Loading...
HomeMy WebLinkAboutTB 2026-09-17 attTB 9-17-26 Page 1 of 12 TOWN OF DRYDEN TOWN BOARD MEETING September 17, 2026 Zoom Hybrid Present: Supervisor Jason Leifer, Cl Daniel Lamb, Cl Leonardo Vargas- Mendez, Cl Christina Dravis, Cl Spring Buck Other Officials: Loren Sparling, Town Clerk (appointed) Other Town Staff: Amanda Anderson, Bookkeeper Ray Burger, Planning Director *Cassie Byrnes, Secretary to the Supervisor Shelley Knickerbocker, Senior Code Enforcement Officer Dave Makar, Dryden Fiber Executive Director Guest(s): Pete Tyler, Dryden Fire Chief *denotes attendance via Zoom Supv Leifer opened the meeting at 6:06 p.m. Board members and audience recited the pledge of allegiance. TOWN CLERK RESOLUTION #188 (2026) APPROVE MINUTES Supv Leifer offered the following resolution and asked for its adoption: RESOLVED, that this Town Board hereby approves the meeting minutes of August 13 and August 20, 2026. 2nd Cl Lamb Roll Call Vote Cl Vargas-Mendez Yes Cl Buck Yes Cl Dravis Yes Cl Lamb Yes Supv Leifer Yes PUBLIC HEARING (cont.) LOCAL LAW REPEALING AND REPLACING ARTICLE IX OF CHAPTER 240 OF THE TOWN CODE REGARDING CONSERVATION SUBDIVISIONS AND ADDRESSING RELATED MATTERS The public hearing on the “Local Law Repealing and Replacing Article IX of Chapter 240 of the Town Code Regarding Conservation Subdivisions and Addressing Related Matters” remained open from last month’s meeting and was continued at 6:07 p.m. No member of the public provided additional comment, so the Board used the time to resolve the one substantive question left hanging from its August 20 discussion. As drafted and posted, Section 240-9.2 (Applicability) states that the Article applies to all major subdivisions proposed in the Rural Agricultural (RA) and Conservation (CV) districts (amounting to over 60% of the Town), thus making the use of conservation subdivisions mandatory in these areas. The Rural Residential (RR) district was deliberately left out, TB 9-17-26 Page 2 of 12 rendering the use of conservation subdivisions optional in these areas. Board members recalled that an earlier draft had included RR. R Burger clarified that the Planning Board removed it after feedback that the law would otherwise impact too much (over 90%) of the Town. Cl Buck revisited that decision, arguing that public comment from the farming community, as well as the Town’s Agriculture Advisory Committee, supported bringing RR back in, but only where it overlaps a New York State agricultural district. With this addition, conservation subdivisions would be applicable to major subdivisions in about 75% of the Town. Cl Lamb added that so much of RR is qualitatively open space that excluding it would undercut the law’s purpose of preserving it. Two concerns surfaced. The first was administrative. State agricultural districts are renewed on an eight-year cycle, so the overlay shifts over time, and the Town would have to track it. Several members judged this a light burden, as the County publishes the district list, the parcels are already identified for tax purposes, and the applicant would be the one establishing whether the overlap applies. One counterpoint was that the Town does not have in-house GIS capability and would still need a way to verify an applicant’s claim. The second was whether the change restricts housing. The answer given was that it does not reduce how much housing can be built; it changes the process by which it is laid out. A parcel in the overlap area would still be developable, but under the conservation subdivision law rather than the standard subdivision law. The Board reached consensus consistent with the August 20 discussion. The agreed path forward is as follows: ∙ Amend 240-9.2 to extend applicability to “RR districts that overlap with New York State Agriculture Districts;” ∙ Fold in the edits due to typos and formatting errors; ∙ Recirculate the consolidated draft to the Board for a final look; and ∙ Notice the result as a new draft local law for a fresh public hearing next month. R Burger characterized the applicability change as the only edit substantial enough to require re-noticing. The clarifying edits on their own would not have justified a rehearing. There were no additional comments from the public, and the public hearing was left open at 6:18 p.m. PUBLIC HEARING LOCAL LAW TO OVERRIDE THE TAX LEVY CAP The Board opened the public hearing on the local law overriding the State tax levy cap at 6:18 p.m. It was described as the annual measure the Town adopts each year with only the dates changed. The override is a precautionary