HomeMy WebLinkAbout7 Gulf Hill Rd. Front Yard SetbackTown of Groton- Zoning Board of Appeals
Appeal and Application for Variance or Interpretation Under
the Town of Groton Land Use and Development Code
PO Box 36, 101 Conger Blvd. Groton, NY 13073
Application Fee: $50.00
Tax Map # .3g � -� -18,
Zone:
C --Appeal for a variance to Section �� "Z�f d
due to denial by Town of Groton Code Enforcement Officer.
El-- Appeal for interpretation of Section of
due to belief that decision of Code Enforcement Officer is incorrect.
Owners Name:
Address: 7 6r / F Hi- l o ��-
Phone: 6 0-)- )-I� 0 _
r'c'�'t'j /J 13 10 -.)-
Property Address involved (if different than above)
OJA Ir ct� S PO 60X nit , n✓ 1 j C
Purpose of Request: Re s U(AJeGO x'70 ��^��'Wa
Justification for Request: 01? '00l C. U ei,,J u A a cit ti
J
j
Previous Appeals: (state, dates and purposes of request):
**Owner should submit with this application any additional supporting materials deemed
necessary that will assist the Board to understand the request'
Signature of Property Owner 061- V;11-� 4A���
Public Hearing Date: For Office Use Only
Date Received �� a"v
[�-Approved El- Denied Date:
Receipt # Date �aJ
Signature: k-0.
Date Ad Paid 0
Zoning Board of Appeals, Chair
Town of Groton
Tompkins County, New York
Zoning Law
Stop Work Order
YOU WILL PLEASE TAKE NOTICE that there exists a violation of, Pages 66, of the Town of Groton
Land Use and Development Code 2011,
Location: 7 Gulf Hill Rd. McLean NY 13102
Applicant: Brian Bethke
Tax Map Number: 38.-6-18
Violation: Failure to comply with front yard setback of 3Oft from front lot line.
You are hereby Directed and Ordered to Stop Work,
comply with the law, and remedy the conditions above mentioned
Before any further construction or reconstruction.
Failure to remedy the condition aforesaid and to comply with the applicable provisions of law may
constitute an offense punishable by fine, imprisonment, or both.
Code Official
Official
W. Rick Fritz
Report of Findings: Pergola is too close to the road.
Recommended Action: Cease building, Applv for a variance to the Zoning Board of Appeals
Dated 10/24/2019
Town of Groton Land Use & Development Code of 2011
Section 344. Medium Intensity One District (M1)
344.1 Intent. The intent of the M1 - Medium Intensity One District is to provide for
opportunities for village and hamlet -scale residential and commercial developments to
serve the varied needs of local residents and to define and establish standard
regulations for specific areas in the Town of Groton to assert reasonable controls over
such development and to promote safe, environmentally sensitive and desirable
communities. See Section 341, Land Use Table for allowable land uses in this district.
See Section 303, Right to Farm.
344.2 Area Regulations.
d. Minimum yard depth
Front Yard: 30 feet from front lot line.
On corner lots with single family or two-family homes, one
front yard may be 24 feet. All other corner lots shall have 30
feet for both yards.
. .... ......
77777777�
LIM,
RUaJ
I KI
�1
Town of Groton
A6ricultural Data Statement
Name and Address of applicant: J �A AJ ke `
CIL 01
r I
Location of}� ro osed action: �J f%" ^'� J e-' C
p
Name, address, telephone number (if known) and tripe of farm of owner (s) of land within the
agricultural district which land contains farm operations (s) and upon which the project is proposed or
which is located within 500 feet of the boundarli of the propertij upon which the project is proposed:
Name: Phone:
Address:
TLS pe of farm:
Name: Phone:
Address:
TLjpe of farm:
Naive: Phone:
Address:
TLS pe of farm:
Name: Phone:
Address:
TLS pe of farm:
Tax map or other snap showing the site of proposed project relative to the location of farm operations
identified to the Ag Data Statement.
Comment llti presiding Board:
Signed: Position: Date:
Short Environmental Assessment Form
Part 1 -Project Information
Instructions for Completing
Part 1 - Project Information. The applicant or project sponsor is responsible for the completion of Part 1. Responses
become part of the application for approval or funding, are subject to public review, and may be subject to further verification.
Complete Part 1 based on information currently available. If additional research or investigation would be needed to fully
respond to any item, please answer as thoroughly as possible based on current information.
Complete all items in Part 1. You may also provide any additional information which you believe will be needed by or useful
to the lead agency; attach additional pages as necessary to supplement any item.
Part 1 - Project and Sponsor Information
Names of Action or Project:
1
Project Lockion (describe, and attach a location map):
Brief Description of Proposed'Action: I
Name of Applicant or Sponsor: Telephone: 6
4 E -Mail: ��., -*J ��� rai4'JJ (N -fn
Address:
City/PO: State: Zip Code:
0 /0
1. Does the proposed action only involve the legislative adoption of a plan, local law, ordinance, NO YES
administrative rule, or regulation?
