Full Environmental Assessment Form
Part 1 - Project and Setting
Instructions for Completing Part 1
Part 1 is to be completed by the applicant or project sponsor. Responses become part of the application for approval or funding,
are subject to public review, and may be subject to further verification.
Complete Part 1 based on information currently available. If additional research or investigation would be needed to fully respond to
any item, please answer as thoroughly as possible based on current information; indicate whether missing information does not exist,
or is not reasonably available to the sponsor; and, when possible, generally describe work or studies which would be necessary to
update or fully develop that information.
Applicants/sponsors must complete all items in Sections A & B. In Sections C, D & E, most items contain an initial question that
must be answered either Yes or No. If the answer to the initial question is Yes, complete the sub-questions that follow. If the
answer to the initial question is No, proceed to the next question. Section F allows the project sponsor to identify and attach any
additional information. Section G requires the name and signature of the project sponsor to verify that the information
contained in Part 1is accurate and complete.
A. Project and Sponsor Information.
Name of Action or Project:
Project Location (describe, and attach a general location map):
Brief Description of Proposed Action (include purpose or need):
Name of Applicant/Sponsor: Telephone:
E-Mail:
Address:
City/PO: State: Zip Code:
Project Contact (if not same as sponsor; give name and title/role): Telephone:
E-Mail:
Address:
City/PO: State: Zip Code:
Property Owner (if not same as sponsor): Telephone:
E-Mail:
Address:
City/PO: State: Zip Code:
NY Groton I (South Main Street), LLC - Commercial Solar Project
South Main Street/CR-169, Town of Groton, Tompkins County NY (Tax Map No. 26.-1-25.22)
The proposed action includes the development of an approximately 5-megawatt of alternating current (MW AC) ground-mounted solar facility on a 102.2±- acre site
located along the northeast and southwest sides of South Main Street (hereinafter subject property). The proposed action would occur on the northeast side of
South Main Street, which comprises approximately 97.13 acres of the site. The owners would lease 28± acres of the subject property to the applicant (i.e., NY
Groton I [South Main Street], LLC). The area of disturbance for the proposed action would be approximately 28.50± acres. The proposed action would situate the
solar facility near the eastern and southern portions of the subject property along the northeast side of South Main Street. The proposed development would include
solar modules with a maximum height of 15 feet, the installation of an eight (8)-foot-high deer fence around the proposed solar facility, two (2) concrete equipment
pads to house electrical equipment (i.e., two [2] inverters and two [2] transformers), electric utility lines to connect the solar panels to the existing distribution power
line along the south side of the subject property as well as the planting of a vegetative screen consisting of approximately 39 Leyland Cypress trees along the
southwest portion of the site. The proposed action would also include the construction of a gravel access road from South Main Street. All solar power generated by
the proposed action would be sold as Community Distributed Generation. This program allows subscribed participants to share the benefits of clean energy
production. According to the applicant, a mix of residential and commercial customers, specifically New York State Electric and Gas (NYSEG), would be able to
receive a share of the solar power generated by the proposed action as well as a discount off their electricity bills.
NY Groton I (South Main Street), LLC attn: Mollie Messenger
(845) 800-8914
mollie.messenger@delawareriversolar.com
33 Lower Main Street PO Box 384
Callicoon NY 12723
James Young
N/A
N/A
3105 N Triphammer Rd, Suite 1
Lansing NY 14882
Page 2 of 13
B. Government Approvals
B. Government Approvals Funding, or Sponsorship.(Funding includes grants, loans, tax relief, and any other forms of financial
assistance.)
Government Entity If Yes: Identify Agency and Approval(s)
Required
Application Date
(Actual or projected)
a. City Town ,Yes No
or Village Board of Trustees
b. City, Town or Village Yes No
Planning Board or Commission
c. City Town or Yes No
Village Zoning Board of Appeals
d. Other local agencies Yes No
e. County agencies Yes No
f. Regional agencies Yes No
g. State agencies Yes No
h. Federal agencies Yes No
i. Coastal Resources.
i. Is the project site within a Coastal Area, or the waterfront area of a Designated Inland Waterway?Yes No
ii. Is the project site located in a community with an approved Local Waterfront Revitalization Program? Yes No
iii. Is the project site within a Coastal Erosion Hazard Area? Yes No
C. Planning and Zoning
C.1. Planning and zoning actions.
Will administrative or legislative adoption, or amendment of a plan, local law, ordinance, rule or regulation be the Yes No
only approval(s) which must be granted to enable the proposed action to proceed?
If Yes, complete sections C, F and G.
If No, proceed to question C.2 and complete all remaining sections and questions in Part 1
C.2. Adopted land use plans.
a. Do any municipally- adopted (city, town, village or county) comprehensive land use plan(s) include the site Yes No
where the proposed action would be located?
If Yes, does the comprehensive plan include specific recommendations for the site where the proposed action Yes No
would be located?
b. Is the site of the proposed action within any local or regional special planning district (for example: Greenway Yes No
Brownfield Opportunity Area (BOA); designated State or Federal heritage area; watershed management plan;
or other?)
If Yes, identify the plan(s):
_______________________________________________________________________________________________________
________________________________________________________________________________________________________
________________________________________________________________________________________________________
c. Is the proposed action located wholly or partially within an area listed in an adopted municipal open space plan, Yes No
or an adopted municipal farmland protection plan?