authorization; it preserves the Board’s ability to exceed the cap if the 2027 budget requires it, without committing the Town to doing so. There were no comments and the public hearing was left open at 6:19 p.m. ANNOUNCEMENTS Budget workshops were scheduled for October 1, October 8, and October 15. The October 1 workshop will follow the joint fire district session that evening. The October 8 and October 15 workshops will follow the regularly scheduled Board meetings. Supv Leifer noted there is room to add a session if needed. PLANNING DEPARTMENT TB 9-17-26 Page 3 of 12 R Burger informed the Board that the Department’s monthly report was circulated to them. He highlighted that the abutments and wing walls for the Rail Trail bridge over Route 13 are complete. The bridge structure is fabricated and waiting in Oklahoma to ship east. A tentative schedule had delivery on September 23 and installation on September 24, with overnight storage at the NYSEG parking lot and the crane mobilized the following morning for same-day placement. Several approvals remained pending, and R Burger cautioned the date could easily move. Installation will happen within a few weeks, but no firm date was available. The original traffic plan required shutting down Route 13 for the day with a detour out to Lower Creek Road and down through Varna. That has been reworked into a single-lane closure with alternating flow all day, avoiding both the detour and a very large number of unhappy commuters. The company invited to present on Battery Energy Storage Systems (BESS) has scaled back its New York operations, is no longer interested in the Dryden project, and is investing elsewhere. There will be no presentation this month. The company was unrelated to the earlier NYSEG discussions. NYSERDA separately presented to the Planning Board and is releasing a second version of its model BESS law. The Town is proceeding with a battery storage law regardless, as part of the Phase 1 zoning rewrite, with the Zoning Advisory Group drafting. It will cover both commercial and residential installations but is focused on commercial. Residential battery systems – the Tesla Powerwall class of product – are already accommodated under existing code as something akin to an HVAC system. Board members noted growing interest in home storage charged during off-peak hours and discharged at peak, both for household cost and grid leveling. DISCUSSION/ACTION ITEMS Authorize Dryden Town Court to Apply for 2026-2027 JCAP Grant The Court has asked for authorization to apply for a Justice Court Assistance Program (JCAP) grant. The resolution under consideration is identical to the one adopted last year except for the grant cycle years. The Board can approve an application for up to $30,000. The Court has requested an amount of $4,849.03 for filing cabinets. RESOLUTION #189 (2026) AUTHORIZE JCAP GRANT APPLICATION Supv Leifer offered the following resolution and asked for its adoption: WHEREAS, the Town of Dryden Justice Court is in need of certain equipment for its offices and has made the Town Board aware of a grant opportunity to cover the expense of that equipment, therefore be it RESOLVED, that this Town Board of the Town of Dryden hereby authorizes the Dryden Town Court to apply for a JCAP grant in the 2026-2027 grant cycle up to $30,000.00. 2nd Cl Dravis Roll Call Vote Cl Vargas-Mendez Yes Cl Buck Yes Cl Dravis Yes Cl Lamb Yes Supv Leifer Yes TB 9-17-26 Page 4 of 12 Approve 2027 Cost of Living Increase for Non-Union Staff A Anderson informed the Board of a decision it needed to make before the 2027 pay schedule – and therefore the 2027 budget – could be finalized. Two reference articles were circulated by email earlier in the afternoon regarding expected CPI (Consumer Price Index) rates for 2027. One was from the Bureau of Labor Statistics’ (BLS) regional report for the Northeast, which lists CPI at 3.9% (regional figure). The other was an article about the projected Social Security COLA increase for 2027, which lists COLA at 3.4% (national figure). (CPI and COLA are similar measures.) The Board opted for the 3.9% COLA increase, reasoning consistency, as the Northeast BLS figure is what the Town has used since A Anderson began preparing the schedule. A Anderson noted in passing that grocery, fuel, and electricity costs supported the higher regional number over the national one, and that the national figure reflects a larger and more diluted basket. RESOLUTION #190 (2026) APPROVAL OF 2027 COST OF LIVING INCREASE FOR NONUNION STAFF Supv Leifer offered the following resolution and asked for its adoption: WHEREAS, the Town Board established a Pay Schedule which set the hiring minimum hourly rate for all positions, which may be increased each year based on a Cost of Living Adjustment (COLA); WHEREAS, the Town Board has reviewed the current and projected 2027 COLA reports for determining the annual payrate increases for the 2027 Pay Schedule; RESOLVED, that this Town Board hereby approves a 3.9% COLA increase for the 2027 Pay Schedule for all nonunion employees. 