Loading...
HomeMy WebLinkAboutLansing-Verizon Lane-Completeness Review-12.19.25 ^^ MRB Elevating Communities Group December 19, 2025 Ms. Heather Dries Code Enforcement Officer Town of Lansing 29 Auburn Road Lansing, New York 14882 Re: DUTHIE SITE PLAN — 8-18 VERIZON LANE APPLICATION COMPLETENESS REVIEW MRB GROUP PROJECT NO. 1207.25000.000 PHASE 171 Dear Ms. Dries, MRB has completed an application completeness review of the Site Plan Application regarding the above referenced project, dated September 25, 2025, and prepared by Timothy C. Buhl, P.E. The following comments should be addressed prior to processing the application with the Planning Board. 1. The setbacks drawing provided is an approximation of the property lines and location of the proposed building, and is not certified by a licensed professional. This does not meet the needs for demonstrating compliance with zoning dimensional requirements. Also, the site plans should show property lines to demonstrate that all work is occurring within the parent parcel. 2. The following items appear to be missing from the site plans and are identified as requirements per the Town of Lansing site plan checklist: a. Widths of driveways on site and access to existing roads and highways. b. The amount, location and dimensions of all street parking and loading areas and access thereto. c. Erosion and sediment controls d. Proposed grading/topography e. Calculations showing the green space available after construction is complete. f. Location and scaled renderings of all proposed signage (if any) 145 Culver Road, Suite 160, Rochester, NY 14620 • 585.381.9250 MRBGroup.com ^^ MRB Elevating Communities Owz Group 3. In accordance with the Town of Lansing Town Code §270-40.1.A, all developments subject to site plan review must submit a landscape plan, whereas no landscape plan was found in the submitted materials. The landscape plan needs to include all items listed in §270-40.1.B. 4. In accordance with the Town of Lansing Town Code §270-40.7.A, all developments subject to site plan review must submit a lighting plan, whereas no lighting plan was found in the submitted materials. The lighting plan needs to include all items listed in §270-40.7.B. 5. In addition to the items above, we suggest that the Town require the following items be shown/provided on the site plans: a. Demolition/ removals plan b. Engineering details 6. We recommend that a statement of operations be provided describing the proposed use, hours of operation, and other pertinent details. Please feel free to contact our office with any comments or questions you may have in this regard. Respectfully submitted, a � � Lande S. Brabant, CPESC ional Director of Planning & Environmental Review Services Re:DUTHIE SITE PLAN—8-18 VERIZON LANE Ms.Heather Dries Town of Lansing December 19,2025 2