HomeMy WebLinkAboutSeptember 23, 2026 - Special Town of Enfield Special Town Board Meeting Minutes1
Town of Enfield Special Town Board Meeting Minutes
September 23, 2026
6:30 PM
In-Person and Via the Zoom Meeting Platform
Call to Order: Supervisor Stephanie Redmond; Councilpersons Jude Lemke, Cassandra Hinkle, Melissa
Millspaugh, Robert Lynch; Town Clerk Mary Cornell.
Privilege of the Floor: Councilperson Lynch led the Assemblage in the Pledge of Allegiance.
Additions and Changes to the Agenda: N/A
Correspondence: N/A
Business
Budget Work Session: Supervisor Redmond stated that she had already made cuts and it was a painful process.
Blixy gave an overview of the budget. This is money that has been saved and this is not something that she can
predict. Buddy this is not really working as we have taken away the reserves increase s each year. Blixy
explained that she does not have reserve increases in the 2026 and 2027 as equipment is being purchased in
these budget years. Councilperson Lynch this is not something for the 2027 Budget. When he had come on this
Board a previous Town Supervisor stated we had spent a lot of money on a new excavator. Now we are looking
to replace it. Buddy, the life span is 10 years, but it can go longer if it is still in good shape. It all depends on the
condition that it is in. We are having a problem with the loader (It has transmission issues) which may cost
thousands of dollars to fix. It may need to be replaced before 2029. Lynch, they gave us a good deal on it at the
time, could we get another good deal. Rollins, we may be able to get a good deal, trade in value is almost non -
existent. Blixy if we follow this budget as we are now and not contributing anything to the equipment reserve
that is will be at approx. $250,000. Blixy would like the Comprehensive plan to be a part of the approval
process so that she knows that it was approved alongside the budget. Lynch, is there any advantage to bonding
a replacement of the Volvo. Blixy explained that bond counsel and interest can be very expensive. Blixy if you
can pay with cash and avoid financing it is the better option.
Equipment Refurbishment is for the Grader. Lynch asked if there was one main thing wrong with it and Rollins
responded that so far, they are all little things, but we do not yet know. Blixy asked Rollins to explain why the
fuel/diesel did not increase. Lynch, we have budgeted $75,000 and so far, have spent less than $50,000. Rollins
has stated that we have more work to do this year and will spend more on fuel and diesel. Redmond asked
what we are currently paying for diesel. Rollins replied that we pay ~2 less a gallon that you would pay at the
pump. Hinkle, the County stated that salt prices had gone up. Rollins replied that it should not affect us as he
uses about 500 tons of salt a year. He uses more sand than salt. Hinkle asked how much he can store in the salt
barn. Rollins replied it all depends on how it is stacked. Councilperson Lynch. Is a 3% increase enough to retain
employees. Rollins would like to have 5% for his employees.
Blixy went over the expenses related to the Platinum plan for the Town Employees. If we put $3,000 aside per
employee in a health reimbursement account and we went to the Platinum Plan and all of the employees went
with the plan for a single plan, then it would be an approximate savings of $20,000 per year. However this does
not include any costs for an agency to operate an HSA. Lemke, this may be kind of late for this year, but
something we can look at for next year. For the current people this would keep them whole, but a discussion
2
would need to be had to make sure they understand what it means. There are some cash incentives that the
County offers that we could look at. Blixy does believe that significant savings would still be attained. Lynch
would like to see the Town move ahead with this. He backed off last year, but he wants to continue moving
forward. Now there is discussion about delaying until 2028 and he does not want to see that happen. He wants
to be firm with it and continue the process. Lemke, there are several hoops that need to be gone through to
make this happen. Blixy needs a lot of support from the consortium, which has been hard to get. Redmond,
are we planning on offering incentives to new and old employees. Blixy, she is not sure, it would be hard to
have one and not offer it to all. Rollins would like new employees to have the same incentives. Lynch, one, you
let things slide until turnover has happened (employees retire). Or you turn all employees to the Platinum Plan
with an incentive, or give the incentive to all. Lynch would like to see Blixy come up with harder numbers, so
we can see where we are with current and new employees. He is inclined to go along with Lemke and not
allow the new person to get on the HRA plan.
