Loading...
HomeMy WebLinkAbout09bTESLA_Commissioning_Document__REV-D ne� -:Amp I-2.6 REV-D S1 TESLA Megapack Commissioning Documents Project Number: Project Address: Project Name: Prepared By: Date: Tesla Checklist Forms to be completed and copies attached to this submittal: ❑ Completed SITE INFORMATION Form ❑ Completed SECTION C: CIVIL WORK CHECKLIST AND TORQUE VALUES Form ❑ Completed SECTION E: ELECTRICAL WORK CHECKLIST, ENERGIZATION Form (One form per each Megapack) ❑ Completed SECTION G: ELECTRICAL WORK CHECKLIST, GENERAL Form ❑ Completed SECTION P: SCADA POI CHECKLIST Form ❑ Completed SECTION R: METER CHECKLIST Form ❑ Completed SECTION S: ELECTRICAL WORK CHECKLIST, SITE-LEVEL Form (One form per each Megapack) ❑ Completed SWITCHING SCHEME Form ❑ Completed PHOTO CHECKLIST AND PROJECT DOCUEMNTATION (Include ALL Photos in .JPG Format) ❑ Completed METERS Form ❑ Completed MEGAPACK SERIAL NUMBERS Form (One form per each Megapack) ❑ Completed EARTH CONTINUITY TEST RESULTS Form ❑ Completed CONSTRUCTION MANAGER SIGNATURE PAGE Deliverables: ❑ ALL Photos listed in the PHOTO CHECKLIST AND PROJECT DOCUMENTATION Form. ❑ Availability, capacity, and RTE test results performed by EPC Contractor ❑ Pad Mount Transformer Photos: (Include Transformer Label IDs from Construction Set with each photo—Ex.XFR.01 High Side) ❑ High Side Terminations ❑ Low Side Terminations ❑ TESLA On-Line Portal Screen Shots: ❑ Charge Rates During Testing ❑ Discharge Rates During Testing ❑ ALL As-Built documents listed in the PHOTO CHECKLIST AND PROJECT DOCUMENTATION Form. For Questions, please contact commissioning@nexamp.com kk 101 Summer Street, 2nd Floor617.431.1440 Boston, 02110 www.nexamp.com