Loading...
HomeMy WebLinkAboutfeafpart2 Project 1Page 1 of 10 Full Environmental Assessment Form Part 2 - Identification of Potential Project Impacts Part 2 is to be completed by the lead agency. Part 2 is designed to help the lead agency inventory all potential resources that could be affected by a proposed project or action. We recognize that the lead agency=s reviewer(s) will not necessarily be environmental professionals. So, the questions are designed to walk a reviewer through the assessment process by providing a series of questions that can be answered using the information found in Part 1. To further assist the lead agency in completing Part 2, the form identifies the most relevant questions in Part 1 that will provide the information needed to answer the Part 2 question. When Part 2 is completed, the lead agency will have identified the relevant environmental areas that may be impacted by the proposed activity. If the lead agency is a state agency and the action is in any Coastal Area, complete the Coastal Assessment Form before proceeding with this assessment. Tips for completing Part 2: •Review all of the information provided in Part 1. •Review any application, maps, supporting materials and the Full EAF Workbook. •Answer each of the 18 questions in Part 2. •If you answer “Yes” to a numbered question, please complete all the questions that follow in that section. •If you answer “No” to a numbered question, move on to the next numbered question. •Check appropriate column to indicate the anticipated size of the impact. •Proposed projects that would exceed a numeric threshold contained in a question should result in the reviewing agency checking the box “Moderate to large impact may occur.” •The reviewer is not expected to be an expert in environmental analysis. •If you are not sure or undecided about the size of an impact, it may help to review the sub-questions for the general question and consult the workbook. •When answering a question consider all components of the proposed activity, that is, the Awhole action@. •Consider the possibility for long-term and cumulative impacts as well as direct impacts. •Answer the question in a reasonable manner considering the scale and context of the project. 1.Impact on Land Proposed action may involve construction on, or physical alteration of,† NO † YES the land surface of the proposed site. (See Part 1. D.1) If “Yes”, answer questions a - j. If “No”, move on to Section 2. Relevant Part I Question(s) No, or small impact may occur Moderate to large impact may occur a. The proposed action may involve construction on land where depth to water table is less than 3 feet.E2d 9 9 b. The proposed action may involve construction on slopes of 15% or greater.E2f 9 9 c. The proposed action may involve construction on land where bedrock is exposed, or generally within 5 feet of existing ground surface. E2a 9 9 d. The proposed action may involve the excavation and removal of more than 1,000 tons of natural material. D2a 9 9 e. The proposed action may involve construction that continues for more than one year or in multiple phases. D1e 9 9 f. The proposed action may result in increased erosion, whether from physical disturbance or vegetation removal (including from treatment by herbicides). D2e, D2q 9 9 g. The proposed action is, or may be, located within a Coastal Erosion hazard area.B1i 9 9 h. Other impacts: _______________________________________________________ ___________________________________________________________________ 9 9 Agency Use Only [If applicable] Project : Date : FEAF 2019 Page 2 of 10 2.Impact on Geological Features The proposed action may result in the modification or destruction of, or inhibit access to, any unique or unusual land forms on the site (e.g., cliffs, dunes, † NO † YES minerals, fossils, caves). (See Part 1. E.2.g) If “Yes”, answer questions a - c. If “No”, move on to Section 3. Relevant Part I Question(s) No, or small impact may occur Moderate to large impact may occur a. Identify the specific land form(s) attached: ________________________________ ___________________________________________________________________ E2g 9 9 b.The proposed action may affect or is adjacent to a geological feature listed as a registered National Natural Landmark. Specific feature: _____________________________________________________ E3c 9 9 c.Other impacts: ______________________________________________________ ___________________________________________________________________ 9 9 3.Impacts on Surface Water The proposed action may affect one or more wetlands or other surface