Stormwater Pollution Prevention Plan O'tooles Contractor Yard (T)Lansing,NY assess performance of pollutant controls. The inspections will be conducted by an independent third party Qualified Inspector to be provided by the Owner using a form similar to the example provided in Attachment F. The Owner/Operator will also be required to arrange for a designated Trained Contractor (as defined by the SPDES General Permit) to be responsible for the management of this SWPPP during construction, while on-site. Based on these inspections, the Trained Contractor will decide whether it is necessary to modify this SWPPP, add or relocate sediment barriers, or whatever else may be needed in order to prevent pollutants from leaving the site via storm water runoff. The Trained Contractor has the duty to cause pollutant control measures to be repaired, modified, maintained, supplemented, or whatever else is necessary in order to achieve effective pollutant control. Examples of particular items to evaluate during site inspections are listed below. This list is not intended to be comprehensive. During each inspection the inspector must evaluate overall pollutant control system performance as well as particular details of individual system components. Additional factors should be considered as appropriate to the circumstances. A. Construction of stormwater facilities. Insure facilities are constructed substantially in accordance with the plans. (Also, Reference Attachment I for sample inspection checklist - NYSDEC Stormwater Construction Checklist): B. Locations where vehicles enter and exit the site must be inspected for evidence of off-site sediment tracking. A stabilized construction entrance will be monitored where vehicles enter and exit. This entrance will be maintained or supplemented as necessary to prevent sediment from leaving the site on vehicles. C. Sediment barriers must be inspected and, if necessary, they must be enlarged or cleaned in order to provide additional capacity. All material from behind sediment barriers will be stockpiled on the up slope side. Additional sediment barriers must be constructed as needed. D. Inspections will evaluate disturbed areas and areas used for storing materials that are exposed to rainfall for evidence of, or the potential for, pollutants entering the drainage system. If necessary, the materials must be covered or original covers must be repaired or supplemented. Also, protective berms must be constructed, if needed, in order to contain runoff from material storage areas. E. Grassed areas will be inspected to confirm that a healthy stand of grass is maintained. The site has achieved final stabilization once all areas are covered with building foundation or pavement, or have a stand of grass with 141Page Stormwater Pollution Prevention Plan O'tooles Contractor Yard (T)Lansing,NY at least 80 percent density. The density of 80 percent or greater must be maintained to be considered as stabilized. Areas must be watered, fertilized, and reseeded as needed to achieve this goal. F. All discharge points must be inspected to determine whether erosion control measures are effective in preventing significant impacts to receiving waters. Based on inspection results, any modification necessary to increase effectiveness of this SWPPP to an acceptable level must be made within seven calendar days of the inspection. The inspection reports must be completed entirely and additional remarks should be included if needed to fully describe a situation. An important aspect of the inspection report is the description of additional measures that need to be taken to enhance plan effectiveness. The inspection report must identify whether the site was in compliance with the SWPPP at the time of inspection and specifically identify all incidents of non-compliance. Inspection reports must be kept on file by the Trained Contractor as an integral part of this SWPPP for at least five years from the date of completion and filing of NOT for the project. Ultimately, it is the responsibility of the site Trained Contractor to assure the adequacy of site pollutant discharge controls. Actual physical site conditions or contractor practices could make it necessary to install more structural controls than are shown on the plans. (For example, localized concentrations of runoff could make it necessary to install additional sediment barriers.) Assessing the need for additional controls and implementing them or adjusting existing controls will be a continuing aspect of this SWPPP until the site achieves final stabilization. 10.0 POST CONSTRUCTION INSPECTION, OPERATION AND MAINTENANCE PLAN A. Maintenance Responsibility Short and Long term maintenance responsibilities for the dry pond shall lie with the owner, Scott Pinney. 1. Copies of the SWPPP and details about the dry pond practice shall also be forwarded to the Town of Lansing for archival purposes. 151Page Stormwater Pollution Prevention Plan O'tooles Contractor Yard (T)Lansing,NY B. Sediment & Debris Removal Silt/sediment shall be removed from the dry pond when the accumulation exceeds 6 inches. The removed sediments shall be disposed in an acceptable manner (ie. Landfill) C. Inspection & Periodic Maintenance To ensure the continued operation and long term performance of the proposed Stormwater management system(s), inspections shall be conducted periodically for the first few months following any inactivity of the contractor work yard and then on an annual basis. Site inspection should also be performed following major storm events (i.e., intense storms, thunder storms, cloud bursts, etc.). Items to check for include, but are not limited to the following: (Reference Attachment J for complete inspection checklist - NYSDEC Stormwater Operation, Maintenance and Management Inspection Checklists): i) Embankment & Structural; ❑ Check basin embankments, outlets and spillways note cracks, bulges, animal burrows, differential settlement, damage to or fatigue of stormwater pipe, structures and permanent erosion control. Components of the system that require repair or replacement should be addressed immediately following identification. Check pipes, channels, grates, inlet structures and spillways to insure design capacity. Look for objects or accumulations of sediments and debris obstructing flow path. ii) Vegetation; ❑ Preclude deep rooted woody plant growth on structure embankment by mowing at least once annually. ❑ Maintain a dense vigorous growth of grass cover. Spot seed, mulch and fertilize where necessary. 161Page Attachment A: Notice of Intent, (NOI) and MS4 Acceptance Form (if applicable) 9/18/26, 1:31 PM NYSDEC eBusiness Portal System-Construction General Permit(CGP)Electronic Notice of Intent(eNOI)GP-0-25-001.Revision 1 Construction General Permit (CGP) Electronic Notice of Intent (eNOI) GP-0-25-001 version 1.19 (Submission M HQR-NMYQ-WXG2F,version 1) Details Originally Started By Scott Gibson Alternate Identifier O'Tooles Contractor Yard—Region 7 Submission ID HQR-NMYQ-WXG2F Status Draft Form Input Eligibility Disturbance Threshold 1.Will the construction activity involve soil disturbances listed in Part I.A.1 of GP-0-25-001? Yes 1.a.Will any runoff from the site enter a sewer system classified as a combined sewer? No 1.b.Is this a remediation project being done under a Department approved work plan(i.e.CERCLA,RCRA,Voluntary Cleanup Agreement,etc.)with a SWPPP which meets the substantive requirements of GP-0-25-001? No 1.c.Is the construction activity related to a stormwater discharge that does not require a permit as described in 40 CFR 122.3(e), e.g.non-point source agriculture or silviculture activities? No Other SPDES Permits 2.Will the discharge from the construction activity meet all conditions listed in Part I.A.2 of GP-0-25-001? Yes Threatened and Endangered Species 3.Will the construction activity potentially adversely affect a species that is endangered or threatened per Part I.A.3.? No State Historic Preservation Act(SHPA) 4.Is the construction activity designated by the Commissioner of the Office of Parks,Recreation and Historic Preservation (OPRHP),pursuant to 9 NYCRR§§428.12 or 428.13 as exempt from the SHPA review(see Attachment 2 of the Letter of Resolution between NYSDEC and OPRHP,dated January 9,2015)? No 4.a.Will the construction activity: a) occur within an archeologically sensitive area indicated on the sensitivity map,or b) have the potential to affect a property that is listed or determined to be eligible for listing on the National or State Registers of Historic Places,or c) include a new permanent building on the construction site within the following distances from a building,structure,or object that is more than 50 years old and OPRHP,a Historic Preservation Commission of a Certified Local Government,or a qualified preservation professional has determined is a historically/archeologically significant building,structure,or object: 1-5 acres of disturbance-20 feet • 5-20 acres of disturbance-50 feet https://nform-prod.dec.ny.gov/app/#/submissionwizard/42713eOc-3968-4db9-9df1-d21 b47894e9f/12 1/6 9/18/26, 1:31 PM NYSDEC eBusiness Portal System-Construction General Permit(CGP)Electronic Notice of Intent(eNOI)GP-0-25-001.Revision 1 • 20+acres of disturbance-100 feet? No 4.b.Is there documentation at the construction site demonstrating: a) that the construction activity is not within an archeologically sensitive area indicated on the sensitivity map,and that the construction activity is not immediately adjacent to a property listed or determined to be eligible for listing on the National or State Registers of Historic Places,and b) that there is no new permanent building to be built on the construction site within the following distances from a building,structure,or object that is more than 50 years old,or if there is such a new permanent building on the construction site within those parameters that OPRHP,a Historic Preservation Commission of a Certified Local Government,or a qualified preservation professional has determined that the building,structure,or object more than 50 years old is not historically/archeologically significant: • 1-5 acres of disturbance—20 feet • 5-20 acres of disturbance—50 feet 20+acres of disturbance—100 feet? Yes State Environmental Quality Review(SEAR) 5.Is the construction activity subject to SEQR(Part I.A.5.),or the equivalent environmental review from another NYS or federal agency(Part I.A.6.)? Yes 5.a.Has the owner/operator obtained documentation that the project review pursuant to SEQR,or the equivalent,has been satisfied per Part I.A.5.or I.A.6.of GP-0-25-001? Yes Uniform Procedures Act(UPA)Permits 6.Has the owner/operator obtained all necessary UPA permits from NYSDEC,or the equivalent from another NYS or federal agency per Part I.A.7.a.of GP-0-25-001?Select"Yes"if no UPA permits,or the equivalent,are required for this construction activity. Yes Steep Slope 7.Is the construction activity within the watershed of surface waters of the State classified as AA or AA-S identified utilizing the Stormwater Interactive Map on NYSDEC's website? No Owner/Operator Information 8.Owner/Operator Name Scott Pinney 9.Owner/Operator Contact Person Information First and Last Name Phone E-mail Scott Pinney 607-227-9698 alexcolepavel@gmail.com 10.OwnerlOperator Mailing Address 70 Oak Hill Road Moravia,NY 13118 USA 11.Is the billing contact different from the Owner/Operator Contact? No 12.What type of organization is the owner/operator? Individual Site Information 13.Project/Site Name O'Tooles Contractor Yard https://nform-prod.dec.ny.gov/app/#/submissionwizard/42713eOc-3968-4db9-9dfl-d21 b47894e9f/l 2 2/6 9/18/26, 1:31 PM NYSDEC eBusiness Portal System-Construction General Permit(CGP)Electronic Notice of Intent(eNOI)GP-0-25-001.Revision 1 14.Site Address Corner of Peruville and Scofield Roads Lansing,NY 14882 Tompkins DEC Region 7 15.Site Latitude&Longitude 42.5403700927705,-76.45479573463871 Project Details 16.This eNOI submission is for: A construction activity not part of a common plan of development or sale in accordance with Part I.D.1.a. 17.Does the project type fall under Table 1 or Table 2 of Appendix B of GP-0-25-001?If any portion of the construction activity falls under Table 2,regardless of the size of the disturbance,select"Table 2". Table 2 1 B.Consistent with Part III.B.1.c.i.of GP-0-25-001,provide a concise overview of the project.Describe existing and proposed conditions,and include any other relevant information. A contractor work yard that has been in operation since 2011.It had consistently received"allowed use by Right'by the Town of Lansing but now requires a Full SWPPP.Nothing will change from the original concept other than an improvement to an existing stormwater practice. Enter the total project site acreage,the acreage to be disturbed,and the future impervious area(acreage)within the disturbed area,rounded to the nearest tenth of an acre. 19.Total Site Area(acres) 10.3 20.Total Area to be Disturbed(acres) 4.9 21.Existing Impervious Area to be Disturbed(acres) 4.9 22.Future Impervious Area Within Disturbed Area(acres) 0.0 Nature of the project: Redevelopment with no increase in impervious area 23.Do you plan to disturb more than 5 acres of soil at any one time? No 24.Indicate the percentage(%)of each Hydrologic Soil Group(HSG)at the site. A(%) 50 B(%) 0 C(%) 50 D(%) 0 25.Enter the planned start and end dates of the disturbance activities. Start Date 06/01/2026 End Date 06/01/2030 26.Identify the nearest surface waterbody(ies)to which construction site runoff will discharge. 18-mile trib/The Gulf trib and tribs-0301-0058 https://nform-prod.dec.ny.gov/app/#/submissionwizard/42713eOc-3968-4db9-9dfl-d21 b47894e9f/l 2 3/6 9/18/26, 1:31 PM NYSDEC eBusiness Portal System-Construction General Permit(CGP)Electronic Notice of Intent(eNOI)GP-0-25-001.Revision 1 27.Type of waterbody identified in question 26? Stream/Creek Off Site 28.Has the surface waterbody in question 26 been identified as a 303(d)segment in Appendix D of GP-0-25-001? No 29.Is this project located in one of the Watersheds identified in Appendix C of GP-0-25-001? No 30.Will the project disturb soils within a State regulated wetland or the protected 100 foot adjacent area? No 31.Does the site runoff enter a separate storm sewer system(including roadside drains,swales,ditches,culverts,etc)? Yes 31.a.What is the name of the municipality/entity that owns the separate storm sewer system?If the separate sewer system is owned by an MS4 Operator,enter the MS4 Operator name. Town of Lansing 32.Will future use of this site be an agricultural property as defined by the NYS Agriculture and Markets Law? No 33.Is this property owned by a state authority,state agency,federal government or local government? No Required SWPPP Components General SWPPP Requirements 34.Has a SWPPP been developed in conformance with the requirements in Part III.of GP-0-25-001? Yes 35.Does the SWPPP demonstrate consideration of the future physical risks due to climate change pursuant to the CRRA,6 NYCRR Part 490,and associated guidance per Part III.A.2.of GP-0-25-001? Yes 36.Has the required Erosion and Sediment Control component of the SWPPP been developed in conformance with the current NYS Standards and Specifications for Erosion and Sediment Control(aka Blue Book)? Yes 37.Which version of the NYS Stormwater Management Design Manual was used to develop the SWPPP? 2015 37.a.Has the post-construction stormwater management practice component of the SWPPP been developed in conformance with the NYS Stormwater Management Design Manual? Yes 38.Has the post-construction stormwater management practice component of the SWPPP been developed by a qualified professional per Part III.A.4.? Yes SWPPP Preparer 39.The Stormwater Pollution Prevention Plan(SWPPP)was prepared by: Professional Engineer(RE.) 40.Name of the person who prepared the SWPPP Timothy C.Buhl 41.SWPPP Preparer Organization Name Timothy C.Buhl,PE 42.SWPPP Preparer Contact Information First and Last Name Phone E-mail Scott Gibson 6072280662 scottgibson198@gmail.com 43.SWPPP Preparer Address 5 Orchard Avenue Watkins Glen,NY 14891 Download SWPPP Preparer Certification Form https://nform-prod.dec.ny.gov/app/#/submissionwizard/42713eOc-3968-4db9-9dfl-d21 b47894e9f/l 2 4/6 9/18/26, 1:31 PM NYSDEC eBusiness Portal System-Construction General Permit(CGP)Electronic Notice of Intent(eNOI)GP-0-25-001.Revision 1 Please take the following steps to prepare and upload your preparer certification form: 1)Click on the link below to download a blank certification form 2)The certified SWPPP preparer should sign this form 3)Upload the completed form Download SWPPP Preparer Certification Form 44.Please upload the SWPPP Preparer Certification NONE PROVIDED Comment NONE PROVIDED 44.a.Has the SWPPP Preparer Certification Form been signed by the SWPPP preparer in accordance with Part VII.J of GP-0-25- 001? Yes Erosion&Sediment Control Criteria 45.Has a construction sequence schedule for the planned management practices been prepared? Yes Post-Construction Criteria Site Planning and Soil Restoration 46.Identify all site planning practices that were used to prepare the final site plan/layout for the project. Preservation of Buffers Locating Development in Less Sensitive Areas 47.Indicate which of the following soil restoration criteria was used to address the requirements in Section 5.1.6("Soil Restoration")of the Design Manual. All disturbed areas will be restored in accordance with the Soil Restoration requirements in Table 5.3 of the Design Manual(see page 5-22). Water Quality Criteria 48.Is the reduction in impervious area greater than 25%? No 49.Water Quality Sizing Criteria Total WQv required Total RRv provided Minimum RRv(acre- Total WQv provided Sum of RRv and WQv (acre-feet) (acre-feet) feet) (acre-feet) provided 0.39 0.39 0.39 Water Quantity Criteria 50.Per Section 9.2.1.C.VI and VII of the 2024 Design Manual,is there 0%change to hydrology that increases the discharge rate and volume from the project site? Yes Operation and Maintenance 53.Has a long-term Operation and Maintenance Plan for the post-construction stormwater management practice(s)been developed? Yes 53.a.Identify the entity responsible for the long-term Operation and Maintenance. Scott Pinney Post-Construction SMP Identification 54.Post-Construction RR Techniques and Standard SMPs RR Techniques and SMPs Contributing Impervious Area(acres) Total Contributing Area(acres) Infiltration Basin(1-2) 4.9 55.Alternative SMPs https://nform-prod.dec.ny.gov/app/#/submissionwizard/42713eOc-3968-4db9-9dfl-d21 b47894e9f/l 2 5/6 9/18/26, 1:31 PM NYSDEC eBusiness Portal System-Construction General Permit(CGP)Electronic Notice of Intent(eNOI)GP-0-25-001.Revision 1 Type of Alternative Manufacturer of the Alternative Name of the Alternative Contributing Impervious Area SMP SMP SMP (acres) NONE PROVIDED NONE PROVIDED NONE PROVIDED NONE PROVIDED Other Permits 56.Identify other permits,existing and new,that are required for this project/facility. None 57.Is this NOI for a change in owner/operator per Part I.G.? No MS4 SWPPP Acceptance 59.Will the construction activities be within the municipal boundary(ies)of Traditional Land Use Control MS4 Operator(s)and discharge to the MS4(s)? Yes 59.a.Which form is required per Part I.D.2.b.ii.? MS4 SWPPP Acceptance Form MS4 SWPPP Acceptance Form Download Download the MS4 SWPPP Acceptance Form from the link below. MS4 SWPPP Acceptance Form 60.MS4 Acceptance or No Jurisdiction Form Upload NONE PROVIDED Comment NONE PROVIDED 60.a.Has the form been signed by the principal executive officer or ranking elected official—or duly authorized representative of that person—in accordance with Part VII.J.and submitted along with this Not? Yes Owner/Operator Certification Owner/Operator Certification Form Download Download the Owner/Operator Certification Form by clicking the link below. Owner/Operator Certification Form 61.Upload Owner/Operator Certification Form NONE PROVIDED Comment NONE PROVIDED 61.a.Has the Owner/Operator Certification Form from Appendix J been signed by the owner/operator,or a representative of the owner/operator in accordance with Part VII.J of GP-0-25-001 and uploaded to the eNOI? Yes Additional Project Information 62.Enter any additional pertinent project information in the text box below. NONE PROVIDED https://nform-prod.dec.ny.gov/app/#/submissionwizard/42713eOc-3968-4db9-9dfl-d21 b47894e9f/l 2 6/6 SO K Department of STI!