If Yes, identify the plan(s):
________________________________________________________________________________________________________
________________________________________________________________________________________________________
________________________________________________________________________________________________________
Town of Groton Town Board - Special Permit and
Solar Permit
Town of Groton Planning Board - Site Plan Approval
Town of Groton Code Enforcement Officer - Building Permit
Tompkins County Department of Planning and Sustainability - GML 239 Referral
Tompkins County Highway Department - Highway Work Permit and Driveway
Permit
NYSDEC - SPDES General Permit for Construction Activity;
NYSERDA/NYSDAM - Partial Funding (NY-Sun Incentive Program)
Tompkins County Agriculture and Farmland Protection Plan
Page 3 of 13
C.3. Zoning
a. Is the site of the proposed action located in a municipality with an adopted zoning law or ordinance. Yes No
If Yes, what is the zoning classification(s) including any applicable overlay district?
_________________________________________________________________________________________________________
_________________________________________________________________________________________________________
b. Is the use permitted or allowed by a special or conditional use permit? Yes No
c. Is a zoning change requested as part of the proposed action? Yes No
If Yes,
i.What is the proposed new zoning for the site? ___________________________________________________________________
C.4. Existing community services.
a. In what school district is the project site located? ________________________________________________________________
b. What police or other public protection forces serve the project site?
_________________________________________________________________________________________________________
c. Which fire protection and emergency medical services serve the project site?
__________________________________________________________________________________________________________
d. What parks serve the project site?
__________________________________________________________________________________________________________
__________________________________________________________________________________________________________
D. Project Details
D.1. Proposed and Potential Development
a. What is the general nature of the proposed action (e.g., residential, industrial, commercial, recreational; if mixed, include all
components)?
_________________________________________________________________________________________________________
b. a. Total acreage of the site of the proposed action? _____________ acres
b. Total acreage to be physically disturbed? _____________ acres
c. Total acreage (project site and any contiguous properties) owned
or controlled by the applicant or project sponsor? _____________ acres
c. Is the proposed action an expansion of an existing project or use? Yes No
i.If Yes, what is the approximate percentage of the proposed expansion and identify the units (e.g., acres, miles, housing units,
square feet)? % ____________________ Units: ____________________
d. Is the proposed action a subdivision, or does it include a subdivision? Yes No
If Yes,
i.Purpose or type of subdivision? (e.g., residential, industrial, commercial; if mixed, specify types)
________________________________________________________________________________________________________
ii.Is a cluster/conservation layout proposed? Yes No
iii.Number of lots proposed? ________
iv.Minimum and maximum proposed lot sizes? Minimum __________ Maximum __________
Yes No
_____ months
_____
_____ month _____ year
Will proposed action be constructed in multiple phases?
If No, anticipated period of construction:
If Yes:
Total number of phases anticipated
Anticipated commencement date of phase 1 (including demolition)
Anticipated completion date of final phase _____ month _____year
Generally describe connections or relationships among phases, including any contingencies where progress of one phase may
determine timing or duration of future phases: _______________________________________________________________
____________________________________________________________________________________________________
____________________________________________________________________________________________________
Rural Agricultural (RA)
Groton Central School District
Town of Groton Police Department; New York State Police; Tompkins County Sheriffs Department
Groton Fire Department and McLean Fire District provide both fire protection and emergency medical services.
N/A - the proposed use includes a commercial solar facility.
102.2±
28.5±
160.93±
5
Commercial solar energy facility
(The proposed action may include an additional ± acres of
trees that would be cut and/or topped to prevent panel
shading.)
(The property owner would lease 28± acres of the subject
property to the applicant.)
Page 4 of 13
f. Does the project include new residential uses? Yes No
If Yes, show numbers of units proposed.
One Family Two Family Three Family Multiple Family (four or more)
Initial Phase ___________ ___________ ____________ ________________________
At completion
of all phases ___________ ___________ ____________ ________________________
g. Does the proposed action include new non-residential construction (including expansions)? Yes No
If Yes,
i. Total number of structures ___________
ii.Dimensions (in feet) of largest proposed structure: ________height; ________width; and _______ length
iii.Approximate extent of building space to be heated or cooled: ______________________ square feet
h. Does the proposed action include construction or other activities that will result in the impoundment of any Yes No
liquids, such as creation of a water supply, reservoir, pond, lake, waste lagoon or other storage?
If Yes,
i.Purpose of the impoundment: ________________________________________________________________________________
ii.If a water impoundment, the principal source of the water: Ground water Surface water streams Other specify:
_________________________________________________________________________________________________________
iii.If other than water, identify the type of impounded/contained liquids and their source.
_________________________________________________________________________________________________________
iv.Approximate size of the proposed impoundment. Volume: ____________ million gallons; surface area: ____________ acres
v.Dimensions of the proposed dam or impounding structure: ________ height; _______ length
vi.Construction method/materials for the proposed dam or impounding structure (e.g., earth fill, rock, wood, concrete):
________________________________________________________________________________________________________
D.2. Project Operations
a. Does the proposed action include any excavation, mining, or dredging, during construction, operations, or both? Yes No
(Not including general site preparation, grading or installation of utilities or foundations where all excavated
materials will remain onsite)
If Yes:
i .What is the purpose of the excavation or dredging? _______________________________________________________________
ii.How much material (including rock, earth, sediments, etc.) is proposed to be removed from the site?