Redmond, has anyone seen anything on this tentative budget that can be changed. Lynch moved to increase
the Justice and Court Clerk to the salary they had requested and no one seconded. Lynch, expect him to bring
this back up at the October meeting. Rollins asked what it would take to increase his employee’s salaries to 5
%, it would be an additional increase of $6,500. Buddy will reduce his materials line by the 2% that will bring
them to 5% with money from his materials line.
Lynch moved to increase the highway employees pay by 5% with the funds coming from the highway
maintenance line and Supervisor Redmond seconded.
Vote: Aye; Hinkle, Lemke, Lynch, Millspaugh, and Redmond
Nay; O Carried.
The Board asked Blixy to provide more solid figures on the insurance and the HRA accounts and correlating
expenses. Discussion continued.
Lynch moved and Redmond seconded to enter executive session under 1051D – Public Officers Law.
Vote: Aye; Hinkle, Lemke, Lynch, Millspaugh, and Redmond
Nay; O Carried.
The Town Board Entered into executive session at 8:46 PM
The Board returned from executive session at 9:10 PM.
Resolution #2026-63 Authorizing the Ratification of a Contract with Fisher Associates, P.E., L.S., L.A., D.P.C. for
Engineering Investigation Services at the Bostwick Road Culvert Replacement Project
WHEREAS, the Town of Enfield is currently undertaking the Bostwick Road Box Culvert Replacement project;
and
WHEREAS, during the course of construction, damage to the precast culvert structure was identified,
necessitating a professional engineering review and investigation; and
3
WHEREAS, the Town Board previously approved a motion on September 9, 2026, to engage Fisher Associates,
P.E., L.S., L.A., D.P.C. to perform a field investigation, review project documentation, and provide a findings
memo regarding the structural integrity of the culvert at a cost of $3,500.00; and
WHEREAS, said motion was drafted and approved at the meeting of September 9, 2026, without the
required 48-hour prior posting; and
WHEREAS, the Town Board now desires to formally ratify the approval of this agreement to ensure compliance
with all procedural requirements; now, therefore, be it
RESOLVED, that the Town Board of the Town of Enfield hereby ratifies and confirms the authorization of the
Town Supervisor to execute a contract with Fisher Associates, P.E., L.S., L.A., D.P.C. for the performance of the
aforementioned professional engineering services at a cost not to exceed $3,500.00., and be if further
RESOLVED, that any and all site inspections performed by representatives of Fisher Associates, P.E. shall be
performed only in the presence and under the supervision of the Town of Enfield Highway Superintendent or
his designee.
Supervisor Redmond and Councilperson Millspaugh moved the original resolution. Councilperson Lynch and
Supervisor Redmond seconded the amendment of the last resolved.
Vote on amendment
Vote: Aye; Hinkle, Lemke, Lynch, Millspaugh, and Redmond
Nay; O Carried.
Vote on the resolution as amended.
Vote: Aye; Hinkle, Lemke, Lynch, Millspaugh, and Redmond
Nay; O Carried.
RESOLUTION #2026-64 Resolution authorizing a public statement regarding the Bostwick Road Culvert
Replacement Project
Whereas, the Town of Enfield has commenced construction on replacement of a stream culvert under
Bostwick Road in the Town, construction forcing a portion of that road’s temporary closure; and
Whereas, unforeseen circumstances have prompted the Town to continue Bostwick Road’s closure for an
indefinite period, closure continuing until further notice; and
Whereas, full transparency demands this Town Board provide the public adequate information as to the
project’s status; therefore be it
Resolved, that the Enfield Town Board hereby authorizes the following Statement regarding the status of the
Bostwick Road Culvert Replacement Project; and be it further
4
Resolved, that the Clerk is directed to post this Statement on the Town website.