►TE Environmental Conservation SWPPP Preparer Certification Form SPDES General Permit for Stormwater Discharges from Construction Activity, GP-0-25-001 (CGP) (In accordance with CGP Part I.D.2.b., the completed form must be attached to the eNOI and submitted to NYSDEC electronically.) Project/Site Name: O'Tooles Contractor Yard eNOl Submission ID: HQR-NMYQ-WXG2F Owner/Operator Name: Scott Pinney Certification Statement — SWPPP Preparer I hereby certify that the Stormwater Pollution Prevention Plan (SWPPP) has been prepared in accordance with the requirements of GP-0-25-001. I certify under penalty of law that the SWPPP and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. Timothy C Buhl, PE SWPPP Preparer First Name MI SWPPP Preparer Last Name Signature Date Revised:January 2025 4EW Department of YORK STATE Environmental Conservation MS4 SWPPP Acceptance Form for construction activities seeking authorization under the SPDES General Permit for Stormwater Discharges from Construction Activity, GP-0-25-001 (CGP) (In accordance with CGP Part I.D.2.b., the completed form must be attached to the eNOI and submitted to NYSDEC electronically.) I. Project Owner/Operator Information 1. Owner/Operator Name: Scott Pinney 2. Contact Person: Scott Pinney 3. Street Address: 70 Oak Hill Road 4. city/state/zip: Moravia, NY 13118 II. Project Site Information 5. Project/Site Name: O'tooles Contractor Yard 6. Street Address: Corner or Peruville and Scofield Roads 7. city/state/zip: Lansing, NY 14882 III. Stormwater Pollution Prevention Plan (SWPPP) Review and Acceptance Information 8. SWPPP Reviewed by: 9. Title/Position: 10. Date Final SWPPP Reviewed and Accepted: IV. Regulated MS4 Information 11. Name of MS4 Operator: 12. MS4 SPDES Permit Identification Number: NYR20A 13. Street Address: 14. City/State/Zip: 15. Telephone Number: Page 1 of 2 MS4 SWPPP Acceptance Form - continued V. Certification Statement-MS4 Official (principal executive officer or ranking elected official) or Duly Authorized Representative I hereby certify that the final Stormwater Pollution Prevention Plan (SWPPP)for the construction project identified in section II. of this form has been reviewed and meets the substantive requirements in the SPDES General Permit for Stormwater Discharges from Construction Activity, GP-0-25-001 (CGP). Note: The MS4 Operator, through the acceptance of the SWPPP, assumes no responsibility for the accuracy and adequacy of the design included in the SWPPP. In addition, review and acceptance of the SWPPP by the MS4 Operator does not relieve the owner/operator or their SWPPP preparer of responsibility or liability for errors or omissions in the plan. Printed Name': Title/Position: Signature: Date: VI. Additional Information ' Printed name of the principal executive officer or ranking elected official for the MS4 Operator or their duly authorized representative in accordance with CGP Part VII.J.2. (NYSDEC - MS4 SWPPP Acceptance Form -January 2025) Page 2 of 2 t NEW Department of YORK STATE Environmental Conservation Owner/Operator Certification Form SPDES General Permit for Stormwater Discharges from Construction Activity, GP-0-25-001 (CGP) (In accordance with CGP Part I.D.2.b. or Part I.F.2. and 3., the completed form must be attached to the eN01 or the Request to Continue Coverage, and submitted to NYSDEC electronically. Project/Site Name: O'tooles Contractor Yard eNOI Submission ID: HQR-NMYQ-WXG2F eNOI Submitted by: ❑ Owner/Operator �✓ SWPPP Preparer Other Certification Statement - Owner/Operator I hereby certify that I read, and will comply with, the GP-0-25-001 permit requirements. I understand that authorization to discharge under the permit for the project/site named above is dependent on receipt of a Letter of Authorization (LOA) or a Letter of Continued Coverage (LOCC) from the New York State Department of Environmental Conservation (NYSDEC) in accordance with CGP Part I.D.3.b. or Part I.F.4. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. Scott Pinney Owner/Operator First Name MI Owner/Operator Last Name Signature Date Revised:January 2025 Attachment B: Notice of Termination, (NOT) New York State Department of Environmental Conservation AmDivision of Water v - 625 Broadway,4th Floor Albany,New York 12233-3505 *(NOTE:Submit completed form to address above)* NOTICE OF TERMINATION for Storm Water Discharges Authorized under the SPDES General Permit for Construction Activity Please indicate your permit identification number: NYR I. Owner or Operator Information 1.Owner/Operator Name: 2.Street Address: 3.City/State/Zip: 4.Contact Person: 4a.Telephone: 5.Contact Person E-Mail: II. Project Site Information 5.Project/Site Name: 6.Street Address: 7.City/Zip: 8.County: III. Reason for Termination 9a. ❑All disturbed areas have achieved final stabilization in accordance with the general permit and SWPPP. *Date final stabilization completed(month/year): 9b.C Permit coverage has been transferred to new owner/operator. Indicate new owner/operator's permit identification number:NYR (Note:Permit coverage can not be terminated by owner identified in 1.1.above until new owner/operator obtains coverage under the general permit) 9c. ❑Other(Explain on Page 2) IV. Final Site Information: 10a. Did this construction activity require the development of a SWPPP that includes post-construction stormwater management practices? ❑yes ❑no (If no,go to question 1 Of.) 10b.Have all post-construction stormwater management practices included in the final SWPPP been constructed? ❑yes I I no (If no,explain on Page 2) 10c.Identify the entity responsible for long-term operation and maintenance of practice(s)? Page 1 of 3 NOTICE OF TERMINATION for Storm Water Discharges Authorized under the SPDES General Permit for Construction Activity-continued 1 Od.Has the entity responsible for long-term operation and maintenance been given a copy of the operation and maintenance plan required by the general permit? Eyes U no I Oe. Indicate the method used to ensure long-term operation and maintenance of the post-construction stormwater management practice(s): I—Post-construction stormwater management practice(s)and any right-of-way(s)needed to maintain practice(s)have been deeded to the municipality. C Executed maintenance agreement is in place with the municipality that will maintain the post-construction stormwater management practice(s). For post-construction stormwater management practices that are privately owned,the deed of record has been modified to include a deed covenant that requires operation and maintenance of the practice(s)in accordance with the operation and maintenance plan. C For post-construction stormwater management practices that are owned by a public or private institution (e.g.school,college,university),or government agency or authority,policy and procedures are in place that ensures operation and maintenance of the practice(s)in accordance with the operation and maintenance plan. 1 Of.Provide the total area of impervious surface(i.e. roof,pavement,concrete,gravel,etc.)constructed within the disturbance area? (acres) 11.Is this project subject to the requirements of a regulated,traditional land use control MS4? ❑yes I I no (If Yes,complete section VI-"MS4 Acceptance"statement V. Additional Information/Explanation: (Use this section to answer questions 9c. and 1 Ob., if applicable) VI. MS4 Acceptance-MS4 Official(principal executive officer or ranking elected official)or Duly Authorized Representative(Note:Not required when 9b. is checked-transfer of coverage) I have determined that it is acceptable for the owner or operator of the construction project identified in question 5 to submit the Notice of Termination at this time. Printed Name: Title/Position: Signature: Date: Page 2 of 3 NOTICE OF TERMINATION for Storm Water Discharges Authorized under the SPDES General Permit for Construction Activity-continued '%'H. Qualified Inspector Certification-Final Stabilization: 1 hereby certify that all disturbed areas have achieved final stabilization as defined in the current version of the general permit,and that all temporary,structural erosion and sediment control measures have been removed. Furthermore,I understand that certifying false,incorrect or inaccurate information is a violation of the referenced permit and the laws of the State of New York and could subject me to criminal,civil and/or administrative proceedings. Printed Name: T itle/Position: Signature: Date: NIH. Qualified Inspector Certification-Post-construction Stormwater Management Practice(s): f hereby certify that all post-construction stormwater management practices have been constructed in conformance with the SWPPP.Furthermore,I understand that certifying false,incorrect or inaccurate information is a violation of the referenced permit and the laws of the State of New York and could subject me to criminal,civil and/or administrative proceedings. Printed Name: T itle/Position: Signature: Date: IX. Owner or Operator Certification I hereby certify that this document was prepared by me or under my direction or supervision.My determination, based upon my inquiry of the person(s)who managed the construction activity,or those persons directly responsible for gathering the information,is that the information provided in this document is true,accurate and complete.Furthermore,I understand that certifying false,incorrect or inaccurate information is a violation of the referenced permit and the laws of the State of New York and could subject me to criminal,civil and/or administrative proceedings. Printed Name: T itle/Position: Si nature: Date: (NYS DEC Notice of Termination-January 2010) Page 3 of 3 Attachment C: Certification Forms CONTRACTOR and SUBCONTRACTOR CERTIFICATION STATEMENT for the New York State Department of Environmental Conservation (DEC) State Pollutant Discharge Elimination System Permit for Stormwater Discharges from Construction Activity (GP-0-10-001) As per Part X.A.6 on page 13 of GP-0-10-001 (effective January 29, 2010): `Prior to the commencement of construction activity, the owner or operator must identify the contractor(s) and subcontractor(s) that will be responsible for installing, constructing, repairing, replacing, inspecting and maintaining the erosion and sediment control practices included in the SWPPP; and the contractor(s) and subcontractor(s) that will be responsible for constructing the post- construction stormwater management practices included in the SWPPP. The owner or operator shall have each of the contractors and sub-contractors identify at least one person from their company that will be responsible for implementation of the SWPPP. This person shall be known as the trained contractor. The owner or operator shall ensure that at least one trained contractor is on site on a daily basis when soil disturbance activities are being performed.' The owner or operator shall have each contractor and subcontractor involved in soil disturbance sign a copy of the following certification statement before they commence any construction activity: NYR Name of Construction Site DEC Permit ID Municipality (MS4) "I hereby certify that I understand and agree to comply with the terms and conditions of the SWPPP and agree to implement any corrective actions identified by the qualified inspector during a site inspection. I also understand that the owner or operator must comply with the terms and conditions of the most current version of the New York State Pollutant Discharge Elimination System ("SPDES')general permit for stormwater discharges from construction activities and that it is unlawful for any person to cause or contribute to a violation of water quality standards. Furthermore, I understand that certifying false, incorrect or inaccurate information is a violation of the referenced permit and the laws of the State of New York and could subject me to criminal, civil and/or administrative proceedings. Responsible Corporate Officer/Partner Signature Date Name of above Signatory Name of Company Title of above Signatory Mailing Address Telephone of Company City, State and Zip Identify the specific elements of the SWPPP the contractor or subcontractor is responsible for: `TRAINED CONTRACTOR'FOR THE CERTIFIED CONTRACTOR OR SUBCONTRACTOR Name of Trained Employee Title of Trained Employee NYSDEC SWT# A copy of this signed contractor certification statement must be maintained at the SWPPP on site Attachment D: State Historic Preservation Mapping Cultural Resource Information System(CRIS) https://cris.parks.ny.gov/Default.aspx# C HOME SUBMIT SEARCH COMMUNICATE Rr-1 t ® — —Buc"d— Pleasant Val[ey Rd � PLeasa"t _ — -- C1 Bl - y U 1f) Brown Rd Brown Rd El a 0 t� L O c� a ecui�Ae Rd W OL Old 0., " a � O o � y N Q Bone Plain Rd 71, Bone plain Rd rry I 4 1 of 1 10/9/2015 3:02 PM �r��r�r��� Parks, Recreation, STATE DF 0 PORTUNITY. and Historic Preservation ANDREW M.CUOMO ROSE HARVEY Governor Commissioner October 15, 2015 Mr. Scott Gibson 5 Orchard Avenue Watkins Glen, NY 14891 Re: DEC Pinney Duplex Apartments Town of Lansing, Tompkins County 15PRO5870 Dear Mr. Gibson: Thank you for requesting the comments of the Office of Parks, Recreation and Historic Preservation (OPRHP). We have reviewed the project in accordance with the New York State Historic Preservation Act of 1980 (Section 14.09 of the New York Parks, Recreation and Historic Preservation Law). These comments are those of the OPRHP and relate only to Historic/Cultural resources. They do not include potential environmental impacts to New York State Parkland that may be involved in or near your project. Such impacts must be considered as part of the environmental review of the project pursuant to the State Environmental Quality Review Act (New York Environmental Conservation Law Article 8) and its implementing regulations (6 NYCRR Part 617). Based upon this review, it is the New York State Office of Parks, Recreation and Historic Preservation's opinion that your project will have no impact on archaeological and/or historic resources listed in or eligible for the New York State and National Registers of Historic Places. If further correspondence is required regarding this project, please be sure to refer to the OPRHP Project Review (PR) number noted above. Sincerely, Ruth L. Pierpont Deputy Commissioner for Historic Preservation Division for Historic Preservation P.O.Box 189,Waterford, New York 12188-0189•(518)237-8643•www.nysparks.com Attachment E: Environmental Mapping GROTON v LANSNG" � 5 • ` Howland I ' Ian strand � Rr�� -�,�i Corners •, Corners ,i 1799 r 349 _ Disclaimer:This map does not show all natural resources regulated by NYS DEC,or for Which permits - from NYS DEC may be required.Please contact your DEC Reg anal office for more information. Pinney - Wetlands Map Pinney Duplex Project Flood Zone Map Y 4" xl y 460 i c ,l 'Iyz Y r R r y* — t x P� Ir♦e:4 30.-1-28.11461 .I li r Legend k Sd - ti � . 470 y, , - -"` ' p► :a Address 30. 1 28.12I -- I. '-+ b Open Water Streams Intermittent Streams Perennial Streams PARCELS Flood Zones 100 Year 436 i' \.� ,. � 500 Year 30.-1-28.211 I� r 482 Not Included in Flood Map ,21. 1-2.4 Building 3Q.-1-31 4 �� }li _ Municipalities ' r=-`f`-_ � j 't by ' t jIw" ; — LILY-SE I I. l� '� LILY-SW LILY-NW — LILY-tNE 2 Ir I NEW-SW NEW-SE NEW-NE L. _�•`., t� �,�`?'`' R" K NEW-NW LAN2ftSouth { 428; 1ti y t I,' q r_ 1 LAN NE ~� I I '� LAN-NW ti S 3 J.-1 28.212 1 I i LAN2ftM id dle, Ile 13J•431 GRO-SE Gi — GRO-SW 21. 1-2.51 - GRO-NEC" — GRO-NW `' - — ENF-SE 30-1 9 t r' r �j. l l I f �� -'l' — ENF-SW 30. � I ENF NE 1 f ', ' ; 1 _ — ENF-NW DRY-SE ,{ _l i — DRY-SW 214 .27 — DRY-NE DRY-tNW 34 - - - - ti S�- -� 'Iti I . \ 1_ `i _ — DAN2ftSW DAN2ftSE Y — J � 21.-1 28`, �I; v — DAN2ftNW � � ram_`_ x f �r� �✓ 1 � � I °I jl 455 III I 0' � I 3 3 =:- _. DrAoNR2_cftGN E 182 21.-1-24.9 425 433 21.-1-29 21. 1-2 4.12 — CAR-SW 393 38. 1-6.21 38.-1 623 381-5' --7d 38.-1-6.1 38.4-5 Y 1' l �i l_ Meadow ram '' '+ I �, t 1:3,287 AVIS rm 547.9 0 273.93 547.9 Feet This map is a user generated static output from an Internet mapping site and Notes is for reference only.Data layers that appear on this map may or may not be This map was automatically generated WGS_1984_Web—Mercator_Auxiliary_Sphere accurate,current,or otherwise reliable. using Geocortex Essentials.Your tax dollars ©Tompkins County GIS 2011 THIS MAP IS NOT TO BE USED FOR NAVIGATION at work! Environmental Resource Mapper ii lP fl. III ED 0 R P i iB ff II 1 w s b Pmuvlll s•Rd� I' I. November 16,2016 1:9,028 0 0.1 0.2 0.4 mi 0 0.175 0.35 0.7 km Sources: Esrl, HERE, DeL,—,, Intermap, in ent P Corp., GEBCO,USGS,FAO,NPS,NRC ,GmBase,IGN,Kadaster NL, Orin—Survey,En Japan, METI,Esd Chlna(Hong Kong), Isstopo,MaWylndia,0 OpenStmelMep contributors,end the GIS User Cemmunity NVS Department of Envlmnmental Consarvatlon Not a kgel dscumeN EAF Mapper Summary Report Wednesday, November 16, 2016 1:42 PM Disclaimer: The EAF Mapper is a screening tool intended to assist project sponsors and reviewing agencies in preparing an environmental assessment form(EAF).Not all questions asked in the EAF are answered by the EAF Mapper.Additional information on any EAF question can be obtained by consulting the EAF Workbooks. Although the EAF Mapper provides the most up-to-date digital data available to DEC,you may also need to contact local or other data sources in order to obtain data not provided by the Mapper.Digital data is not a substitute for agency determinations. Otl"W" Montreal LansingDryden t Lirtrolt Boston i Scum: E_ — _ eLcrme, USCGS, GPrefd ;lrovl[Line InteFmap UrunEI.SE-.T+ F, NRCan, ESFi r .' t� Japan,METI,Esri�Chinle lHong Kong),Esri Pittsburgh S'0urr:-'7i,%E, K_rea, Esri 1-hailand), hapmylndie, NGCC, Ccturribus Intermap, 90penStreetr-Alap mn4ibutcrs,and theClS '' o INCR"ENIENT R NR an,Esri Use Community � Icinflad 1Na a P.lET1, Esri China:Hong ,.F t B.i.i [Coastal or Waterfront Area] No B.i.ii [Local Waterfront Revitalization Area] No C.2.b. [Special Planning District] Digital mapping data are not available or are incomplete. Refer to EAF Workbook. E.1.h [DEC Spills or Remediation Site - Digital mapping data are not available or are incomplete. Refer to EAF Potential Contamination History] Workbook. E.1.h.i [DEC Spills or Remediation Site - Digital mapping data are not available or are incomplete. Refer to EAF Listed] Workbook. E.1.h.i [DEC Spills or Remediation Site - Digital mapping data are not available or are incomplete. Refer to EAF Environmental Site Remediation Database] Workbook. E.1.h.iii [Within 2,000' of DEC Remediation No Site] E.2.g [Unique Geologic Features] No E.2.h.i [Surface Water Features] Yes E.2.h.ii [Surface Water Features] Yes E.2.h.iii [Surface Water Features] Yes - Digital mapping information on local and federal wetlands and waterbodies is known to be incomplete. Refer to EAF Workbook. E.2.h.iv [Surface Water Features- Stream 898-239 Name] E.2.h.iv [Surface Water Features-Stream C Classification] E.2.h.iv [Surface Water Features-Wetlands Federal Waters Name] E.2.h.v [Impaired Water Bodies] No E.2.i. [Floodway] Digital mapping data are not available or are incomplete. Refer to EAF Workbook. Full Environmental Assessment Form - EAF Mapper Summary Report 1 E.2.j. [100 Year Floodplain] Digital mapping data are not available or are incomplete. Refer to EAF Workbook. E.2.k. [500 Year Floodplain] Digital mapping data are not available or are incomplete. Refer to EAF Workbook. E.2.1. [Aquifers] No E.2.n. [Natural Communities] Yes E.2.n.i [Natural Communities- Name] Rich Hemlock-Hardwood Peat Swamp E.2.n.i [Natural Communities-Acres] 11.0 E.2.o. [Endangered or Threatened Species] No E.2.p. [Rare Plants or Animals] No E.3.a. [Agricultural District] Yes E.3.a. [Agricultural District] TOMP001 E.3.c. [National Natural Landmark] No E.3.d [Critical Environmental Area] No E.3.e. [National Register of Historic Places] Digital mapping data are not available or are incomplete. Refer to EAF Workbook. E.3.f. [Archeological Sites] No E.3.i. [Designated River Corridor] No Full Environmental Assessment Form - EAF Mapper Summary Report 2 Attachment F: Inspection Report (Sample Form) TOWN OF Construction Stormwater Inspection Report for SPDES General Permit GP-0- 15-002 Project Name and Location: Date: Weather: Permit#(if any): NYR10 Municipality: County: Entry Time: Exit Time: Name of SPDES Permittee: Contacted: Yes[] No❑ Inspection Type: Phone Number: Compliance ❑Referral ®Complaint I NOT On-site Representative(s)and Company(s): Phone Number(s): SPDES Authority Yes No N/A 1. ❑ ❑ ❑ Does the project have permit coverage? 2. ❑ ❑ ❑ Is a copy of the NOI and Acknowledgment Letter available on site and accessible for viewing? 3. ❑ ❑ ❑ Is a copy of the MS4 SWPPP Acceptance Form available on site and accessible for viewing? 4. ❑ ❑ ❑ Is an up-to-date copy of the signed SWPPP retained at the construction site? 5. ❑ ❑ ❑ Is a copy of the SPDES General Permit retained at the construction site? 6. ❑ ❑ ❑ Does the NOI accurately report the number of acres to be disturbed? SWPPP Content Yes No NIA 7. ❑ ❑ ❑ Does the SWPPP describe and identify the erosion and sediment control measures to be employed? S. ❑ ❑ ❑ Does the SWPPP provide an inspection schedule and maintenance requirements for the E&SC measures? 9. ❑ ❑ ❑ Does the SWPPP describe and identify the stormwater management practices to be employed? 10.❑ ❑ ❑ Does the SWPPP identify the contractor(s)and subcontractor(s)responsible for each measure? 11.❑ ❑ ❑ Does the SWPPP identify at least one trained individual from each contractor(s)and subcontractor(s)companies' 12.❑ ❑ ❑ Does the SWPPP include all the necessary Contractor Certification Statements and signatures? 13.❑ ❑ ❑ Is the SWPPP signed by the permittee? 14.❑ ❑ ❑ Is the SWPPP prepared by a qualified professional(if post-construction stormwater management required)? 15.❑ ❑ ❑ Do the SMPs conform to the Enhanced Phosphorus Removal Standards(projects in TMDL watersheds)? Recordkeepina Yes No N/A 16.❑ ❑ ❑ Are self-inspections performed as required by the permit(weekly,or twice weekly for>5 acres disturbed)? 17.❑ ❑ ❑ Are the self-inspections performed by and signed by a qualified inspector and retained on site? 1 S.❑ ❑ ❑ Do the qualified inspector's reports include the minimum reporting requirements? 19.❑ ❑ ❑ Do inspection reports identify corrective measures that have not been implemented or are recurring? Visual Ob servations Yes No NIA 20.❑ ❑ ❑ Are all erosion and sediment control measures installed properly? 21.❑ ❑ ❑ Are all erosion and sediment control measures being maintained properly? 22.❑ ❑ ❑ Was written authorization issued for any disturbance greater than 5 acres? 23.❑ ❑ ❑ Have stabilization measures been implemented in inactive areas per Permit(>5 acres)and E&SC Standards? 24.❑ ❑ ❑ Are post-construction stormwater management practices constructed/installed correctly? 25.❑ ❑ ❑ Has final site stabilization been achieved and temporary E&SC measures removed prior to NOT submittal? 26.❑ ❑ ❑ Was there a discharge from the site on the day of inspection? 27.