2nd Cl Dravis Roll Call Vote Cl Vargas-Mendez Yes Cl Buck Yes Cl Dravis Yes Cl Lamb Yes Supv Leifer Yes PUBLIC HEARING (cont.) LOCAL LAW TO OVERRIDE THE TAX LEVY CAP Supv Leifer closed the public hearing at 6:33 p.m. RESOLUTION #191 (2026) ADOPT LOCAL LAW TO EXCEED THE TAX LEVY CAP Supv Leifer offered the following local law and asked for its adoption: RESOLVED, that this Town Board hereby adopts the following local law and directs the Town Clerk to file the same with the Secretary of State of the State of New York: A Law to Override the Tax Levy Limit Established in General Municipal Law §3-c TB 9-17-26 Page 5 of 12 Section 1. Legislative Intent: It is the intent of this local law to override the limit on the amount of real property taxes that may be levied by the Town of Dryden, County of Tompkins pursuant to General Municipal Law §3-c, and to allow the Town of Dryden, County of Tompkins to adopt a town budget for (a) town purposes, (b) fire protection districts, and (c) any other special or improvement district, and Town improvements provided pursuant to Town Law Article 12-C, governed by the Town Board for the fiscal year beginning January 1, 2027 and ending December 31, 2027 that requires a real property tax levy in excess of the “tax levy limit” as defined by General Municipal Law §3-c. Section 2. Authority: This local law is adopted pursuant to subdivision 5 of General Municipal Law §3-c, which expressly authorizes the Town Board to override the tax levy limit by the adoption of a local law approved by vote of at least sixty percent (60%) of the Town Board. Section 3. Tax Levy Limit Override: The Town Board of the Town of Dryden, County of Tompkins is hereby authorized to adopt a budget for the fiscal year 2027 that requires a real property tax levy in excess of the limit specified in General Municipal Law §3-c. Section 4. Severability: If any clause, sentence, paragraph, subdivision, or part of this Local Law or the application thereof to any person, firm or corporation, or circumstance, shall be adjusted by any court of competent jurisdiction to be invalid or unconstitutional, such order or judgment shall not affect, impair, or invalidate the remainder thereof, but shall be confined in its operation to the clause, sentence, paragraph, subdivision, or part of this Local Law or in its application to the person, individual, firm or corporation or circumstance, directly involved in the controversy in which such judgment or order shall be rendered. Section 5. Effective date: This local law shall take effect immediately upon filing with the Secretary of State. 2nd Cl Lamb Roll Call Vote Cl Vargas-Mendez Yes Cl Buck Yes Cl Dravis Yes Cl Lamb Yes Supv Leifer Yes DRYDEN FIRE P Tyler reported on a difficult morning: a head-on collision on Slaterville Road requiring extensive extrication and a multi-department response. The Department was called relatively late and was on scene an additional fifteen minutes beyond arrival. It was the second such incident in a few weeks, following a box truck extrication, and was described as another demonstration of the value of the recently purchased extrication tools. He provided the following details from the August call report: Total calls: 40 Structure fires: 1 Medical calls: 13 Rescue calls: 5 Motor vehicle accidents: 5 Extrications performed: 5 Service calls: 11 Alarm calls: 4 Average personnel per call: 6.7 Average response time: Just over 3 minutes TB 9-17-26 Page 6 of 12 Two figures were highlighted. Five extrications in a single month were offered as direct support for the cost-benefit case made when the tools were purchased. There being only four alarm calls was presented as evidence that the Department’s working relationship with TC3 is having its intended effect – alarms are being taken more seriously at the source and repeat calls are down. The Department hopes the trend holds into the school year. Two public events were announced: 1) the Dryden Fire Department open house on October 11, 11 a.m. to 2 p.m., with apparatus displays, food trucks, and activities, to