TESLA Megapack Commissioning Documents
Project Number:
Project Address:
Project Name:
Prepared By:
Date:
Tesla Checklist Forms to be completed and copies attached to this submittal:
❑ Completed SITE INFORMATION Form
❑ Completed SECTION C: CIVIL WORK CHECKLIST AND TORQUE VALUES Form
❑ Completed SECTION E: ELECTRICAL WORK CHECKLIST, ENERGIZATION Form (One form per each Megapack)
❑ Completed SECTION G: ELECTRICAL WORK CHECKLIST, GENERAL Form
❑ Completed SECTION P: SCADA POI CHECKLIST Form
❑ Completed SECTION R: METER CHECKLIST Form
❑ Completed SECTION S: ELECTRICAL WORK CHECKLIST, SITE-LEVEL Form (One form per each Megapack)
❑ Completed SWITCHING SCHEME Form
❑ Completed PHOTO CHECKLIST AND PROJECT DOCUEMNTATION (Include ALL Photos in .JPG Format)
❑ Completed METERS Form
❑ Completed MEGAPACK SERIAL NUMBERS Form (One form per each Megapack)
❑ Completed EARTH CONTINUITY TEST RESULTS Form
❑ Completed CONSTRUCTION MANAGER SIGNATURE PAGE
Deliverables:
❑ ALL Photos listed in the PHOTO CHECKLIST AND PROJECT DOCUMENTATION Form.
❑ Availability, capacity, and RTE test results performed by EPC Contractor
❑ Pad Mount Transformer Photos:
(Include Transformer Label IDs from Construction Set with each photo—Ex.XFR.01 High Side)
❑ High Side Terminations ❑ Low Side Terminations
❑ TESLA On-Line Portal Screen Shots:
❑ Charge Rates During Testing ❑ Discharge Rates During Testing
❑ ALL As-Built documents listed in the PHOTO CHECKLIST AND PROJECT DOCUMENTATION Form.
For Questions, please contact commissioning@nexamp.com