❑ ❑ ❑ Is there evidence that a discharge caused or contributed to a violation of water quality standards? Page 1 of2 Page 2 of2 Water Quality Observations Describe the discharge(s):location,source(s),impact on receiving water(s),etc. Describe the quality of the receiving water(s)both upstream and downstream of the discharge Describe any other water quality standards or permit violations Additional Comments F—lPhotographs attached Overall Inspection Rating: 7,Satisfactory Marginal ansatisfactory Name/Agency of TR atureofLead Inspector: Inspector: Names/Agencies of Other Inspectors: Attachment G: Record of Stabilization and Construction Activity Dates (Sample Form) SITE STABILIZATION and CONSTRUCTION ACTIVITY DATES A record of dates when major grading activities occur, when construction activities temporarily or permanently cease on a portion of the site, and when stabilization measures are initiated shall be maintained until final site stabilization is achieved and the Notice of Termination is filed. The dates can be entered in the following form, or on a different form. MAJOR GRADING ACTIVITIES: Description of Activity: Begin (date): Site Contractor: Location: End(date): Description of Activity: Begin(date): Site Contractor: Location: End(date): Description of Activity: Begin(date): Site Contractor: Location: End(date): Description of Activity: Begin(date): Site Contractor: Location: End(date): Description of Activity: Begin (date): Site Contractor: Location: End(date): Description of Activity: Begin(date): Site Contractor: Location: End(date): Description of Activity: Begin (date): Site Contractor: Location: End(date): Attachment H: Vegetative and Structural Measures For Erosion and Sediment Control (NYS Standards & Specifications for Erosion & Sediment Control) (Reference) STANDARD AND SPECIFICATIONS FOR MULCHING Remove all undesirable stones and other debris to meet the needs of the anticipated land use and maintenance required. Apply mulch after soil amendments and planting is accomplished or simultaneously if hydroseeding is used. Select appropriate mulch material and application rate or material needs. Hay mulch shall not be used in wetlands or in areas of permanent seeding. Clean straw mulch is preferred alternative in wetland application. Determine local availability. Definition and Scope Select appropriate mulch anchoring material. Applying coarse plant residue or chips,or other suitable NOTE: The best combination for grass/legume materials,to cover the soil surface to provide initial erosion establishment is straw(cereal grain)mulch applied at 2 ton/ control while a seeding or shrub planting is establishing. acre(90 lbs./1000sq.ft.)and anchored with wood fiber Mulch will conserve moisture and modify the surface soil mulch(hydromulch)at 500—750 lbs./acre(11 — 17 temperature and reduce fluctuation of both. Mulch will lbs./l000 sq.ft.). The wood fiber mulch must be applied prevent soil surface crusting and aid in weed control.Mulch through a hydroseeder immediately after mulching. can also be used alone for temporary stabilization in non- growing months. Use of stone as a mulch could be more permanent and should not be limited to non-growing months. Conditions Where Practice Applies On soils subject to erosion and on new seedings and shrub plantings. Mulch is useful on soils with low infiltration rates by retarding runoff. Criteria Site preparation prior to mulching requires the installation of necessary erosion control or water management practices and drainage systems. Slope,grade and smooth the site to fit needs of selected mulch products. New York State Standards and Specifications Page 4.39 November 2016 For Erosion and Sediment Control Table 4.2 Guide to Mulch Materials, Rates, and Uses onOR o M nay °' t.t� � 2o 1 t -o° �D > i r o ° b o ao Lt y O �> Yo � ,= F t U U . ' N " O 4 O CIS O Y O l:0. bA O bq 3 ¢ rn Y O U cd Y W 'C cdLOD � ° 3 r�. Cr Cd C � ago ; �, .cl a� p CI a� a a y 3 �D.2 0 w o � AOw 0 U v V � vi '� 00 � N 'IT N d N 0 O � O `n O b O -0 N i. 01 x00 N O U l� O O 01 0100 k ,� U U O U U api ° 3 Cu Cd NPR 8"to U N U •�" N cn N 8 F. CSC w " VI N ,� Y 4" Cc U 3 o �•14 d o b U O 3CIO ° November 2016 Page 4.40 New York State Standards and Specifications For Erosion and Sediment Control Table 4.3 Mulch Anchoring Guide Anchoring Method Kind of Mulch to or Material be Anchored How to Apply After mulching,divide areas into blocks approximately 1 sq. yd.in size. Drive 4-6 pegs per block to within 2"to 3"of soil 1. Peg and Twine Hay or straw surface. Secure mulch to surface by stretching twine between pegs in criss-cross pattern on each block. Secure twine around each peg with 2 or more tight turns. Drive pegs flush with soil. Driving stakes into ground tightens the twine. Staple the light-weight paper,jute,wood fiber,or plastic 2. Mulch netting Hay or straw nettings to soil surface according to manufacturer's recommendations. Should be biodegradable. Most products are not suitable for foot traffic. Apply with hydroseeder immediately after mulching. Use 500 3. Wood cellulose fiber Hay or straw lbs.wood fiber per acre. Some products contain an adhesive material("tackifier"),possibly advantageous. Apply mulch and pull a mulch anchoring tool(blunt, straight 4. Mulch anchoring tool Hay or straw discs)over mulch as near to the contour as possible. Mulch material should be"tucked"into soil surface about 3". Mix and apply polymeric and gum tackifiers according to 5. Tackifier Hay or straw manufacturer's instructions. Avoid application during rain.oA 24-hour curing period and a soil temperature higher than 45 Fahrenheit are required. New York State Standards and Specifications Page 4.41 November 2016 For Erosion and Sediment Control STANDARD AND SPECIFICATIONS FOR PERMANENT CONSTRUCTION AREA PLANTING -. ground agricultural limestone to attain a pH of 6.0 in the -t upper 2 inches of soil. If soil must be fertilized before results of a soil test can be obtained to determine fertilizer needs,apply commercial fertilizer at 600 lbs.per acre of 5-5 -10 or equivalent. If manure is used,apply a quantity to meet the nutrients of the above fertilizer. This requires an appropriate manure analysis prior to applying to the site. Do not use manure on sites to be planted with birdsfoot trefoil or in the path of concentrated water flow. 4 Seed mixtures may vary depending on location within the state and time of seeding. Generally,warm season grasses should only be seeded during early spring,April to May. These grasses are primarily used for vegetating excessively drained sands and gravels. See Standard and Specification Definition & Scope for Sand and Gravel Mine Reclamation. Other grasses may be seeded any time of the year when the soil is not frozen Establishing permanent grasses with other forbs and/or and is workable. When legumes such as birdsfoot trefoil shrubs to provide a minimum 80%perennial vegetative are included, spring seeding is preferred. See Table 4.4, cover on areas disturbed by construction and critical areas "Permanent Construction Area Planting Mixture to reduce erosion and sediment transport. Critical areas Recommendations"for additional seed mixtures. may include but are not limited to steep excavated cut or fill slopes as well as eroding or denuded natural slopes and areas subject to erosion. General Seed Mix: Variety lbs./ lbs/1000 acre sq.ft. Conditions Where Practice Applies Red Clover' OR Acclaim,Rally, 8 0.20 This practice applies to all disturbed areas void of,or Red Head II, having insufficient,cover to prevent erosion and sediment Renegade transport. See additional standards for special situations Common white clover' Common 8 0.20 such as sand dunes and sand and gravel pits. PLUS Criteria Creeping Red Fescue Common 20 0.45 All water control measures will be installed as needed prior PLUS to final grading and seedbed preparation. Any severely Smooth Bromegrass 2 0.05 compacted sections will require chiseling or disking to OR Common provide an adequate rooting zone,to a minimum depth of 12",see Soil Restoration Standard. The seedbed must be Ryegrass(perennial) Pennfnc/Linn 5 0.10 prepared to allow good soil to seed contact,with the soil not 1 too soft and not too compact. Adequate soil moisture must 2 add inoculant immediately prior to seeding be present to accomplish this. If surface is powder dry or Mix 4 lbs each of Empire and Pardee OR 4 lbs of sticky wet,postpone operations until moisture changes to a Birdsfoot and 4 lbs white clover per acre. All seeding rates favorable condition. If seeding is accomplished within 24 are given for Pure Live Seed(PLS) hours of final grading,additional scarification is generally not needed,especially on ditch or stream banks. Remove Pine Live Seed,or(PLS)refers to the amount of live seed all stones and other debris from the surface that are greater in a lot of bulk seed. Information on the seed bag label than 4 inches,or that will interfere with future mowing or includes the type of seed,supplier,test date,source of seed, maintenance. purity,and germination. Purity is the percentage of pure Soil amendments should be incorporated into the upper 2 seed. Germination is the percentage of pure seed that will inches of soil when feasible. The soil should be tested to produce normal plants when planted under favorable determine the amounts of amendments needed. Apply conditions. November 2016 Page 4.42 New York State Standards and Specifications For Erosion and Sediment Control To compute Pure Live Seed multiply the"germination F percent"times the"purity"and divide that by 100 to get Pure Live Seed. PUNLiveSeadm)=%Germinatim x%Purity 100 For example,the PLS for a lot of Kentucky Blue grass with 75%purity and 96%germination would be calculated as follows: (96)x(75) =72%Pure Livc Sced - 100 For 1 Olbs of PLS from this lot= 10 =13 916e 80%Perennial Vegetative Cover on Therefore, 13.9 lbs of seed is the actual weight needed to meet 1 Olbs PSL from this specific seed lot. Time of Seeding: The optimum timing for the general seed mixture is early spring. Permanent seedings may be made any time of year if properly mulched and adequate moisture is provided. Late June through early August is not a good time to seed,but may facilitate covering the land without additional disturbance if construction is completed. Portions of the seeding may fail due to drought and heat. These areas may need reseeding in late summer/fall or the following spring. Method of seeding: Broadcasting,drilling,cultipack type seeding,or hydroseeding are acceptable methods. Proper soil to seed contact is key to successful seedings. Mulching: Mulching is essential to obtain a uniform stand of seeded plants. Optimum benefits of mulching new seedings are obtained with the use of small grain straw 50%Perennial Vegetative Cover applied at a rate of 2 tons per acre,and anchored with a netting or tackifier. See the Standard and Specifications for Mulching for choices and requirements. Irrigation:.ion: Watering may be essential to establish a new seeding when a drought condition occurs shortly after a new seeding emerges. Irrigation is a specialized practice and care must be taken not to exceed the application rate for the soil or subsoil. When disconnecting irrigation pipe,be sure pipes are drained in a safe manor,not creating an erosion concern. New York State Standards and Specifications Page 4.43 November 2016 For Erosion and Sediment Control Table 4.4 Permanent Construction Area Planting Mixture Recommendations Seed Mixture Variety Rate in lbs./acre Rate in Ms./ (PLS) 1,000 ft Mix#1 Creeping red fescue Ensylva,Pennlawn,Boreal 10 .25 Perennial ryegrass Pennfine,Linn 10 .25 *This mix is used extensively for shaded areas. Mix#2 Switchgrass Shelter,Pathfinder,Trailblazer,or Blackwell 20 .50 *This rate is in pure live seed,this would be an excellent choice along the upland edge of a wetland to filter runoff and pro- vide wildlife benefits. In areas where erosion may be a problem,a companion seeding of sand lovegrass should be added to provide quick cover at a rate of 2 lbs.per acre(0.05 lbs.per 1000 sq. ft.). Mix#3 Switchgrass Shelter,Pathfinder,Trailblazer,or Blackwell 4 .10 Big bluestem Niagara 4 .10 Little bluestem Aldous or Camper 2 .05 Indiangrass Rumsey 4 .10 Coastal panicgrass Atlantic 2 .05 Sideoats grama El Reno or Trailway 2 .05 Wildflower mix .50 .01 *This mix has been successful on sand and gravel plantings. It is very difficult to seed without a warm season grass seeder such as a Truax seed drill. Broadcasting this seed is very difficult due to the fluffy nature of some of the seed,such as bluestems and indiangrass. Mix#4 Switchgrass Shelter,Pathfmder,Trailblazer,or Blackwell 10 .25 Coastal panicgrass Atlantic 10 .25 *This mix is salt tolerant,a good choice along the upland edge of tidal areas and roadsides. Mix#5 Saltmeadow cordgrass(Spartina patens)--This grass is used for tidal shoreline protection and tidal marsh restoration. It is planted by vegetative stem divisions. 'Cape'American beachgrass can be planted for sand dune stabilization above the saltmeadow cordgrass zone. Mix#6 Creeping red fescue Ensylva,Pennlawn,Boreal 20 .45 Chewings Fescue Common 20 .45 Perennial ryegrass Pennfine,Linn 5 .10 Red Clover Common 10 .45 *General purpose erosion control mix. Not to be used for a turf planting or play grounds. November 2016 Page 4.44 New York State Standards and Specifications For Erosion and Sediment Control STANDARD AND SPECIFICATIONS FOR TEMPORARY CONSTRUCTION AREA SEEDING Criteria Water management practices must be installed as appropriate for site conditions. The area must be rough graded and slopes physically stable. Large debris and rocks are usually removed. Seedbed must be seeded within 24 } hours of disturbance or scarification of the soil surface will be necessary prior to seeding. Fertilizer or lime are not typically used for temporary seedings. ` - IF: Spring or summer or early fall,then seed the area with r ryegrass(annual or perennial)at 30 lbs.per acre Definition & Scope (Approximately 0.7 lb./1000 sq.ft.or use 1 lb./1000 sq.ft.). IF: Late fall or early winter,then seed Certified Providing temporary erosion control protection to disturbed `Aroostook'winter rye(cereal rye)at 100 lbs.per acre(2.5 areas and/or localized critical areas for an interim period by lbs./1000 sq.ft.). covering all bare ground that exists as a result of construction activities or a natural event. Critical areas may Any seeding method may be used that will provide uniform include but are not limited to steep excavated cut or fill application of seed to the area and result in relatively good slopes and any disturbed,denuded natural slopes subject to soil to seed contact. erosion. Mulch the area with hay or straw at 2 tons/acre(approx.90 Conditions Where Practice Applies lbs./l000 sq.ft. or 2 bales). Quality of hay or straw mulch allowable will be determined based on long term use and Temporary seedings may be necessary on construction sites visual concerns. Mulch anchoring will be required where to protect an area,or section,where final grading is wind or areas of concentrated water are of concern. Wood complete,when preparing for winter work shutdown,or to fiber hydromulch or other sprayable products approved for provide cover when permanent seedings are likely to fail erosion control(nylon web or mesh)may be used if applied due to mid-summer heat and drought. The intent is to according to manufacturers' specification. Caution is provide temporary protective cover during temporary advised when using nylon or other synthetic products. They shutdown of construction and/or while waiting for optimal may be difficult to remove prior to final seeding and can be planting time. a hazard to young wildlife species. November 2016 Page 4.58 New York State Standards and Specifications For Erosion and Sediment Control STANDARD AND SPECIFICATIONS FOR TOPSOILING Site Preparation 1. As needed,install erosion and sediment control practices such as diversions,channels,sediment traps, and stabilizing measures,or maintain if already installed. 2. Complete rough grading and final grade,allowing for depth of topsoil to be added. 3. Scarify all compact,slowly permeable,medium and fine textured subsoil areas. Scarify at approximately right angles to the slope direction in soil areas that are steeper than 5 percent.Areas that have been overly compacted shall be decompacted in accordance with the Soil Restoration Standard. 4. Remove refuse,woody plant parts,stones over 3 inches in diameter,and other litter. Definition & Scope Topsoil Materials Spreading a specified quality and quantity of topsoil 1. Topsoil shall have at least 6 percent by weight of fine materials on graded or constructed subsoil areas to provide textured stable organic material,and no greater than 20 acceptable plant cover growing conditions,thereby percent. Muck soil shall not be considered topsoil. reducing erosion;to reduce irrigation water needs;and to reduce the need for nitrogen fertilizer application. 2. Topsoil shall have not less than 20 percent fine textured material(passing the NO.200 sieve)and not more than Conditions Where Practice Appfies 15 percent clay. Topsoil is applied to subsoils that are droughty(low 3. Topsoil treated with soil sterilants or herbicides shall available moisture for plants),stony,slowly permeable, be so identified to the purchaser. salty or extremely acid. It is also used to backfill around 4. Topsoil shall be relatively free of stones over 1 1/2 shrub and tree transplants.This standard does not apply to inches in diameter,trash,noxious weeds such as nut wetland soils. sedge and quackgrass,and will have less than 10 percent gravel. Design Criteria 5. Topsoil containing soluble salts greater than 500 parts 1. Preserve existing topsoil in place where possible, per million shall not be used. thereby reducing the need for added topsoil. 6. Topsoil may be manufactured as a mixture of a mineral 2. Conserve by stockpiling topsoil and friable fine component and organic material such as compost. textured subsoils that must be stripped from the Application and Grading excavated site and applied after final grading where vegetation will be established. Topsoil stockpiles must 1. Topsoil shall be distributed to a uniform depth over the be stabilized. Stockpile surfaces can be stabilized by area. It shall not be placed when it is partly frozen, vegetation,geotextile or plastic covers. This can be muddy,or on frozen slopes or over ice,snow,or aided by orientating the stockpile lengthwise into standing water puddles. prevailing winds. 2. Topsoil placed and graded on slopes steeper than 5 3. Refer to USDA Natural Resource Conservation Service percent shall be promptly fertilized,seeded,mulched, soil surveys or soil interpretation record sheets for and stabilized by"tracking"with suitable equipment. further soil texture information for selecting appropriate design topsoil depths. 3. Apply topsoil in the amounts shown in Table 4.7 below: New York State Standards and Specifications Page 4.59 November 2016 For Erosion and Sediment Control Table 4.7- Topsoil Application Depth Minimum Site Conditions Intended Use Topsoil Depth 1.Deep sand or Mowed lawn 6 in. loamy sand Tall legumes,unmowed 2 in. Tall grass,unmowed 1 in. 2.Deep sandy Mowed lawn 5 in. loam Tall legumes,unmowed 2 in. Tall grass,unmowed none 3.Six inches or Mowed lawn 4 in. more: silt loam, clay loam,loam, Tall legumes,unmowed 1 in. or silt Tall grass,unmowed 1 in. November 2016 Page 4.60 New York State Standards and Specifications For Erosion and Sediment Control STRUCTURAL MEASURES FOR EROSION AND SEDIMENT CONTROL General minimize the amount of sediment that is produced. In general,it is advantageous to clear only as much area as is Uncontrolled runoff and excess erosion often occurs in necessary to accommodate construction needs. Grade and urban developments,particularly during the construction stabilize large sites in stages whenever possible. Limiting stage. This erosion forms rills and gullies;washes out the amount of disturbed area limits the amount of sediment roads; scours cut and fill areas;fills road ditches, storm that is generated,thus decreasing the amount of drains,and streams; and does other damage that is costly to maintenance required on sediment control measures. the developers and damaging to land and water users below. Careful inclusion of proven conservation practices in the Sediment generated during the construction of cut and fill development plan can prevent or alleviate much of this slopes can also be minimized through design and grading damage and should be a part of every development plan. techniques. When designing either a cut or fill slope, factors to consider include slope length and steepness,soil These practices will usually be a combination of vegetative type,and upslope drainage area. In general,it is important and structural measures. They may be temporary and serve to leave soil surfaces on disturbed slopes in a roughened only during the construction stage or they may be condition and to construct a water diversion practice at the permanent in nature and become a part of the completed top of slopes. Rough soil surfaces do not erode as readily development. Permanent structural practices should be as smooth soil surfaces. installed as early as possible in the construction stage. This section deals with the more common structural measures Although design and grading techniques can reduce soil that may be used. Adequate designs,plans,and erosion,they cannot eliminate it entirely. Therefore, specification should be prepared for the measures to be practices must be installed to prevent offsite sedimentation. used. A number of measures and specifications are included throughout this section. The designer shall Even though the specific conditions of each site determine determine those elements to be installed to control erosion what measures are necessary to control erosion and (Section 2)and follow the criteria included in these sedimentation, some general principles apply to the standards and specifications. selection and placement of sediment control measures. Introduction 1. Prevent clean water from becoming turbid,by diverting runoff from upslope areas away from Structural erosion and sediment control practices have been disturbed areas. Earth dikes,temporary swales, classified as either temporary or permanent,according to perimeter dike/swales,or diversions that outlet in how they are used. Temporary structural practices are used stable areas can be used in this capacity. during construction to prevent offsite sedimentation. The length of time that temporary practices are functional varies 2. Remove sediment from turbid water before the water from project to project,since the sediment control strategy leaves the site. The method of sediment removal. may change as construction activity progresses. Permanent depends upon how the water drains from the site. structural practices are used to convey surface water runoff Concentrated flow must be diverted to a trapping to a safe outlet. Permanent structural practices will remain device so that suspended sediment can be deposited. Dikes or swales that outlet into traps or basins can in place and continue to function after the completion of construction. accomplish this. A storm drain system may be used to convey concentrated sediment laden water only if Regardless of whether the practices are temporary or the system empties into a trap or basin. Otherwise, permanent,runoff control measures should be the first items all storm drain inlets must be protected so that constructed when grading begins,and be completely sediment laden water cannot enter the drainage functional before downslope land disturbance takes place. system before being treated to remove the sediment. Earthen structures such as diversions,dikes,and swales should be stabilized before being considered functional. 