be held rain or shine; and 2) Fire Prevention Week soon thereafter. District business is also underway. Supv Leifer added that Dryden Ambulance marks its 50th anniversary on September 26 at 1 p.m. P Tyler encouraged attendance, with praise for the service’s sustained performance. ADVISORY BOARD UPDATES Affordable and Workforce Housing Committee Cl Vargas-Mendez reported that the Affordable and Workforce Housing Committee undertook no action items. The Committee heard a presentation from Broome County BOCES on its tiny house construction program, which members found promising, and thus is following up locally with TST BOCES. Board members confirmed the Committee had not discussed zoning because tiny houses are already permitted under the current code; the missing ingredient is someone to build them. Agriculture Advisory Committee Supv Leifer reported that the Agriculture Advisory Committee did not meet last week. Their next session will occur in October. Climate Action Committee Cl Dravis reported that the Climate Action Committee is hosting two events at the Dryden Center for Community. On Tuesday, September 22, 6:30-8:30 p.m., the first installment of a speaker series will take place. This presentation will introduce the Committee itself, how it formed, and what it is working on. On Saturday, September 26, 9 a.m. – 12 p.m., the next Repair Café will occur. Conservation Board Cl Buck reported that the Conservation Board did not meet this month. DRYC (Dryden Recreation and Youth Commission) Supv Leifer reported that the DRYC meets next week. Current business is County program (i.e., OURS, YOURS) requests, which will arrive before month’s end. On grants, the budgeted grant writer position was discussed with a consultant who was used for Town grants a few years ago and who is currently available to work on recreation and other grants. The Board agreed to let the Commission decide and then engage her under whatever her current agreement terms are. The Commission intends to apply for the NY PLAYS grant for playground updates. TB 9-17-26 Page 7 of 12 Planning Board Cl Lamb reported that the Planning Board heard a presentation from Alan Lord, the developer of the 172 Ed Hill Road project, on revised lot designs. The plan now shows 15 lots, each ranging from 5 to 12 acres – most of which are substantially smaller than originally presented. Cl Lamb characterized this as a positive development still under review. The developer will provide the Town access on the rail bed, preserving the option of a trail there. There are no immediate plans to build out the Rail Trail there, but Cl Lamb wanted access secured. R Burger noted that access to some of the homes originally ran off the trail, meaning the trail would function as a shared driveway for a portion of its length. Cl Lamb said plainly that co-using the Rail Trail as a driveway is not something he is enthusiastic about, while acknowledging it may be a trade-off the Town has to accept. Trillium Woods is to be conveyed to the Town. Cl Lamb remarked that the Town had not anticipated becoming the holder of that property but welcomed it. There was also discussion about the need to develop a BESS policy for the Town. The Zoning Advisory Group (ZAG) met and spent considerable time on manufactured homes, clarifying the language and ensuring the zoning rewrite is as open as possible to manufactured housing. R Burger added that the preliminary plat hearing on the Ed Hill Road development is scheduled for next Thursday’s meeting of the Planning Board. Rail Trail Task Force The Rail Trail Task Force last met on August 17, so Cl Lamb had nothing new to offer since his last report on August 20. The next meeting of the Task Force is scheduled for next Monday at 7:00 p.m. Veterans Committee Cl Dravis reported that planning continues on the Hometown Heroes banners, with the Committee chair in contact with both villages. The chair is also exploring the possibility of banners in Varna. For Varna, the Town’s role would be limited to hanging the banners, as NYSEG owns the poles and the Town owns the light fixtures. The chair is also coordinating with the Climate Action Committee. Operation Green Light returns in November, with 500 light bulbs secured – more than expected, with surplus to be stored. DRYDEN FIBER D Makar reported that the project needs easements primarily along highway-by-use roads in order to do underground work in the right-of-way. Easements fully executed (as of September 1, 2026): 75 (compared to 47 in August) Easements fully executed (as of this meeting): ~79 