HomeMy WebLinkAbout1998-04-16;O TOWN OF DRYDEN PLANNING BOARD
APRIL 16, 1998
AGENDA: (1) Pleasant Mountain Subdivision- Re: Road Frontage Properties
MEMBERS PRESENT: CHAIR BARBARA CALDWELL, JOSEPH LALLEY, GORDON
DEIBLER, ERICA EVANS, AND MARTIN
CHRISTOFFERSON.
ALSO PRESENT: HENRY SLATER.
................................................... ...............................
The meeting was called to order by Chair. Barbara Caldwell. Ms. Caldwell circulated a flyer
regarding a planning board workshop and encouraged as many as possible to attend.
Re: PLEASANT MOUNTAIN SUBDIVISION
• Henry Slater stated that the developer had secured financing for the infrastructure,
providing a home existed. The lending institution wished to see a development in progress if they
were to lend money for infrastructure.
Mr. Hovanec phoned the Zoning Department and inquired if this were a possibility?
1. Mr. Hovanec has a conditional approval for the sub - division upon completion of
the road and infrastructure.
2. According to David Putnam the sewer lateral is along Mt. Pleasant Road and
therefore not a problem. The water is to the edge of the property. As long as the
developer works with T.G. Miller Engineers and Surveyors when the water is
extended, doesn't pose a problem.
3. Town Attorney Mahlon Perkins stated that in reality this is not a subdivision
because it can't be recorded. Since he owns the land he can create three
conforming lots. He would return to the Planning Board for a phase one approval
if he wished to build on a forth lot. Mr. Perkins emphases that the developer
should understand he is developing lots, roads and infrastructure simultaneously as
per the original approval.
• Page 1 of 2
0
0
0
.�
JR
4. The proposed lots have road frontage. Lots being considered are # 1, 117 14, and
10.
S. Permits issued will be consistent with zoning.
6. The developer agrees to follow the proposed plan allowing the development of the
road and infrastructure to complete the sub - division later on.
7. The Board is aware that the developer would need their approval for development
after the third lot.
8. The developer needs to have the infrastructure completed within the 180 day
extension, and therefore should comply with the plans submitted..
..................... ...............................
MEETING ADJOURNED
Page 2 of 2