Loading...
HomeMy WebLinkAbout2024-08-27_0852_1Inspections sheets & letter issued with permitTown of Groton Building Department W. Rick Fritz, Code Official 101 Conger Boulevard PO Box 36, Groton, NY 13073 (607) 898-4428 (607)-591-9898 code4,grotontown.com Raymond Brehm 11 /27/2023 520 Pleasant Valley Road Groton, NY 13073 Enclosed is your Building Permit for your New House As a reminder: All inspections need to be scheduled. I respect the need for the project to keep moving. Please call, leave a message, or send an e-mail a few days in advance of a stage of completion as same day service may not always be possible. You will need a Third Party Electrical Inspection/Certificate in order to receive your Letter of Certificate Sincerely, 13�C � W. Rick Fritz Code Enforcement Officer TOWN OF GROTON INSPECTIONS REQUIRED The undersigned is hereby notified and understands that, a Certificate of Occupancy or a Certificate of Completion will only be issued on the condition that all building code or local code specified inspections have been made and are approved. The following is a list which may include, but is not exclusive of the inspections that are required. SWPPP: Stormwater-Management Plan & Notice Septic permit and Final Inspect, by Tompkins County Health Department ;oo-'undation: o' "gs and Piers: rod in place, prior to concrete pour walls tarred, footer drains and stone before backfilling. Frostwall: 42" minimum depth, building size, setbacks, rod in place, prior to pour. Slab: size, thickness, vapor barrier placed, setbacks, rod/mesh in place *Inform if fiber used Framing: according to plan & all exterior penetrations shall be sealed (mandatory) Posts: treated, 42" depth, spacing, setbacks Pre -cladding: all penetrations sealed & house wrap or foam board sealed & taped Roofing: ice and water shield Rough Plumping BOTH DRAIN & WATER LINES (ask for test requirements) - Materials used, venting, pipe support, structural integrity. Below grade plumbing: cast or PVC, must be sleeved, bedding material. Pre -Fab Chimney: zero clearance fireplace —installed to manufactures specifications Masonry Chimney/Fireplace A) Foundation, materials, depth below grade B) Clean out, outside air, hearth, clearances C) Smoke chamber, firebox, solid masonry, parging D) Final Termination height - 2'-10' rules Woodstove: fireplace insert, direct connect, installed to manufactures specifications. Insulation: before any sheetrock /completely open & viewable / shall not be ,� Compressed Electric: rough wire and final inspections by a third -party electrical inspector Pool: inground framing & electrical prior to concrete, fence enclosure, electric, audible alarm, final electrical by a third -party electrical inspector. Address Identification Other — inal — Project complete. ALL INSPECTIONS REQURIE TWO BUSINESS DA YPRIOR NOTICE I have read this entire document and I am completely aware of all the required inspections and that I am the one who is responsible for notifying the Code Enforcement/Building Official for all required inspections. I am aware of items that shall remain completely open and viewable until inspected and approved. The applicant, all contractors/workers on the project, will contact the code/building office with a minimum of 24 hours prior notice of the required inspection. A licant scant Signature Code Official Signature Inspection Report Town of Groton Code Enforcement—W. Rick Fritz Owners Raymond Brehm Tax 32.-1-42.4 Expires 11/26/2024 Name Map Project Project New House Address 520 Pleasant Valley Road, Groton, NY 13073 Type CONDITIONS/PERMITS VERIFIED/ISSUED Zone District RA L M1 M2 H I1 12 Building Plans Flood Development Permit Fresh Water Wetlands Highway Supt. (Culvert) Set Backs for Zone Sewage (TCHD) Water Supply TYPE OF CONSTRUCTION I [ ] Fire Resistive II [ ] Non -Combustible III [ ] Heavy Timber Ill [ ] Ordinary V [ ] Wood Frame Truss Type Decal ------------------------ Foundation Framing Satisfactory X= Satisfact Inspected on Next Inspect Next Inspect Inspected on Complete & Next Inspect Approved for CC Complete & �Approved for CC USE & OCCUPANCY [ ] Single Family [ ] Two Family [ ] Assembly (A) ❑ Pla [ ] Bed & Breakfast ❑ RE [ ] Business (B) [ ] Educational (E) ❑ Tru [ ] Factory/Industrial (F) ❑ Se [ ] High Hazard [ ] Institutional (1) ❑ Se [ ] Mercantile (M) [ ] Residential ® Inspec [ ] Storage (S) [ ] Utility (U) Auto Sprinkler [ ] Required Occupancy Load Completed Structure X = Satisfactory ; ry ! ❑ Stairs & Decking ! Material ; ❑ Windows & Doors meet Energy Code i ❑ Fire/CO Detectors Working g ❑ Thermostats & setback type ht & ; ❑ Siding i ❑ Plumbing final al ! ❑ Fuel Storage ' parations ! ! ❑ Electrical Final ❑ Electrical Inspection Cert. ❑ Truss Type Sticker applied ---�-� ❑ Energy Inspect Cert. (Blower Door test) ; ❑ E911 # Posted Inspected on o Sep Sep Next Inspect Inspected on Next Inspect Complete & Approved for CC/CO Construction Drawings X= Satisfactory ns s Check ss Specs (Existing) (New) ted on