water † NO † YES bodies (e.g., streams, rivers, ponds or lakes). (See Part 1. D.2, E.2.h) If “Yes”, answer questions a - l. If “No”, move on to Section 4. Relevant Part I Question(s) No, or small impact may occur Moderate to large impact may occur a. The proposed action may create a new water body.D2b, D1h 9 9 b. The proposed action may result in an increase or decrease of over 10% or more than a 10 acre increase or decrease in the surface area of any body of water. D2b 9 9 c. The proposed action may involve dredging more than 100 cubic yards of material from a wetland or water body. D2a 9 9 d. The proposed action may involve construction within or adjoining a freshwater or tidal wetland, or in the bed or banks of any other water body. E2h 9 9 e. The proposed action may create turbidity in a waterbody, either from upland erosion, runoff or by disturbing bottom sediments. D2a, D2h 9 9 f.The proposed action may include construction of one or more intake(s) for withdrawal of water from surface water. D2c 9 9 g.The proposed action may include construction of one or more outfall(s) for discharge of wastewater to surface water(s). D2d 9 9 h.The proposed action may cause soil erosion, or otherwise create a source of stormwater discharge that may lead to siltation or other degradation of receiving water bodies. D2e 9 9 i. The proposed action may affect the water quality of any water bodies within or downstream of the site of the proposed action. E2h 9 9 j. The proposed action may involve the application of pesticides or herbicides in or around any water body. D2q, E2h 9 9 k.The proposed action may require the construction of new, or expansion of existing, wastewater treatment facilities. D1a, D2d 9 9 Page 3 of 10 l. Other impacts: _______________________________________________________ ___________________________________________________________________ 9 9 4.Impact on groundwater The proposed action may result in new or additional use of ground water, or † NO † YES may have the potential to introduce contaminants to ground water or an aquifer. (See Part 1. D.2.a, D.2.c, D.2.d, D.2.p, D.2.q, D.2.t) If “Yes”, answer questions a - h. If “No”, move on to Section 5. Relevant Part I Question(s) No, or small impact may occur Moderate to large impact may occur a. The proposed action may require new water supply wells, or create additional demand on supplies from existing water supply wells. D2c 9 9 b. Water supply demand from the proposed action may exceed safe and sustainable withdrawal capacity rate of the local supply or aquifer. Cite Source: ________________________________________________________ D2c 9 9 c. The proposed action may allow or result in residential uses in areas without water and sewer services. D1a, D2c 9 9 d. The proposed action may include or require wastewater discharged to groundwater.D2d, E2l 9 9 e. The proposed action may result in the construction of water supply wells in locations where groundwater is, or is suspected to be, contaminated. D2c, E1f, E1g, E1h 9 9 f. The proposed action may require the bulk storage of petroleum or chemical products over ground water or an aquifer. D2p, E2l 9 9 g. The proposed action may involve the commercial application of pesticides within 100 feet of potable drinking water or irrigation sources. E2h, D2q, E2l, D2c 9 9 h. Other impacts: ______________________________________________________ __________________________________________________________________ 9 9 5.Impact on Flooding The proposed action may result in development on lands subject to flooding.† NO † YES (See Part 1. E.2) If “Yes”, answer questions a - g. If “No”, move on to Section 6. Relevant Part I Question(s) No, or small impact may occur Moderate to large impact may occur a. The proposed action may result in development in a designated floodway.E2i 9 9 b. The proposed action may result in development within a 100 year floodplain.E2j 9 9 c. The proposed action may result in development within a 500 year floodplain.E2k 9 9 d. The proposed action may result in, or require, modification of existing drainage patterns. D2b, D2e 9 9 e. The proposed action may change flood water flows that contribute to flooding.D2b, E2i, E2j, E2k 9 9 f.If there is a dam located on the site of the proposed action, is the dam in need of repair, or upgrade? E1e 9 9 Page 4 of 10 g. Other impacts: ______________________________________________________ ___________________________________________________________________ 9 9 6.Impacts on Air † NO † YES The proposed action may include a state regulated air emission source. (See Part 1. D.2.f., D.2.h, D.2.g) If “Yes”, answer questions a - f. If “No”, move on to Section 7. Relevant Part I Question(s) No, or small impact may occur Moderate to large impact may occur a. If the proposed action requires federal or state air emission permits, the action may also emit one or more greenhouse gases at or above the following levels: i. More than 1000 tons/year of carbon dioxide (CO2) ii.More than 3.5 tons/year of nitrous oxide (N2O) iii. More than 1000 tons/year of carbon equivalent of perfluorocarbons (PFCs) iv. More than .045 tons/year of sulfur hexafluoride (SF6) v. More than 1000 tons/year of carbon dioxide equivalent of hydrochloroflourocarbons (HFCs) emissions vi. 43 tons/year or more of methane D2g D2g D2g D2g D2g D2h 9 9 9 9 9 9 9 9 9 9 9 9 b. The proposed action may generate 10 tons/year or more of any one designated hazardous air pollutant, or 25 tons/year or more of any combination of such hazardous air pollutants. D2g 9 9 c. The proposed action may require a state air registration, or may produce an emissions rate of total contaminants that may exceed 5 lbs. per hour, or may include a heat source capable of producing more than 10 million BTU=s per hour. D2f, D2g 9 9 d.The proposed action may reach 50% of any of the thresholds in “a” through “c”, above. D2g 9 9 e. The proposed action may result in the combustion or thermal treatment of more than 1 ton of refuse per hour. D2s 9 9 f. Other impacts: ______________________________________________________ __________________________________________________________________ 9 9 7.Impact on Plants and Animals The proposed action may result in a loss of flora or fauna. (See Part 1. E.2. m.-q.)† NO † YES If “Yes”, answer questions a - j. If “No”, move on to Section 8. Relevant Part I Question(s) No, or small impact may occur Moderate to large impact may occur a.The proposed action may cause reduction in population or loss of individuals of any threatened or endangered species, as listed by New York State or the Federal government, that use the site, or are found on, over, or near the site. E2o 9 9 b. The proposed action may result in a reduction or degradation of any habitat used by any rare, threatened or endangered species, as listed by New York State or the federal government. E2o 9 9 c. The proposed action may cause reduction in population, or loss of individuals, of any species of special concern or conservation need, as listed by New York State or the Federal government, that use the site, or are found on, over, or near the site. E2p 9 9 d. The proposed action may result in a reduction or degradation of any habitat used by any species of special concern and conservation need, as listed by New York State or the Federal government. E2p 9 9 Page 5 of 10 e. The proposed action may diminish the capacity of a registered National Natural Landmark to support the biological community it was established to protect. E3c 9 9 f. The proposed action may result in the removal of, or ground disturbance in, any portion of a designated significant natural community. Source: ____________________________________________________________ E2n 9 9 g.The proposed action may substantially interfere with nesting/breeding, foraging, or over-wintering habitat for the predominant species that occupy or use the project site.E2m 9 9 h. The proposed action requires the conversion of more than 10 acres of forest, grassland or any other regionally or locally important habitat. Habitat type & information source: ______________________________________ __________________________________________________________________ E1b 9 9 i.Proposed action (commercial, industrial or recreational projects, only) involves use of herbicides or pesticides. D2q 9 9 j. Other impacts: ______________________________________________________ __________________________________________________________________ 9 9 8.Impact on Agricultural Resources The proposed action may impact agricultural resources. (See Part 1. E.3.a. and b.)