HomeMy WebLinkAbout2019-06-26 SpecialTOWN OF GROTON — MINUTES OF SPECIAL TOWN BOARD MEETING
BID OPENING - HIGHWAY GARAGE ROOF REPLACEMENT
WEDNESDAY, JUNE 269 2019 AT 7:00 PM
THE TOWN HALL, 101 CONGER BOULEVARD
Town Officers Present:
Donald F. Scheffler, Supervisor
Richard Gamel, Councilperson
Crystal Young, Councilperson
Brian Klumpp, Councilperson
Sheldon C. Clark, Councilperson
Michael Perkins, Highway Supt.
April L. Scheffler, Town Clerk
W. Rick Fritz, Code Official
Donald Armstrong, Attorney
Also Present:
David Spaulding, J&B Installations, Inc.
Robert Young
The Special Meeting was called for the purpose of opening bids for the Highway Garage Roof
Replacement; for discussion and action on awarding such bid; and for action on a Permissive Referendum
to spend funds from the Town of Groton Capitol Municipal Building Repair Account for said purpose.
BID OPENING
Bids had been received from AB Construction and Roofing, Inc. and J&B Installations, Inc. and are
attached in the following pages.
Special Town Board Minutes Page 2 June 26, 2019
BID FORM
TOWN OF GROTON
REPLACEMENT OF ROOF OF THE TOWN HIGHWAY GARAGE - 2019
Town of Groton
101 Conger Blvd.
PO Box 36
Groton, New York 13073
GENTLEPERSONS:
The undersigned bidder has carefully examined the Contract Documents for the proposed work and will provide all
necessary labor, materials, equipment and incidentals as necessary and called for by the said contract Documents in the
manner prescribed therein and in said Contract, and in accordance with the requirements of the Town of Groton at the
following unit and lump sum prices:
Name of Bidder: AB Construction and Roofinq Inc.
Address of Bidder: 2586 Main St., Whitney Point, N.Y. 13862
Signature:
Signed By: Daniel T. Baker
Title : President
Date: 6-26-2019
NOTE: Contractor is advised that all square/linear footages and sheathing material sizes are estimated or
assumed and provided solely for Contractor's convenience and for payment purposes. Contractor shall investigate the
site and make actual determinations as to extent of materials, labor, supplies and incidentals necessary for a complete,
functioning and watertight roofing system.
TOWN OF GROTON
REPLACEMENT OF ROOF AT THE TOWN HIGHWAY GARAGE — 2019
Replacement of the roofing at the Town Highway Garage as shown on the drawing attached as Exhibit A.
Lump Sum Price: includes all materials, labor, supplies, Lump Sum Price
Equipment, transport, incidentals, disposal, etc. (Words) (Numerals)
BID - Pursuant to and in compliance with the advertisement for bids and the instructions to bidders relating hereto, the
undersigned, as a bidder, proposes and agrees, if this proposal is accepted, to furnish the Town of Groton, New York,
the above-mentioned product(s) as required by the manner therein prescribed by the Purchaser prior to the opening of
bids.
Work shall begin no more than ten (1% calendar days from the execution of the Contract by the parties. The work shall
be completed within sixty (,V) days from the execution of the Contract by the parties.