Volume (specify tons or cubic yards): ____________________________________________
Over what duration of time? ____________________________________________________
iii.Describe nature and characteristics of materials to be excavated or dredged, and plans to use, manage or dispose of them.
________________________________________________________________________________________________________
________________________________________________________________________________________________________
iv.Will there be onsite dewatering or processing of excavated materials? Yes No
If yes, describe. ___________________________________________________________________________________________
________________________________________________________________________________________________________
v.What is the total area to be dredged or excavated? _____________________________________acres
vi.What is the maximum area to be worked at any one time? _______________________________ acres
vii.What would be the maximum depth of excavation or dredging? __________________________ feet
viii.Will the excavation require blasting? Yes No
ix.Summarize site reclamation goals and plan: _____________________________________________________________________
________________________________________________________________________________________________________
________________________________________________________________________________________________________
b. Would the proposed action cause or result in alteration of, increase or decrease in size of, or encroachment Yes No
into any existing wetland, waterbody, shoreline, beach or adjacent area?
If Yes:
i.Identify the wetland or waterbody which would be affected (by name, water index number, wetland map number or geographic
description): ______________________________________________________________________________________________
_________________________________________________________________________________________________________
N/A
N/A N/A N/A
N/A
Page 5 of 13
ii.
iii.
Describe how the proposed action would affect that waterbody or wetland, e.g. excavation, fill, placement of structures, or
alteration of channels, banks and shorelines. Indicate extent of activities, alterations and additions in square feet or acres:
_________________________________________________________________________________________________________
_________________________________________________________________________________________________________
_________________________________________________________________________________________________________
_________________________________________________________________________________________________________
Will proposed action cause or result in disturbance to bottom sediments? Yes No
If Yes, describe: __________________________________________________________________________________________
iv.Will proposed action cause or result in the destruction or removal of aquatic vegetation? Yes No
If Yes:
a of vegetation proposed to be removed ___________________________________________________________
acreage of aquatic vegetation remaining after project completion ________________________________________
purpose of proposed removal (e.g. beach clearing, invasive species control, boat access): ____________________________
____________________________________________________________________________________________________
proposed method of plant removal: ________________________________________________________________________
if chemical/herbicide treatment will be used, specify product(s): _________________________________________________
v.Describe any proposed reclamation/mitigation following disturbance: _________________________________________________
_________________________________________________________________________________________________________
c. Will the proposed action use, or create a new demand for water? Yes No
If Yes:
i.Total anticipated water usage/demand per day: __________________________ gallons/day
ii.Will the proposed action obtain water from an existing public water supply? Yes No
If Yes:
Name of district or service area: _________________________________________________________________________
Does the existing public water supply have capacity to serve the proposal? Yes No
Is the project site in the existing district? Yes No
Is expansion of the district needed? Yes No
Do existing lines serve the project site? Yes No
iii.Will line extension within an existing district be necessary to supply the project? Yes No
If Yes:
Describe extensions or capacity expansions proposed to serve this project: ________________________________________
____________________________________________________________________________________________________
Source(s) of supply for the district: ________________________________________________________________________
iv.Is a new water supply district or service area proposed to be formed to serve the project site? Yes No
If, Yes:
Applicant/sponsor for new district: ________________________________________________________________________
Date application submitted or anticipated: __________________________________________________________________
Proposed source(s) of supply for new district: _______________________________________________________________
v.If a public water supply will not be used, describe plans to provide water supply for the project: ___________________________
_________________________________________________________________________________________________________
vi. If water supply will be from wells (public or private),maximum pumping capacity: _______ gallons/minute.
d. Will the proposed action generate liquid wastes? Yes No
If Yes:
i.Total anticipated liquid waste generation per day: _______________ gallons/day
ii.Nature of liquid wastes to be generated (e.g., sanitary wastewater, industrial; if combination, describe all components and
approximate volumes or proportions of each): __________________________________________________________________
_________________________________________________________________________________________________________
_________________________________________________________________________________________________________
iii.Will the proposed action use any existing public wastewater treatment facilities? Yes No
If Yes:
Name of wastewater treatment plant to be used: _____________________________________________________________
Name of district: ______________________________________________________________________________________
Does the existing wastewater treatment plant have capacity to serve the project? Yes No
Is the project site in the existing district? Yes No
Is expansion of the district needed? Yes No
Page 6 of 13
Yes No Do existing sewer lines serve the project site?
Will line extension within an existing district be necessary to serve the project? Yes No
If Yes:
Describe extensions or capacity expansions proposed to serve this project: ____________________________________
____________________________________________________________________________________________________
____________________________________________________________________________________________________
iv.Will a new wastewater (sewage) treatment district be formed to serve the project site? Yes No
If Yes:
Applicant/sponsor for new district: ____________________________________________________________________
Date application submitted or anticipated: _______________________________________________________________
What is the receiving water for the wastewater discharge? __________________________________________________
v.If public facilities will not be used, describe plans to provide wastewater treatment for the project, including specifying proposed
receiving water (name and classification if surface discharge or describe subsurface disposal plans):
________________________________________________________________________________________________________
________________________________________________________________________________________________________
vi.Describe any plans or designs to capture, recycle or reuse liquid waste: _______________________________________________
________________________________________________________________________________________________________
________________________________________________________________________________________________________
e. Will the proposed action disturb more than one acre and create stormwater runoff, either from new point Yes No
sources (i.e. ditches, pipes, swales, curbs, gutters or other concentrated flows of stormwater) or non-point
source (i.e. sheet flow) during construction or post construction?