****
Statement by the Enfield Town Board on the status of the Bostwick Road Culvert Replacement Project
September 23, 2026
For the past three years, the Town of Enfield has undertaken an effort to replace the aging and undersized
culvert that carries Enfield Creek under Bostwick Road and improve the adjoining streambed. The project will
allow for better stream flow during storm events and reduce risk to critical infrastructure and adjacent
properties in the Cayuga Lake Watershed.
In February 2024, the New York State Department of Environmental Conservation (DEC) awarded the Town of
Enfield a Water Quality Improvement Projects (WQIP) grant of $693,866. This grant money will finance the
majority of the project’s cost. During the two years that followed, the Town commissioned engineering
studies, purchased a replacement concrete box culvert, and awarded a construction contract for culvert
installation and stream realignment of Enfield Creek adjacent to Bostwick Road.
Fisher Associates of Rochester and Ithaca, NY performed the culvert’s engineering design. Jefferson Concrete
Corporation, Watertown, NY, supplied the concrete box culvert at a cost of $471,600. JB’s Excavation,
Apalachin, NY, performed the installation and stream repair. Jefferson Concrete and JB’s Excavation were
each low bidders for their respective products or services.
The Town of Enfield has been assisted in this project by staff from the Tompkins County Soil and Water
Conservation District and a professional engineer with the Tioga County Soil and Water Conservation District,
the latter serving as the Town’s engineering consultant.
A revised budget for this project carries a total cost of $1,100,696. In addition to funds from the WQIP grant,
the Town of Enfield would provide $406,830, principally through in -kind services by its Highway Department.
The Town Board has budgeted money for these expenses. Final cost totals remain subject to change.
On July 6, 2026, Bostwick Road between South Applegate Road and Enfield Main Road, New York State Route
327 was closed to enable the culvert’s replacement. Site work proceeded throughout the summer. On August
14, 2026, placement of the multi-section concrete culvert began. Its placement in the stream was completed
shortly thereafter.
Initial schedules had contemplated that site work would proceed to enable substantial completion of the
project by late-September of this year, with the reopening of Bostwick Road upon that completion.
On September 14, 2026, the Town of Enfield announced that “Due to unforeseen circumstances, Bostwick Rd
between South Applegate Rd and NYS 327 will continue to be closed until further notice.” Accordingly, as of
the date of this Statement, Bostwick Road in the affected area remains closed. A reopening date cannot be
predicted at this time.
Continued closure and temporary cessation of construction operations comes at the recommendation of the
Town of Enfield’s engineering consultant, in consultation with the Town Board and Enfield’s Highway
5
Superintendent. At its meetings of September 9 and again this date, September 23, and acting upon its
engineer’s recommendation, the Town Board retained the services of two firms: the project’s design
engineer, Fisher Associates; and also ATL Engineering, P.C. Both firms will perform inspection services that the
Town deems necessary to ensure the integrity of the culvert replacement project.
Further questions about this project and Bostwick Road’s closure should be directed to Enfield Highway
Superintendent Barry “Buddy” Rollins at 607-272-6490.
The Town of Enfield and its Town Board will attempt to inform the public in a timely manner as best it can as
to the continued status of this project. The Town pledges to reopen Bostwick Road to the public as soon as
practicable. The Town apologizes for any inconvenience this continued closure may have caused.
The Enfield Town Board
Councilperson Lynch moved the Public statement and Supervisor Redmond seconded. Discussion.
Councilperson Lemke moved two amendments. One is to strike the words “and provide it to local media in
accordance with normal protocol.” And the second is to delete the third from the bottom paragraph of the
statement. Supervisor Redmond seconded.
Vote on Amendment’s
Vote: Aye; Hinkle, Lemke, Lynch, Millspaugh, and Redmond
Nay; O Carried.
Vote on Public Statement
Vote: Aye; Hinkle, Lemke, Lynch, Millspaugh, and Redmond
Nay; O Carried.
Adjournment; Councilperson Millspaugh moved and Councilperson Hinkle seconded to adjourn, adjourned at
9:14 pm.
Respectfully submitted,
Mary Cornell
Mary Cornell
Town Clerk