HomeMy WebLinkAbouthigh fac bids-20150709161046.pdf ADDENDUM NO. l February 24, 2011 SPECIFICATIONS FOR NEW HIGHWAY GARAGE TOWN OF ENFIELD APPLICATION: The original specification prepared by Resource Associates of 27 North Church Street, Cortland, New York 13045 dated January 31, 2011, remains in full force and effect, except and only as changed by this Addendum No. 1 which hereby becomes a part of the original specification. 1. Reference : Advertisement for Bid, Information for Bidders a. DATE of BID is HEREBY CHANGED TO MARCH 16, 2011 b. TIME of BIDDING OPENING IS CHANGED TO 5:30 pm. Location remains the same. 2. Reference : Specification Sections 16050, 16430 NYSEG Application and Fees a. DELETE: 16050 - 1.1 E, 1.4 B 1. and 16430 -1.1 B b. INSERT: The owner has made application to NYSEG for the new permanent electrical service and will pay fees associated with the same. This will include poles along the access road and lights on those poles to the building service entrance. Electrical Contractor will be responsible for secondary service from NYSEG transformer to building and temporary electric service to the site per section 01500. Coordinate with NYSEG for requirements. 3. Reference Drawing S-1.22,Sections 01100,02300,15150,16050 underground electric feeds for site and under slab buried sanitary and drainage piping. In order provide more efficient use of available equipment, the General Contractor shall provide excavation and backfill for exterior buried conduit and interior under slab sanitary drainage piping as follows: a. Site Electric : GC to excavate trenches a minimum of 30"in depth from building to; i. Light poles,flag poles,holding tanks,spreader storage structure,salt storage structure, fence gate, well,and other locations as indicated on drawings. ii. Provide 3" bedding material in bottom of trench iii. Electrical contractor to install conduit and pull wires and or conductors and stub above grade. iv. GC to cover with 3" of bedding material then backfill and compact. V. Electrician to test conductivity before and after backfill. vi. Runs to light poles, salt storage and spreader structures may be ganged in single trench. Gate power and control and fuel storage structure runs may be ganged in single trench. b. Under Slab Drainage piping i. GC to excavate trenches for buried sanitary lines at grades and approximately locations shown. Coordinate with Plumbing Contractor. Minimum depth of sanitary lines to be 18"`below'finish floor. Excavate to sufficient depth for 4 of bedding material under pipe. 1 Plumbing Contractor to install and test buried sanitary piping. GC to provide backf ll with bedding material to 4" above piping with assistance of Plumbing contractor to assure no damage to piping. Plumbing Contractor is responsible for leakage or damage to piping and must oversee backfill. iv. GC to provide backfill and compaction with Structural Fill Material to bottom of subbase and subbase for slabs. C. ADD to 01100- 1.2 B 1 j .Excavation and backfill including bedding for site buried` electrical conduits. d. ADD to 01100 - 1.2 B I Excavation and backfill including bedding for buried sanitary and drainage piping under slabs e. ADD to 01 100 1.2 B 4 b "Excavation and backfill of exterior site buried electric by General Contractor. Coordinate runs and installation timing". f ADD to 011001.2 B b- "Excavation and backfill of buried below slab sanitary and drainage piping will be by General Contractor at Plumbing Contractor's direction. Coordinate runs,slope,installation,and timing. PC is responsible for protection of buried pipe and overseeing bedding and backfill placement by GC. 4. Reference: Section 02821 Chain Link Fence, Detail 3/S2.2Section 01100 B 4 b Electrical work: Detail3/S2.2 a. Change 8'to 6' on detail 3/S2.2 Fence and gate are 6'in height.. b. Delete: Chain link fence detail and replace with new attached detail AD-1 SECTION 0281 C. DELETE 2.1 A and B d. INSERT: A Framework: SS 40®Fence Framework to Standard Specification ASTM F 1043, Group IC. High-strength steel pipe triple coated per ASTM F 1043: external coating, Type B internal coating, Type D 1. Terminal Posts 3" diameter 2. Line Posts : 2-1/2" diameter 3 Top and Mid Rails: 1-5/8" diameter. B Fabric to be 9-gauge wire, woven in a 2"diamond mesh. Top selvage to be twisted and barbed, bottom selvage to be knuckled unless otherwise specified. 