If Yes, attach a narrative description of the intent of the proposed action and the environmental resources that LEI ❑
may be affected in the municipality and proceed to Part 2. If no, continue to question 2.
2. Does the proposed action require a permit, approval or funding from any other governmental Agency? NO YES
If Yes, list agency(s) name and permit or approval:
F-1 F/I
3.a. Total acreage of the site of the proposed action? acres
b. Total acreage to be physically disturbed? acres
c. Total acreage (project site and any contiguous properties) owned
or controlled by the applicant or project sponsor? acres
4. Check all land uses that occur on, adjoining and near the proposed action.
❑ Urban 0 Rural (non -agriculture) []Industrial ❑ Commercial ElResidential (suburban)
❑Forest ❑Agriculture ❑Aquatic ❑Other (specify):
❑Parkland
Page 1 of 3
5. Is the proposed action, NO YES N/A
a. A permitted use under the zoning regulations? El F I El
b. Consistent with the adopted comprehensive plan? 1:1 1-1 121
6. Is the proposed action consistent with the predominant character of the existing built or natural NO YES
landscape? F I El
7. Is the site of the proposed action located in, or does it adjoin, a state listed Critical Environmental Area? NO YES
If Yes, identify: F_\1 F-1
8. a. Will the proposed action result in a substantial increase in traffic above present levels? NO YES
F1 F-1
b. Are public transportation service(s) available at or near the site of the proposed action? El 1-1
c. Are any pedestrian accommodations or bicycle routes available on or near site of the proposed action? ❑ F 1
9. Does the proposed action meet or exceed the state energy code requirements? NO YES
If the proposed action will exceed requirements, describe design features and technologies: F-1 EJ
10. Will the proposed action connect to an existing public/private water supply? NO YES
's
If No, describe method for providing potable water:
11. Will the proposed action connect to existing wastewater utilities? NO YES
If No, describe method for providing wastewater treatment: 1-1
12. a. Does the site contain a structure that is listed on either the State or National Register of Historic NO YES
Places? F;, i, I F-1
b. Is the proposed action located in an archeological sensitive area? El
F-1
13. a. Does any portion of the site of the proposed action, or lands adjoining the proposed action, contain NO YES
wetlands or other waterbodies regulated by a federal, state or local agency? 2`. F I
b. Would the proposed action physically alter, or encroach into, any existing wetland or waterbody? ❑ F I
If Yes, identify the wetland or waterbody and extent of alterations in square feet or acres:
14. Identify the typical habitat types that occur on, or are likely to be found on the project site. Check all that apply:
❑ Shoreline ;]Forest ❑Agricultural/grasslands El Early mid -successional
❑ Wetland ❑ Urban ❑ Suburban
15. Does the site of the proposed action contain any species of animal, or associated habitats, listed NO YES
by the State or Federal government as threatened or endangered? 2 F-1
16. Is the project site located in the 100 year flood plain? NO YES
I V -I 1 1
17. Will the proposed action create storm water discharge, either from point or non -point sources? NO YES
If Yes, El 1:1a. Will storm water discharges flow to adjacent properties? Q NO [:]YES
b. Will storm water discharges be directed to established conveyance systems (runoff and storm drains)?
If Yes, briefly describe: ,ENO ❑YES
Page 2 of 3
18. Does the proposed action include construction or other activities that result in the impoundment of NO YES
water or other liquids (e.g. retention pond, waste lagoon, dam)?
If Yes, explain purpose and size: F-1
19. Has the site of the proposed action or an adjoining property been the location of an active or closed NO YES
solid waste management facility?
If Yes, describe: '`° .' F
20. Has the site of the proposed action or an adjoining property been the subject of remediation (ongoing or NO YES
completed) for hazardous waste?
If Yes, describe: El F
I AFFIRM THAT THE INFORMATION PROVIDED ABOVE IS TRUE AND ACCURATE TO THE BEST OF MY
KNOWLEDGE 1
Applicant/sponsor name: j GA J `T C, Date:
Signature:
I PRINT FORM I Page 3 of 3
TOWN OF GROTON BUILDING PERMIT APPLICATION
Rick Fritz, Code Enforcement Officer - 607-898-4428 or 607-591-9898
No Construction shall begin until a permit has been issued.
Check documents you are supplying:
❑ Application Form & Fee- to Groton Town Clerk at 101 Conger Blvd. (Po Box 36) Groton, NY 13073
❑ Plot plan of the lot with dimensions for new and existing structures, septic and wells.
❑ Construction specification drawings (professional stamped drawings may be required) or Appliance specifications
❑ Completed Affidavit of Exemption for owner occupied residences
❑ If you have a contractor, proof of Workers Compensation or a signed CE -200 Exemption form.