If Yes:
i.How much impervious surface will the project create in relation to total size of project parcel?
_____ Square feet or _____ acres (impervious surface)
_____ Square feet or _____ acres (parcel size)
ii.Describe types of new point sources. __________________________________________________________________________
_________________________________________________________________________________________________________
iii.Where will the stormwater runoff be directed (i.e. on-site stormwater management facility/structures, adjacent properties,
groundwater, on-site surface water or off-site surface waters)?
________________________________________________________________________________________________________
________________________________________________________________________________________________________
If to surface waters, identify receiving water bodies or wetlands: ________________________________________________
____________________________________________________________________________________________________
____________________________________________________________________________________________________
Will stormwater runoff flow to adjacent properties? Yes No
iv.Does proposed plan minimize impervious surfaces, use pervious materials or collect and re-use stormwater? Yes No
f. Does the proposed action include, or will it use on-site, one or more sources of air emissions, including fuel Yes No
combustion, waste incineration, or other processes or operations?
If Yes, identify:
i. Mobile sources during project operations (e.g., heavy equipment, fleet or delivery vehicles)
_________________________________________________________________________________________________________
ii.Stationary sources during construction (e.g., power generation, structural heating, batch plant, crushers)
________________________________________________________________________________________________________
iii.Stationary sources during operations (e.g., process emissions, large boilers, electric generation)
________________________________________________________________________________________________________
g. Will any air emission sources named in D.2.f (above), require a NY State Air Registration, Air Facility Permit, Yes No
or Federal Clean Air Act Title IV or Title V Permit?
If Yes:
i.Is the project site located in an Air quality non-attainment area? (Area routinely or periodically fails to meet Yes No
ambient air quality standards for all or some parts of the year)
ii.In addition to emissions as calculated in the application, the project will generate:
___________Tons/year () of Carbon Dioxide (CO2)
___________Tons/year () of Nitrous Oxide (N2 )
___________Tons/year () of Perfluorocarbons (PFCs)
___________Tons/year () of Sulfur Hexafluoride (SF6)
___________Tons/year () of Carbon Dioxide equivalent of Hydroflo rocarbons (H )
___________Tons/year () of Hazardous Air Pollutants (HAPs)
0.01±
102.2±
Solar modules, concrete equipment pads, footings and gravel access road
The proposed design would include the installation of water bars in areas with slopes ranging from 5% to 10%. Areas with revised grading would
maintain current conditions directing stormwater runoff towards the stream located on the northwest portion of the subject property.
the northwest portion of the subject property. It is anticipated that the proposed action would not result in a change of flow to this stream as
compared to pre-construction conditions.
Stormwater runoff would be directed towards the stream located on
Page 7 of 13
h. Will the proposed action generate or emit methane (including, but not limited to, sewage treatment plants, Yes No
landfills, composting facilities)?
If Yes:
i.Estimate methane generation in tons/year (metric): ________________________________________________________________
ii. Describe any methane capture, control or elimination measures included in project design (e.g., combustion to generate heat or
electricity, flaring): ________________________________________________________________________________________
_________________________________________________________________________________________________________
i. Will the proposed action result in the release of air pollutants from open-air operations or processes, such as Yes No
quarry or landfill operations?
If Yes: Describe operations and nature of emissions (e.g., diesel exhaust, rock particulates/dust):
_________________________________________________________________________________________________________
_________________________________________________________________________________________________________
j. Will the proposed action result in a substantial increase in traffic above present levels or generate substantial Yes No
new demand for transportation facilities or services?
If Yes:
i.When is the peak traffic expected (Check all that apply): Morning Evening Weekend
Randomly between hours of __________ to ________.
ii.For commercial activities only, projected number of truck trips/day
v.
Parking spaces: Existing _____________Proposed ___________ Net increase/decrease _____________
Yes No vi.Are public/private transportation service(s) or facilities available within ½ mile of the proposed site?
vii Will the proposed action include access to public transportation or accommodations for use of hybrid, electric Yes No
or other alternative fueled vehicles?
viii. Will the proposed action include plans for pedestrian or bicycle accommodations for connections to existing Yes No
pedestrian or bicycle routes?
k. Will the proposed action (for commercial or industrial projects only) generate new or additional demand Yes No
for energy?
If Yes:
i.Estimate annual electricity demand during operation of the proposed action: ____________________________________________
_________________________________________________________________________________________________________
ii.Anticipated sources/suppliers of electricity for the project (e.g., on-site combustion, on-site renewable, via grid/local utility, or
other):
________________________________________________________________________________________________________
iii.Will the proposed action require a new, or an upgrade to an existing substation? Yes No
l. Hours of operation. Answer all items which apply.
i.During Construction:ii.During Operations:
Monday - Friday: _________________________Monday - Friday: ____________________________
Saturday: ________________________________Saturday: ___________________________________
Sunday: _________________________________Sunday: ____________________________________
Holidays: ________________________________Holidays: ___________________________________
8:00am-6:00pm
8:00am-6:00pm
N/A
N/A
24/7*
24/7*
24/7*
24/7*
*The site would not be occupied 24/7. It would be remotely monitored and inspections would occur as needed to ensure a properly maintained site.