Easements verbally accepted, but not yet signed: 25 Estimated completion: About one-third Easements originally identified: ~240 Easements after verification: ~180 Easements added since May 1 (newly discovered need): +60 TB 9-17-26 Page 8 of 12 The 60 newly discovered locations are largely a consequence of missing pole licensing. Where a pole is not ready for the project’s use, there are two options. The first is to pursue a pole license – coordinating with NYSEG and engineering firms, replacing poles, moving existing attachments – which takes six to 12 months. The second is to come down from the last usable pole, run underground parallel to the road, and go back up at the next ready pole; this process takes about 22 days. Given the project deadline, the second is the working default. That choice converts a licensing problem into an easement problem, which is why the denominator keeps growing. Dryden Fiber has a count of 593 customers, a net gain of 10 in August – 14 added, four lost. Three of the four lost customers moved out of town; one relocated beyond the service area and asked to stay on the list. New owners of the relocated property are expected to sign up. There were 78 inbound service requests in August, 17 more than July. Construction is ongoing all over town. The firm originally engaged for the project did not install grounding in the cabinets, requiring a remediation project that took months, largely waiting on supplies. Completed last month, with an added upgrade giving cabinets both AC and DC power so different server and network device types can be housed, this was described as a major unlock for adding houses to the network, with that work starting within 30 days. Milestone two under the New York State grant required progress on the Caroline hut and 44 miles of construction built – 30% of the project. Both have been met. The associated reimbursement is $3.2 million, expected within 60 days, though D Makar cautioned it is the first reimbursement tied to mileage and the State will scrutinize the claimed miles. Payment could slip to January. Pre-installation – running service from the street to the building ahead of activation, to save time in winter – has begun. Of 43 previously signed-up households emailed in areas expected to activate soon, 37 confirmed they still want service. Installations are underway. About 100 new customers have been added this year against roughly 600 new sign-ups. Demand is well ahead of capacity to serve it. The Municipal Infrastructure Program (MIP) portion totals 147 miles – about 57 in Dryden and about 90 in Caroline. Dryden’s final payment is contingent on the entire project being complete, Caroline included, which is why both builds are being pushed in parallel. D Makar introduced a distinction the Board should carry forward, because the two mileage figures displayed tell opposite stories: Miles constructed and credited (44.1) – Counts toward state reimbursement milestones, about 30% of the required build Miles connected into the live network (5.1) – About 3.4% of the project is actually serviceable The discrepancy exists because gaps in State highway permits, pole readiness, and easements prevent segments from being tied together. Crews can earn milestone credit by building three miles here and five miles there – e.g., on Peruville, Bone Plain, West Dryden, Hanshaw, and Etna Roads – without those segments forming a continuous path back to a point of presence. Progress toward the grant and progress toward customers are, for now, different things. Of the first 106 easements processed, 96 owners said yes and 10 said no, about 90% acceptance. Roughly three-quarters of the owners who signed went on to request service TB 9-17-26 Page 9 of 12 themselves, often the same day. Only a small share of easement targets was already on the waitlist; an early sample put it at about 25 of 150, or 12%. Easement outreach is functioning as customer acquisition. The obstacle in easement acquisition is not refusal; it is contact. For most parcels, the Town has only the tax mailing address – no phone number, no email. Staff resort to search engines, white pages listings, and asking the Planning Department and Clerk’s Office. Once contact is made, the average time to a signed and notarized easement is about 22 days. Where the owner already knows the presenter or the easement specialist, it drops to five or six days. Making first contact can itself take weeks. More than 100 easement packages have been mailed cold (after attempts to contact owners by phone or email have failed), and not