1. Aluminized fabric shall be manufactured m'accordance with ASTM A 491 and coated before weaving with a minimum .40 ounces of aluminum per square foot of surface area.The steel wire and coating shall conform to ASTM A 817. e. All ties and accessories to match above materials f. CHANGE 2.1-F 1. by Deleting reference to "Heavy Duty". Gate shall be "Structural"type with 4 4" posts and track on both sides of gate. g. DELETE 2.1 F-5, 6, and 7 and INSERT the following: 5. Gate Frame a. The gate frame shall be fabricated from 6063-T6 aluminum alloy extrusions. The top member shall be a 3" x 5" aluminum structural channel/tube extrusion weighing not less than 3.0 lb/If(4.4kg/m). To maintain structural integrity this frame member shall be "keyed" to interlock with the "keyed" track member. If fabricated as a single 2 horizontal piece, the bottom member shall be a 2" x 5" aluminum structural tube weighing not less than 2.0 lb/lf. If fabricated in two horizontal pieces, the bottom member shall be a 5", aluminum, structural channel weighing not less than 2.65 lb/lf, and the two horizontal pieces or sections shall be spliced in the field (the gate frame shall be fabricated in one or multiple sections depending on size requirements or project constraints). b. Vertical Members(Chain Link):The vertical members at the ends of the opening portion of the frame shall be"P"shaped in cross section with a nominal base dimension of no less than 2"x 2" (51mm x 51mm) and weighing not less than 1.6 lb/If(2.3kg/m). Major 2" x 2" (51mm x 51mm)vertical members weighing not less than 1.1lb/If shall separate each bay 'and shall be spaced at less than gate height intervals. Intermediate 1"x 2" (25mm x 51mm)vertical members weighing not less than .82 lb/lf'(1.2kg/m) shall alternate between the 2"x 2"major members. C. Gate Track The gate frame shall have separate semi-enclosed"keyed" tracks,extruded from 6005A-T61 or 6105-T5 aluminum alloy,weighing not less than 2.9 lb/If. Track members are to be located on each side of the top member. When interlocked and welded to the "keyed" top member,it forms a composite structure with the top of the gate frame. Welds are to be placed alternately along the top and side of the track at 9" (229mm)centers with welds being a minimum of 2"(51mm)long. d. All welds on the gate frame >shall conform to Welding Procedure Specification and Procedure Qualification Record to insure conformance to the AWS D 1.2 Structural Welding Code. All individual welders shall be certified to AWS D 1.2 welding code e. Gate Mounting:The gate fi ame is to be supported from the track by four (4) swivel type, self-aligning, 4-wheeled, sealed lubricant,ball-bearing track assemblies. The bottom of each support post shall have a bracket equipped with a pair of 3"(76mm)U11MW guide wheels Wheel cover protectors shall be included with bottom guides to comply with Gap protectors shall be provided and installed, compliant with ASTM F 2200-05. f Diagonal"X"bracing of 3/16"(5mm)minimum diameter stainless steel aircraft cable shall be installed throughout the entire gate frame. 6 The gate shall be completed by installation of approved filler as specified. Chain Link:2"x 2"x 9 gauge aluminized steel chain link fabric shall extend the entire length of the gate,counterbalance must also have fabric to prevent reach through and comply with ASTM F2200. Fabric shall be attached at each end of the gate frame by standard fence industry tension bars and tied at each 2"x 2"(51 mm x 51 mm)vertical memberwith standard fence industry ties.ASTM F2200 requires attachment method that leaves no leading or bottom edge protrusions (cannot exceed 0.5 inch). 7. POSTS: Double sets of support posts;shall be minimum 4" O.D. (102mm) round SS-40 or 4"x 4"x 3/16"wall square steel tubing,grade 500. Gate posts shall be galvanized as per other posts and supported in concrete footings as specified by the design team. h. CHANGE 2.1 F- 11 CONTROLS. 