Page 8 of 13
m. Will the proposed action produce noise that will exceed existing ambient noise levels during construction, Yes No
operation, or both?
If yes:
i.Provide details including sources, time of day and duration:
_______________________________________________________________________________________________________
_______________________________________________________________________________________________________
ii. Will proposed action remove existing natural barriers that could act as a noise barrier or screen? Yes No
Describe: _________________________________________________________________________________________________
_________________________________________________________________________________________________________
n. W thill prope os actioed havn e outd lighoor ting? Yes No
If yes:
i.Describe source(s), location(s), height of fixture(s), direction/aim, and proximity to nearest occupied structures:
_________________________________________________________________________________________________________
_________________________________________________________________________________________________________
ii.Will proposed action remove existing natural barriers that could act as a light barrier or screen? Yes No
Describe: _________________________________________________________________________________________________
_________________________________________________________________________________________________________
o.Does the proposed action have the potential to produce odors for more than one hour per day? Yes No
If Yes, describe possible sources, potential frequency and duration of odor emissions, and proximity to nearest
occupied structures: ______________________________________________________________________________________
________________________________________________________________________________________________________
________________________________________________________________________________________________________
p. Yes NoWill the proposed action include any bulk storage of petroleum (over 1,100 gallons)
or chemical products ?
If Yes:
Product(s) to be stored ______________________________________________________________________________________
Volume(s) ______ per unit time ___________ (e.g., month, year)
Generally describe proposed storage facilities ________________________________________________________________
________________________________________________________________________________________________________
q. Will the proposed action (commercial, industrial and recreational projects only) use pesticides (i.e., herbicides, Yes No
insecticides) during construction or operation?
If Yes:
i.Describe proposed treatment(s):
________________________________________________________________________________________________________
________________________________________________________________________________________________________
________________________________________________________________________________________________________
________________________________________________________________________________________________________
ii.Will the proposed action use Integrated Pest Management Practices? Yes No
r. Will the proposed action (commercial or industrial projects only) involve or require the management or disposal Yes No
of solid waste (excluding hazardous materials)?
If Yes:
i.Describe any solid waste(s) to be generated during construction or operation of the facility:
Construction: ____________________ tons per ________________ (unit of time)
Operation : ____________________ tons per ________________ (unit of time)
ii.Describe any proposals for on-site minimization, recycling or reuse of materials to avoid disposal as solid waste:
Construction: ________________________________________________________________________________________
____________________________________________________________________________________________________
Operation: __________________________________________________________________________________________
____________________________________________________________________________________________________
iii.Proposed disposal methods/facilities for solid waste generated on-site:
Construction: ________________________________________________________________________________________
____________________________________________________________________________________________________
Operation: __________________________________________________________________________________________
____________________________________________________________________________________________________
Temporary noise during construction would be expected. Construction would occur during non-sensitive hours (8:00am-6:00pm Monday through Saturday
with no construction on Sundays or holidays).
The project area would result in the clearing of 13.78± acres of woodland for the proposed solar facility. However, upon implementation of
the proposed action, 47.03± acres of woodland would remain.
0.1
0
month
According to the applicant, waste would consist of office waste and cardboard items from deliveries, which would be recycled to
the maximum extent practicable.
N/A
A refuse container would be placed on-site during construction and would be emptied by a licensed hauler as needed.
N/A
Page 9 of 13
s. Does the proposed action include construction or modification of a solid waste management facility? Yes No
If Yes:
i.Type of management or handling of waste proposed for the site (e.g., recycling or transfer station, composting, landfill, or
other disposal activities): ___________________________________________________________________________________
ii.Anticipated rate of disposal/processing:
________ Tons/month, if transfer or other non-combustion/thermal treatment, or
________ Tons/hour, if combustion or thermal treatment
iii.If landfill, anticipated site life: ________________________________ years
t. Will proposed action at the site involve the commercial generation, treatment, storage, or disposal of hazardous Yes No
waste?
If Yes:
i.Name(s) of all hazardous wastes or constituents to be generated, handled or managed at facility: ___________________________
_________________________________________________________________________________________________________
_________________________________________________________________________________________________________
ii.Generally describe processes or activities involving hazardous wastes or constituents: ___________________________________
_________________________________________________________________________________________________________
________________________________________________________________________________________________________
iii. Specify amount to be handled or generated _____ tons/month
iv.Describe any proposals for on-site minimization, recycling or reuse of hazardous constituents: ____________________________
________________________________________________________________________________________________________
________________________________________________________________________________________________________
v.Will any hazardous wastes be disposed at an existing offsite hazardous waste facility? Yes No
If Yes: provide name and location of facility: _______________________________________________________________________
________________________________________________________________________________________________________
If No: describe proposed management of any hazardous wastes which will not be sent to a hazardous waste facility:
________________________________________________________________________________________________________
________________________________________________________________________________________________________
E. Site and Setting of Proposed Action
E.1. Land uses on and surrounding the project site
a. Existing land uses.
i.Check all uses that occur on, adjoining and near the project site.
Urban Industrial Commercial Residential (suburban) Rural (non-farm)
Forest Agriculture Aquatic Other (specify): ____________________________________
ii.If mix of uses, generally describe:
__________________________________________________________________________________________________________
__________________________________________________________________________________________________________
b. Land uses and covertypes on the project site.
