Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
11060_FEIS_Figure-4_Revised-Project-Setbacks_pg-1.pdf
&=! &=! Wetland C Wetland J Wetland K Wetland D Wetland FWetland E 13.-1-4.121 18.-1-3.22 18.-1-3.21 13.-2-6.2 18.-1-2 18.-1-3.1 18.-2-1.21 18.-1-3.4 18.-1-3.6 18.-1-3.5 18.-1-3.23 18.-1-3.24 18.-2-1.25 13.-1-4.11 18.-1-1 18.-1-3.31 13.-1-4.4 13.-1-4.22 13.-2-7.2 13.-1-4.122 13.-2-7.8 13.-2-7.5 18.-2-1.27 13.-1-6.2 18.-1-3.8 13.-1-2.1 18.-2-1.24 18.-1-3.32 13.-2-7.4 18.-2-1.7 13.-1-6.6 13.-2-7.1 13.-2-7.7 18.-2-1.23 13.-1-4.3 13.-1-513.-1-6.7 13.-1-6.9 13.-1-6.5 13.-1-6.413.-1-6.8 18.-2-1.62 13.-1-2.1 18.-1-3.25 13.-2-7.3 18.-2-1.61 4 2 Weatherby Rd CR 136 Black Oak Rd µ0 500 1,000250Feet Black Oak Wind Power ProjectTown of Enfield, Tompkins County, New YorkFigure 4: Revised Project Setbacks Notes:1. Basemap: 2-ft resolution natural color orthoimagery, 2007.2. Locations for the Enterprise Products (Houston, TX) Gas Pipeline and NYSEG Existing 115kV Transmission Line were approximated from aerial photography. www.edrdpc.com June 2014 Page 1 of 4 Occupied Structure &=!Turbines Buried Interconnect Access Road Existing 115kV Transmission Line Gas Pipeline 527-ft Setback 100-ft Setback 181-ft Setback Delineated Wetlands Substation Staging Area Project Site Participating Parcel Non-participating Parcel 100-ft setback from mappedor jurisdictional wetlands 181-ft setback from non-participating land parcels 527-ft setback from turbinesand residences