3 a. Push button control at door must be hold down for open and close.If released, gate will stop moving. Button must have clear sight line to full gate to permit use without additional safety on/off devices being installed on gate. If this cannot be accomplished eliminate button. d. General Contractor and Fence supplier responsible for low voltage control wiring including remote push button control. Electric Contractor responsible for power wiring to the gate control and motor. Coordinate conduit nuns and trenching. 5. Reference:Drawing M2.1 Equipment Schedule. Use Equipment Schedule in Specifications. a. AS-1 to be decreased in size to match piping and circulating pump capacities 6. Reference : SECTION 13100 SALT STORAGE FABRIC'STRUCTURE a. The structure shown on the drawings was based on a Cover-All Titan building. Other Manufacturers meeting the specification and size are acceptable. Frame and fabric components must meet specification. 7. Reference:Section 01100-12B 1 g(2),Alternate 7,Section 11801 Vehicle Exhaust Removal System,Drawing M1.1,Equipment Schedule. a. CLARIFICATION: Although normally a mechanical item, the Vehicle Exhaust Removal System specified in section 11801 is to be included in the General Construction Bid, NOT the HVAC bid. The equipment is located on Drawing M1.1 and it's fan is listed in the Equipment Schedule as FUA-I. This is the equipment that is part of deduct Alternate No 7. The fans and louvers for the main truck bay area ARE part of the HVAC contract and are NOT part of Alternate No 7. b. The system is based on a PLYMOVENT system. i. Contact: Tony Melanese, Air Cleaning Systems, 800-247-1020 8. Reference;Drawing S1.22,Lighting Schedule. a. Fixture shown as LP on site drawing is fixture H on Lighting Schedule i. Provide units with photocell operation and a timer for both exterior pole circuits b. Fixture C may be chain hung or ceiling mounted. If chain hung they will be mounted within 24" of ceiling. Height to;be coordinated with Co Ray Vac units to prevent interference and damage. 9. Reference 13554. Pre-engineered Wood Frame Building,General Construction Bid Form, Section 01200. The Pre Engineered Wood Frame Section is extensively modified and two deduct alternates are added to the General Construction Bid form. These changes provide for some variation in building details as follows: for SECTION 13554 DELETE : 1.01 INSERT: 1.01 This Section Includes' A Pre-engineered wood frame structural system consisting of wall columns,roof trusses, lateral bracing system,headers, girts and purlins. B Pre finished siding panels'and metal roofing panels. C Prefinished metal trim items. D Prefinished ridge vents and soffits. E Prefiiiished gutter and downspouts. 4 F Insulation, and liner panel systems DELETE 1.03 A INSERT: 1.03 A Preservative Treated Lumber: I All material to meet AWPA Use Category Standard U l . Treated item shall bear the quality mark of an independent testing agency or service certified by the AWPA to inspect preservative-treated wood. (unless exception listed below). 2 Columns and posts below grade: Use Category UC4B or UC4C for use in exterior in contact with ground with high or severe potential for deterioration 3 Sills,interior baseboard in contact with concrete not exposed to ground,UC2 4 Exterior perimeter base boards,UC4B if in contact with ground and exposed As an exception ICC Evaluation Service Report 1980 ( Building Code Compliance for Micronized Copper Quaternary preservative'treatment)maybe substituted for AWPA Ul compliance. CHANGE 1.03 C 3 and 4 from "current "edition to "2002 " edition as referenced per Building Code of New York 2010 . DELETE 1.03 C -3 a. INSERT: 1.03 C -3 a Connector plates shall be fabricated from ASTM 653 Grade A, 16 to 20 gauge steel sheets galvanized with a G-60 or G 90 coating. DELETE 1.04 System Description INSERT: 1.04 System Description: A Clear span frame: spacing of columns and trusses will be at manufacturer's discretion withe the exception of