Land use or
Covertype
Current
Acreage
Acreage After
Project Completion
Change
(Acres +/-)
Roads, buildings, and other paved or impervious
surfaces
Forested
Meadows, grasslands or brushlands (non-
agricultural, including abandoned agricultural)
Agricultural
(includes active orchards, field, greenhouse etc.)
Surface water features
(lakes, ponds, streams, rivers, etc.)
Wetlands (freshwater or tidal)
Non-vegetated (bare rock, earth or fill)
Other
Describe: _______________________________
________________________________________
Institutional (Groton Elementary School)
The subject property is currently inactive agricultural land with surrounding residential, institutional and agricultural land uses, as well as forested land.
0.10± 0.11±+0.01
60.81± 47.03± -13.78
40.23±25.51± -14.72
0 0 0
1.06± 1.06± 0
0 0 0
0 0 0
Landscaping/seeded areas and gravel access
road*
0 28.49± +28.49
*Upon implementation of the proposed action, 1.04± acre of gravel would be installed for the proposed access road.
Page 10 of 13
c. Is the project site presently used by members of the community for public recreation? Yes No
i.If Yes: explain: __________________________________________________________________________________________
d. Are there any facilities serving children, the elderly, people with disabilities (e.g., schools, hospitals, licensed Yes No
day care centers, or group homes) within 1500 feet of the project site?
If Yes,
i.Identify Facilities:
________________________________________________________________________________________________________
________________________________________________________________________________________________________
e. Does the project site contain an existing dam? Yes No
If Yes:
i.Dimensions of the dam and impoundment:
Dam height: _________________________________ feet
Dam length: _________________________________ feet
Surface area: _________________________________ acres
Volume impounded: _______________________________ gallons OR acre-feet
ii.Dam s existing hazard classification: _________________________________________________________________________
iii.Provide date and summarize results of last inspection:
_______________________________________________________________________________________________________
_______________________________________________________________________________________________________
f. Has the project site ever been used as a municipal, commercial or industrial solid waste management facility, Yes No
or does the project site adjoin property which is now, or was at one time, used as a solid waste management facility?
If Yes:
i.Has the facility been formally closed? Yes No
If yes, cite sources/documentation: _______________________________________________________________________
ii.Describe the location of the project site relative to the boundaries of the solid waste management facility:
_______________________________________________________________________________________________________
_______________________________________________________________________________________________________
iii.Describe any development constraints due to the prior solid waste activities: __________________________________________
_______________________________________________________________________________________________________
g. Have hazardous wastes been generated, treated and/or disposed of at the site, or does the project site adjoin Yes No
property which is now or was at one time used to commercially treat, store and/or dispose of hazardous waste?
If Yes:
i.Describe waste(s) handled and waste management activities, including approximate time when activities occurred:
_______________________________________________________________________________________________________
_______________________________________________________________________________________________________
h. Potential contamination history. Has there been a reported spill at the proposed project site, or have any Yes No
remedial actions been conducted at or adjacent to the proposed site?
If Yes:
i.Is any portion of the site listed on the NYSDEC Spills Incidents database or Environmental Site Yes No
Remediation database? Check all that apply:
Yes Spills Incidents database Provide DEC ID number(s): ________________________________
Yes Environmental Site Remediation database Provide DEC ID number(s): ________________________________
Neither database
ii.If site has been subject of RCRA corrective activities, describe control measures:_______________________________________
________________________________________________________________________________________________________
________________________________________________________________________________________________________
iii.Is the project within 2000 feet of any site in the NYSDEC Environmental Site Remediation database? Yes No
If yes, provide DEC ID number(s): ______________________________________________________________________________
iv.If yes to (i), (ii) or (iii) above, describe current status of site(s):
_______________________________________________________________________________________________________
_______________________________________________________________________________________________________
Groton Elementary School is located approximately 830 feet northwest of the subject property.
Page 11 of 13
v.Is the project site subject to an institutional control limiting property uses? Yes No
If yes, DEC site ID number: ____________________________________________________________________________
Describe the type of institutional control (e.g., deed restriction or easement): ____________________________________
Describe any use limitations: ___________________________________________________________________________
Describe any engineering controls: _______________________________________________________________________
Will the project affect the institutional or engineering controls in place? Yes No
Explain: ____________________________________________________________________________________________
___________________________________________________________________________________________________
___________________________________________________________________________________________________
E.2. Natural Resources On or Near Project Site
a. What is the average depth to bedrock on the project site? ________________ feet
b. Are there bedrock outcroppings on the project site? Yes No
If Yes, what proportion of the site is comprised of bedrock outcroppings? __________________%
c. Predominant soil type(s) present on project site: ___________________________ __________%
___________________________ __________%
____________________________ __________%
d. What is the average depth to the water table on the project site? Average: _________ feet
e. Drainage status of project site soils: Well Drained: _____% of ite
Moderately Well Drained: _____% of site
Poorly Drained _____% of ite
f. Approximate proportion of proposed action site with slopes:0-10%: _____% of site
10-15%: _____% of site
15% or greater: _____% of site
g. Are there any unique geologic features on the project site? Yes No
If Yes, describe: _____________________________________________________________________________________________
________________________________________________________________________________________________________
h. Surface water features.
i.Does any portion of the project site contain wetlands or other waterbodies (including streams, rivers, Yes No
ponds or lakes)?
ii.Do any wetlands or other waterbodies adjoin the project site? Yes No
If Yes to either i or ii, continue. If No, skip to E.2.i.
iii.Are any of the wetlands or waterbodies within or adjoining the project site regulated by any federal, Yes No
state or local agency?
iv.For each identified wetland and waterbody on the project site, provide the following information
Streams: Name ____________________________________________ Classification _______________________
Lakes or Ponds: Name ____________________________________________ Classification _______________________
Wetlands: Name ____________________________________________ Approximate Size ___________________
Wetland No. (if regulated by DEC) _____________________________
v.Are any of the above water bodies listed in the most recent compilation of NYS water quality-impaired Yes No
waterbodies?
