Project.1556 Corland Rd'.Site Plan-Lt Industry
Date* 1 4/16/2026
Short Environmental Assessment Form
Part -Impact Assessment
Part 2 is to.be completed by the Lead Agency.
Answer all of the fallowing questions in Part 2 using the information contained'in Part I'and other materials submitted by
0
the project sponsor or otherwise,available.to the reviewer. When answering the questions the reviewer should be guided by
the concept"Have my responses been reasonable considering the scale and context of the proposed action?"
No,or Moderate
small to large
impact impact,
may may
occur occur
I. Will the,proposed action create a material conflict with an,adopted1and,we plan or zoning
regulations? ED
2, Mill the proposed action result in,a change in the use or intensity of use of land?
Z
I Will the proposed action impair the character.or,quality of the existing community? D
4. Will.the proposed action have an.impact on the environmental characteristics that caused the
establishment of a Critical Environmental Area(CEA)?
5. Will the proposed action result in an adverse change in the existing level of traffic or
affect existing infrastructure for mass transit,biking or walkway?
6. Will the proposed action cause an increase in the use of energy and it fails to incorporate
reasonably available energy conservation or renewable energy opportunities?
7. Will the proposed action impact existing. LZ A
a,public I privatewater supplies?
b.'public/-private wastewater treatment utilities? Li
8 Will the proposed action impair the character or quality of important historic,archaeological,
architectural,or aesthetic resources? El
9. Wifl,the proposed action result in an adverse change to natural resources(e.g.,wetlands,
�vatcrbodies,groundwater,air quality,'flora and fauna)? El
10, Will the proposed action result in an increase in the potential for erosion,flooding or drainage
problems? 1:1
11, Will the proposed action create.4bazard to environmental resources or human health? 1:1
PRINT FORM I -Page I of 2 8EAF2019
Agei cy Use Only tIf applicablel
Project: 556 Garland Rd,
Date: T11 612026
Short Environmen tat Assessment Form
Part 3 Determindtion ofSignificance
for every,question in Part 2 that was answered"rilioderate to,large impact may occur",or if there is A need to explain by a,
particular element of the proposed,action may or will not result in a significant,adverse environmental impact,please
-complete Part 3.Part 3 should,in'sufficient,detail,identify the impact,including any measures or design elements that
havebeen included by the project sponsor to avoid or reduce Impacts, Part 3 should also explain how the lead agency
detennined that the impact may or will,not'be significant,Each Potential impact should be assessed considering its setting,
probability of occurring,duration,irreversibility,geographic scope and`magnitude. Also consider the potential for short-
term,long-term and cumulative impacts.
Check this box if you have determined,based on the information and analysis above,and any supporting documentation,
that the proposed action may result in one or more potentially large or significant adverse impacts'and an
environmental impact statement is required.
Check this box if you have determined,based on the information and analysis above,and any supporting documentation,
that the proposed action will not result in any significant adverse environmental impacts.
tj I
Town of Groton Lead Agency 4W AV 7,o X!
Name of Lead Agency,
Leon Brockway Jr Planning Board Chair
Print o A7ype Name of Responsible Officer in Lead,Agency Title of Responsible Officer
�Ype N�3111O 01
Officer in Lead Agency Signature of'Preparer(if different from Responsible Officer)
PRINT FORM Page.2 oft