overhead door locations. If column and truss locations are changed from drawings,provide coordination drawings for other trades in DWG format to allow other trades to modify equipment locations. General.Contractor responsible for coordination ofplans with other trades and costs associated with the same. Window and pass doors may be relocated to as needed to accommodate column spacing. . B Primary framing-wood roof trusses, columns,headers, and wind bracing systems. C Secondary framing-purl ins, girts,baseboards,fascias,blocking, grounds, furring and- other items as required. D Wall and roof systems prefinished ribbed metal panels. E Insulation and liners 1. Wall insulation. 2. Ceiling insulation. 3. Air deflectors. 4. Vapor retarder. 5. Wall stripping. 6. Prefinished ribbed metal panels. CHANGE: 105 A-.3. from Importance factor IV,to Occupancy Category II CHANGE 1.05 A-. 5 from C to B ADD: to 1.05 the following: C Roof and wall system shall be able to withstand the imposed loads with maximum allowable deflection of as allowed by the Building Code of New York D Assembly shall permit movement of components without buckling,failure of joint seals; 5 undue stress on fasteners or other detrimental effects. E Size and fabricate wall and roof system to be free of distortion or defects that would be detrimental to appearance or performance CHANGE 1`.07 A from"30 years"to"25 years" . DELETE : 1.07 B,C,D,E 'F, G,and H INSERT: : 1.07 B Contractor shall be responsible for all materials, whether famished by himself or a subcontractor, and proper storage of the same. DELETE 1.08 A INSERT: 1.08 A Design structural components under direct supervision of a Professional Engineer experienced in design of this work and licensed in the State of New York. ADD 108 C All manufacturers submitting bids for the project must submit with the bid form a list of at list 5 buildings of similar size and purpose, constructed in the Central New York area within the last 5 years. Manufacturer must include name of owner of facility, address,and date of construction as well as an owner contact (not contractor)if available. To be of similar size and use,buildings must house vehicles(municipal trucks, fire trucks,etc) ,have spans of at least 50' and be a minimum of 10,000 sf in area. DELETE 1.09 C DELETE 1.010 B ADD 1.011 D Stack materials on platforms, pallets or other structures covered with tarpaulins or other suitable weather tight ventilated covering. Handle and store structural parts in a manner that will avoid deforming members or subjecting parts to excessive stresses. ADD to 1.012 A- 1. Manufacturer shall also repair,or at its discretion,replace free of charge the building framework, including roofing,and /or siding panels, if directly damaged by snow loads. DELETE 1.012 A-2. INSERT: 1.012 A-2 For a period of THIRTY-FIVE( 35) years a. Repaint or 'replace any roofing or siding panel on which, under conditions of-normal weathering,the paint has separated from the panels due to flaking or peeling. b. Repaint or replace any roofing or siding panels on which, under conditions of normal weathering, chalking greater than a rating of 8 (ASTM D4212 Method " A ") or color change greater than 5 units (ASTM D2244)has occurred. DELETE 1.012 A- 3, 4 , 5, 6 , INSERT: 1.012 A 3 For a period of TWENTY(20)' years: a. Repaint any roofing or siding panel on which, under conditions of normal weathering,exhibit corrosionresulting in red rust greater than 1/2" from any sheared edge which is clearly visible in casual observation. 4. For a period of FIVE( 5 ) years a. Repair, or at its discretion,replace free of charge the building framework,including roofing and/or siding panels,if directly damaged 6 by wind loads,unless damage is caused by flying or falling objects. b. Repair any roof leaks due to defects 'in materials or workmanship_. 