one has come back. Every executed easement followed a human conversation. Three or four in the sampled set signed only because staff went to the door in person. The countermeasure is a short advance postcard: “Dryden Fiber is coming. We need your help. It concerns the frontage along the road. Expect a call or a package in the next 10 days.” D Makar described the effect on response as a complete reversal. Without it, cold calls are heard as sales calls. Owners who already have service hear a pitch to switch and never register the word “easement.” The postcard costs about seven days in mail transit, which is now built into the front of the process alongside drafting. Residential customers do not receive a static IP; it is a business-tier benefit. The original add-on product offered five additional addresses for $40 per month, priced competitively against the market. In practice, most businesses needing more than one do not need five and allocating five to a customer who uses only one or two addresses strands the remainder. The revised policy, brought though the Broadband Committee, keeps one address with the business tier and sells additional addresses individually at $10 per month each. Customers pay only for what they use, and the Town preserves its address inventory. A declination letter is sent to those owners who decline an easement. This letter was developed over recent months with Cl Lamb. It is explicit about the consequences assumed due to the declination, as follows: ∙ The parcel will not be included in Dryden Fiber’s construction. ∙ The parcel will not be eligible to connect to the network through the primary build. ∙ Any future connection, if technically feasible, will be at the property owner’s expense – estimated at $3,000 to $5,000 to remobilize engineering, construction crews, directional drilling equipment, and to place a vault and run service. ∙ The parcel’s status will appear on the public service map, shown in red with an explanation that needed property access was not provided. ∙ The owner has 30 days from the date of the letter to reconsider. Four such letters have already been sent by email. One owner reversed within 12 hours. Letters are also sent by certified mail, so the Town holds a signed record that the owner was informed – closing off a future claim of ignorance, including by a subsequent purchaser. Board reaction was favorable, describing it as a fair process that lets people understand what they are declining. Roughly 103 miles remain to be built against a June 30 deadline, about eight-and-a- half months away. Three representatives of New York State’s ConnectALL office are visiting Dryden in person on Monday, from 9 a.m. to roughly 2 p.m., with a fourth joining virtually, to discuss this; engineering staff will also be in attendance. The agenda comprises pole readiness, TB 9-17-26 Page 10 of 12 permits, materials, construction plans, and how the remaining miles get built in the time available. It is the Town’s first in-person meeting with the Empire State Development team. Engineering is currently handled by Vantage Point as primary firm and ECC of Rochester as secondary. The State has asked the Town to bring a role in-house rather than rely solely on outsourced consultants and requested the hire of a Fiber Deployment Manager to own the technical side of delivery: pole readiness, pole licensing, coordination with NYSEG and DOT, and holding subcontractors to the deployment rates their firms have represented as achievable. This sits alongside the existing financial, account management, outreach, and easement functions. The position was posted in July, screened in August, and interviewed the week before the Board meeting. A finalist has been offered the job, paperwork is scheduled for tomorrow, and a Monday start is expected. The name will come before the Board for approval at its first October meeting. All 16 New York State DOT permits are in hand and being implemented. All points of presence (POPs) have been upgraded. Some parcels are expected to go live in the green zone within four weeks. D Makar closed with a request for public patience, framing the network as a 40+ year asset that is worth building correctly now. OTHER ITEMS Tompkins County Council of Governments (TCCOG) Cl Lamb flagged next week’s Tompkins County Council of Governments (TCCOG) meeting as worth attending, as two guests will be featured. Jay Franklin, the County Assessor, will be speaking on the disabled veterans tax credit, an item that was raised at a previous Board meeting and one the Assessor believes