3. Surface runoff draining in sheet flow must be Only after the runoff control structures are operational and controlled and treated before the water leaves the sediment control measures are in place,should clearing and site. Straw bale dikes, silt fences,or vegetative buffer strips can be used to treat sheet flow. grading on the rest of the construction site begin. While clearing and grading the site,it is important to August 2005 Page 5.1 New York Standards and Specifications For Erosion and Sediment Control All practices designed and implemented must be properly 3. Protect streams from chemicals,fuel,lubricants, maintained in order to remain functional. Sediment sewage,or other pollutants. accumulated in basins and traps must be removed and disposed of in a manner that stabilizes them on the 4. Avoid disposal of fill in floodplains or drainage ways. construction site. This reduces the capacity of these areas to pass flood flows. Other factors should be observed during construction in order to make erosion and sediment control measures more 5. Do not locate sanitary facilities over,or adjacent to, effective in pollution control. waterways,wells,or springs. These are: 6. Locate storage yards and stockpiles where erosion and sediment hazards are slight. Where this is not 1. Sprinkle or apply dust suppressors. Keep dust down possible, apply necessary erosion control practices. to a tolerable limit on construction sites and haul roads. 2. Use temporary bridges or culverts where fording of streams is objectionable. Avoid borrow areas where pollution from this operation is inevitable. New York Standards and Specifications Page 5.2 August 2005 For Erosion and Sediment Control STANDARD SYMBOLS BRANCH PACKING BP BRUSH LAYER BL BRUSH MATTRESS BM CHECK DAM — ► — ► CONSTRUCTION ROAD STABILIZATION = CRS = CURB DROP INLET PROTECTION pfll� DIVERSION D DUNE STABILIZATION DS DUST CONTROL EARTH DIKE ►�=z�H—= EXCAVATED DROP INLET PROTECTION FIBER ROLL FR FILTER FABRIC DROP INLET PROTECTION GRADE STABILIZATION STRUCTURE �-- GRASSED WATERWAY GL ADAPTED FROM DETAILS PROVIDED BY, USDA — NRCS, NEW YORK STATE DEPARTMENT OF TRANSPORTATION, STANDARD SYMBOLS NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION, NEW YORK STATE SOIL & WATER CONSERVATION COMMITTEE August 2005 Page 5.3 New York Standards and Specifications For Erosion and Sediment Control STANDARD SYMBOLS (cont'd) LAND GRADING Y LEVEL SPREADER LINED WATERWAY RR LIVE CRIBWALL LCW LIVE CUTTINGS/LIVE STAKES PLANTING LC/LS LIVE FASCINE LF MULCHING OPTIONAL SEDIMENT TRAP DEWATERING DEVICE PAVED FLUME PERIMETER DIKE OR SWALE PD PERMANENT SEEDING PS PIPE OUTLET SEDIMENT TRAP , O ` PIPE SLOPE DRAIN FLEXIBLE P S D PORTABLE SEDIMENT TANK PROTECTING VEGETATION FO ADAPTED FROM DETAILS PROVIDED BY, USDA - NRCS, NEW YORK STATE DEPARTMENT OF TRANSPORTATION, NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION, STANDARD SYMBOLS NEW YORK STATE S❑IL 3 WATER CONSERVATION COMMITTEE New York Standards and Specifications Page 5.4 August 2005 For Erosion and Sediment Control STANDARD SYMBOLS (cont'd) RECREATI❑N AREA IMPROVEMENT RAI RIP RAP OUTLET PROTECTION RIP RAP SLOPE PROTECTION RS RIP RAP STREAMBANK PROTECTION ��®��1 ROCK DAM SEDIMENT BASIN SEDIMENT TRAP SEGMENTED RETAINING WALL SILT FENCE �--f-� SODDING O STABILIZED CONSTRUCTION ENTRANCE 0000 STONE & BLOCK DROP INLET PROTECTION STRUCTURE 0000 STRAW BALE DIKE �'♦ SUBSURFACE DRAIN SD� SUMP PIT ADAPTED FROM DETAILS PROVIDED BY, USDA - NRCS, YORK STATENEW YORKWSTATE DEPARTMENTRNT OFEENVIIRONMENTALORCONSERVATION, STANDARD SYMBOLS NEW YORK STATE SOIL 6 WATER CONSERVATION COMMITTEE August 2005 Page 5.5 New York Standards and Specifications For Erosion and Sediment Control STANDARD SYMBOLS (cont'd) SURFACE ROUGHENING TEMPORARY SEEDING TS A-2 B-3 TEMPORARY SWALE TOPSOILING TREE REVETMENT TR TURBIDITY CURTAIN VEGETATED ROCK GABIONS VRG WATER BAR —W B WATERWAY CROSSING :=)T(= ADAPTED FROM DETAILS PROVIDED BY, USDA - NRCS, NEW YORK STATE DEPARTMENT OF TRANSPORTATION, NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION, STANDARD SYMBOLS NEW YORK STATE SOIL & WATER CONSERVATION COMMITTEE New York Standards and Specifications Page 5.6 August 2005 For Erosion and Sediment Control Attachment I: NYSD E C Stormwater Construction Checklists (Sample Form) Appendix F: Construction Inspection Checklists Stormwater/Wetland Pond Construction Inspection Checklist Project: Location: Site Status: Date: Time: Inspector: CONSTRUCTION SEQUENCE SATISFACTORY/ COMMENTS UNSATISFACTORY Pre-Construction/Materials and Equipment Pre-construction meeting Pipe and appurtenances on-site prior to construction and dimensions checked 1. Material (including protective coating, if specified) 2. Diameter 3. Dimensions of metal riser or pre-cast concrete outlet structure 4. Required dimensions between water control structures (orifices, weirs, etc.) are in accordance with approved plans 5. Barrel stub for prefabricated pipe structures at proper angle for design barrel slope 6. Number and dimensions of prefabricated anti-seep collars 7. Watertight connectors and gaskets 8. Outlet drain valve Project benchmark near pond site Equipment for temporary de-watering F-1 New York State Stormwater Management Design Manual Appendix F CONSTRUCTION SEQUENCE SATISFACTORY/ COMMENTS UNSATISFACTORY 2. Subgrade Preparation Area beneath embankment stripped of all vegetation, topsoil, and organic matter 3. Pipe Spillway Installation Method of installation detailed on plans A. Bed preparation Installation trench excavated with specified side slopes Stable, uniform, dry subgrade of relatively impervious material (If subgrade is wet, contractor shall have defined steps before proceeding with installation) Invert at proper elevation and grade B. Pipe placement Metal / plastic pipe 1. Watertight connectors and gaskets properly installed 2. Anti-seep collars properly spaced and having watertight connections to pipe 3. Backfill placed and tamped by hand under "haunches" of pipe 4. Remaining backfill placed in max. 8 inch lifts using small power tamping equipment until 2 feet cover over pipe is reached F-2 New York State Stormwater Management Design Manual Appendix F CONSTRUCTION SEQUENCE SATISFACTORY/ COMMENTS UNSATISFACTORY 3. Pipe Spillway Installation Concrete pipe 1. Pipe set on blocks or concrete slab for pouring of low cradle 2. Pipe installed with rubber gasket joints with no spalling in gasket interface area 3. Excavation for lower half of anti-seep collar(s) with reinforcing steel set 4. Entire area where anti-seep collar(s) will come in contact with pipe coated with mastic or other approved waterproof sealant 5. Low cradle and bottom half of anti-seep collar installed as monolithic pour and of an approved mix 6. Upper half of anti-seep collar(s)formed with reinforcing steel set 7. Concrete for collar of an approved mix and vibrated into place (protected from freezing while curing, if necessary) 8. Forms stripped and collar inspected for honeycomb prior to backfilling. Parge if necessary. C. Backfilling Fill placed in maximum 8 inch lifts Backfill taken minimum 2 feet above top of anti- seep collar elevation before traversing with heavy equipment F-3 New York State Stormwater Management Design Manual Appendix F CONSTRUCTION SEQUENCE SATISFACTORY/ COMMENTS UNSATISFACTORY 4. Riser I Outlet Structure Installation Riser located within embankment A. Metal riser Riser base excavated or formed on stable subgrade to design dimensions Set on blocks to design elevations and plumbed Reinforcing bars placed at right angles and projecting into sides of riser Concrete poured so as to fill inside of riser to invert of barrel B. Pre-cast concrete structure Dry and stable subgrade Riser base set to design elevation If more than one section, no spalling in gasket interface area; gasket or approved caulking material placed securely Watertight and structurally sound collar or gasket joint where structure connects to pipe spillway C. Poured concrete structure Footing excavated or formed on stable subgrade, to design dimensions with reinforcing steel set Structure formed to design dimensions, with reinforcing steel set as per plan Concrete of an approved mix and vibrated into place (protected from freezing while curing, if necessary) Forms stripped & inspected for "honeycomb" prior to backfilling; parge if necessary F-4 New York State Stormwater Management Design Manual Appendix F CONSTRUCTION SEQUENCE SATISFACTORY/ COMMENTS UNSATISFACTORY 5. Embankment Construction Fill material Compaction Embankment 1. Fill placed in specified lifts and compacted with appropriate equipment 2. Constructed to design cross-section, side slopes and top width 3. Constructed to design elevation plus allowance for settlement 6. Impounded Area Construction Excavated /graded to design contours and side slopes Inlet pipes have adequate outfall protection Forebay(s) Pond benches 7. Earth Emergency Spillway Construction Spillway located in cut or structurally stabilized with riprap, gabions, concrete, etc. Excavated to proper cross-section, side slopes and bottom width Entrance channel, crest, and exit channel constructed to design grades and elevations F-5 New York State Stormwater Management Design Manual Appendix F CONSTRUCTION SEQUENCE SATISFACTORY/ COMMENTS UNSATISFACTORY 8. Outlet Protection A. End section Securely in place and properly backfilled B. Endwall Footing excavated or formed on stable subgrade, to design dimensions and reinforcing steel set, if specified Endwall formed to design dimensions with reinforcing steel set as per plan Concrete of an approved mix and vibrated into place (protected from freezing, if necessary) Forms stripped and structure inspected for "honeycomb" prior to backfilling; parge if necessary C. Riprap apron /channel Apron /channel excavated to design cross- section with proper transition to existing ground Filter fabric in place Stone sized as per plan and uniformly place at the thickness specified 9. Vegetative Stabilization Approved seed mixture or sod Proper surface preparation and required soil amendments Excelsior mat or other stabilization, as per plan F-6 New York State Stormwater Management Design Manual Appendix F CONSTRUCTION SEQUENCE SATISFACTORY/ COMMENTS UNSATISFACTORY 10. Miscellaneous Drain for ponds having a permanent pool Trash rack I anti-vortex device secured to outlet structure Trash protection for low flow pipes, orifices, etc. Fencing (when required) Access road Set aside for clean-out maintenance 11. Stormwater Wetlands Adequate water balance Variety of depth zones present Approved pondscaping plan in place Reinforcement budget for additional plantings Plants and materials ordered 6 months prior to construction Construction planned to allow for adequate planting and establishment of plant community (April-June planting window) Wetland buffer area preserved to maximum extent possible Comments: F-7 New York State Stormwater Management Design Manual Appendix F Actions to be Taken: F-8 New York State Stormwater Management Design Manual Appendix F Open Channel System Construction Inspection Checklist Project: Location: Site Status: Date: Time: Inspector: CONSTRUCTION SEQUENCE SATISFACTORY COMMENTS UNSATISFACTORY 1. Pre-Construction Pre-construction meeting Runoff diverted Facility location staked out 2. Excavation Size and location Side slope stable Soil permeability Groundwater I bedrock Lateral slopes completely level Longitudinal slopes within design range Excavation does not compact subsoils 3. Check dams Dimensions Spacing Materials F-20 New York State Stormwater Management Design Manual Appendix F CONSTRUCTION SEQUENCE SATISFACTORY/ COMMENTS UNSATISFACTORY 4. Structural Components Underdrain installed correctly Inflow installed correctly Pretreatment devices installed 5. Vegetation Complies with planting specifications Topsoil adequate in composition and placement Adequate erosion control measures in place 6. Final inspection Dimensions Check dams Proper outlet Effective stand of vegetation and stabilization Contributing watershed stabilized before flow is routed to the factility Comments: F-21 New York State Stormwater Management Design Manual Appendix F Actions to be Taken: F-22 Attachment J: NYSDEC Operation & Maintenance Checklist (Sample Form) Appendix G: Maintenance Inspection Checklists Stormwater Pond/Wetland Operation, Maintenance and Management Inspection Checklist Project Location: Site Status: Date: Time: Inspector: Maintenance Item Satisfactory/ Comments Unsatisfactory 1. Embankment and emergency spillway (Annual, After Major Storms) 1. Vegetation and ground cover adequate 2. Embankment erosion 3. Animal burrows 4. Unauthorized planting 5. Cracking, bulging, or sliding of dam a. Upstream face b. Downstream face c. At or beyond toe downstream upstream d. Emergency spillway 6.Pond, toe & chimney drains clear and functioning 7.Seeps/leaks on downstream face 8.Slope protection or riprap failure 9. Vertical/horizontal alignment of top of dam "As-Built" G-1 New York State Stormwater Management Design Manual Appendix G Maintenance Item Satisfactory/ Comments Unsatisfactory 10. Emergency spillway clear of obstructions and debris 11. Other(specify) 2. Riser and principal spillway (Annual) Type: Reinforced concrete Corrugated pipe Masonry 1. Low flow orifice obstructed 2. Low flow trash rack. a. Debris removal necessary b. Corrosion control 3. Weir trash rack maintenance a. Debris removal necessary b. corrosion control 4. Excessive sediment accumulation insider riser 5. Concrete/masonry condition riser and barrels a. cracks or displacement b. Minor spalling (<1" ) c. Major spalling (rebars exposed) d. Joint failures e. Water tightness 6. Metal pipe condition 7. Control valve a. Operational/exercised b. Chained and locked 8. Pond drain valve a. Operational/exercised b. Chained and locked 9. Outfall channels functioning 10. Other(specify) G-2 New York State Stormwater Management Design Manual Appendix G Maintenance Item Satisfactory/ Comments Unsatisfactory 3. Permanent Pool (Wet Ponds) (monthly) 1. Undesirable vegetative growth 2. Floating or floatable debris removal required 3. Visible pollution 4. Shoreline problem 5. Other(specify) 4. Sediment Forebays 1.Sedimentation noted 2. Sediment cleanout when depth < 50% design depth 5. Dry Pond Areas 1. Vegetation adequate 2. Undesirable vegetative growth 3. Undesirable woody vegetation 4. Low flow channels clear of obstructions 5. Standing water or wet spots 6. Sediment and /or trash accumulation 7. Other(specify) 6. Condition of Outfalls (Annual , After Major Storms) 1. Riprap failures 2. Slope erosion 3. Storm drain pipes 4.Endwalls/ Headwalls 5. Other(specify) 7. Other ( Monthly) 1. Encroachment on pond, wetland or easement area G-3 New York State Stormwater Management Design Manual Appendix G Maintenance Item Satisfactory/ Comments Unsatisfactory 2. Complaints from residents 3.Aesthetics a. Grass growing required b. Graffiti removal needed c. Other(specify) 4. Conditions of maintenance access routes. 5. Signs of hydrocarbon build-up 6. Any public hazards (specify) 8. Wetland Vegetation (Annual) 1. Vegetation healthy and growing Wetland maintaining 50% surface area coverage of wetland plants after the second growing season. (If unsatisfactory, reinforcement plantings needed) 2. Dominant wetland plants: Survival of desired wetland plant species Distribution according to landscaping plan? 3. Evidence of invasive species 4. Maintenance of adequate water depths for desired wetland plant species 5. Harvesting of emergent plantings needed 6. Have sediment accumulations reduced pool volume significantly or are plants "choked"with sediment 7. Eutrophication level of the wetland. 8. Other(specify) Comments: G-4 New York State Stormwater Management Design Manual Appendix G Actions to be Taken: G-5 New York State Stormwater Management Design Manual Appendix G Open Channel Operation, Maintenance, and Management Inspection Checklist Project: Location: Site Status: Date: Time: Inspector: MAINTENANCE ITEM SATISFACTORY/ COMMENTS UNSATISFACTORY 1. Debris Cleanout (Monthly) Contributing areas clean of debris 2. Check Dams or Energy Dissipators (Annual, After Major Storms) No evidence of flow going around structures No evidence of erosion at downstream toe Soil permeability Groundwater/ bedrock 3. Vegetation (Monthly) Mowing done when needed Minimum mowing depth not exceeded No evidence of erosion Fertilized per specification 4. Dewatering (Monthly) Dewaters between storms G-13 New York State Stormwater Management Design Manual Appendix G MAINTENANCE ITEM SATISFACTORY/ COMMENTS UNSATISFACTORY 5. Sediment deposition (Annual) Clean of sediment 6. Outlet/Overflow Spillway (Annual) Good condition, no need for repairs No evidence of erosion Comments: Actions to be Taken: G-14 Attachment K: Stormwater Management Summary INDEX Stormwater Management Summary SiteDate—General..............................................................................................................2 Runoff Reduction Management Strategy.............................................................................4 Design Point 1 Summary (DP-1).........................................................................................6 Methodology........................................................................................................................7 DesignModeling Results.....................................................................................................8 StageStorage Tables............................................................................................................9 Water Quality Volume/Runoff Reduction Volume Worksheets........................Appendix 1 Hydraulic Modeling Results...............................................................................Appendix 2 Soils.....................................................................................................................Appendix 3 Precipitation Data................................................................................................Appendix 4 STORMWATER MANAGEMENT SUMMARY SITE DATA - GENERAL Site Notes: This summary has been prepared for major activities associated with the ongoing operation of a contractor work yard in the Town of Lansing. The production originally started in 2011 which was allowed use by right through the Town. In 2016, a full site plan review process was conducted for a conceptual apartment complex located downslope from the facility which included an approved SWPPP. As part of the storm plan, the work yard was allowed continued use by right but several restrictions were placed on the property limiting the size and scope of the work zone while also requiring the installation of a stormwater management sump practice to provide runoff mitigation and attenuation. Because the apartment complex was never realized, the 2016 restrictions became null and void with the exception that the operation would now be required to carry its own SWPPP. Subcatchment Evaluation: There is one pre-developed(existing)watershed subcatchments (ESC-1) for this site totaling 449,606-SF (10.32-AC). This area is isolated from eastern upland watershed runoff by a road R.O.W. drainage ditch along Scofield Road and a large berm along the southern parcel line Peruville Road. In as much as flow naturally moves in a northwest direction across the site, this prevents influences onto the parcel from the north. General site runoff is directed toward the west over moderately flat slopes where it terminates into an existing l' dry pond (sump) sedimentation basin designed to capture and treat flow. Any surge from the practice outlets harmlessly where it eventually finds its way into the Peruville Road R.O.W. swale below. (DP-1). Because the contractor work yard has been in operation since 2011, this Full Stormwater Pollution Prevention Plan(SWPPP) addresses runoff concerns. As such, the proposed runoff model generally mirrors that of the existing site conditions with the exception that the site has expanded from 2.57-Ac to 4.93-AC through the years. As such the sedimentation basin will need an additional 1' of volume added to ensure that it can continue to meet runoff attenuation requirements from Proposed Subcatchment 1 (PSC-1) Site Control Methods: This project follows DEC design standards on runoff reduction by applying a sedimentation basin to address runoff concerns. Site Soils: There are a two soil types in hydrologic soil groups A and C located across the site. Palmyra gravelly loam (PaQ belongs in the hydrologic soil group A with a well drained permeability range of 0.63 — 6.3 inches per hour. Finally, Kendaia (KnA) is a somewhat poorly drained C type soil with a slow permeability of 0.20 inches per hour. See Appendix 3 for more information. Soils data was obtained from the Tompkins County Soil Survey conducted by the USDA Soil Conservation Service and the on-line Web Soil Survey. 