If yes, name of impaired water body/bodies and basis for listing as impaired: _____________________________________________
___________________________________________________________________________________________________________
i. Is the project site in a designated Floodway? Yes No
j. Is the project site in the 100 year Floodplain? Yes No
k. Is the project site in the 500 year Floodplain? Yes No
l. Is the project site located over, or immediately adjoining, a primary, principal or sole source aquifer? Yes No
If Yes:
i.Name of aquifer: _________________________________________________________________________________________
8±
Howard gravelly loam (HdD), 15-25% slopes
22
Bath and Valois soils (BgC), 5-15% slopes
17
Phelps gravelly silt loam (PhB), 3-8% slopes
15
10±
57
28
15
43
32
25
C898-93, 898-97
Federal Waters, Federal Waters, Federal Waters,... **See below
Name - Pollutants - Uses:Owasco Inlet, Upper, and tribs Nutrients Aquatic Life
Principal Aquifer
below grade surface*
**The EAF Mapper indicates the presence of federal waterbodies on or adjoining the subject property. Review of the NYSDEC Environmental Resource Mapper indicates that the subject property contains a
Stream regulated as 898-93 and classified as C (i.e., for fisheries and non-contact activities). Additionally, a Stream regulated as 898-97 and also classified as C is located approximately 420 feet south of
the subject property. Stream 898-93 is identified on the U.S. Fish and Wildlife Services National Wetlands Inventory (NWI) Mapper as a 7.43-acre Riverine classified as R4SBC and Stream 898-97 is
identified on the NWI Mapper as a 5.53-acre Riverine classified as R4SBC. The NWI Mapper also indicates the presence of a 0.38-acre and 1.20-acre Freshwater Forested/Shrub Wetland both classified as
PSS1E, as well as a 0.27-acre Freshwater Emergent Wetland, which is classified as PEM1E. These three (3) wetlands are located to the adjacent east of the subject property.
*There are areas on the northeastern portion of the subject property with perched water at approximately seven (7) feet below grade surface.
below grade surface
Page 12 of 13
m. Identify the predominant wildlife species that occupy or use the project site: ______________________________
______________________________ _______________________________ ______________________________
______________________________ _______________________________ ______________________________
n. Does the project site contain a designated significant natural community? Yes No
If Yes:
i.Describe the habitat/community (composition, function, and basis for designation): _____________________________________
________________________________________________________________________________________________________
ii.Source(s) of description or evaluation: ________________________________________________________________________
iii.Extent of community/habitat:
Currently: ______________________ acres
Following completion of project as proposed: _____________________ acres
Gain or loss (indicate + or -): ______________________ acres
o. Does project site contain any species of plant or animal that is listed by the federal government or NYS as Yes No
endangered or threatened, or does it contain any areas identified as habitat for an endangered or threatened species?
p. Does the project site contain any species of plant or animal that is listed by NYS as rare, or as a species of Yes No
special concern?
q. Is the project site or adjoining area currently used for hunting, trapping, fishing or shell fishing? Yes No
If yes, give a brief description of how the proposed action may affect that use: ___________________________________________
________________________________________________________________________________________________________
E.3. Designated Public Resources On or Near Project Site
a. Is the project site, or any portion of it, located in a designated agricultural district certified pursuant to Yes No
Agriculture and Markets Law, Article 25-AA, Section 303 and 304?
If Yes, provide county plus district name/number: _________________________________________________________________
b. Are agricultural lands consisting of highly productive soils present? Yes No
i.If Yes: acreage(s) on project site? ___________________________________________________________________________
ii.Source(s) of soil rating(s): _________________________________________________________________________________
c. Does the project site contain all or part of, or is it substantially contiguous to, a registered National Yes No
Natural Landmark?
If Yes:
i.Nature of the natural landmark: Biological Community Geological Feature
ii.Provide brief description of landmark, including values behind designation and approximate size/extent: ___________________
________________________________________________________________________________________________________
________________________________________________________________________________________________________
d. Is the project site located in or does it adjoin a state listed Critical Environmental Area? Yes No
If Yes:
i.CEA name: _____________________________________________________________________________________________
ii.Basis for designation: _____________________________________________________________________________________
iii.Designating agency and date: ______________________________________________________________________________
Grey squirrels White-tailed deer
Rabbits Raccoons
Field rodents
TOMP001
29± acres
NYSERDA 2022 Soils Data; USDA NRCS Web Soil Survey
Page 13 of 13
e. Does the project site contain, or is it substantially contiguous to, a building, archaeological site, or district Yes No
which is listed on of Historic P
of Historic Places?