† NO † YES If “Yes”, answer questions a - h. If “No”, move on to Section 9. Relevant Part I Question(s) No, or small impact may occur Moderate to large impact may occur a. The proposed action may impact soil classified within soil group 1 through 4 of the NYS Land Classification System. E2c, E3b 9 9 b.The proposed action may sever, cross or otherwise limit access to agricultural land (includes cropland, hayfields, pasture, vineyard, orchard, etc). E1a, Elb 9 9 c. The proposed action may result in the excavation or compaction of the soil profile of active agricultural land. E3b 9 9 d.The proposed action may irreversibly convert agricultural land to non-agricultural uses, either more than 2.5 acres if located in an Agricultural District, or more than 10 acres if not within an Agricultural District. E1b, E3a 9 9 e. The proposed action may disrupt or prevent installation of an agricultural land management system. El a, E1b 9 9 f. The proposed action may result, directly or indirectly, in increased development potential or pressure on farmland. C2c, C3, D2c, D2d 9 9 g.The proposed project is not consistent with the adopted municipal Farmland Protection Plan. C2c 9 9 h. Other impacts: ________________________________________________________9 9 Page 6 of 10 9. Impact on Aesthetic Resources The land use of the proposed action are obviously different from, or are in † NO † YES sharp contrast to, current land use patterns between the proposed project and a scenic or aesthetic resource. (Part 1. E.1.a, E.1.b, E.3.h.) If “Yes”, answer questions a - g. If “No”, go to Section 10. Relevant Part I Question(s) No, or small impact may occur Moderate to large impact may occur a. Proposed action may be visible from any officially designated federal, state, or local scenic or aesthetic resource. E3h 9 9 b.The proposed action may result in the obstruction, elimination or significant screening of one or more officially designated scenic views. E3h, C2b 9 9 c. The proposed action may be visible from publicly accessible vantage points: i. Seasonally (e.g., screened by summer foliage, but visible during other seasons) ii. Year round E3h 9 9 9 9 d. The situation or activity in which viewers are engaged while viewing the proposed action is: i. Routine travel by residents, including travel to and from work ii. Recreational or tourism based activities E3h E2q, E1c 9 9 9 9 e. The proposed action may cause a diminishment of the public enjoyment and appreciation of the designated aesthetic resource. E3h 9 9 f. There are similar projects visible within the following distance of the proposed project: 0-1/2 mile ½ -3 mile 3-5 mile 5+ mile D1a, E1a, D1f, D1g 9 9 g.Other impacts: ______________________________________________________ __________________________________________________________________ 9 9 10. Impact on Historic and Archeological Resources The proposed action may occur in or adjacent to a historic or archaeological † NO † YES resource. (Part 1. E.3.e, f. and g.) If “Yes”, answer questions a - e. If “No”, go to Section 11. Relevant Part I Question(s) No, or small impact may occur Moderate to large impact may occur E3e 9 9 b. The proposed action may occur wholly or partially within, or substantially contiguous to, an area designated as sensitive for archaeological sites on the NY State Historic Preservation Office (SHPO) archaeological site inventory. E3f 9 9 c. The proposed action may occur wholly or partially within, or substantially contiguous to, an archaeological site not included on the NY SHPO inventory. Source: ____________________________________________________________ E3g 9 9 a.The proposed action may occur wholly or partially within, or substantially contiguous to, any buildings, archaeological site or district which is listed on the National or State Register of Historical Places, or that has been determined by the Commissioner of the NYS Office of Parks, Recreation and Historic Preservation to be eligible for listing on the State Register of Historic Places. Page 7 of 10 d. Other impacts: ______________________________________________________ __________________________________________________________________ 9 9 e.If any of the above (a-d) are answered “Moderate to large impact may occur”, continue with the following questions to help support conclusions in Part 3: i.The proposed action may result in the destruction or alteration of all or part of the site or property. ii.The proposed action may result in the alteration of the property’s setting or integrity. iii.The proposed action may result in the introduction of visual elements which are out of character with the site or property, or may alter its setting. E3e, E3g, E3f E3e, E3f, E3g, E1a, E1b E3e, E3f, E3g, E3h, C2, C3 9 9 9 9 9 9 11. Impact on Open Space and Recreation The proposed action may result in a loss of recreational opportunities or a † NO † YES reduction of an open space resource as designated in any adopted municipal open space plan. (See Part 1. C.2.c, E.1.c., E.2.q.) If “Yes”, answer questions a - e. If “No”, go to Section 12. Relevant Part I Question(s) No, or small impact may occur Moderate to large impact may occur a. The proposed action may result in an impairment of natural functions, or “ecosystem services”, provided by an undeveloped area, including but not limited to stormwater storage, nutrient cycling, wildlife habitat. D2e, E1b E2h, E2m, E2o, E2n, E2p 9 9 b. The proposed action may result in the loss of a current or future recreational resource.C2a, E1c, C2c, E2q 9 9 c. The proposed action may eliminate open space or recreational resource in an area with few such resources. C2a, C2c E1c, E2q 9 9 d. The proposed action may result in loss of an area now used informally by the community as an open space resource. C2c, E1c 9 9 e. Other impacts: _____________________________________________________ _________________________________________________________________ 9 9 12. Impact on Critical Environmental Areas The proposed action may be located within or adjacent to a critical † NO † YES environmental area (CEA). (See Part 1. E.3.d) If “Yes”, answer questions a - c. If “No”, go to Section 13. Relevant Part I Question(s) No, or small impact may occur Moderate to large impact may occur a. The proposed action may result in a reduction in the quantity of the resource or characteristic which was the basis for designation of the CEA. E3d 9 9 b. The proposed action may result in a reduction in the quality of the resource or characteristic which was the basis for designation of the CEA. E3d 9 9 c. Other impacts: ______________________________________________________ __________________________________________________________________ 9 9 Page 8 of 10 13. Impact on Transportation The proposed action may result in a change to existing transportation systems.† NO † YES (See Part 1. D.2.j) If “Yes”, answer questions a - f. If “No”, go to Section 14. Relevant Part I Question(s) No, or small impact may occur Moderate to large impact may occur a. Projected traffic increase may exceed capacity of existing road network.D2j 9 9 b. The proposed action may result in the construction of paved parking area for 500 or more vehicles. D2j 9 9 c. The proposed action will degrade existing transit access.D2j 9 9 d. The proposed action will degrade existing pedestrian or bicycle accommodations.D2j 9 9 e.The proposed action may alter the present pattern of movement of people or goods.D2j 9 9 f.Other impacts: ______________________________________________________ __________________________________________________________________ 9 9 14. Impact on Energy The proposed action may cause an increase in the use of any form of energy.† NO † YES (See Part 1. D.2.k) If “Yes”, answer questions a - e. If “No”, go to Section 15. Relevant Part I Question(s) No, or small impact may occur Moderate to large impact may occur a. The proposed action will require a new, or an upgrade to an existing, substation.D2k 9 9 b. The proposed action will require the creation or extension of an energy transmission or supply system to serve more than 50 single or two-family residences or to serve a commercial or industrial use. D1f, D1q, D2k 9 9 c. The proposed action may utilize more than 2,500 MWhrs per year of electricity.D2k 9 9 d. The proposed action may involve heating and/or cooling of more than 100,000 square feet of building area when completed. D1g 9 9 e. Other Impacts: ________________________________________________________ ____________________________________________________________________ 15. Impact on Noise, Odor, and Light The proposed action may result in an increase in noise, odors, or outdoor lighting. † NO † YES (See Part 1. D.2.m., n., and o.) If “Yes”, answer questions a - f. If “No”, go to Section 16. Relevant Part I Question(s) No, or small impact may occur Moderate to large impact may occur a. The proposed action may produce sound above noise levels established by local regulation. D2m 9 9 b. The proposed action may result in blasting within 1,500 feet of any residence, hospital, school, licensed day care center, or nursing home. D2m, E1d 9 9 c. The proposed action may result in routine odors for more than one hour per day.D2o 9 9 Page 9 of 10 d. The proposed action may result in light shining onto adjoining properties.D2n 9 9 e. The proposed action may result in lighting creating sky-glow brighter than existing area conditions. D2n, E1a 9 9 f. Other impacts: ______________________________________________________ __________________________________________________________________ 9 9 16. Impact on Human Health The proposed action may have an impact on human health from exposure † NO † YES to new or existing sources of contaminants. (See Part 1.D.2.q., E.1. d. f. g. and h.) If “Yes”, answer questions a - m. If “No”, go to Section 17. Relevant Part I