2 1 P a g e Site Topography: The site as a whole has a varied slope of<1% - 5% primarily moving downhill from east to west. Site Watershed: Of the 10.32-acre watershed, the area of disturbance will continue to be approximately 4.93-acres. Flow is channeled across the property into a sedimentation basin. Rainfall: Rainfall data used in the modeling and analysis was taken from www.precipt.net, from the Northeast Regional Climate Center which is an accepted NYSDEC reference. Rainfall data specific to Tompkins County under consideration, for various 24-hour storm events tabled below: RAINFALL DATA STORM 24-HOUR RAINFALL 1-year 2.0 inches 10-year 3.41 inches 100-year 5.85 inches These values were used in modeling for the evaluation of existing and proposed stormwater run-off conditions. 3 1 P a g e RUNOFF REDUCTION VOLUME MANAGEMENT STRATEGY (See Appendix 1 for Worksheet Analyses) 1. Water Quality Volume and Runoff Reduction Stormwater Management Strategy -Reference modeling results and WQvIPRv worksheets which follow this summary: The total site water quality volume for DP-1 is DP-1 WQv= 17,000 cu-ft (0.390) Of this amount, there was no potential for the conservation of natural areas,protection of riparian areas, tree planting, rooftop disconnection, etc. that would lend to a reduction in total WQv. WQv credit=0 cuft(0.00 af) The minimum RRv was based on the following calculation: Soil group for site: A—2.47-AC S = 55% C—2.47-AC S = 30% Minimum RRv: S = 0.43 Impervious Area=4.93-AC Precipitation= 1.0 in Rv=0.95 Minimum Rv= [(P)(Rv)(A)] /12 = ((1.0 * 0.95"/AC X 4.93AC)/12)0.43= 7,225 cuft or, 0.170-acft 2. Water Quality Volume Treatment Practices A single sedimentation basin dry pond is used to capture and treat runoff. A summary of total runoff reduction volumes is provided in the table below: Subcatchment Required RRv (cult) RRv Applied (Cult) Practice PSC-1 7,225 17,000 3P 4 1 P a g e 3. Total of RRv Total RRv provided by practices 17,000 cuft(0.390-AF) Total Remaining Storage Volume for practices (after RRv) 17000 cuft - 17000 cuft = 0 cuft(O.Oaf) Is provided RRv>minimum RRv for all soils from#1? 0.390 aeft> 0.170 acft YES Is provided RRv>adjusted WQv from#1? 0.390 acft> 0.390 acft YES Is volume available within standard practices for remaining untreated WQv? Total WQv 0.390AF RRv 0.390 AF Remaining WQv O.OAF (0-CF) YES Is all of the watershed drainage area treated by either area reduction or source control practices? YES Is all of the watershed impervious area treated with either reduction or source control practices? YES Minimum runoff reduction requirements are met for this project. 5 1 P a g e DP-1 Design Point 1 Summary (DP-1) CONTROL SIZING Sedimentation Basin Please see the attached worksheets to determine bioretention area sizing. Cpv=24 hour extended detention of post-developed 1-year, 24-hour Storm event. The required CPv is a summation of the modeled 1 yr runoff output from each untreated subcatchment(2.0-inch rainfall Tompkins County) after runoff reduction(RRv). 1 yr Cpv 0.193-AF—RRV 0.390-AF=-0.00-AF (-0.00)-CF The Cpv Channel Protection Volume is provided by the basin practices as determined by measuring the storage volume allowed between the floor of the practice at(0.0') and the primary outlet(1.5'), less the amount required for RRV. CPv conditions are met. Overbank Flood (Op)—DPI Qp = Controls the peak discharge from the 10-year storm(3.41-inch rainfall Tompkins County) to 10-year predevelopment rates. Pre-developed max rate = 0.00-CFS, Total Volume = O.000AF (0-CF). The maximum post-developed run-off rate with the bioretention areas in-line is 0- CFS, and the total run-off volume is 0.000-AF (0-CF). The Qp Overbank Flood control criterion is met with the sump area in-line. Extreme Storm (Of)—DP1 Control the peak discharge from the 100-year storm(5.85-inch rainfall Tompkins County) to 100-year predevelopment rates. Safely pass the 100-year storm event. Pre-developed max run-off rate = 6.12-CFS, Total Volume =0.770-AF (33,541-CF). The maximum post-developed run-off rate with the structure inline is 5.64-CFS, and the total run-off volume is 0.946-AF (41,208-CF). The Qf Extreme Storm control criterion is met with the sedimentation basin in-line. 6 1 P a g e METHODOLOGY The methodology used for the hydrologic and hydraulic analysis was obtained from the United States Department of Agriculture (USDA) Soil Conservation Service's (SCS) Technical Release No. 20, as implemented by the application program HydroCAD. HydroCAD, developed by Applied Microcomputer Systems of Chocorua,New Hampshire, is a Computer-Aided-Design(CAD)program for analyzing the hydrologic and hydraulic characteristics of a given watershed and associated stormwater management facilities. It utilizes the latest modeling techniques to predict the consequences of any given storm. HydroCAD has the capability of computing hydrographs and routing flows through pipes, streams and ponds. Hydrographs represent discharge rates characteristic of specified watershed conditions,precipitation and geologic factors. For this analysis, the watershed and drainage system was broken down into a network consisting of three types of components described below: Subcatchment: A relatively homogeneous area of land, which produces a volume and rate of surface run-off unique to that area. Reach: Uniform streams, channels or pipes which convey stormwater from one distinct point to another reach or pond. Pond: Natural or man-made impoundment (ie. pond), which temporarily stores stormwater run-off and empties in a manner determined by its geometry and the hydraulic structure located at its outlet(s). Subcatchments, reaches and ponds are represented by hexagons, squares and triangles, respectively, on the watershed routing diagrams provided with the computations reference modeling results attached. 7 1 P a g e Modelint4 Results Tabled: (See Appendix 2 for actual modeling data) DPI EXISTING EXISTING FLOW CONDITIONS AT DESIGN POINT DPI STORM EVENT PEAK FLOW TOTAL VOLUME CFS AF 1-year 0.00 0.000 10- ear 0.00 0.000 100- ear 6.12 0.770 PROPOSED WITH SEDIMENTATION BASIN IN-LINE PROPOSED FLOW CONDITIONS AT DESIGN POINT(DPI) STORM EVENT PEAK FLOW TOTAL VOLUME CFS AF 1-year 0.00 0.000 10- ear 0.00 0.000 100- ear 5.64 0.946 The run-off rates decrease for the 10 and 100 yr storm events as modeled. 81Page Stage Storalle Tables: BASIN I STAGE-STORAGE TABLE 3P STORM EVENT PEAK PEAK DEPTH STORAGE CF FT WQv 17000 1.03' 1 year (Cpv) 0 0.00, 10 year 0 0.00, 100 year 55,753 2.92' Notes: Bottom of Practice El. = 0.00' 8'x 4'Broad Crested Weir Outlet inv. = 2.50' Top of Embankment Elev. = 3.00' 91Page APPENDIX 1 WATER QUALITY VOLUME/RUNOFF REDUCTION WORKSHEETS 101Page Version 1.6 Total Water Quality Volume Calculation Last Updated: 03/28/2014 WQv(acre-feet) = [(P)(Rv)(A)] /12 Is this project subject to Chapter 10 of the NYS Design Manual (i.e. WQv is equal to post- development 1 year runoff volume)?...................................................................................... No Design Point: 1 Manually enter P, Total Area and Impervious Cover. P=J 1.00 linch Breakdown of Subcatchments Catchment Total Area Impervious Area Percent WQv Impervious Rv 3 Description Number (Acres) (Acres) (ft ) 1 4.93 4.93 100% 0.95 17,001 Sedimentation Basin 2 3 4 5 6 7 8 9 10 Subtotal (1-30) 4.93 4.93 100% 0.95 17,001 Subtotal 1 Total 4.93 4.93 100% 0.95 17,001 Initial WQv Identify Runoff Reduction Techniques By Area Total Contributing Technique Contributing Impervious Area Notes Area (Acre) (Acre) Conservation of Natural Areas 0.00 0.00 minimum 10,000 sf Riparian Buffers 0.00 0.00 maximum contributing length 75 feet to 150 feet Filter Strips 0.00 0.00 Tree Planting 0.00 0.00 Up to 100 sf directly connected impervious area may be subtracted per tree Total 0.00 0.00 Recalculate WQv after application of Area Reduction Techniques Total Area Impervious Area Percent Runoff WQv Impervious Coefficient 3 (Acres) (Acres) / Rv (ft ) "<<Initial WQv" 4.93 4.93 100% 0.95 17,001 Subtract Area 0.00 0.00 WQv adjusted after Area 4.93 4.93 100% 0.95 17,001 Reductions Disconnection of Rooftops 0.00 Minimum RRv Enter the Soils Data for the site Soil Group Acres S A 2.47 55 B 40 C 2.47 30% D 20 Total Area 4.94 Calculate the Minimum RRv S = 0.43 Impervious = 4.93 acre Precipitation 1 in Rv 0.95 Minimum RRv j 7,225 Ift3 0.17 laf APPENDIX 2 HYDRAULIC MODELING DATA III Page ESC 1 Existing Subcatchment 1 Attenuation Basin DP E Design Point Summation Existing 2S 3P Proposed Subcatchment 1 Attenuation Basin DP P Design Point Summation Proposed Subcat Reach on Link Routing Diagram for PinneyFillSite EHydAD d by{enter your company name here}, Printed 6/29/2026 ®10.00-26 s/n 01939 ©2020 HydroCAD Software Solutions LLC PinneyExpansion - 1 Yr Rain Event PinneyFillSite Prepared by {enter your company name here} Printed 6/29/2026 HydroCAD® 10.00-26 s/n 01939 ©2020 HydroCAD Software Solutions LLC Page 2 Area Listing (all nodes) Area CN Description (acres) (subcatchment-numbers) 5.971 30 Brush, Good, HSG A (2S, ESC 1) 5.648 65 Brush, Good, HSG C (2S, ESC 1) 6.630 98 Compacted Fill Site A& C Soils (2S, ESC 1) 1.328 30 Future Fill Site Brush, Good, HSG A (ESC 1) 0.190 65 Future Fill Site Brush, Good, HSG C (ESC 1) 0.877 98 Paved parking & roofs (2S, ESC 1) 20.643 65 TOTAL AREA PinneyExpansion - 1 Yr Rain Event PinneyFillSite Prepared by {enter your company name here} Printed 6/29/2026 HydroCAD® 10.00-26 s/n 01939 ©2020 HydroCAD Software Solutions LLC Page 3 Ground Covers (all nodes) HSG-A HSG-B HSG-C HSG-D Other Total Ground Subcatchment (acres) (acres) (acres) (acres) (acres) (acres) Cover Numbers 5.971 0.000 5.648 0.000 0.000 11.619 Brush, Good 2S, ES C1 0.000 0.000 0.000 0.000 6.630 6.630 Compacted Fill Site A& C Soils 2S, ES C1 1.328 0.000 0.190 0.000 0.000 1.518 Future Fill Site Brush, Good ES C1 0.000 0.000 0.000 0.000 0.877 0.877 Paved parking & roofs 2S, ES C1 7.299 0.000 5.838 0.000 7.507 20.643 TOTAL AREA PinneyExpansion - 1 Yr Rain Event PinneyHlSite TYPE 1124-HR Rainfall=2.00" Prepared by {enter your company name here} Printed 6/29/2026 HydroCAD® 10.00-26 s/n 01939 ©2020 HydroCAD Software Solutions LLC Page 4 Time span=5.00-20.00 hrs, dt=0.05 hrs, 301 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment2S: Proposed Runoff Area=449,606 sf 47.78% Impervious Runoff Depth>0.22" Flow Length=932' Tc=26.9 min CN=71 Runoff=1.58 cfs 0.193 of SubcatchmentESC 1: Existing Runoff Area=449,606 sf 24.94% Impervious Runoff Depth>0.03" Flow Length=814' Tc=24.9 min CN=58 Runoff=0.04 cfs 0.022 of Reach DP E: Design Point Summation Existing Inflow=0.00 cfs 0.000 of Outflow=0.00 cfs 0.000 of Reach DP P: Design Point Summation Proposed Inflow=0.00 cfs 0.000 of Outflow=0.00 cfs 0.000 of Pond 1 P: Attenuation Basin Peak EIev=73.08' Storage=966 cf Inflow=0.04 cfs 0.022 of Outflow=0.00 cfs 0.000 of Pond 3P: Attenuation Basin Peak EIev=72.57' Storage=8,402 cf Inflow=1.58 cfs 0.193 of Outflow=0.00 cfs 0.000 of Total Runoff Area = 20.643 ac Runoff Volume = 0.215 of Average Runoff Depth = 0.13" 63.64% Pervious = 13.136 ac 36.36% Impervious = 7.507 ac PinneyExpansion - 1 Yr Rain Event PinneyFillSite TYPE 1124-HR Rainfall=2.00" Prepared by {enter your company name here} Printed 6/29/2026 HydroCAD® 10.00-26 s/n 01939 ©2020 HydroCAD Software Solutions LLC Page 5 Summary for Subcatchment 2S: Proposed Subcatchment 1 Runoff = 1.58 cfs @ 12.28 hrs, Volume= 0.193 af, Depth> 0.22" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs TYPE II 24-HR Rainfall=2.00" Area (sf) CN Description 113,251 65 Brush, Good, HSG C 121,512 30 Brush, Good, HSG A 17,128 98 Paved parking & roofs 197,715 98 Compacted Fill Site A & C Soils 449,606 71 Weighted Average 234,763 52.22% Pervious Area 214,843 47.78% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.5 100 0.0100 0.08 Sheet Flow, First 100' Flowpath Grass: Dense n= 0.240 P2= 2.70" 6.4 832 0.0180 2.16 Shallow Concentrated Flow, Balance of Longest Flowpath Unpaved Kv= 16.1 fps 26.9 932 Total Subcatchment 2S: Proposed Subcatchment 1 Hydrograph 1.58 cfs —Runoff TYPE II 24-WR Rainfall=2.0'0" Runoff Area=449,60&sf y1 Runoff'Volume=0.193'�,af Runoff Depth>0.2,2" LL Plow Length=932' Tc=26.9 min CN=71 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) PinneyExpansion - 1 Yr Rain Event PinneyFillSite TYPE 1124-HR Rainfall=2.00" Prepared by {enter your company name here} Printed 6/29/2026 HydroCAD® 10.00-26 s/n 01939 ©2020 HydroCAD Software Solutions LLC Page 6 Summary for Subcatchment ESC 1: Existing Subcatchment 1 Runoff = 0.04 cfs @ 15.31 hrs, Volume= 0.022 af, Depth> 0.03" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs TYPE II 24-HR Rainfall=2.00" Area (sf) CN Description 132,773 65 Brush, Good, HSG C 138,575 30 Brush, Good, HSG A 21,061 98 Paved parking & roofs 91,084 98 Compacted Fill Site A & C Soils 57,845 30 Future Fill Site Brush, Good, HSG A 8,268 65 Future Fill Site Brush, Good, HSG C 449,606 58 Weighted Average 337,461 75.06% Pervious Area 112,145 24.94% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.5 100 0.0100 0.08 Sheet Flow, First 100' Flowpath Grass: Dense n= 0.240 P2= 2.70" 4.4 714 0.0320 2.68 Shallow Concentrated Flow, Balance of Longest Flowpath Grassed Waterway Kv= 15.0 fps 24.9 814 Total Subcatchment ESC 1: Existing Subcatchment 1 Hydrograph 0.046 - - - - ---- ----'- - - - -i--- 0.044 ---- -- --- T 0.04ds 0.042 ---------------' --- ----L- - ------' --------+---- 0.04HR +- j +--- ----+---- TYP Ell 0.038 ---- ----r------- T---- --- ---- ---- ---r---- 0.036 Rainfall=3�00�'-------------------- - -------- ------------- ---- 0.034 - - - - - - - - - - --I----1----'---- ---- --------+-------- -------------+-- 0.032 -110inoff Area=144 A06-sf-'r----- - --------------,--------;---- 0.03 - ----- - - ----- ----I- -------------------- -------- 0.028- -F_ U-noft Volume=0.021 of L--------1---- 1----L----;--- ---- 0.026 ------ ----i---- ----'---- ----r----i ---+---- ----i---- --------+---- v- "� 0.024 -Runoff D�pt�r>a.03--�----�----� ---�----�----�----�----�----,---- O 0.022 - -----' ------------------' --- T - ------------- C - ------------- 0.02 Flow Len th=8- 4!--- ----' ---- -------- -------------a ---- 0.01a ------=------------- -------- --------------------------- 0.016 0.014 1----L----1----1----'---- ----L--- ----1----'---- -------------L---- 0.012 -C =58---- ---- ----' --- ----+-------- ----' ----'---- ---- 0.01 -------,--- r- --- ----,---- ---- ----r--- ---- ------------- 0.008- ---- ----L-------- --------- ---------- -------- -------------+---- 0.006 --- ---- -------- ----L---- - -- -----+-------- ----L- -- } - - - - - - - - , - _ 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) PinneyExpansion - 1 Yr Rain Event PinneyFillSite TYPE/1 24-HR Rainfall=2.00" Prepared by {enter your company name here} Printed 6/29/2026 HydroCAD® 10.00-26 s/n 01939 ©2020 HydroCAD Software Solutions LLC Page 7 Summary for Reach DP E: Design Point Summation Existing [40] Hint: Not Described (Outflow=Inflow) Inflow Area = 10.322 ac, 24.94% Impervious, Inflow Depth = 0.00" Inflow = 0.00 cfs @ 5.00 hrs, Volume= 0.000 of Outflow = 0.00 cfs @ 5.00 hrs, Volume= 0.000 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Reach DP E: Design Point Summation Existing Hydrograph 1- —Inflow —Outflow Inflow Area=10.322 ac N i w i 3 _o LL 0.00 cfs I, , 0- 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) PinneyExpansion - 1 Yr Rain Event PinneyFillSite TYPE 1124-HR Rainfall=2.00" Prepared by {enter your company name here} Printed 6/29/2026 HydroCAD® 10.00-26 s/n 01939 ©2020 HydroCAD Software Solutions LLC Page 8 Summary for Reach DP P: Design Point Summation Proposed [40] Hint: Not Described (Outflow=Inflow) Inflow Area = 10.322 ac, 47.78% Impervious, Inflow Depth = 0.00" Inflow = 0.00 cfs @ 5.00 hrs, Volume= 0.000 of Outflow = 0.00 cfs @ 5.00 hrs, Volume= 0.000 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Reach DP P: Design Point Summation Proposed Hydrograph 1 Inflow Outflow Inflow Area=10.322 ac Vl U 3 0 L 0.00 cfs , 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) PinneyExpansion - 1 Yr Rain Event PinneyFillSite TYPE/1 24-HR Rainfall=2.00" Prepared by {enter your company name here} Printed 6/29/2026 HydroCAD® 10.00-26 s/n 01939 ©2020 HydroCAD Software Solutions LLC Page 9 Summary for Pond 1 P: Attenuation Basin Inflow Area = 10.322 ac, 24.94% Impervious, Inflow Depth > 0.03" Inflow = 0.04 cfs @ 15.31 hrs, Volume= 0.022 of Outflow = 0.00 cfs @ 5.00 hrs, Volume= 0.000 af, Atten= 100%, Lag= 0.0 min Primary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 73.08' @ 20.00 hrs Surf.Area= 11,884 sf Storage= 966 cf Plug-Flow detention time= (not calculated: initial storage exceeds outflow) Center-of-Mass det. time= (not calculated: no outflow) Volume Invert Avail.Storage Storage Description #1 73.00' 23,317 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 73.00 11,363 0 0 74.00 17,635 14,499 14,499 75.00 0 8,818 23,317 Device Routing Invert Outlet Devices #1 Primary 74.50' 8.0' long x 4.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.38 2.54 2.69 2.68 2.67 2.67 2.65 2.66 2.66 2.68 2.72 2.73 2.76 2.79 2.88 3.07 3.32 Primary OutFlow Max=0.00 cfs @ 5.00 hrs HW=73.00' (Free Discharge) t1=Broad-Crested Rectangular Weir( Controls 0.00 cfs) PinneyExpansion - 1 Yr Rain Event PinneyFillSite TYPE 11 24-HR Rainfall=2.00" Prepared by {enter your company name here} Printed 6/29/2026 HydroCAD® 10.00-26 s/n 01939 ©2020 HydroCAD Software Solutions LLC Page 10 Pond 1 P: Attenuation Basin Hydrograph 0.046= - 0.044= -- -- 0iO4 cfs —Inflow 0.042. --- -- _ —Primary 004- Inflow Area=10.322 ac -- 0.038- - - - - - - - - - - - 7- - 0.036_ --I- 0.°34= Peek Elev=73.08'-- --- - - - - - - - ----- -- I 0.032_ ----- --- - - 7- - -,- - - , ---r- ,----r �- = - Storage=966-of_I_ 0.03= I 0.028= ---- --------+--------L ---I---- ---- ---J----L---J-- y I I I ----I-- - --- -----------------------I 0 0.022_ --------I ----� I,----- I I LL 0.02 + - ----I---- -- 0.018' 7- ---- -r - - - 0.016= -------------lI--------I-------- ----j---- ----i---- I----li---- I 0.014- L----I---- ----I---- ----I---- ----L--------L-- I I I I I I I I 0.012= ---------I --+---+---- ---1----F--- 0.008- ---- 0-006'_' -I--- --- - I I 0.004- T-- ,----I - - -r ,- 0. --- 0=, 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) PinneyExpansion - 1 Yr Rain Event PinneyFillSite TYPE/1 24-HR Rainfall=2.00" Prepared by {enter your company name here} Printed 6/29/2026 HydroCAD® 10.00-26 s/n 01939 ©2020 HydroCAD Software Solutions LLC Page 11 Summary for Pond 3P: Attenuation Basin Inflow Area = 10.322 ac, 47.78% Impervious, Inflow Depth > 0.22" Inflow = 1.58 cfs @ 12.28 hrs, Volume= 0.193 of Outflow = 0.00 cfs @ 5.00 hrs, Volume= 0.000 af, Atten= 100%, Lag= 0.0 min Primary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 72.57' @ 20.00 hrs Surf.Area= 17,031 sf Storage= 8,402 cf Plug-Flow detention time= (not calculated: initial storage exceeds outflow) Center-of-Mass det. time= (not calculated: no outflow) Volume Invert Avail.Storage Storage Description #1 72.00' 55,838 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 72.00 12,395 0 0 73.00 20,512 16,454 16,454 74.00 29,128 24,820 41,274 75.00 0 14,564 55,838 Device Routing Invert Outlet Devices #1 Primary 74.50' 8.0' long x 4.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.38 2.54 2.69 2.68 2.67 2.67 2.65 2.66 2.66 2.68 2.72 2.73 2.76 2.79 2.88 3.07 3.32 Primary OutFlow Max=0.00 cfs @ 5.00 hrs HW=72.00' (Free Discharge) L1=Broad-Crested Rectangular Weir( Controls 0.00 cfs) PinneyExpansion - 1 Yr Rain Event PinneyFillSite TYPE 11 24-HR Rainfall=2.00" Prepared by {enter your company name here} Printed 6/29/2026 HydroCAD® 10.00-26 s/n 01939 ©2020 HydroCAD Software Solutions LLC Page 12 Pond 3P: Attenuation Basin Hydrograph 1.58 cfs —Inflow —Primary Inflow Area=10.322 ac Peak Elev=72.57' Storage=8,402 cf ----1----1---------L---------J - --- o LL 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) PinneyExpansion - 10 Yr Rain Event PinneyFillSite Prepared by {enter your company name here} Printed 6/29/2026 HydroCAD® 10.00-26 s/n 01939 ©2020 HydroCAD Software Solutions LLC Page 1 Area Listing (all nodes) Area CN Description (acres) (subcatchment-numbers) 5.971 30 Brush, Good, HSG A (2S, ESC 1) 5.648 65 Brush, Good, HSG C (2S, ESC 1) 6.630 98 Compacted Fill Site A& C Soils (2S, ESC 1) 1.328 30 Future Fill Site Brush, Good, HSG A (ESC 1) 0.190 65 Future Fill Site Brush, Good, HSG C (ESC 1) 0.877 98 Paved parking & roofs (2S, ESC 1) 20.643 65 TOTAL AREA PinneyExpansion - 10 Yr Rain Event PinneyFillSite Prepared by {enter your company name here} Printed 6/29/2026 HydroCAD® 10.00-26 s/n 01939 ©2020 HydroCAD Software Solutions LLC Page 2 Soil Listing (all nodes) Area Soil Subcatchment (acres) Group Numbers 7.299 HSG A 2S, ESC 1 0.000 HSG B 5.838 HSG C 2S, ESC 1 0.000 HSG D 7.507 Other 2S, ESC 1 20.643 TOTAL AREA PinneyExpansion - 10 Yr Rain Event PinneyFillSite Prepared by {enter your company name here} Printed 6/29/2026 HydroCAD® 10.00-26 s/n 01939 ©2020 HydroCAD Software Solutions LLC Page 3 Ground Covers (all nodes) HSG-A HSG-B HSG-C HSG-D Other Total Ground Subcatchment (acres) (acres) (acres) (acres) (acres) (acres) Cover Numbers 5.971 0.000 5.648 0.000 0.000 11.619 Brush, Good 2S, ES C1 0.000 0.000 0.000 0.000 6.630 6.630 Compacted Fill Site A& C Soils 2S, ES C1 1.328 0.000 0.190 0.000 0.000 1.518 Future Fill Site Brush, Good ES C1 0.000 0.000 0.000 0.000 0.877 0.877 Paved parking & roofs 2S, ES C1 7.299 0.000 5.838 0.000 7.507 20.643 TOTAL AREA PinneyExpansion - 10 Yr Rain Event PinneyHlSite TYPE 1124-HR Rainfall=3.41" Prepared by {enter your company name here} Printed 6/29/2026 HydroCAD® 10.00-26 s/n 01939 ©2020 HydroCAD Software Solutions LLC Page 4 Time span=5.00-20.00 hrs, dt=0.05 hrs, 301 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment2S: Proposed Runoff Area=449,606 sf 47.78% Impervious Runoff Depth>0.90" Flow Length=932' Tc=26.9 min CN=71 Runoff=8.79 cfs 0.770 of SubcatchmentESC 1: Existing Runoff Area=449,606 sf 24.94% Impervious Runoff Depth>0.35" Flow Length=814' Tc=24.9 min CN=58 Runoff=2.47 cfs 0.303 of Reach DP E: Design Point Summation Existing Inflow=0.00 cfs 0.000 of Outflow=0.00 cfs 0.000 of Reach DP P: Design Point Summation Proposed Inflow=0.00 cfs 0.000 of Outflow=0.00 cfs 0.000 of Pond 1 P: Attenuation Basin Peak Elev=73.92' Storage=13,162 cf Inflow=2.47 cfs 0.303 of Outflow=0.00 cfs 0.000 of Pond 3P: Attenuation Basin Peak Elev=73.72' Storage=33,508 cf Inflow=8.79 cfs 0.770 of Outflow=0.00 cfs 0.000 of Total Runoff Area = 20.643 ac Runoff Volume = 1.072 of Average Runoff Depth = 0.62" 63.64% Pervious = 13.136 ac 36.36% Impervious = 7.507 ac PinneyExpansion - 10 Yr Rain Event PinneyFillSite TYPE 11 24-HR Rainfall=3.41" Prepared by {enter your company name here} Printed 6/29/2026 HydroCAD® 10.00-26 s/n 01939 ©2020 HydroCAD Software Solutions LLC Page 5 Summary for Subcatchment 2S: Proposed Subcatchment 1 Runoff = 8.79 cfs @ 12.23 hrs, Volume= 0.770 af, Depth> 0.90" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs TYPE II 24-HR Rainfall=3.41" Area (sf) CN Description 113,251 65 Brush, Good, HSG C 121,512 30 Brush, Good, HSG A 17,128 98 Paved parking & roofs 197,715 98 Compacted Fill Site A & C Soils 449,606 71 Weighted Average 234,763 52.22% Pervious Area 214,843 47.78% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.5 100 0.0100 0.08 Sheet Flow, First 100' Flowpath Grass: Dense n= 0.240 P2= 2.70" 6.4 832 0.0180 2.16 Shallow Concentrated Flow, Balance of Longest Flowpath Unpaved Kv= 16.1 fps 26.9 932 Total Subcatchment 2S: Proposed Subcatchment 1 Hydrograph -- 8.79 cfs —Runoff TYPE 11 24-W R-_ Rainfall=3.411I 7 -I- ------- --- --- Runoff Area=449,60&sf y 6 Runoff IIIVolum =0.770114f w 5 - ----7--- - - --- Ruhoff Depth>G.90' I I LL 4 ------?