A CE -200 can be applied for @ https://www.wcb.nv.gov/icexempt/index.isp
❑ Sewage System Construction Permit issued by the Tompkins County Department of Health, 607-274-6688 55 Brown
Rd., Ithaca, NY 14850. Applications are on their web site www.tompkinscountvnv.gov/health/eh/owts/index
Owner
NamekQ-
Mailing 2
Address OX Ni ��G}
ProjectTax Map #
Address R �( e ./ie-)euJ N
Description 0
of 1A1 L, /• c ..._ __ /
Date
1'3 �atY
Phone
6 v? cl- HW3
Flood Zone
(yes/no) N o
/ Cost
�•V1� �' �ua�T f-o�c.b, ..1, refglgG�' �roo►� P +�� f ot,l.II Estimate -**P' t-%^
Building Use : � -� � Total Acrea�e Total Floor
iCS,�e ��'� I �of lot : -25 Area — Sq ft
Circle applicable: esiden i or Commercial Will any part of the building be a place used by the Public?
Yes / ,Ncs`)
Will any part of,thp building be used for human Will any part of"the building be a place of employment
habitation? Yes / No where agricultural products are processed, treated or
Builder/ Contractor M Ygc JF packaged? Yes / No ,i
Name &Phone Other Builder /Contractor
Name &Phone
PROJECT COMPLETION or OCCUPANCY PROCESS
1. Permit will be issued upon approval of a completed application with fee and all paperwork as above.
Construction can begin with permit prominently displayed. Permit is good for a one year.
2. Once passing all required inspections including the installation of the E911 sign, the permit will be closed and a
Certificate of Occupancy or Completion will be issued.
NO OCCUPANCY OR USE IS ALLOWED UNTIL PERMIT IS CLOSED!!!
I hereby affirm under penalty of perjury that all information provided in this application is complete, correct, and
contains no misleading statements. I understand that any false or inaccurate information contained in the
application or attachments; any construction changes made after the issuance of a building permit; or failure to
schedule required inspections, may invalidate all permits issued under this application, and that I may be required to
remove any buildings, structures, or other construction started or completed as a result. I certify that I have read and
understand the permit process and all requirements.
I hereby license, permit and give privilege to the Town of Groton, or a designee, to enter the premises or land to
conduct any onsite inspections. Such license or privilege is revoked once the Certificate of Occupancy or Completion
is issued. I understand and agree that no building shall be occupied, used in part or in whole for any purpose, until
first obtaining the Certificate of Occupancy or Completion.
Land Owner(s) Signature: 13 r --,A-,—
[ } APPROVED Date
Comment:
Signedo ' y��----
Co a nforcement Officer
r -
Date: `1-- Z� - aoo
[ ] DENIED
Date Date Received 9.2.2w?
Reason:
Permit Fee 6b. 00
Signed
Receipt # $ 7
Code Enforcement Officer
Activation Date
VARIANCE [ ]GRANTED
Date PERMIT #/ g'Q.Sg
[ ] DENIED
Date Truss Decal
r uj
r-
4
f
{
PLOT PLAN
❑For Interior work only
Check box & skip to Name.
MAP SHOWING THE STRUCTURE IS THE REQUIRED DISTANCE AWAY
FROM PROPERTY LINES AND OTHER STRUCTURES:
Using a survey map (or draw on the line below as the road) sketch your lot including the following
• Property Lines 4 Location/(or proposed) well & septic with distances to lot lines.
• Other structures 4 Location of new structure/addition with distances to lot lines.
4 Center of driveway or right-of-ways 4. Location of reflective house number sign
Cal -C
L o J elrc,G
.till 4
Indicate
North
I
NAME AFR4ADORSTREET - - - - -•--•-•-•-�-�-�-�-•-•-•-•-•-•-•-1 �- - - -�-._._._._._._._._._._._._._._._._._.-.-.'._�I
Owner Name ell-OEr t-cuf L 5�4�.
Lot Size Tax Map #
( Acres)
34a. -6-i8.
Amount of Road Frontage
CERTIFICATION-
I herby affirm under penalty of perjury that all information provided in this application is complete, correct, and contains
no misleading statements. I understand that any false or inaccurate information contained in the application or
attachments; any construction changes made after the issuance of a building permit; or failure to schedule required
inspections, may invalidate all permits issued under this application, and that I may be required to remove any buildings,
structures, or other construction started or completed as a result. I certify that I have read and understand the permit
process and all requirements. I hereby authorize the Code Enforcement Officer of the Town of Groton, or a designee, to
conduct all onsite inspections. I understand and agree that no building shall be occupied or used in part or in whole for
any purpose until obtaining the Certificate of Occupancy or Completion.
Owner(s) Signature: b,r-,?,r e_j ' Date:
All
?In
, IN
fq,
Afta