If Yes:
i.Nature of historic/archaeological resource: Archaeological Site Historic Building or District
ii.Name: _________________________________________________________________________________________________
iii.Brief description of attributes on which listing is based:
_______________________________________________________________________________________________________
f. Is the project site, or any portion of it, located in or adjacent to an area designated as sensitive for Yes No
archaeological sites on the NY State Historic Preservation Office (SHPO) archaeological site inventory?
g. Have additional archaeological or historic site(s) or resources been identified on the project site? Yes No
If Yes:
i. Describe possible resource(s): _______________________________________________________________________________
ii.Basis for identification: ___________________________________________________________________________________
h. Yes No the project site any officially designated and publicly accessible federal, state, or local
scenic or aesthetic resource?
If Yes:
i.Identify resource: _________________________________________________________________________________________
ii.Nature of, or basis for, designation (e.g., established highway overlook, state or local park, state historic trail or scenic byway,
etc.): ___________________________________________________________________________________________________
iii.Distance between project and resource: _____________________ miles.
i. Is the project site located within a designated river corridor under the Wild, Scenic and Recreational Rivers Yes No
Program 6 NYCRR 666?
If Yes:
i.Identify the name of the river and its designation: ________________________________________________________________
ii.Is the activity consistent with development restrictions contained in 6NYCRR Part 666? Yes No
F. Additional Information
Attach any additional information which may be needed to clarify your project.
If you have identified any adverse impacts which could be associated with your proposal, please describe those impacts plus any
measures which you propose to avoid or minimize them.
G. Verification
I certify that the information provided is true to the best of my knowledge.
Applicant/Sponsor Name ___________________________________ Date_______________________________________
Signature________________________________________________ Title_______________________________________ __________________________
Groton Memorial Park; Genung Nature Preserve; Groton Ave Park; Mill Dam Park; Summer Hill State Forest
Village Park; Village Park; Town Park; Village Park; State Park
varying distances within 5
NY Groton I, LLC
Attn: P.W. Grosser Consulting, Inc. as Environmental Consultant 1/26/2023
PRINT FORM
Sr. Environmental Planner/Project Manager
Katelyn Kaim, AICP
EAF Mapper Summary Report Friday, January 26, 2024 8:55 AM
Disclaimer:The EAF Mapper is a screening tool intended to assist
project sponsors and reviewing agencies in preparing an environmental
assessment form (EAF). Not all questions asked in the EAF are
answered by the EAF Mapper. Additional information on any EAF
question can be obtained by consulting the EAF Workbooks. Although
the EAF Mapper provides the most up-to-date digital data available to
DEC, you may also need to contact local or other data sources in order
to obtain data not provided by the Mapper. Digital data is not a
substitute for agency determinations.
B.i.i [Coastal or Waterfront Area] No
B.i.ii [Local Waterfront Revitalization Area] No
C.2.b. [Special Planning District] Digital mapping data are not available or are incomplete. Refer to EAF
Workbook.
E.1.h [DEC Spills or Remediation Site -
Potential Contamination History]
Digital mapping data are not available or are incomplete. Refer to EAF
Workbook.
E.1.h.i [DEC Spills or Remediation Site -
Listed]
Digital mapping data are not available or are incomplete. Refer to EAF
Workbook.
E.1.h.i [DEC Spills or Remediation Site -
Environmental Site Remediation Database]
Digital mapping data are not available or are incomplete. Refer to EAF
Workbook.
E.1.h.iii [Within 2,000' of DEC Remediation
Site]
No
E.2.g [Unique Geologic Features] No
E.2.h.i [Surface Water Features] Yes
E.2.h.ii [Surface Water Features] Yes
E.2.h.iii [Surface Water Features] Yes - Digital mapping information on local and federal wetlands and
waterbodies is known to be incomplete. Refer to EAF Workbook.
E.2.h.iv [Surface Water Features - Stream
Name]
898-93
E.2.h.iv [Surface Water Features - Stream
Classification]
C
E.2.h.iv [Surface Water Features - Wetlands
Name]
Federal Waters
E.2.h.v [Impaired Water Bodies] Yes
E.2.h.v [Impaired Water Bodies - Name and
Basis for Listing]
Name - Pollutants - Uses:Owasco Inlet, Upper, and tribs Nutrients Aquatic
Life
E.2.i. [Floodway] Digital mapping data are not available or are incomplete. Refer to EAF
Workbook.
1Full Environmental Assessment Form - EAF Mapper Summary Report
E.2.j. [100 Year Floodplain] Digital mapping data are not available or are incomplete. Refer to EAF
Workbook.
E.2.k. [500 Year Floodplain] Digital mapping data are not available or are incomplete. Refer to EAF
Workbook.
E.2.l. [Aquifers] Yes
E.2.l. [Aquifer Names] Principal Aquifer
E.2.n. [Natural Communities] No
E.2.o. [Endangered or Threatened Species] No
E.2.p. [Rare Plants or Animals] No
E.3.a. [Agricultural District] Yes
E.3.a. [Agricultural District] TOMP001
E.3.c. [National Natural Landmark] No
E.3.d [Critical Environmental Area] No
E.3.e. [National or State Register of Historic
Places or State Eligible Sites]
Digital mapping data are not available or are incomplete. Refer to EAF
Workbook.
E.3.f. [Archeological Sites] No
E.3.i. [Designated River Corridor] No