----,-------- ----r---- - -,I---- --flow Length=932' I I I I I I Tc=26.9 min CN=71 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) PinneyExpansion - 10 Yr Rain Event PinneyFillSite TYPE 11 24-HR Rainfall=3.41" Prepared by {enter your company name here} Printed 6/29/2026 HydroCAD® 10.00-26 s/n 01939 ©2020 HydroCAD Software Solutions LLC Page 6 Summary for Subcatchment ESC 1: Existing Subcatchment 1 Runoff = 2.47 cfs @ 12.26 hrs, Volume= 0.303 af, Depth> 0.35" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs TYPE II 24-HR Rainfall=3.41" Area (sf) CN Description 132,773 65 Brush, Good, HSG C 138,575 30 Brush, Good, HSG A 21,061 98 Paved parking & roofs 91,084 98 Compacted Fill Site A & C Soils 57,845 30 Future Fill Site Brush, Good, HSG A 8,268 65 Future Fill Site Brush, Good, HSG C 449,606 58 Weighted Average 337,461 75.06% Pervious Area 112,145 24.94% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.5 100 0.0100 0.08 Sheet Flow, First 100' Flowpath Grass: Dense n= 0.240 P2= 2.70" 4.4 714 0.0320 2.68 Shallow Concentrated Flow, Balance of Longest Flowpath Grassed Waterway Kv= 15.0 fps 24.9 814 Total Subcatchment ESC 1: Existing Subcatchment 1 Hydrograph 2.47 cfs —Runoff TYP t 11 24-W R Rainfall=3.41 V1 2- -----i---- ----, ----i -i Runoff Area=449,60&sf Runoff'Volume=0.30af g Runoff Depth>0.3'5" U- Flow Length=814' 1 ----- ----r----i----;--------- -- -----r-- --T----F----i--- Tc=24.9 niin CN=$8 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) PinneyExpansion - 10 Yr Rain Event PinneyFillSite TYPE 11 24-HR Rainfall=3.41" Prepared by {enter your company name here} Printed 6/29/2026 HydroCAD® 10.00-26 s/n 01939 ©2020 HydroCAD Software Solutions LLC Page 7 Summary for Reach DP E: Design Point Summation Existing [40] Hint: Not Described (Outflow=Inflow) Inflow Area = 10.322 ac, 24.94% Impervious, Inflow Depth = 0.00" Inflow = 0.00 cfs @ 5.00 hrs, Volume= 0.000 of Outflow = 0.00 cfs @ 5.00 hrs, Volume= 0.000 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Reach DP E: Design Point Summation Existing Hydrograph 1- —Inflow —Outflow Inflow Area=10.322 ac N i w i 3 _o LL 0.00 cfs I, , 0- 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) PinneyExpansion - 10 Yr Rain Event PinneyFillSite TYPE/1 24-HR Rainfall=3.41" Prepared by {enter your company name here} Printed 6/29/2026 HydroCAD® 10.00-26 s/n 01939 ©2020 HydroCAD Software Solutions LLC Page 8 Summary for Reach DP P: Design Point Summation Proposed [40] Hint: Not Described (Outflow=Inflow) Inflow Area = 10.322 ac, 47.78% Impervious, Inflow Depth = 0.00" Inflow = 0.00 cfs @ 5.00 hrs, Volume= 0.000 of Outflow = 0.00 cfs @ 5.00 hrs, Volume= 0.000 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Reach DP P: Design Point Summation Proposed Hydrograph 1 Inflow Outflow Inflow Area=10.322 ac Vl U 3 0 L 0.00 cfs , 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) PinneyExpansion - 10 Yr Rain Event PinneyFillSite TYPE 11 24-HR Rainfall=3.41" Prepared by {enter your company name here} Printed 6/29/2026 HydroCAD® 10.00-26 s/n 01939 ©2020 HydroCAD Software Solutions LLC Page 9 Summary for Pond 1 P: Attenuation Basin Inflow Area = 10.322 ac, 24.94% Impervious, Inflow Depth > 0.35" Inflow = 2.47 cfs @ 12.26 hrs, Volume= 0.303 of Outflow = 0.00 cfs @ 5.00 hrs, Volume= 0.000 af, Atten= 100%, Lag= 0.0 min Primary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 73.92' @ 20.00 hrs Surf.Area= 17,153 sf Storage= 13,162 cf Plug-Flow detention time= (not calculated: initial storage exceeds outflow) Center-of-Mass det. time= (not calculated: no outflow) Volume Invert Avail.Storage Storage Description #1 73.00' 23,317 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 73.00 11,363 0 0 74.00 17,635 14,499 14,499 75.00 0 8,818 23,317 Device Routing Invert Outlet Devices #1 Primary 74.50' 8.0' long x 4.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.38 2.54 2.69 2.68 2.67 2.67 2.65 2.66 2.66 2.68 2.72 2.73 2.76 2.79 2.88 3.07 3.32 Primary OutFlow Max=0.00 cfs @ 5.00 hrs HW=73.00' (Free Discharge) t1=Broad-Crested Rectangular Weir( Controls 0.00 cfs) PinneyExpansion - 10 Yr Rain Event PinneyFillSite TYPE 11 24-HR Rainfall=3.41" Prepared by {enter your company name here} Printed 6/29/2026 HydroCAD® 10.00-26 s/n 01939 ©2020 HydroCAD Software Solutions LLC Page 10 Pond 1 P: Attenuation Basin Hydrograph 2.47 ds —Inflow Primary Inflow Area=10.322 ac 2- Peak Elev=73.92' Storage=13,162 cf N 3 0 LL 0- 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) PinneyExpansion - 10 Yr Rain Event PinneyFillSite TYPE 11 24-HR Rainfall=3.41" Prepared by {enter your company name here} Printed 6/29/2026 HydroCAD® 10.00-26 s/n 01939 ©2020 HydroCAD Software Solutions LLC Page 11 Summary for Pond 3P: Attenuation Basin Inflow Area = 10.322 ac, 47.78% Impervious, Inflow Depth > 0.90" Inflow = 8.79 cfs @ 12.23 hrs, Volume= 0.770 of Outflow = 0.00 cfs @ 5.00 hrs, Volume= 0.000 af, Atten= 100%, Lag= 0.0 min Primary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 73.72' @ 20.00 hrs Surf.Area= 26,733 sf Storage= 33,508 cf Plug-Flow detention time= (not calculated: initial storage exceeds outflow) Center-of-Mass det. time= (not calculated: no outflow) Volume Invert Avail.Storage Storage Description #1 72.00' 55,838 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 72.00 12,395 0 0 73.00 20,512 16,454 16,454 74.00 29,128 24,820 41,274 75.00 0 14,564 55,838 Device Routing Invert Outlet Devices #1 Primary 74.50' 8.0' long x 4.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.38 2.54 2.69 2.68 2.67 2.67 2.65 2.66 2.66 2.68 2.72 2.73 2.76 2.79 2.88 3.07 3.32 Primary OutFlow Max=0.00 cfs @ 5.00 hrs HW=72.00' (Free Discharge) L1=Broad-Crested Rectangular Weir( Controls 0.00 cfs) PinneyExpansion - 10 Yr Rain Event PinneyFillSite TYPE 11 24-HR Rainfall=3.41" Prepared by {enter your company name here} Printed 6/29/2026 HydroCAD® 10.00-26 s/n 01939 ©2020 HydroCAD Software Solutions LLC Page 12 Pond 3P: Attenuation Basin Hydrograph 8.79 cfs —Inflow 9 ---- ---------= --- Primary Y Inflow Area=10.322 ac Peak Elev=73.72' 6 Storage=33,508 cf I I c � I I -- -- -- I I i I I i i I I i I I i I I i I I 1 --- ---- -- -I---- ----r-------- ---- ---- 0.00 cfs 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) PinneyExpansion - 100 Yr Rain Event PinneyFillSite Prepared by {enter your company name here} Printed 6/29/2026 HydroCAD® 10.00-26 s/n 01939 ©2020 HydroCAD Software Solutions LLC Page 1 Area Listing (all nodes) Area CN Description (acres) (subcatchment-numbers) 5.971 30 Brush, Good, HSG A (2S, ESC 1) 5.648 65 Brush, Good, HSG C (2S, ESC 1) 6.630 98 Compacted Fill Site A& C Soils (2S, ESC 1) 1.328 30 Future Fill Site Brush, Good, HSG A (ESC 1) 0.190 65 Future Fill Site Brush, Good, HSG C (ESC 1) 0.877 98 Paved parking & roofs (2S, ESC 1) 20.643 65 TOTAL AREA PinneyExpansion - 100 Yr Rain Event PinneyFillSite Prepared by {enter your company name here} Printed 6/29/2026 HydroCAD® 10.00-26 s/n 01939 ©2020 HydroCAD Software Solutions LLC Page 2 Ground Covers (all nodes) HSG-A HSG-B HSG-C HSG-D Other Total Ground Subcatchment (acres) (acres) (acres) (acres) (acres) (acres) Cover Numbers 5.971 0.000 5.648 0.000 0.000 11.619 Brush, Good 2S, ES C1 0.000 0.000 0.000 0.000 6.630 6.630 Compacted Fill Site A& C Soils 2S, ES C1 1.328 0.000 0.190 0.000 0.000 1.518 Future Fill Site Brush, Good ES C1 0.000 0.000 0.000 0.000 0.877 0.877 Paved parking & roofs 2S, ES C1 7.299 0.000 5.838 0.000 7.507 20.643 TOTAL AREA PinneyExpansion - 100 Yr Rain Event PinneyHlSite TYPE 1124-HR Rainfall=5.85" Prepared by {enter your company name here} Printed 6/29/2026 HydroCAD® 10.00-26 s/n 01939 ©2020 HydroCAD Software Solutions LLC Page 3 Time span=5.00-20.00 hrs, dt=0.05 hrs, 301 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment2S: Proposed Runoff Area=449,606 sf 47.78% Impervious Runoff Depth>2.53" Flow Length=932' Tc=26.9 min CN=71 Runoff=26.36 cfs 2.177 of SubcatchmentESC 1: Existing Runoff Area=449,606 sf 24.94% Impervious Runoff Depth>1.48" Flow Length=814' Tc=24.9 min CN=58 Runoff=15.19 cfs 1.271 of Reach DP E: Design Point Summation Existing Inflow=6.12 cfs 0.770 of Outflow=6.12 cfs 0.770 of Reach DP P: Design Point Summation Proposed Inflow=5.64 cfs 0.946 of Outflow=5.64 cfs 0.946 of Pond 1 P: Attenuation Basin Peak Elev=74.95' Storage=23,290 cf Inflow=15.19 cfs 1.271 of Outflow=6.12 cfs 0.770 of Pond 3P: Attenuation Basin Peak Elev=74.92' Storage=55,753 cf Inflow=26.36 cfs 2.177 of Outflow=5.64 cfs 0.946 of Total Runoff Area = 20.643 ac Runoff Volume = 3.448 of Average Runoff Depth = 2.00" 63.64% Pervious = 13.136 ac 36.36% Impervious = 7.507 ac PinneyExpansion - 100 Yr Rain Event PinneyFillSite TYPE 11 24-HR Rainfall=5.85" Prepared by {enter your company name here} Printed 6/29/2026 HydroCAD® 10.00-26 s/n 01939 ©2020 HydroCAD Software Solutions LLC Page 4 Summary for Subcatchment 2S: Proposed Subcatchment 1 Runoff = 26.36 cfs @ 12.21 hrs, Volume= 2.177 af, Depth> 2.53" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs TYPE II 24-HR Rainfall=5.85" Area (sf) CN Description 113,251 65 Brush, Good, HSG C 121,512 30 Brush, Good, HSG A 17,128 98 Paved parking & roofs 197,715 98 Compacted Fill Site A & C Soils 449,606 71 Weighted Average 234,763 52.22% Pervious Area 214,843 47.78% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.5 100 0.0100 0.08 Sheet Flow, First 100' Flowpath Grass: Dense n= 0.240 P2= 2.70" 6.4 832 0.0180 2.16 Shallow Concentrated Flow, Balance of Longest Flowpath Unpaved Kv= 16.1 fps 26.9 932 Total Subcatchment 2S: Proposed Subcatchment 1 Hydrograph 28 26.36 cfs —Runoff I I I I I I I 24 -------------i----'I -- _ _ TYPE II 24-HR I I I � I I I 22 Rainfall=5.8'15' I 20- --t------------------I Runoff Area=449,6061sf ^w 1 N 16 - - - - - - - - - - - - -------- ---------- - Runoff Vo-l-p- llrne=2.177'-af -------- ---- I I I I I I I I I I _a 14----------- ----+----I---- ----+---- - --------Runoff Depth>2,53"-- LL I I I I 12 , - - - - ;- - - Flow Length=932' 10 - - - - - - - --------- ' ---- -- -I-----II---- I --- I I I I I I I Tc=26.9 min s ------------- ---------I---- ------ -I---- L ---L--- I I I I _ __ _C-R- 1- I I I I - I 4- -- -i- - - - r - - - -- - - - - II — r - 2 ------------------ --- -------------11---------'i---- 0 5 6 7 8 9 10 11 12 13 14 1s 16 17 18 19 20 Time (hours) PinneyExpansion - 100 Yr Rain Event PinneyFillSite TYPE 11 24-HR Rainfall=5.85" Prepared by {enter your company name here} Printed 6/29/2026 HydroCAD® 10.00-26 s/n 01939 ©2020 HydroCAD Software Solutions LLC Page 5 Summary for Subcatchment ESC 1: Existing Subcatchment 1 Runoff = 15.19 cfs @ 12.21 hrs, Volume= 1.271 af, Depth> 1.48" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs TYPE II 24-HR Rainfall=5.85" Area (sf) CN Description 132,773 65 Brush, Good, HSG C 138,575 30 Brush, Good, HSG A 21,061 98 Paved parking & roofs 91,084 98 Compacted Fill Site A & C Soils 57,845 30 Future Fill Site Brush, Good, HSG A 8,268 65 Future Fill Site Brush, Good, HSG C 449,606 58 Weighted Average 337,461 75.06% Pervious Area 112,145 24.94% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.5 100 0.0100 0.08 Sheet Flow, First 100' Flowpath Grass: Dense n= 0.240 P2= 2.70" 4.4 714 0.0320 2.68 Shallow Concentrated Flow, Balance of Longest Flowpath Grassed Waterway Kv= 15.0 fps 24.9 814 Total Subcatchment ESC 1: Existing Subcatchment 1 Hydrograph 17- 16 1 15.19cfs 15= --, - ------------ --- ----- ----+---14 ' � �- ---�---- �----r---T-YPE 11 24-FAR-- Raigfa1l=5-85"-- 12- -------------r---- T---- -------;----r ---- ----r---- 11 --- ----' - ----Ru-noff.A- r-ea=449-,-60-6,sf-- 10 -------------=---------'--- ----' - Runoff Volume -.27 -af- U9 ---- --- ----- -- ---r---- 3 8 - -- I---- i--- - - --- Runof#_Depth>'1t4,8 LL 7 Flow- Leingth=814'- - 6------ --- -+---- -- -I---- ---- --- -- - -- ---- ---- 5 - ---'- - -- ----- ---- ' -----Ic=24.9Mn 4 ---- ----7---- I----T---- -- ----- ----;--------,- Ctql--�58-- 3 - +-------------+--- +--- ---- ----+----------+-- ----+---- 2 ----- - --- -------------------' --- ----'- -- '---------'-----,----'----'----- 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) PinneyExpansion - 100 Yr Rain Event PinneyFillSite TYPE/1 24-HR Rainfall=5.85" Prepared by {enter your company name here} Printed 6/29/2026 HydroCAD® 10.00-26 s/n 01939 ©2020 HydroCAD Software Solutions LLC Page 6 Summary for Reach DP E: Design Point Summation Existing [40] Hint: Not Described (Outflow=Inflow) Inflow Area = 10.322 ac, 24.94% Impervious, Inflow Depth > 0.89" Inflow = 6.12 cfs @ 12.58 hrs, Volume= 0.770 of Outflow = 6.12 cfs @ 12.58 hrs, Volume= 0.770 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Reach DP E: Design Point Summation Existing Hydrograph 6.12 cfs _Inflow 6 Outflow Inflow Area=10.322 ac 5 - ----i-- - ----i-- -i---- 4 --li - -------- ----i---- ----------------------- N O i i i � �----- 2 ------------------------' ---------'-- - '--- ----------- ' ---------'---- - ---- 1 _ --' -------------!----'-- -=- i----'-----'--------- 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) PinneyExpansion - 100 Yr Rain Event PinneyFillSite TYPE/1 24-HR Rainfall=5.85" Prepared by {enter your company name here} Printed 6/29/2026 HydroCAD® 10.00-26 s/n 01939 ©2020 HydroCAD Software Solutions LLC Page 7 Summary for Reach DP P: Design Point Summation Proposed [40] Hint: Not Described (Outflow=Inflow) Inflow Area = 10.322 ac, 47.78% Impervious, Inflow Depth > 1.10" Inflow = 5.64 cfs @ 12.86 hrs, Volume= 0.946 of Outflow = 5.64 cfs @ 12.86 hrs, Volume= 0.946 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Reach DP P: Design Point Summation Proposed Hydrograph 6 5.64 cfs _Inflow Outflow Inflow Area=10.322 ac 5 - -------- ---- ------' 4 --- ---- -----i----li ---------i--- -- N i II i i II � II II U a3 -i --------- +- --i---- ---- ----------------- 2 - ---- ----,--- ----i -- ---- ----------------- - ---- ---1 - ---------r---r----r----r--- - r----- 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) PinneyExpansion - 100 Yr Rain Event PinneyFillSite TYPE/1 24-HR Rainfall=5.85" Prepared by {enter your company name here} Printed 6/29/2026 HydroCAD® 10.00-26 s/n 01939 ©2020 HydroCAD Software Solutions LLC Page 8 Summary for Pond 1 P: Attenuation Basin Inflow Area = 10.322 ac, 24.94% Impervious, Inflow Depth > 1.48" Inflow = 15.19 cfs @ 12.21 hrs, Volume= 1.271 of Outflow = 6.12 cfs @ 12.58 hrs, Volume= 0.770 af, Atten= 60%, Lag= 22.2 min Primary = 6.12 cfs @ 12.58 hrs, Volume= 0.770 of Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 74.95' @ 12.58 hrs Surf.Area= 961 sf Storage= 23,290 cf Plug-Flow detention time= 152.1 min calculated for 0.770 of(61% of inflow) Center-of-Mass det. time= 67.9 min ( 896.1 - 828.2 ) Volume Invert Avail.Storage Storage Description #1 73.00' 23,317 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 73.00 11,363 0 0 74.00 17,635 14,499 14,499 75.00 0 8,818 23,317 Device Routing Invert Outlet Devices #1 Primary 74.50' 8.0' long x 4.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.38 2.54 2.69 2.68 2.67 2.67 2.65 2.66 2.66 2.68 2.72 2.73 2.76 2.79 2.88 3.07 3.32 Primary OutFlow Max=6.01 cfs @ 12.58 hrs HW=74.94' (Free Discharge) t1=Broad-Crested Rectangular Weir(Weir Controls 6.01 cfs @ 1.71 fps) PinneyExpansion - 100 Yr Rain Event PinneyFillSite TYPE 11 24-HR Rainfall=5.85" Prepared by {enter your company name here} Printed 6/29/2026 HydroCAD® 10.00-26 s/n 01939 ©2020 HydroCAD Software Solutions LLC Page 9 Pond 1 P: Attenuation Basin Hydrograph 17- 16 - I 1519cs ,- - - - -,- - - - -�- - - - - - - - —Inow 15- - - - - - - - - - - ---1 - - - - Prima ry Inflow-Are'a=10.322 ac-- I I I I I I I I -------------' ----'-13 --- ----'I----II -------I, ReakElev=14.95�-- 12 - - - - - - - - - - - - r -- .----7---- ----I ---r----:----r----r----I--- , --- - I I I I 11 � --II --- Storage=�23,2aO icf- 10 - - - - - - - - - - - - - - - - - - --- - - - - --- ----,--------- -------- ---- V9 - - - -I- - - - - - - - - r - - - - - - - - - - - - - - ---I - - - - - --- G8-- I. - - - - - - - - - - - - -IL - LL • : I : I i I I I I 6 --- - I 5 - - - - - - - - - - - - - - - - - - - - - - - - - - - --- -- ---- ----'---- -------------i---- _ I I I 3 - -- - --- -------- -- -----i- I 2 ---'---- -- ----'---- --------------I---- I 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) PinneyExpansion - 100 Yr Rain Event PinneyFillSite TYPE/1 24-HR Rainfall=5.85" Prepared by {enter your company name here} Printed 6/29/2026 HydroCAD® 10.00-26 s/n 01939 ©2020 HydroCAD Software Solutions LLC Page 10 Summary for Pond 3P: Attenuation Basin Inflow Area = 10.322 ac, 47.78% Impervious, Inflow Depth > 2.53" Inflow = 26.36 cfs @ 12.21 hrs, Volume= 2.177 of Outflow = 5.64 cfs @ 12.86 hrs, Volume= 0.946 af, Atten= 79%, Lag= 38.8 min Primary = 5.64 cfs @ 12.86 hrs, Volume= 0.946 of Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 74.92' @ 12.86 hrs Surf.Area= 2,225 sf Storage= 55,753 cf Plug-Flow detention time= 190.9 min calculated for 0.946 of(43% of inflow) Center-of-Mass det. time= 107.5 min ( 914.3 - 806.8 ) Volume Invert Avail.Storage Storage Description #1 72.00' 55,838 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 72.00 12,395 0 0 73.00 20,512 16,454 16,454 74.00 29,128 24,820 41,274 75.00 0 14,564 55,838 Device Routing Invert Outlet Devices #1 Primary 74.50' 8.0' long x 4.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.38 2.54 2.69 2.68 2.67 2.67 2.65 2.66 2.66 2.68 2.72 2.73 2.76 2.79 2.88 3.07 3.32 Primary OutFlow Max=5.55 cfs @ 12.86 hrs HW=74.92' (Free Discharge) L1=Broad-Crested Rectangular Weir(Weir Controls 5.55 cfs @ 1.65 fps) PinneyExpansion - 100 Yr Rain Event PinneyFillSite TYPE 11 24-HR Rainfall=5.85" Prepared by {enter your company name here} Printed 6/29/2026 HydroCAD® 10.00-26 s/n 01939 ©2020 HydroCAD Software Solutions LLC Page 11 Pond 3P: Attenuation Basin Hydrograph 28 ; I -- - - r - - - -- - - - - - - - - 7 - I- - - - —Inflow 26.36 cfs 26 - - - - -I --- - ----I- —Primary i I I I I I 24 --------1 ---------i---------'I Inflow Arela--1-0.322ac I I I I I I 22 ----I---- ;- ---III -- ---- Peak Elev=74.92'-- _ I I I I I I I I I Stora a=63-7'53 cf- I I I I 18- -------�---- -- r. I I I I I I I I I I I I I I w 16 --------1----L--------1---------I ___1____L____I_ L____L____I_ V I I I I I I I I I I I --{----_ ---- - - ° I I I I I I I I I LL 12 - - - - - - - - - - - - - r ---I ----r--- -- - - ----r--------r----r-------- r---- I I I I I I I I I I 10 ____ ____ ____I____ ___ _ I I I I I I I I I I I I 8 ----1----1----L--- 1--- ----L - J 1 I I I I I I I I I I I I 5.64 cfs I 6 - - - - - - - - - - --- ----- +----L-- --+--------+---- --------+---- I I I I I I I I I I 2 - - - ------- --- --- --- ----- ---I- ----' ---'- --I -- - I I 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) APPENDIX 3 SOILS DATA 121Page USDA United States A product of the National Custom Soil Resource Department of Cooperative Soil Survey, Agriculture a joint effort of the United Report for States Department of ~N RCS Agriculture and other Tompkins Federal agencies, State Natural agencies including the Resources Agricultural Experiment County, New Conservation Stations, and local Service participants York Pinney Duplex Apartments - y .• a ;firs '�, f�, . : .;�. Vet wA _ '�-� - - Y!�� R r. - .• :'S i9 0 6 000 May 11, 2016 Preface Soil surveys contain information that affects land use planning in survey areas. They highlight soil limitations that affect various land uses and provide information about the properties of the soils in the survey areas. Soil surveys are designed for many different users, including farmers, ranchers, foresters, agronomists, urban planners, community officials, engineers, developers, builders, and home buyers. Also, conservationists, teachers, students, and specialists in recreation, waste disposal, and pollution control can use the surveys to help them understand,protect,or enhance the environment. Various land use regulations of Federal, State, and local governments may impose special restrictions on land use or land treatment. Soil surveys identify soil properties that are used in making various land use or land treatment decisions.The information is intended to help the land users identify and reduce the effects of soil limitations on various land uses.The landowner or user is responsible for identifying and complying with existing laws and regulations. Although soil survey information can be used for general farm, local, and wider area planning,onsite investigation is needed to supplement this information in some cases. Examples include soil quality assessments (http://www.nres.usda.gov/wps/portal/ nres/main/soils/health/)and certain conservation and engineering applications. For more detailed information, contact your local USDA Service Center(http:// offices.sc.egov.usda.gov/locator/app?agency=nres)or your NRCS State Soil Scientist(http://www.nres.usda.gov/wps/portal/nres/detail/soils/contactus/? cid=nres142p2_053951). Great differences in soil properties can occur within short distances. Some soils are seasonally wet or subject to flooding. Some are too unstable to be used as a foundation for buildings or roads.Clayey or wet soils are poorly suited to use as septic tank absorption fields. A high water table makes a soil poorly suited to basements or underground installations. The National Cooperative Soil Survey is a joint effort of the United States Department of Agriculture and other Federal agencies, State agencies including the Agricultural Experiment Stations, and local agencies. The Natural Resources Conservation Service (NRCS) has leadership for the Federal part of the National Cooperative Soil Survey. Information about soils is updated periodically. Updated information is available through the NRCS Web Soil Survey, the site for official soil survey information. The U.S. Department of Agriculture(USDA)prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation,genetic information, political beliefs, reprisal, or because all or a part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.) Persons with disabilities who require alternative means 2 for communication of program information (Braille, large print, audiotape, etc.)should contact USDA's TARGET Center at(202) 720-2600 (voice and TDD). To file a complaint of discrimination, write to USDA, Director, Office of Civil Rights, 1400 Independence Avenue, S.W., Washington, D.C. 20250-9410 or call (800) 795-3272 (voice)or(202) 720-6382 (TDD). USDA is an equal opportunity provider and employer. 