5. For a period of ONE (1 ) year: a. Repair other building parts that prove to be defective in materials or workmanship. DELETE 2.01 B-.2 DELETE 2.02 A. INSERT: the following: 2.02 A Columns 1. Laminated Columns a. Fabricated from minimum 3 ply,No I or better southern yellow pine. b The area in contact with the ground shall be pressure treated pursuant to 1.03 above: c. . The treated portion of the column shall be laminated with stainless steel nails or connectors. d. For non full length columns provide details of splice connections and calculations supporting their use. DELETE 2.02 B-1. INSERT: 2.02 B- 1 1. Grade of lumber for use in trusses shall be at manufacturer's discretion but not Tess thanNo 2 or better SPF. Provide calculations verifying use of lumber grades and listed stresses with submittals. CHANGE 2.02 B-3 see 1.03 C 3 a above DELETE 2.02 C-2 see 1.03 A 4 above for Pressure treating DELETE 2.02 C-2 3 4 , and 5 DELETE 2.02 D -L INSERT: 2.02 D- 1 Wall girts or nailers to be a minimum of No 2 or better SPF. Size and spacing to be determined by design calculations ADD to 2.02 G 3. Method of wind bracing to be determined by manufacturer . Provide calculations verifying sizing and type. Calculations to include acknowledgment of door and other opening and to accommodate the same. CHANGE 2.02 I- Headers to read: I Provide built up headers as required by loads. Provide calculations supporting size and material. ADD to 2.02 J. "or 2 x 6 SPF" ADD 2.02 K Interior framing 2 x4 or 2 x 6 No 2 or better SPF ADD 2.02 L Wainscot or base reinforcing. -1. Provide 7/16 OSB orplywood backing panel behind metal siding ofwainscoting or base panel for perimeter of building per sections shown on the drawings. Notch baseboard and first girt or nailer as required to accept wood reinforcing panel and not cause offset of metal panel. 2. Deduct Alternate #11 will deduct backer panel and notching of girts, and ` baseboard and provide for mounting of wainscoting or base panel directly to girts. ADD 2.02 M Fasteners, corrosion protection 1. Manufacturer to provide stainless steel fasteners for all fasteners into pressure treated material. In lieu of stainless steel,manufacturer may provide certification 7 from fastener manufacturer that coating or material used is suitable for use in type of pressure treating material used without deterioration for the fastener type. , 2 Provide certification that the panels used not require protection or separation from pressure treated materials for the type use on the project. If no certification is available,provide separation barrier between pressure treatment lumber and back of panels where in contact: DELETE 2.03 A,B, and C INSERT the following: 2.03 A -Base Bid Exposed Fastener Exterior Roofing and Siding Panels to meet one of the following: 1. Panel substrate shall be .019" thickness commercial steel sheet with an AZ55 Aluminum/Zinc (Galvalume)coating(ASTM A792). a. The weather side of the panel shall receive a nominal one mil polyurethane primer and a nominal one mil topcoat of 70% Polyvinylidene Fluoride Resin ( * KYNAR 500 / HYLAR 5000 ) to achieve a total paint film thickness of not less than two mils. b. The non weather side paint system shall consist of a two coat finish with a total nominal thickness of one half mil. 2. Panel;substrate 26 Gage,with AZ50 or 55 galvalume coating (ASTM A792) Grade 80,000 psi structural steel. Configuration of ribs and panel suitable for proposed loads and spans. Similar to Fabral GrandRib 3 a. Weather side finish: i Alt I -Kynar 500 or Hylar 5000 1 mil and 1 mil primer ii Alt 2 - Silicone Modified Polyester, min I mil over primer, similar to Fabral Enduracote or Akzonobel Ceram-A-Star 2.03 B-Alternate#10 Deduct Bid -Exterior Exposed Fastener Roofing and Siding Panels 1. 29 gage,ASTM A792 galvalume or ASTM A 653 Structural G 90 Galvanized, 80,000 psi yield strength. Rib configuration suitable for span lengths and load, similar to Fabral GrandRib3. Exterior finish - Silicone Modified Polyester similar to Fabral Enduracote 1 mil minimum over primer.Interior finish with galvanizing,zinc pretreatment, sealer coat,primer coat, and backer coat. a. Warranty: 30 year Chalk and fade; 15 year minimum edge rust against acid rain,25 year Non perforation against Acid Rain walls,and 20 year -roofs. 