municipalities do not understand well. Hailley Delisle from County Planning will also be speaking on the County’s Climate Action Plan. The meeting is publicly noticed and available on Zoom. Establishing Sewer/Water EDUs A Anderson read the following statement regarding the establishment of sewer/water EDUs: This report is to let the Board know about future steps and actions that will need to be taken over the next 9 to 12 months to establish Sewer and Water Equivalent Dwelling Units (EDUs) for future tax assessment. The Town representatives to the Ithaca Wastewater Treatment Facility have been informed that there will be significant debt to be shared between the member municipalities. Also, the Town will have its own debt through EFC for the sewer project and water project capital improvements that have been happening to the Town-owned sewer lines. Currently, the consolidated sewer and water districts have no debt, and all expenses (repairs, maintenance, and supply costs) have been funded through sewer and water usage rates that are set annually by the Town. But with the new debt, the Town will need to levy property taxes to all parcels that are served and within the sewer and water districts to fund these capital improvement debts. In order for debt to be assessed in 2028, the Town will need to determine how to levy the taxes before September 2027 for 2028 budget planning. The consolidated sewer and water study done by TG Miller in 2017 provided a suggested method to assign EDUs for each parcel, but no final action was taken at the time the districts were consolidated in 2019. TB 9-17-26 Page 11 of 12 Looking at the current records, EDUs have not been assessed for the parcels in the districts. The County assessment office has provided their current list of properties that are in the districts. And in the 2017 study, there is a list of properties with possible EDUs assigned. The Town needs to update the assessment roll in order to tax the properties in the districts. The Town will need to look at the properties that are benefitted and those that could benefit (meaning they could have sewer and water service but are not currently utilizing it). At a future meeting, a recommendation will be provided on how to assign EDUs. Once the Town Board approves the recommendation, there will need to be a mailing to every property owner within the district with their individual assessment. Then, there will be a public hearing for a local law to establish the method of assessing EDUs for each property in the district. At this public hearing, which should be held in late spring 2027 (but as late as August 2027), property owners can make comments about the process. The work requires a single individual to take on the process. The position would touch legal, engineering, assessment, planning/zoning, and the Town Clerk’s office (which handles billing). A Anderson volunteered to take it on, describing it as already within the scope of the job and noting the advantage of holding several of the relevant threads – tax assessment, the budget, and the relationships with the engineer and attorney. Concepts discussed include: ∙ Full EDUs for existing served units; a fractional share – a quarter or a half – for vacant parcels ∙ Whether the fraction should turn on acreage or on zoning-permitted density. A two- acre parcel might carry half an EDU because only one house fits. A hundred-acre parcel zoned for one-acre lots raises the question of whether it carries a hundred fractional units. ∙ Mobile home parks are currently billed as a single account but would likely receive units assigned by lot count. ∙ A pre-consolidation precedent exists – a reduced formula by acreage or percentage applied to vacant land, associated with the parcel on Turkey Hill Road where the solar array now sits. The documents exist somewhere and should be located before the Town reinvents the method. The hardest issue is how to treat land that does not receive service but could. The working definition offered for this was land with no structure currently taking service, which would be eligible if the mains run past it. The rationale offered to property owners is that the availability of Town sewer and water is itself a benefit to the parcel, and that the choice is between paying for the infrastructure now or paying to buy into the district later. Cl Lamb’s substantive question was whether a property owner could face a higher assessment purely because of development potential, without changing anything on the parcel. The answer was that this is precisely the open