Question(s) No,or small impact may cccur Moderate to large impact may occur a. The proposed action is located within 1500 feet of a school, hospital, licensed day care center, group home, nursing home or retirement community. E1d 9 9 b. The site of the proposed action is currently undergoing remediation.E1g, E1h 9 9 c. There is a completed emergency spill remediation, or a completed environmental site remediation on, or adjacent to, the site of the proposed action. E1g, E1h 9 9 d.The site of the action is subject to an institutional control limiting the use of the property (e.g., easement or deed restriction). E1g, E1h 9 9 e. The proposed action may affect institutional control measures that were put in place to ensure that the site remains protective of the environment and human health. E1g, E1h 9 9 f. The proposed action has adequate control measures in place to ensure that future generation, treatment and/or disposal of hazardous wastes will be protective of the environment and human health. D2t 9 9 g. The proposed action involves construction or modification of a solid waste management facility. D2q, E1f 9 9 h. The proposed action may result in the unearthing of solid or hazardous waste.D2q, E1f 9 9 i. The proposed action may result in an increase in the rate of disposal, or processing, of solid waste. D2r, D2s 9 9 j. The proposed action may result in excavation or other disturbance within 2000 feet of a site used for the disposal of solid or hazardous waste. E1f, E1g E1h 9 9 k. The proposed action may result in the migration of explosive gases from a landfill site to adjacent off site structures. E1f, E1g 9 9 l. The proposed action may result in the release of contaminated leachate from the project site. D2s, E1f, D2r 9 9 m. Other impacts: ______________________________________________________ __________________________________________________________________ Page 10 of 10 17. Consistency with Community Plans The proposed action is not consistent with adopted land use plans. † NO † YES (See Part 1. C.1, C.2. and C.3.) If “Yes”, answer questions a - h. If “No”, go to Section 18. Relevant Part I Question(s) No, or small impact may occur Moderate to large impact may occur a. The proposed action’s land use components may be different from, or in sharp contrast to, current surrounding land use pattern(s). C2, C3, D1a E1a, E1b 9 9 b. The proposed action will cause the permanent population of the city, town or village in which the project is located to grow by more than 5%. C2 9 9 c. The proposed action is inconsistent with local land use plans or zoning regulations. C2, C2, C3 9 9 d. The proposed action is inconsistent with any County plans, or other regional land use plans. C2, C2 9 9 e. The proposed action may cause a change in the density of development that is not supported by existing infrastructure or is distant from existing infrastructure. C3, D1c, D1d, D1f, D1d, Elb 9 9 f. The proposed action is located in an area characterized by low density development that will require new or expanded public infrastructure. C4, D2c, D2d D2j 9 9 g. The proposed action may induce secondary development impacts (e.g., residential or commercial development not included in the proposed action) C2a 9 9 h. Other: _____________________________________________________________ __________________________________________________________________ 9 9 18. Consistency with Community Character The proposed project is inconsistent with the existing community character. † NO † YES (See Part 1. C.2, C.3, D.2, E.3) If “Yes”, answer questions a - g. If “No”, proceed to Part 3. Relevant Part I Question(s) No, or small impact may occur Moderate to large impact may occur a. The proposed action may replace or eliminate existing facilities, structures, or areas of historic importance to the community. E3e, E3f, E3g 9 9 b. The proposed action may create a demand for additional community services (e.g. schools, police and fire) C4 9 9 c. The proposed action may displace affordable or low-income housing in an area where there is a shortage of such housing. C2, C3, D1f D1g, E1a 9 9 d. The proposed action may interfere with the use or enjoyment of officially recognized or designated public resources. C2, E3 9 9 e. The proposed action is inconsistent with the predominant architectural scale and character. C2, C3 9 9 f. Proposed action is inconsistent with the character of the existing natural landscape. C2, C3 E1a, E1b E2g, E2h 9 9 g. Other impacts: ______________________________________________________ __________________________________________________________________ 9 9