2.03 C-Interior Liner panels-to be one of following: 1. Panel substrate shall be.019"MINIMUM thickness commercial steel sheet with a G90 ( Zinc ) coating (ASTM A525). The exposed side of the panel shall receive a nominal two tenths mil acrylic primer and a nominal eight tenths mil topcoat of white polyester paint to achieve a total nominal paint film thickness of one mil. The non exposed side paint system shall consist of a two coat finish with a total nominal thickness of one half mil. 2. Same panel as Exterior wall panel 3. Same Panel as in 203 B above. DELETE the words "placed in the rib of the steel." from the 4' sentence of 203 E. Placement of screw fasteners in roof and`siding panels to be per panel manufacturer's recommendation for wind uplift roofing rating and leakage warranty. Ordinarily screw fasteners will be in flat section of panel. 8 CLARIFY 2.03 F Soffits Eave soffits vented, gable end soffits solid DELETE 2.03 H Gutters and Downspouts INSERT 2.03 H Gutters and Downspouts 1. Provide 5"style"K" gutter on both sides of building. 2. Material to be one of following: a. same specification as trim b. .030 minimum thickness 3004 H36 tempered aluminum alloy. Exterior finish- Kynar 500 / Hylar 5000 paint system with a total nominal thickness of one mil, hlteriorpaint finish shall be a nominal one half mil polyester wash coat. 3. Silicone sealant and rubber gaskets shall be used at laps to maintain leak prevention and to relieve,stress due to thermal movement. 4. Provide 3"x 4" downspouts with appropriate elbows and connector bands. One per 1800 sf of roof area. Downspout locations to be determine jointly with Engineer and Owner during submittal review. ADD to 2.04 C. Vapor Retarders 1. Min 4 mil thick polyethylene sheets 2. '/2"thick foil faced polyisocyanurate sheets D. Snow retainers;provide one of following: 1. Formed shape from .030" minimum thickness 3004 H36 tempered aluminum alloy,finished with Kynar 500/Hylar 5000 paint system with a total nominal thickness of one mil on the visible side. Wood blocking between purlins over trusses. Non acidic sealant and screw fasteners. 2. SnoJax If or equal as per drawing with adhesive attachment per manufacturer's recommendation for type of panel and finish.'Locate at purlins or blocking. E. Steel comer bracing if used 1. Provide 1 '/2'wide high tensile steel strapping in all unobstructed comers in an 11XV1 configuration ADD to 2.05'Insulation E. Blown fiberglass ceiling insulation R38 with polyethylene vapor retarder. DELETE 3.03 A INSERT the following: 3.03 A Columns 1. Columns may be placed in augered holes on cast in place footings a minimum of P thick. Diameter and depth of footings are dependent on column spacing and uplift calculations. Manufacturer to provide calculations showing details. Provide galvanized steel hold down angles or post anchors; 2 Concrete to meet Section 03300 Concrete requirements 3. Accurately position column in the hole. Set and hold plumb until concrete has set. 4. Backfill with Structural Fill Material as specified in Section 02300. . Compacted in 8"lifts to 98 %Proctor. MODIFY 3.03 E to read 1 Install minimum 2"x4"purlins at minimum 24"on center and attach to trusses with 60d ring shank nails. Size and,spacing of purlins may be modified 9 depending on manufacturers calculations. MODIFY 3.03 F 1. to read 1. Install 2"x4" or 2 x 6 truss ties and ceiling joists at locations and spacing recommended by Manufacturer. Provide calculations verifying load carrying capability for minimum dead loads and truss spans. ADD 3.03 H Interior Framing 1. Install 2"x 4"baseboard with bottom at top of slab planned elevations. 2 Install "x 4"horizontal stripping at maximum 33 1/4" o.c.in areas receiving liner panels. 3. Install 2" x 4" horizontal stripping at maximum 18" o.c. and 2" x 4" vertical blocking at 48"o.c. in areas receiving gypsum board. ADD to 3.05 F 1. "... Gutters may be installed with spikes and ferrules>spaced 24" o.c. if approved by Owner. ADD to 3.05 H. Interior panels 1. Install panels perpendicular to supports, aligned level and plumb. 2. Panels to be fastened to wall girts or stripping with either 2 1/4" EPDM washered ring shank nails or in the same manner as exterior siding panels. 