Le -Fu a! q ��c�a�:� 6► dale o� award
�� C U� � `4
�� y
Special Town Board Minutes Page 3 June 26, 2019
PROPOSAL
Z:]Ei
AB Construction & Roofing, Inc. (607) 692-2858
2586 Main Street Quality Roofing Safely Installed Right - The First Time! Fax (607) 692-7639
Whitney Point, N.Y. 13862 T062619PUBPJ www.abconstructionandroofinq.com
PROPOSAL SUBMITTED TO PHONE DATE
Town of Groton 607-898-5035 June 26, 2019
STREET E-MAIL ADDRESS
101 Conger Blvd. (P.O. Box 36) 607-898-3086 townclerk(a)grotontown.com
CITY. STATE AND ZIP CODE JOB NAME/LOCATION
Groton, N.Y. Groton Highway Garage Roof Replacement
ARCHITECT DATE OF PLANS CONTACT CONTACT PHONE
Don Scheffler 607-898-5102
AB Construction & Roofing, Inc. proposes to furnish all insurance, labor, materials and debris removal to complete the
job as follows:
- Over existing smooth modified Built -Up -Roof System, adhere one layer of fleeceback EPDM
(.115) using foam bead adhesive
- Flash new EPDM to existing vent/exhaust pipes and exhaust fan curb
- Provide and install two new cast roof drains to tie into existing drain leaders with Ferncos
inside the garage
- Terminate new EPDM with new, standard color, edge metal fascia over existing metal edge
Provide a 20 Yr. Manufacturer's Watertight Warranty (Labor & Material) $ 64,000.00
Note: Two new roof drains are included because the existing ones are in poor condition and
they are high.
Not Includinq
- Roof tear off - Gutters
- Permits or testing (if required) - Asbestos work
- Interior cleaning - Winter conditions
- Drain pipe insulation - Bonding
- Sales tax
We Propose hereby to furnish material and labor - complete in accordance with above specification, for the sum of:
Sixty Four Thousand dollars (s 647000.00 �.
Payment to be as follows.
As Work Is Completed
All material is guaranteed to be as specified. All work to be completed in a workman
like manner according to standard practices Any alteration or deviation from above
specifications involving extra costs will be executed only upon written orders, and will
become an extra charge over and above the estimate All agreements contingent upon
strikes. accidents, or delays beyond our control Owner to carry fire, tornado, and
other necessary insurance. Our workers are fully covered by Workmen's Compensation
Insurance, AB Construction & Roofing Inc. will not be liable for mold.
Acceptance of Proposal -the above prices, specifications and
conditions are satisfactory and are hereby accepted. You are authorized to do the work
specified Payment will be made as outlined above
Date of Acceptance
Authorized
-
Signature
DAN BAKER, PRESIDENT
Note This Proposal May be
withdrawn by us if not accepted within
30 deys.
Signature
Signature
Special Town Board Minutes Page 4
RID FORM
TOWN OF GROTON
REPLACEMENT OF ROOF OF THE TOWN HIGHWAY GARAGE - 2019
Town of Groton
101 Conger Blvd.
PO Boa 36
Groton, New York 13073
June 26, 2019
GENTLEPERSONS:
The undersigned bidder has carefully examined the Contract Documents for the proposed work and will provide all
necessary labor, materials, equipment and incidentals as necessary and called for by the said contract Documents in the
manner prescribed therein and in said Contract, and in accordance with the requirements of the Town of Groton at the
following unit and lump sum prices:
Name of Bidder: J&B Installations, Inc.
Address of Bidder: 732 Visions rive, POB 18 , Ska teles F s, Y 13153
Signature:
i
Signed By: Robert J Parker
Title : President
Date: 6/19/2019
NOTE: Contractor is advised that all square/linear footages and sheathing material sizes are estimated or
assumed and provided solely for Contractor's convenience and for payment purposes. Contractor shall investigate the
site and make actual determinations as to extent of materials, labor, supplies and incidentals necessary for a complete,
functioning and watertight roofing system.
TOWN OF GROTON
REPLACEMENT OF ROOF AT THE TOWN HIGHWAY GARAGE — 2019
Replacement of the roofing at the Town Highway Garage as shown on the drawing attached as Exhibit A.
Lump Sum Price: includes all materials, labor, supplies, Lump Sum Price
Equipment, transport, incidentals, disposal, etc. (Words) (Numerals)
Seventy Four Thousand Dollars** 74,000.00**
**See attached J&B Scope of Work Dated 6/26/2019
BID - Pursuant to and in compliance with the advertisement for bids and the instructions to bidders relating hereto, the
undersigned, as a bidder, proposes and agrees, if this proposal is accepted, to furnish the Town of Groton, New York,
the above-mentioned product(s) as required by the manner therein prescribed by the Purchaser prior- to the opening of
bids.
