Loading...
HomeMy WebLinkAbout2026 Draft Town of Groton Zoning Fees 8x11Town of Groton Fees to a permit being issued Accessory Structures: Pools, Decks, Sheds, $40 plus 2.00 per $1000 of cost $25 Building Commercial New Construction ‐ $.60 per Sq Ft (gross area) Alterations/Renovations: $60 plus Building Residential New Construction ‐ $.45 per Sq Ft (gross area) Alterations/Renovations ‐ $40 plus 2.00 per $1000 of cost Buildings within the Floodplain New Construction ‐ $.60 per Sq Ft Alterations/Renovations ‐ $60 plus 3.00 per $1000 of project cost PLUS Applicant is responsible for all Town Engineering $25 Building Permit Renewal ½ Original Fee & approval of CEO Cellular Tower $200 plus $2.50 per $1,000 of Construction Cost Demolition Permit $25 Energy Production ‐ Small Scale $40 plus 2.00 per $1000 of cost Energy Production‐ Large Scale Fence 6ft or higher/ Replace pool Floodplain Development Permit $550 1‐car = $30 2‐car = $60 3‐car = $90 + $30 for each car bay added Junk Yard Permit Renewal $25 Letter of Land Use Reg $75 Life Safety Inspection/ Operating $25 $25 Annually Mobility Ramp No Charge Outdoor Fireworks/Indoor $25 Road Preservation Application $75 or Metal Replacement-Non‐ Structural renovations No Charge- Must Supply Workman’s comp or Exemption Certificate $40 plus 2.00 per $1000 of cost Sign Permit $10 Administrative Lot Line $25 Interpretation $175 Cluster Development Preliminary Review ‐ $100 + $20 per lot Final Review ‐ $100 + $20 per lot Mass Gathering Permit $750 Planned Unit Development Town Board Review ‐ $200 Site Plan Review by Planning Board ‐ $200 Site Plan Review (Land Use 2000 sq. ft. & under ‐ $100 2001 sq. ft. & over ‐ $200 Site Plan Review for Echo Housing No Charge Subdivision ‐ Exempt $50 Subdivision ‐ Minor $30 + $20 per lot Subdivision ‐ Major Level Major Level Preliminary Review ‐ $100 + $20 per lot Final Review ‐ $100 + $20 per lot Special Permit (TBSP) ‐ Cemetery $200 Special Permit (TBSP)‐ Junk Yard $4,500 Special Permit (TBSP)‐ High $5,000 Special Permit (TBSP)‐ Mining $5,000 Special Permit (TBSP_‐ Large $4,500 Special Permit (TBSP)‐ $5,000 Special Permit ‐ Sexually Oriented $7,500 $2,500 (base) with additional $500 per acre over 5Acres 1. Fees listed do not include postage, which may be an additional charge at current postal rates. 2. If a public hearing is required, the applicant shall pay the cost of advertising fees. 3. Costs incurred by the Town of Groton for engineering, planning, legal and other necessary expenses for the purpose of reviewing any application with regard to an item covered by this fee schedule shall be paid by the applicant . 4. When Fees Are To Be Paid: All fees costs and/or expenses required by this fee schedule shall be paid to the Town of Groton before any certificate/permit is issued. 5. The applicant shall be responsible for costs incurred by the Town of Groton for the review and/or preparation of an Environmental Impact Statement if said statement is necessary.