3. Fasten panels to ceiling joists with 1"painted screws ADD to 3.06 A 2. In addition to NFBA -maximum 1/4" from level. 3. - 1/8" from plumb. ADD to 3.06 B Maximum 1/8" from"true" ADD 3.07 Insulation A Ceiling:Install in attic to achieve a "R"value of 38. B. Wall: Install full width,full height and full thickness fiberglass blankets in wallcavities Minimum R 19. C. Vapor retarder: Cover all insulation on interior side with vapor retarder. l. Ceiling:Install sheets with long dimension perpendicular to framing and edges over longitudinal blocking. 2 Walls: Install sheets with long dimension perpendicular to framing and edges over vertical blocking. 3. Joints: Seal all joints with manufacturer approved tape. 4. Repair any damaged foil facers in accordance with manufacturer's instructions. 5. Inspect and Repair vapor retarders after installation of mechanical and electrical trades and prior to installation of sheet rock or liner panels. Seal gaps between electric boxes and vapor retarder with tape or sealant. Seal penetrations of mechanical and plumbing with tape or sealant. Coordinate with mechanical and electrical trades on vapor retarder penetrations and confirm locations prior to start of work to limit cutting and repairs to retarders. For SECTION 01200 ADD to 1.1 ALTERNATES B 10 Alternate Number 10: Deduct for base bid 26 gage Exterior Wall and Roof Panels specified in 2.03 A above and substitute 29 gage panel as specified in 2.03 B above. I I Alternate Number 11 Deduct for eliminating 7/16 OSB backer panel for wainscoting as described in 2.02 L 1 and 2 above. 10 DELETE CONTRACT 1 GENERAL BID FORM INSERT New CONTRACT 1 GENERAL BID FORM with Alternates 10 and 11 added 10. Reference: Specifications and Electrical Drawings a. DELETE SECTION 16620 Packaged Generator System: Owner will provide portable generator. Electrical Contractor responsible for receptacle and manual transfer switch not for Generator. 11. Reference: Electrical Panel Schedule MDP and transfer switch. a. MDP to be changed to a"Main Breaker"panel from MLO or provide fused disconnect prior to panel or with transfer switch. 12. Reference: Section 16050-3.6 and Site drawings a. All conduit in exterior site structures (Salt Storage Building, Spreader Storage, Fuel Cover Structure)are to be treated as underground type installation andhave PVC conduit. 13. Reference: Drawing2.1 B a. DELETE reference to"SSR"roof. See Addendum and Specification forroofing 14. Reference Section 014001.1,A-2,Section 023001.3 and 1.4,Section 033001.1 D TESTING AGENCY. a. The OWNER will provide for field testing Agency for the work for both soil testing (compaction,moisture content,sieve analysis,etc)and for field testing of concrete during pours and laboratory testing of cylinders made in field during pours. Testing agency may provide blank cylinders to Contractor to take samples of concrete in the field.`Owner will hire testing agency and pay for testing of samples and delivery. Contractors to provide support and make site and facility available for testing as required. b. If work is covered or performed without required-test occurring, contractor is responsible for uncovering work or extra cost to TESTINGAGENCY for performing additional. C. IF TESTS FAIL, CONTRACTOR WILL BE RESPONSIBLE FOR ADDITIONAL COSTS TO OWNER FOR RETESTING. d. IF CONCRETE CYLINDER STRENGTH TESTS FAIL AFTER SPECIFIED NUMBER OF DAYS, CONTRACTOR WILL BE RESPONSIBLE FOR REMOVAL AND REPLACEMENT. e. Contractor or supplier is responsible for mix design testing and any factory or independent test results to provide proof that furnish items meet specifications. 15. Reference Drawing S-23 Detail 1/S2.3 Delete 6" dimension a. Bollards shall be 8"pipe. b. Paint bollards per Exterior paint schedule as ferrous metal lb. Reference: Section 01100 and 10520 a. Clarification: General Contractor is to supply building specialties including Fire Extinguishers where shown. 