Work shall begin no more than ten (10) calendar days from the execution of the Contract by the parties. The work shall
be completed within sixty (60) days from the execution of the Contract by the parties.
Special Town Board Minutes Page S June 26, 2019
INSTALLATIONS, INC.
INDUSTRIAL & COMMERCIAL ROOFING CONTRACTORS
Single Ply
June 26, 2019
Membranes
Town of Groton
Firestone
Genf lex
101 Conger Boulvard
Carlisle
PO Box 36
Sarnafil
Groton, NY 13073
Duro-Last
(607) 898-4428 Rick Fritz
Built -Up
completed operations coverage.
Roofs
3. Provide all safety equipment required by OSHA and supply workers properly trained on
GAF
Re: Town Highway Garage
Garland
4. Broom sweep, debris from the existing roof.
Tremco
5. Remove (1) existing roof top ventilator. Cover the opening with new '/a" steel.
Sop rem a
Rick Fritz,
Si pl ast
roofing.
Firestone
7. Fully adhere, Firestone non -reinforced 60 mil, black in color, EPDM membrane to the
Below is a description of the existing roof.
Green Roofing
1. Consist of a smooth modified- bitumen membrane, applied over '/2" fiberboard,
xeroflor
which is applied over a concrete deck.
Roof a
2. There is ponding water between each drain and from the drain to the outer roof edge.
Bui w
CusThe
existing drains should be lowered, to allow proper roof drainage.
Metal
Roof/Wall
J&B Installations scope of work for the above reference project, as priced in the quoted cost:
Panels
ATAS
TAS
MBO
1. Provide AIA contract with "Hold Harmless Agreement" with complete scope of work
Fab ral
including payment terms.
Englert
2. Provide liability insurance $2,000,000.00/$4,000,000.00; $10,000,000.00 Umbrella and
Petersen
Workman's Compensation Insurance Certificates. Liability policy shall include
Firestone
completed operations coverage.
Metal Roof
3. Provide all safety equipment required by OSHA and supply workers properly trained on
Coatings
OSHA safety.
Truro
4. Broom sweep, debris from the existing roof.
United Coatings
5. Remove (1) existing roof top ventilator. Cover the opening with new '/a" steel.
Roof Accessories
6. Adhere (1) layer of 1" thick, polyisocyanurate rigid insulation board to the existing
Roof Hatches
roofing.
Skylidits
7. Fully adhere, Firestone non -reinforced 60 mil, black in color, EPDM membrane to the
insulation board.
Sheet Metal
8. Install all manufacturer specified flashing details to all roof penetrations and drains.
Fabrication
9. Install new Gravel Stop metal to all roof edges. Color of all edge metal will be chosen by
Copings
Gravel Stops
owner from manufacturer's standard color chart.
Fan Guards
10. Provide owner with Manufacturer's 20 year full roof system warranty. Warranty to cover
Gutters
all materials and workmanship against defects for full 20 years and is not prorated.
Roof Ladders
11. Clean up and haul away all job, related debris. Debris to be disposed of off-site in legal
Asbestos
landfill.
Abatement
Note: To meet Firestone warranty, a pull test will need to be conducted on the adhesion of
Waterproofing
the new insulation board to the existing roof. Firestone will also inspect the completed roof
Sarnafil
and supply the No DOLLAR LIMIT warranty.
732 Visions Drive - PO Box 188 - Skaneateles Falls. New York 13153
Tel: (-3] 5) 685-8993 - Fax: (3 15) 685-0508 - Toll Free: 1-800-440-8993
www.jbinstallations.com
Special Town Board Minutes Page 6 June 26, 2019
The Board asked if any contractors were present and wanted to talk about their bid and their processes
and why they thought their process was the best.