3 Contents Preface....................................................................................................................2 How Soil Surveys Are Made..................................................................................5 SoilMap..................................................................................................................7 SoilMap................................................................................................................8 Legend..................................................................................................................9 MapUnit Legend................................................................................................10 MapUnit Descriptions........................................................................................10 Tompkins County, New York..........................................................................12 BgC—Bath and Valois soils, 5 to 15 percent slopes...................................12 CfB—Conesus gravelly silt loam, 3 to 8 percent slopes..............................14 KnA—Kendaia and Lyons soils, 0 to 3 percent slopes................................16 Ly—Lyons soils, 0 to 3 percent slopes........................................................19 PaC—Palmyra gravelly loam, 5 to 15 percent simple slopes......................21 PhB—Phelps gravelly silt loam, 3 to 8 percent slopes................................22 References............................................................................................................24 4 How Soil Surveys Are Made Soil surveys are made to provide information about the soils and miscellaneous areas in a specific area.They include a description of the soils and miscellaneous areas and their location on the landscape and tables that show soil properties and limitations affecting various uses. Soil scientists observed the steepness, length, and shape of the slopes; the general pattern of drainage; the kinds of crops and native plants; and the kinds of bedrock.They observed and described many soil profiles.A soil profile is the sequence of natural layers, or horizons, in a soil. The profile extends from the surface down into the unconsolidated material in which the soil formed or from the surface down to bedrock. The unconsolidated material is devoid of roots and other living organisms and has not been changed by other biological activity. Currently,soils are mapped according to the boundaries of major land resource areas (MLRAs). MLRAs are geographically associated land resource units that share common characteristics related to physiography, geology, climate, water resources, soils, biological resources, and land uses (USDA, 2006). Soil survey areas typically consist of parts of one or more MLRA. The soils and miscellaneous areas in a survey area occur in an orderly pattern that is related to the geology, landforms, relief, climate, and natural vegetation of the area. Each kind of soil and miscellaneous area is associated with a particular kind of landform or with a segment of the landform. By observing the soils and miscellaneous areas in the survey area and relating their position to specific segments of the landform,a soil scientist develops a concept,or model,of how they were formed.Thus, during mapping, this model enables the soil scientist to predict with a considerable degree of accuracy the kind of soil or miscellaneous area at a specific location on the landscape. Commonly, individual soils on the landscape merge into one another as their characteristics gradually change. To construct an accurate soil map, however, soil scientists must determine the boundaries between the soils. They can observe only a limited number of soil profiles. Nevertheless, these observations, supplemented by an understanding of the soil-vegetation-landscape relationship, are sufficient to verify predictions of the kinds of soil in an area and to determine the boundaries. Soil scientists recorded the characteristics of the soil profiles that they studied. They noted soil color, texture, size and shape of soil aggregates, kind and amount of rock fragments, distribution of plant roots, reaction, and other features that enable them to identify soils. After describing the soils in the survey area and determining their properties, the soil scientists assigned the soils to taxonomic classes (units). Taxonomic classes are concepts. Each taxonomic class has a set of soil characteristics with precisely defined limits. The classes are used as a basis for comparison to classify soils systematically. Soil taxonomy, the system of taxonomic classification used in the United States, is based mainly on the kind and character of soil properties and the arrangement of horizons within the profile. After the soil scientists classified and named the soils in the survey area, they compared the 5 Custom Soil Resource Report individual soils with similar soils in the same taxonomic class in other areas so that they could confirm data and assemble additional data based on experience and research. The objective of soil mapping is not to delineate pure map unit components; the objective is to separate the landscape into landforms or landform segments that have similar use and management requirements. Each map unit is defined by a unique combination of soil components and/or miscellaneous areas in predictable proportions. Some components may be highly contrasting to the other components of the map unit. The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The delineation of such landforms and landform segments on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, onsite investigation is needed to define and locate the soils and miscellaneous areas. Soil scientists make many field observations in the process of producing a soil map. The frequency of observation is dependent upon several factors, including scale of mapping, intensity of mapping, design of map units, complexity of the landscape, and experience of the soil scientist. Observations are made to test and refine the soil- landscape model and predictions and to verify the classification of the soils at specific locations. Once the soil-landscape model is refined, a significantly smaller number of measurements of individual soil properties are made and recorded. These measurements may include field measurements, such as those for color, depth to bedrock, and texture, and laboratory measurements, such as those for content of sand, silt, clay, salt, and other components. Properties of each soil typically vary from one point to another across the landscape. Observations for map unit components are aggregated to develop ranges of characteristics for the components. The aggregated values are presented. Direct measurements do not exist for every property presented for every map unit component. Values for some properties are estimated from combinations of other properties. While a soil survey is in progress, samples of some of the soils in the area generally are collected for laboratory analyses and for engineering tests. Soil scientists interpret the data from these analyses and tests as well as the field-observed characteristics and the soil properties to determine the expected behavior of the soils under different uses. Interpretations for all of the soils are field tested through observation of the soils in different uses and under different levels of management. Some interpretations are modified to fit local conditions, and some new interpretations are developed to meet local needs. Data are assembled from other sources, such as research information, production records, and field experience of specialists. For example, data on crop yields under defined levels of management are assembled from farm records and from field or plot experiments on the same kinds of soil. Predictions about soil behavior are based not only on soil properties but also on such variables as climate and biological activity. Soil conditions are predictable over long periods of time, but they are not predictable from year to year. For example, soil scientists can predict with a fairly high degree of accuracy that a given soil will have a high water table within certain depths in most years, but they cannot predict that a high water table will always be at a specific level in the soil on a specific date. After soil scientists located and identified the significant natural bodies of soil in the survey area, they drew the boundaries of these bodies on aerial photographs and identified each as a specific map unit.Aerial photographs show trees, buildings,fields, roads, and rivers, all of which help in locating boundaries accurately. 6 Soil Map The soil map section includes the soil map for the defined area of interest, a list of soil map units on the map and extent of each map unit, and cartographic symbols displayed on the map. Also presented are various metadata about data used to produce the map, and a description of each soil map unit. 7 Custom Soil Resource Report Soil Map F F N N ip iD n n 380060 380120 380180 380240 380300 380360 380420 380480 380540 380600 380660 42°32'33"N 42°32'33"N All ry i ••���� � � 'sir '.,-.q�.,�, •._ w y4� - 1 O O O W o— a n 9 42'32'20"N ,.e..J-�._.,..I _r 1.�_ _ R^�` '.l..i�r .n .�.'-•. -Y. �. 42'32'20"N 380060 380120 380180 380240 380300 380360 380420 380480 380540 380600 380660 3 3 5, Map Scale:1:2,910 if printed on A landscape(11"x 8.5")sheet. F Meters N N 0 40 80 160 240 I 0 100 200 400 600— Map projection:Web Mercator Comer coordinates:WGS84 Edge tics:UTM Zone 18N WGS84 8 Custom Soil Resource Report MAP LEGEND MAP INFORMATION Area of Interest(AOI) _. Spoil Area The soil surveys that comprise your AOI were mapped at 1:20,000. Area of Interest(AOI) Stony Spot Soils Very Stony Spot Warning:Soil Map may not be valid at this scale. 0 Soil Map Unit Polygons Wet Spot Enlargement of maps beyond the scale of mapping can cause s, soil Map unit Lines Other misunderstanding of the detail of mapping and accuracy of soil line O Soil Map Unit Points placement.The maps do not show the small areas of contrasting .� Special Line Features soils that could have been shown at a more detailed scale. Special Point Features (* Blowout Water Features Streams and Canals Please rely on the bar scale on each map sheet for map Borrow Pit measurements. Transportation Clay Spot a-r+ Rails Source of Map: Natural Resources Conservation Service 0 Closed Depression N Interstate Highways Web Soil Survey URL: http://websoilsurvey.nres.usda.gov Gravel Pit US Routes Coordinate System: Web Mercator(EPSG:3857) Gravelly Spot Major Roads Maps from the Web Soil Survey are based on the Web Mercator O Landfill Local Roads projection,which preserves direction and shape but distorts distance and area.A projection that preserves area,such as the A Lava Flow Background Albers equal-area conic projection,should be used if more accurate Marsh or swamp Aerial Photography calculations of distance or area are required. Mine or Quarry This product is generated from the USDA-NRCS certified data as of O Miscellaneous Water the version date(s)listed below. O Perennial Water Soil Survey Area: Tompkins County,New York V Rock Outcrop Survey Area Data: Version 10,Sep 24,2015 Saline Spot Soil map units are labeled(as space allows)for map scales 1:50,000 Sandy Spot or larger. 40 Severely Eroded Spot Date(s)aerial images were photographed: Jun 2,2010—Oct 8, 0 Sinkhole 2010 Slide or Slip The orthophoto or other base map on which the soil lines were Sodic Spot compiled and digitized probably differs from the background imagery displayed on these maps.As a result,some minor shifting of map tinit boundaries may be evident. Custom Soil Resource Report Map Unit Legend Tompkins County,New York(NY109) Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI BgC Bath and Valois soils,5 to 15 1.6 4.8% percent slopes CfB Conesus gravelly silt loam,3 to 8 11.2 33.0% percent slopes KnA Kendaia and Lyons soils,0 to 3 12.6 37.2% percent slopes Ly Lyons soils,0 to 3 percent slopes 0.1 0.4% PaC Palmyra gravelly loam,5 to 15 6.8 20.0% percent simple slopes PhB Phelps gravelly silt loam,3 to 8 1.6 4.6% percent slopes Totals for Area of Interest 33.9 100.0% Map Unit Descriptions The map units delineated on the detailed soil maps in a soil survey represent the soils or miscellaneous areas in the survey area. The map unit descriptions, along with the maps, can be used to determine the composition and properties of a unit. A map unit delineation on a soil map represents an area dominated by one or more major kinds of soil or miscellaneous areas. A map unit is identified and named according to the taxonomic classification of the dominant soils. Within a taxonomic class there are precisely defined limits for the properties of the soils.On the landscape, however,the soils are natural phenomena,and they have the characteristic variability of all natural phenomena. Thus, the range of some observed properties may extend beyond the limits defined for a taxonomic class. Areas of soils of a single taxonomic class rarely, if ever, can be mapped without including areas of other taxonomic classes. Consequently,every map unit is made up of the soils or miscellaneous areas for which it is named and some minor components that belong to taxonomic classes other than those of the major soils. Most minor soils have properties similar to those of the dominant soil or soils in the map unit, and thus they do not affect use and management. These are called noncontrasting, or similar, components. They may or may not be mentioned in a particular map unit description. Other minor components, however, have properties and behavioral characteristics divergent enough to affect use or to require different management.These are called contrasting,or dissimilar,components.They generally are in small areas and could not be mapped separately because of the scale used. Some small areas of strongly contrasting soils or miscellaneous areas are identified by a special symbol on the maps. If included in the database for a given area, the contrasting minor components are identified in the map unit descriptions along with some characteristics of each. A few areas of minor components may not have been observed, and consequently they are not mentioned in the descriptions, especially 10 Custom Soil Resource Report where the pattern was so complex that it was impractical to make enough observations to identify all the soils and miscellaneous areas on the landscape. The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The objective of mapping is not to delineate pure taxonomic classes but rather to separate the landscape into landforms or landform segments that have similar use and management requirements. The delineation of such segments on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, however, onsite investigation is needed to define and locate the soils and miscellaneous areas. An identifying symbol precedes the map unit name in the map unit descriptions. Each description includes general facts about the unit and gives important soil properties and qualities. Soils that have profiles that are almost alike make up a soil series. Except for differences in texture of the surface layer, all the soils of a series have major horizons that are similar in composition, thickness, and arrangement. Soils of one series can differ in texture of the surface layer, slope, stoniness, salinity, degree of erosion, and other characteristics that affect their use. On the basis of such differences, a soil series is divided into soil phases. Most of the areas shown on the detailed soil maps are phases of soil series. The name of a soil phase commonly indicates a feature that affects use or management. For example, Alpha silt loam, 0 to 2 percent slopes, is a phase of the Alpha series. Some map units are made up of two or more major soils or miscellaneous areas. These map units are complexes, associations, or undifferentiated groups. A complex consists of two or more soils or miscellaneous areas in such an intricate pattern or in such small areas that they cannot be shown separately on the maps.The pattern and proportion of the soils or miscellaneous areas are somewhat similar in all areas. Alpha-Beta complex, 0 to 6 percent slopes, is an example. An association is made up of two or more geographically associated soils or miscellaneous areas that are shown as one unit on the maps. Because of present or anticipated uses of the map units in the survey area, it was not considered practical or necessary to map the soils or miscellaneous areas separately. The pattern and relative proportion of the soils or miscellaneous areas are somewhat similar. Alpha- Beta association, 0 to 2 percent slopes, is an example. An undifferentiated group is made up of two or more soils or miscellaneous areas that could be mapped individually but are mapped as one unit because similar interpretations can be made for use and management. The pattern and proportion of the soils or miscellaneous areas in a mapped area are not uniform. An area can be made up of only one of the major soils or miscellaneous areas, or it can be made up of all of them. Alpha and Beta soils, 0 to 2 percent slopes, is an example. Some surveys include miscellaneous areas. Such areas have little or no soil material and support little or no vegetation. Rock outcrop is an example. 