17. Reference Drawing'A-1.2,S-23,PLI,E12 and Panel N DP Schedule, Section 01100: Well and Water Supply a. CT-1 shown on mezzanine on Drawing A-1.2 is the water supply compression tank. It 11 is to be relocated to the floor of the Track Bay(room 101 near the air compressor in the north west comer where the service line from the well comes to the building. CT-1 will be by a separate well contractor. b. DELETE item 30 l on drawing S-1.22 from GC work,but provide excavation and backfill as directed by Well driller for installation of HDPE pipe. If for any reason well driller is not able to install pipe by time contractor is ready to pour building floor,GC to provide 4" long sweep PVC el to act as sleeve for future pipe. C. Electric Contractor to provide power to well with excavation and backfill by GC. EC to provide junction box at corner for Well Driller to install controls at CT-1 d. Plumbing Contractor to provide 3/4" pipe from CT-1 at new location to;distribution system as required. PC to provide shut off valves at CT-1 pressure side to the system. e. Well contractor to provide disconnect at well head. 12 CONTRACT I -GENERAL BID FORM Proposal of (hereinafter called "BIDDER"), organized and existing under the laws of the State of New York doing business as *. (*Insert"a corporation", or "a partnership", of"an individual" as applicable.) To the Town of Enfield (hereinafter called"OWNER"). In compliance with your Advertisement for Bids,BIDDER herebyproposes to perform all WORK for the construction of "PROPOSED HIGHWAY 'GARAGE" in strict accordance with the CONTRACT DOCUMENTS, within the time set forth therein, and at the prices stated below. BIDDER hereby agrees to commence WORK under this contract on or before a date to be specified in the NOTICE TO PROCEED and to fully complete the PROJECT within 180 consecutive calendar days thereafter. BIDDER further agrees to pay as liquidated damages, the sum of$250 for each consecutive day thereafter as provided in Article 9,Paragraph 9.11 of the Supplementary General conditions. BIDDER ACKNOWLEDGES RECEIPT OF THE FOLLOWING ADDENDA BIDDER agrees to perform all the work described in the CONTRACT DOCUMENTS for the following basic lump sum:($ and /100 dollars. ALTERNATES Alternate#1: Delete 40' "Cold Storage" Section Deduct for Alternate#l: ($ )- and /100 dollars. Alternate #2: "Standard" Pre engineered Wood Building Manufacturers Windows in lieu of Specified Windows Deduct for Alternate#2: ($ }. and /100 dollars. Alternate#3: Salt Spreader Storage Structure Deduct for Alternate#3: ($ ). and /100 dollars. Alternate 94: Delete Salt Storage Building. Deduct for Alternate#4: ($ ). and /100 dollars. Alternate#5: Delete Kitchen Cabinets and fixtures. Deduct for Alternate#5: ($ )= and /100 dollars. Alternate#6:Delete Decorative Column Veneers Deduct for Alternate#6 ($and /100 dollars. Alternate#7: Delete truck maintenance area exhaust system Deduct for Alternate#7: ($ ) and /100 dollars. Alternate#8: Delete Fire Alarm and Security System Deduct for Alternate#8 ($ ) and /100 dollars. Alternate#9: Delete Air Compressor equipment Deduct for Alternate#9: and /100 dollars. Alternate #10: Delete 26 Gage Exterior Wall and Roof Panels and Substitute 29 gage Panels as specified'in Addendum 1 Reference Item 9 Deduct for Alternate#10: ($and /100 dollars. Alternate #11: Delete 7/16 OSB backer panel from wainscoting as described in Addendum 1 Reference Item Deduct for Alternate#11 ($ )• and /100 dollars. Contractor: Name: Address: Phone No.: Contact: Respectfully submitted: Signature Title Date License Number(if applicable) (SEAL If BID is by a corporation) Attest 1801, 12 1/2 a Aluminized 4 :Pt Barb Aire 1211 xxxxxxxyyyX 1 5/8 x SS-40 To & Mid Bail 3" x SS-40 Terminal Post 8" x 8 9a Aluminized ChainlinK Fabric 8411 72" 5-40 7 ga Aluminized Tension Wire Line Past q0- •d..p C4 9p 8.. pd pd - °8 •as d_ +} �-1�y 9°a vdp 3000 psi conorete a• a a a a 4211 •9p d Pa pG - G 8 pap a '•a: qpp PO q•p 4811 a• d °4 ?dP 9 9 p P 9.9 pa�a O8 .d A. 9 p q 1 011 12" WHITMORE FENCE COMPANY: -= I . 126 North Street DRYDEN, NEW YORK 13053 ' 607-844-9011 Standard Industrial Spec 6' high DRAWN sY: 02/15/11 SCALE: PAGE: REVISED: 02/15/11 FILE: :Inaustr.i 1 of 1