David Spaulding, from J&B Installations, was present and spoke to the Board about his company's
process and their plans for the Highway Garage roof. He said that one of the things they would do would
be to install crickets that would direct all of the water toward the drains and explained how they would
work. The crickets hadn't been specifically listed on the bid but had been figured into the total price.
The Board had an extensive discussion on the differences between the two bids. One important
difference to the Board was that AB Construction would put one layer of fleece -back EPDM roofing
material over the existing roof and J&B Installations would install 1" thick insulation board and then an
EPDM membrane over that. They felt that the J&B proposal would provide additional insulation as well
as cover any irregularities in the existing roof that might cause problems with the membrane. The other
main concern was that there is a very large, existing roof -top exhaust fan structure above the former paint
shop. At the pre-bid meeting, the Code Enforcement Officer had let everyone know that this structure
needed to be removed and a suitable plan provided for covering the approximately six-foot hole that
would be left after its removal. The AB proposal said that it would flash to the existing vent/exhaust
pipes and exhaust fan curb. The Board interpreted this as not removing the fan structure as there was no
plan to cover the hole. The J&B proposal said that they would remove the roof -top structure and cover
the hole with new 1/4" steel. Mr. Spaulding said that the roofing would then go over the top of the steel.
The Board and the Code Enforcement Officer felt that this would be a good solution and would make the
roof safe should anyone be walking around up there in the future. In addition to the obvious leaks in the
existing roof, there is also a problem of pooling water. The Board felt that the crickets to direct the water
to the drains was definitely an added benefit and would help prevent future problems.
RESOLUTION #19-064 - AWARD BID FOR HIGHWAY GARAGE ROOF REPLACEMENT
MOVED by Councilperson Clark, seconded by Councilperson Gamel
WHEREAS, the Groton Town Board has reviewed and compared bids for the replacement of the
Highway Garage roof from AB Construction & Roofing, Inc. and J&B Installations, Inc., and
WHEREAS, the Town Board has determined that in their opinion the J&B Installations proposal for 1"
insulation board covered by an EPDM membrane would be of better quality and provide more insullation
than a fleece -backed EPDM membrane, and
WHEREAS, J&B Installations has provided a plan for removing the roof -top fan structure and safely
repairing the resulting hole while AB Construction provide no plan and indicated just flashing, and
WHEREAS, J&B has provided what the Town Board considers and excellent plan for ensuring that the
water drains efficiently by installing crickets, no therefore be it
RESOLVED, that the Town Board has determined that it is in the best interest of the Town to award the
bid for replacement of the Highway Garage roof to J&B Installations, Inc., in the amount of $74,000.00,
and be it further
RESOLVED, that said award is contingent upon the Town receiving all approvals necessary to use funds
from the Capital Municipal Building Repair Reserve Fund as required by the laws of the State of New
York.
Ayes - Clark, Young, Klumpp, Gamel, Scheffler
Nays -
Resolution Passed
Special Town Board Minutes Page 7 June 26, 2019
RESOLUTION #19-065 - AUTHORIZE USE OF FUNDS FROM THE CAPITAL MUNICIPAL
BUILDING REPAIR RESERVE FUND FOR THE HIGHWAY GARAGE ROOF SUBJECT TO
PERMISSIVE REFERENDUM
MOVED by Councilperson Gamel, second Supervisor Scheffler
RESOLVED, that the Town Board hereby authorizes the replacement of the Town Highway Garage roof.
The contract amount of $74,000.00 will be taken from the Town's Capital Municipal Building Repair
Reserve Fund, and be it further
RESOLVED, that said roof repair will take place unless a petition, in compliance with Section 91 of
New York State Town Law, protesting said resolution and requesting a referendum thereon is received by
the Groton Town Clerk.
Ayes - Clark, Young, Klumpp, Gamel, Scheffler
Nays -
Resolution Passed
There being no further business, Councilperson Gamel moved to adjourn, seconded by Councilperson
Clark, at 8:01 pm. Unanimous.
April L. Scheffler, RMC