11 Custom Soil Resource Report Tompkins County, New York BgC—Bath and Valois soils, 5 to 15 percent slopes Map Unit Setting National map unit symbol: 2v32c Elevation: 330 to 2,460 feet Mean annual precipitation: 31 to 70 inches Mean annual air temperature: 39 to 52 degrees F Frost-free period: 105 to 180 days Farmland classification: Farmland of statewide importance Map Unit Composition Bath and similar soils: 40 percent Valois and similar soils: 35 percent Minor components: 25 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Bath Setting Landform: Hills, mountains Landform position (two-dimensional): Backslope, shoulder, summit Landform position (three-dimensional): Interfluve, side slope Down-slope shape: Concave Across-slope shape: Linear Parent material: Loamy till derived mainly from gray and brown siltstone,sandstone, and shale Typical profile Ap - 0 to 9 inches: channery silt loam Bw1 - 9 to 15 inches: channery silt loam Bw2- 15 to 25 inches: channery loam E-25 to 29 inches: channery loam Bx-29 to 52 inches: very channery silt loam C-52 to 72 inches: very channery silt loam Properties and qualities Slope: 5 to 15 percent Percent of area covered with surface fragments: 0.0 percent Depth to restrictive feature: 26 to 38 inches to fragipan Natural drainage class: Well drained Capacity of the most limiting layer to transmit water(Ksat): Very low to moderately low (0.00 to 0.14 in/hr) Depth to water table: About 24 to 36 inches Frequency of flooding: None Frequency of ponding: None Calcium carbonate, maximum in profile: 15 percent Available water storage in profile: Low(about 4.5 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 3e Hydrologic Soil Group: C 12 Custom Soil Resource Report Description of Valois Setting Landform: End moraines, lateral moraines, valley sides Landform position (two-dimensional): Shoulder Landform position (three-dimensional): Crest Down-slope shape: Convex Across-slope shape: Convex Parent material: Loamy till derived mainly from sandstone, siltstone, and shale Typical profile H1 -0 to 2 inches: gravelly silt loam H2-2 to 32 inches: gravelly silt loam H3- 32 to 49 inches: gravelly silt loam H4-49 to 60 inches: gravelly silt loam Properties and qualities Slope: 5 to 15 percent Depth to restrictive feature: 24 to 36 inches to fragipan Natural drainage class: Well drained Capacity of the most limiting layer to transmit water(Ksat): Moderately low to moderately high (0.06 to 0.20 in/hr) Depth to water table: About 24 to 35 inches Frequency of flooding: None Frequency of ponding: None Available water storage in profile: Low(about 4.2 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 3e Hydrologic Soil Group: C Minor Components Lordstown Percent of map unit: 5 percent Landform: Benches, ridges, hills Landform position (two-dimensional): Backslope Landform position (three-dimensional): Side slope Down-slope shape: Convex Across-slope shape: Convex Langford Percent of map unit: 5 percent Landform: Hills, till plains, drumlinoid ridges Landform position (two-dimensional): Shoulder Landform position (three-dimensional): Crest Down-slope shape: Convex Across-slope shape: Convex Volusia Percent of map unit: 5 percent Landform: Hills, mountains Landform position (two-dimensional): Footslope, summit Landform position (three-dimensional): Base slope, interfluve, side slope Down-slope shape: Concave Across-slope shape: Linear 13 Custom Soil Resource Report Mardin Percent of map unit: 5 percent Landform: Hills, mountains Landform position (two-dimensional): Summit, shoulder Landform position (three-dimensional): Interfluve, side slope Down-slope shape: Convex Across-slope shape: Convex Erie Percent of map unit: 5 percent Landform: Hills, till plains, drumlinoid ridges Landform position (two-dimensional): Footslope, summit Landform position (three-dimensional): Base slope, side slope Down-slope shape: Concave Across-slope shape: Linear U13—Conesus gravelly silt loam, 3 to 8 percent slopes Map Unit Setting National map unit symbol: 2w3j3 Elevation: 820 to 1,800 feet Mean annual precipitation: 31 to 57 inches Mean annual air temperature: 41 to 50 degrees F Frost-free period: 100 to 190 days Farmland classification: All areas are prime farmland Map Unit Composition Conesus and similar soils: 85 percent Minor components: 15 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Conesus Setting Landform: Drumlins, hills, till plains Landform position (two-dimensional): Summit, shoulder Landform position (three-dimensional): Crest Down-slope shape: Linear Across-slope shape: Convex Parent material: Calcareous loamy lodgment till derived from limestone, sandstone, and shale Typical profile Ap - 0 to 9 inches: gravelly silt loam E/B-9 to 14 inches: gravelly silt loam WE- 14 to 19 inches: gravelly silt loam Bt1 - 19 to 25 inches: gravelly silt loam Bt2-25 to 36 inches: gravelly silt loam C-36 to 79 inches: gravelly loam 14 Custom Soil Resource Report Properties and qualities Slope: 3 to 8 percent Depth to restrictive feature: More than 80 inches Natural drainage class: Moderately well drained Runoff class: Medium Capacity of the most limiting layer to transmit water(Ksat): Moderately low to moderately high (0.01 to 1.42 in/hr) Depth to water table: About 18 to 24 inches Frequency of flooding: None Frequency of ponding: None Calcium carbonate, maximum in profile: 40 percent Available water storage in profile: Moderate (about 7.5 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 2w Hydrologic Soil Group: B/D Minor Components Lansing Percent of map unit: 7 percent Landform: Drumlins, hills, till plains Landform position (two-dimensional): Summit, shoulder, backslope Landform position (three-dimensional): Crest, side slope Down-slope shape: Convex Across-slope shape: Convex Kendaia Percent of map unit: 3 percent Landform: Drumlins, till plains Landform position (two-dimensional): Footslope Landform position (three-dimensional): Base slope Down-slope shape: Concave Across-slope shape: Linear Nunda Percent of map unit: 2 percent Landform: Hills, drumlinoid ridges Landform position (two-dimensional): Summit Landform position (three-dimensional): Crest Down-slope shape: Concave Across-slope shape: Convex Appleton Percent of map unit: 2 percent Landform: Drumlins, till plains Landform position (two-dimensional): Footslope Landform position (three-dimensional): Base slope Down-slope shape: Concave Across-slope shape: Linear Lyons Percent of map unit: 1 percent Landform: Depressions, drainageways Landform position (two-dimensional): Toeslope Landform position (three-dimensional): Base slope 15 Custom Soil Resource Report Down-slope shape: Concave Across-slope shape: Concave KnA—Kendaia and Lyons soils, 0 to 3 percent slopes Map Unit Setting National map unit symbol: 2trwv Elevation: 430 to 1,510 feet Mean annual precipitation: 31 to 57 inches Mean annual air temperature: 41 to 50 degrees F Frost-free period: 100 to 190 days Farmland classification: Prime farmland if drained Map Unit Composition Kendaia and similar soils: 50 percent Lyons and similar soils: 25 percent Lyons, frequently ponded, and similar soils: 15 percent Minor components: 10 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Kendaia Setting Landform: Drumlins, ridges, till plains Landform position (two-dimensional): Footslope Landform position (three-dimensional): Base slope Down-slope shape: Concave Across-slope shape: Linear Parent material: Calcareous loamy lodgment till derived from limestone, sandstone, and shale Typical profile Ap - 0 to 8 inches: silt loam Bw- 8 to 15 inches: silt loam Bg- 15 to 20 inches: gravelly silt loam BCg- 20 to 24 inches: gravelly loam C- 24 to 79 inches: gravelly loam Properties and qualities Slope: 0 to 3 percent Depth to restrictive feature: More than 80 inches Natural drainage class: Somewhat poorly drained Runoff class: Very high Capacity of the most limiting layer to transmit water(Ksat): Very low to moderately high (0.00 to 1.42 in/hr) Depth to water table: About 6 to 18 inches Frequency of flooding: None Frequency of ponding: None Calcium carbonate, maximum in profile: 40 percent Available water storage in profile: Moderate (about 7.8 inches) 16 Custom Soil Resource Report Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 3w Hydrologic Soil Group: B/D Description of Lyons Setting Landform: Depressions, drainageways Landform position (two-dimensional): Toeslope Landform position (three-dimensional): Base slope Down-slope shape: Concave Across-slope shape: Concave Parent material: Calcareous loamy lodgment till derived from limestone and shale Typical profile Ap - 0 to 10 inches: silt loam Bg1 - 10 to 19 inches: silt loam Bg2- 19 to 25 inches: silty clay loam BCg- 25 to 34 inches: gravelly silt loam C- 34 to 79 inches: gravelly loam Properties and qualities Slope: 0 to 3 percent Depth to restrictive feature: More than 80 inches Natural drainage class: Poorly drained Runoff class: Negligible Capacity of the most limiting layer to transmit water(Ksat): Very low to moderately high (0.00 to 1.42 in/hr) Depth to water table: About 0 to 6 inches Frequency of flooding: None Frequency of ponding: None Calcium carbonate, maximum in profile: 40 percent Available water storage in profile: Moderate (about 8.9 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 5w Hydrologic Soil Group: C/D Description of Lyons, Frequently Ponded Setting Landform: Depressions, drainageways Landform position (two-dimensional): Toeslope Landform position (three-dimensional): Base slope Down-slope shape: Concave Across-slope shape: Concave Parent material: Calcareous loamy lodgment till derived from limestone and shale Typical profile Ap - 0 to 10 inches: mucky silt loam Bg1 - 10 to 19 inches: silt loam Bg2- 19 to 25 inches: silty clay loam BCg- 25 to 34 inches: gravelly silt loam C-34 to 79 inches: gravelly loam 17 Custom Soil Resource Report Properties and qualities Slope: 0 to 3 percent Depth to restrictive feature: More than 80 inches Natural drainage class: Very poorly drained Runoff class: Negligible Capacity of the most limiting layer to transmit water(Ksat): Very low to moderately high (0.00 to 1.42 in/hr) Depth to water table: About 0 inches Frequency of flooding: None Frequency of ponding: Frequent Calcium carbonate, maximum in profile: 40 percent Available water storage in profile: High (about 9.1 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 5w Hydrologic Soil Group: C/D Minor Components Conesus Percent of map unit: 3 percent Landform: Hills, till plains, drumlinoid ridges Landform position (two-dimensional): Summit Landform position (three-dimensional): Crest Down-slope shape: Concave Across-slope shape: Convex Lima Percent of map unit: 3 percent Landform: Drumlins, till plains Landform position (two-dimensional): Summit Landform position (three-dimensional): Crest Down-slope shape: Concave Across-slope shape: Convex Palms Percent of map unit: 2 percent Landform: Marshes, swamps Landform position (two-dimensional): Toeslope Landform position (three-dimensional): Talf Down-slope shape: Concave Across-slope shape: Concave Ilion Percent of map unit: 2 percent Landform: Depressions Landform position (two-dimensional): Toeslope Landform position (three-dimensional): Base slope Down-slope shape: Concave Across-slope shape: Concave 18 Custom Soil Resource Report Ly—Lyons soils, 0 to 3 percent slopes Map Unit Setting National map unit symbol: 2spjy Elevation: 250 to 1,900 feet Mean annual precipitation: 31 to 57 inches Mean annual air temperature: 41 to 50 degrees F Frost-free period: 100 to 190 days Farmland classification: Not prime farmland Map Unit Composition Lyons and similar soils: 75 percent Lyons, frequently ponded, and similar soils: 15 percent Minor components: 10 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Lyons Setting Landform: Depressions, drainageways Landform position (two-dimensional): Toeslope Landform position (three-dimensional): Base slope Down-slope shape: Concave Across-slope shape: Concave Parent material: Calcareous loamy lodgment till derived from limestone and shale Typical profile Ap - 0 to 10 inches: silt loam Bg1 - 10 to 19 inches: silt loam Bg2- 19 to 25 inches: silty clay loam BCg- 25 to 34 inches: gravelly silt loam C- 34 to 79 inches: gravelly loam Properties and qualities Slope: 0 to 3 percent Depth to restrictive feature: More than 80 inches Natural drainage class: Poorly drained Runoff class: Negligible Capacity of the most limiting layer to transmit water(Ksat): Very low to moderately high (0.00 to 1.42 in/hr) Depth to water table: About 0 to 6 inches Frequency of flooding: None Frequency of ponding: None Calcium carbonate, maximum in profile: 40 percent Available water storage in profile: Moderate (about 8.9 inches) 19 Custom Soil Resource Report Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 5w Hydrologic Soil Group: C/D Description of Lyons, Frequently Ponded Setting Landform: Depressions, drainageways Landform position (two-dimensional): Toeslope Landform position (three-dimensional): Base slope Down-slope shape: Concave Across-slope shape: Concave Parent material: Calcareous loamy lodgment till derived from limestone and shale Typical profile Ap - 0 to 10 inches: mucky silt loam Bg1 - 10 to 19 inches: silt loam Bg2- 19 to 25 inches: silty clay loam BCg- 25 to 34 inches: gravelly silt loam C- 34 to 79 inches: gravelly loam Properties and qualities Slope: 0 to 3 percent Depth to restrictive feature: More than 80 inches Natural drainage class: Very poorly drained Runoff class: Negligible Capacity of the most limiting layer to transmit water(Ksat): Very low to moderately high (0.00 to 1.42 in/hr) Depth to water table: About 0 inches Frequency of flooding: None Frequency of ponding: Frequent Calcium carbonate, maximum in profile: 40 percent Available water storage in profile: High (about 9.1 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 5w Hydrologic Soil Group: C/D Minor Components Canandaigua Percent of map unit: 3 percent Landform: Depressions Landform position (two-dimensional): Toeslope Landform position (three-dimensional): Tread Down-slope shape: Concave Across-slope shape: Concave Appleton Percent of map unit: 3 percent Landform: Drumlins, till plains Landform position (two-dimensional): Footslope Landform position (three-dimensional): Base slope Down-slope shape: Concave Across-slope shape: Linear 20 Custom Soil Resource Report Kendaia Percent of map unit: 2 percent Landform: Drumlins, till plains Landform position (two-dimensional): Footslope Landform position (three-dimensional): Base slope Down-slope shape: Concave Across-slope shape: Linear Ilion Percent of map unit: 1 percent Landform: Depressions Landform position (two-dimensional): Toeslope Landform position (three-dimensional): Base slope Down-slope shape: Concave Across-slope shape: Concave Palms Percent of map unit: 1 percent Landform: Marshes, swamps Landform position (two-dimensional): Toeslope Landform position (three-dimensional): Talf Down-slope shape: Concave Across-slope shape: Concave PaC—Palmyra gravelly loam, 5 to 15 percent simple slopes Map Unit Setting National map unit symbol: 9xnt Mean annual precipitation: 32 to 42 inches Mean annual air temperature: 45 to 48 degrees F Frost-free period: 120 to 160 days Farmland classification: Farmland of statewide importance Map Unit Composition Palmyra and similar soils: 75 percent Minor components: 25 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Palmyra Setting Landform: Deltas, outwash plains, terraces Landform position (two-dimensional): Shoulder Landform position (three-dimensional): Tread Down-slope shape: Convex Across-slope shape: Convex Parent material: Loamy over sandy and gravelly glaciofluvial deposits, derived mainly from limestone and other sedimentary rocks 21 Custom Soil Resource Report Typical profile H1 - 0 to 12 inches: gravelly loam H2- 12 to 21 inches: gravelly clay loam H3-21 to 60 inches: stratified extremely gravelly sand Properties and qualities Slope: 5 to 15 percent Depth to restrictive feature: More than 80 inches Natural drainage class: Well drained Capacity of the most limiting layer to transmit water(Ksat): Moderately high to high (0.57 to 5.95 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Calcium carbonate, maximum in profile: 10 percent Available water storage in profile: Low(about 3.9 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 3e Hydrologic Soil Group: A Minor Components Fredon Percent of map unit: 5 percent Phelps Percent of map unit: 5 percent Genesee (hamlin) Percent of map unit: 5 percent Howard Percent of map unit: 5 percent Honeoye Percent of map unit: 5 percent PhB—Phelps gravelly silt loam, 3 to 8 percent slopes Map Unit Setting National map unit symbol: 9xny Mean annual precipitation: 32 to 42 inches Mean annual air temperature: 45 to 48 degrees F Frost-free period: 120 to 160 days Farmland classification: All areas are prime farmland Map Unit Composition Phelps and similar soils: 75 percent Minor components: 25 percent Estimates are based on observations, descriptions, and transects of the mapunit. 22 Custom Soil Resource Report Description of Phelps Setting Landform: Terraces, valley trains Landform position (two-dimensional): Summit Landform position (three-dimensional): Tread Down-slope shape: Concave Across-slope shape: Convex Parent material: Loamy glaciofluvial deposits over sandy and gravelly glaciofluvial deposits, containing significant amounts of limestone Typical profile H1 -0 to 9 inches: gravelly silt loam H2- 9 to 15 inches: gravelly loam H3- 15 to 25 inches: silt loam H4-25 to 60 inches: stratified gravelly loam to silt Properties and qualities Slope: 3 to 8 percent Depth to restrictive feature: More than 80 inches Natural drainage class: Moderately well drained Capacity of the most limiting layer to transmit water(Ksat): Moderately high to high (0.57 to 1.98 in/hr) Depth to water table: About 15 to 24 inches Frequency of flooding: None Frequency of ponding: None Calcium carbonate, maximum in profile: 10 percent Available water storage in profile: Low(about 4.7 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 2e Hydrologic Soil Group: B/D Minor Components Howard Percent of map unit: 5 percent Palmyra Percent of map unit: 5 percent Fredon Percent of map unit: 5 percent Arkport Percent of map unit: 5 percent Braceville Percent of map unit: 5 percent 23 References American Association of State Highway and Transportation Officials(AASHTO).2004. Standard specifications for transportation materials and methods of sampling and testing. 24th edition. American Society for Testing and Materials (ASTM). 2005. Standard classification of soils for engineering purposes. ASTM Standard D2487-00. Cowardin, L.M., V. Carter, F.C. Golet, and E.T. LaRoe. 1979. Classification of wetlands and deep-water habitats of the United States. U.S. Fish and Wildlife Service FWS/OBS-79/31. Federal Register. July 13, 1994. Changes in hydric soils of the United States. Federal Register. September 18, 2002. Hydric soils of the United States. Hurt,G.W.,and L.M.Vasilas,editors.Version 6.0,2006. Field indicators of hydric soils in the United States. National Research Council. 1995. Wetlands: Characteristics and boundaries. Soil Survey Division Staff. 1993. Soil survey manual. Soil Conservation Service. U.S. Department of Agriculture Handbook 18. http://www.nres.usda.gov/wps/portal/nres/ d eta il/national/soils/?cid=nres 142p2_054262 Soil Survey Staff. 1999.Soil taxonomy:A basic system of soil classification for making and interpreting soil surveys. 2nd edition. Natural Resources Conservation Service, U.S. Department of Agriculture Handbook 436. http://www.nres.usda.gov/wps/portal/ nres/detail/national/soils/?cid=nres142p2_053577 Soil Survey Staff. 2010. Keys to soil taxonomy. 11th edition. U.S. Department of Agriculture, Natural Resources Conservation Service. http://www.nres.usda.gov/wps/ portal/nres/d eta il/national/soils/?cid=nres142p2_053580 Tiner, R.W., Jr. 1985. Wetlands of Delaware. U.S. Fish and Wildlife Service and Delaware Department of Natural Resources and Environmental Control, Wetlands Section. United States Army Corps of Engineers, Environmental Laboratory. 1987. Corps of Engineers wetlands delineation manual. Waterways Experiment Station Technical Report Y-87-1. United States Department of Agriculture, Natural Resources Conservation Service. National forestry manual. http://www.nres.usda.gov/wps/portal/nres/detail/soils/ home/?cid=nres142p2_053374 United States Department of Agriculture, Natural Resources Conservation Service. National range and pasture handbook. http://www.nres.usda.gov/wps/portal/nres/ detail/national/landuse/rangepasture/?cid=stelprdb1043084 24 Custom Soil Resource Report United States Department of Agriculture, Natural Resources Conservation Service. National soil survey handbook, title 430-VI. http://www.nres.usda.gov/wps/portal/ nres/detail/soils/scientists/?cid=nres142p2_054242 United States Department of Agriculture, Natural Resources Conservation Service. 2006. Land resource regions and major land resource areas of the United States, the Caribbean, and the Pacific Basin. U.S. Department of Agriculture Handbook 296. http://www.nres.usda.gov/wps/portal/nres/detail/national/soils/? cid=nres142p2_053624 United States Department of Agriculture, Soil Conservation Service. 1961. Land capability classification. U.S. Department of Agriculture Handbook 210. http:// www.nrcs.usda.gov/lnternet/FSE—DOCUMENTS/nrcsl42p2_052290.pdf 25 APPENDIX 4 PRECIPITATION DATA 131Page 10/5/2015 Extreme Precipitation Tables:42.541°N,76.457°W Extreme Precipitation Tables Northeast Regional Climate Center Data represents point estimates calculated from partial duration series.All precipitation amounts are displayed in inches. Smoothing Yes State New York Location Longitude 76.457 degrees West Latitude 42.541 degrees North Elevation Unknown/Unavailable Date/Time Mon,05 Oct 2015 10:10:17-0400 Extreme Precipitation Estimates 5min 10min 15min 30min 60min 120min lhr 2hr 3hr 6hr 12hr 24hr 48hr lday 2day 4day 7day 10day lyr 0.28 0.43 0.53 0.70 0.87 1.07 lyr 0.75 0.95 1.21 1.44 1.70 2.00 2.26 lyr 1.77 2.17 2.57 3.10 3.57 lyr 2yr 0.32 0.49 0.62 0.81 1.02 1.26 2yr 0.88 1.12 1.42 1.70 2.00 2.34 2.61 2yr 2.07 2.51 2.95 3.50 4.01 2yr 5yr 0.38 0.59 0.74 0.99 1.26 1.56 5yr 1.09 1.39 1.77 2.12 2.49 2.90 3.23 5yr 2.56 3.11 3.62 4.21 4.81 5yr 10yr 0.42 0.66 0.84 1 1.14 1.48 1.85 10yr 1.28 1.63 2.10 2.51 2.94 3.41 3.80 10yr 3.01 3.66 4.23 1 4.84 1 5.53 10yr 25yr 0.50 0.79 1.00 1.38 1.83 2.30 25yr 1.58 2.02 2.63 3.13 3.67 4.22 4.72 25yr 3.74 4.53 5.21 5.83 6.66 25yr 50yr 0.56 0.90 1.15 1.60 2.15 2.72 50yr 1.86 2.38 3.11 3.71 4.33 4.97 5.55 50yr 4.40 5.34 6.10 6.72 7.66 50yr 100yrtO.6A1.391.82 31 1.86 2.53 3.23 100yr 2.19 2.80 3.69 4.40 5.12 5.85 6.54 100yr 5.18 6.29 7.14 7.74 8.81 100yr 200yr51 2.16 2.98 3.81 200yr 2.58 3.30 4.37 5.20 6.04 6.89 7.70 200yr 6.10 7.41 8.36 8.91 10.15 200yr 1 2.64 3.71 4.76 SOOyr 3.20 4.1015.46 6.50 7.53 8.56 9.57 500yr 7.57 9.20 10.31 10.75 12.22 1500yr Lower Confidence Limits 5min 10min 15min 30min 60min 120min lhr 2hr 3hr 6hr 12hr 24hr 48hr lday 2day 4day 7day 10day lyr 0.25 0.39 0.47 0.64 0.78 0.82 lyr 0.68 0.80 0.94 1.06 1.49 1.86 110 lyr 1.65 2.02 2.43 2.96 3.33 lyr 2yr 0.32 0.49 0.60 0.82 1.01 1.11 2yr 0.87 1.09 1.23 1.52 1.85 2.28 2.55 2yr 2.02 2.45 2.87 3.42 3.93 2yr 5yr 0.36 0.55 0.69 0.94 1.20 1.32 5yr 1.03 1.29 1.44 1.78 2.17 2.71 3.03 5yr 2.40 2.92 3.41 3.98 4.58 5yr 10yr 0.40 1 0.61 0.76 1 1.06 1 1.36 1.50 10yr 11.1811.47 1.63 1.98 2.45 3.0913.441 tOyr 2.74 3.31 13.87 4.471 5.14 10yr 25yr 0.451 0.69 0.86 1.23 1 1.61 1.78 25yr 1.39 1.74 1.92 2.29 2.85 3.66 4.05 25yr 3.24 3.90 -1.57 5.20 6.00 25yr 50yr 0.501 0.76 0.95 1.36 1.83 2.03 50yr 1.58 1.99 2.17 2.56 3.21 4.17 4.59 50yr 3.69 4.41 5.18 5.82 6.75 50yr 100yr 0.55 0.83 1.04 1.51 2.07 2.33 100yr 1.78 2.28 2.46 2.85 3.60 4.74 5.19 100yr 4.19 4.99 5.87 6.54 7.59 100yr 200yr 0.61 0.92 1.17 1.69 2.36 2.66 20Oyr 2.03 2.60 2.80 3.18 4.05 5.39 5.88 200yr 4.77 5.66 0.65 7.32 8.54 200yr 500yr 0.72 1.06 1.37 1.99 2.83 3.20 500yr 2.44 3.13 3.32 3.67 4.72 6.38 6.92 500yr 5.65 6.65 7.85 8.50 9.98 500yr Upper Confidence Limits 5min 10min 15min 30min 60min 120min lhr 2hr 3hr 6hr 12hr 24hr 48hr lday 2day 4day 7day lOday lyr 0.30 0.47 0.57 0.77 0.94 1.03 lyr 0.81 1.01 1.161.44 1.77 2.12 2.38 lyr 1.88 2.29 2.72 3.25 1 3.74 1yr 2yr 0.34 0.52 0.64 0.87 1.07 1.18 2yr 0.92 1.15 1.31 1.62 1.98 2.41 2.71 2yr 2.13 2.60 3.03 3.59 4.11 2yr 5yr 0.40 0.62 0.76 1.05 1.33 1.52 5yr 1.15 1.49 1.68 2.06 2.53 3.09 3.43 5yr 2.73 3.30 3.85 4.44 5.08 5yr 10yr 0.46 0.71 0.88 1.23 1.59 1.86 1 10yr 1.37 1.81 2.04 2.48 3.06 3.73 4.14 1 10yr 3.31 3.98 4.62 5.23 5.97 10yr 25yr 0.57 0.86 1.07 1.53 2.01 2.41 25yr 1.74 2.36 2.63 3.17 3.95 4.81 5.30 25yr 4.25 5.10 5.89 6.49 7.42 25yr 50yr 0.661 1.00 1.25 1.80 2.42 2.93 50yr 2.09 2.87 3.19 3.83 4.79 5.82 6.40 50yr 5.15 6.15 7.10 7.65 8.74 50yr 100yr 0.77 1 1.16 1.46 2.11 2.89 3.57 100yr 2.49 3.49 3.86 4.64 5.80 7.06 7.72 100yr 6.25 7.43 8.56 9.03 10.29 100yr F200yr 0.90 1.35 1.71 2.48 3.46 4.35 200yr 2.98 4.25 4.69 5.60 7.04 8.56 9.34 200yr 7.58 8.98 10.31 10.65 12.13 200yr OOyr 1.11 1.65 2.13 3.09 4.40 5.63 , Oyr 3.79 5.51 6.05 7.181 9.12 11.07 12.00 500yr 9.79 11.54 13.21 13.25 15.07 500yr :::e by ,Cif, Northeast Regional Climate Center http://precip.eas.cornell.edu/data.php?1444054216331 1/1