question and there is no final answer yet. Supv Leifer offered to be a part of future discussions on the matter, and voiced that, at roughly 90 parcels, Yellow Barn will need a similar treatment and appears never to have been studied. It also carries an operational problem, as pipes failed last winter and the Highway Department had to replace a section that burst in the cold. Board members agreed that the Highway Superintendent needs to be brought into that conversation, and that it is a separate exercise from the consolidated district work. There being no further business, the meeting was adjourned at 7:31 p.m. TB 9-17-26 Page 12 of 12 Respectfully submitted, Loren Sparling Town Clerk DRYDEN FIBER MONTHLY REPORT for August 2026 DRYDEN BROADBAND COMMITTEE MEETING on Sept 11, 2026 And DRYDEN TOWN BOARD on Sept 17, 2026 Our Mission is to provide reliable, affordable, high - speed, fiber -based internet access. We offer state-of- the-art technology and unmatched customer service. EXECUTIVE SUMMARY – 9/1/2026 ▪The Good News: Easements: The first 75 (+28) are completed (signed and filed);25 more verbally o 593 customers are active as of Sept. 1, 2026 (Net of 10; +14 in August; -4 in August) o 78 in-bound service requests in August (17 more than July) o Construction is on-going all over town: Both underground and aerial o Cabinet/Pop Grounding and DC Power Project: 100% complete ▪Next up: Calix Installations week of September 14 o Milestone #2: Mileage Goal Complete! ▪30% of MIP (44 of 147 miles) ▪$3.2M reimbursement request ▪TBD on payment (review details of miles, construction, and expenditures) o Pre-Installation Process has started Service Requests Service Requests – Map Watchers ▪They installed the cable down the road this week. I know there may be time yet before it all gets connected to the network and tested but I'd like to be put down on the list for installation as soon as its ready. ▪I believe service is coming to our area if it is not here already. We received a postcard in the mail advising that we could register. ▪It seems I'm in the yellow zone so let me know when and if I go green. Thanks ▪Our street is in orange right now on the map, looking forward to joining! ▪It is unclear to me if this service is provided at this location - but it seems if it is not currently it will be in a month or so? ▪Service is coming to my area soon, and I’m signing up early ▪It looks like there is a buildout date for my residence and I want to make sure I'm in the queue for that. ▪Sign me up for the pre-service install. Cable is already hung at my location so I would like to be ready to go as soon as service is turned on. Service Requests – Functionality / Service ▪I wanted to start with the 1gb but if i do not need or notice a difference I was just curious if it is easy to switch to a lower plan? ▪Will I be contacted when you know more about the availability in my neighborhood? ▪Can I use the wifi routers I currently have? Or a new mess system. ▪If we set up an uninterrupted power supply in case there is a power outage, would we continue to receive service or will the power outage affect the main source? ▪we have an existing router, just want to see if it will be possible to use with fiber. ▪Do you provide underground cable installation? At what cost? ▪I'm on the West side of [Road]. Can the fiber be run across/under the road if the main line runs on the east side of the road? ▪Email or Phone, both are fine. Also wondering recommendation of packages - silver, gold or platinum. ▪I would like an additional plume to put in my garage for mesh coverage. I also was reached out to in the past to add service but was not ready at that time. I am ready now! ▪Want 5 Static IP addresses Service Requests – Patient Waiters ▪can't wait no longer ▪we are waiting for you! ▪Please hurry. I’d like to reliably make phone calls, watch tv and get Ring security. Thank you! ▪How quickly can I get service? ▪? When is earliest service can be operational ? ▪Looking forward to add service as soon as it reaches my home ▪I look forward to service! ▪How soon can we start!? ▪Patiently awaiting fiber on Sheldon Rd! ▪I think I may have filled this out before, but I am looking forward to having service available and will sign up as soon as it is in my area. Service Requests - Competition ▪We would like service ASAP as [Our Cable Provider] is trash! We love your residential! ▪I see my property has recently been added to the Yellow and I would very much appreciate being aligned with Dryden Fiber (I'm sick and tired of [Our Cable Provider]) ▪We are unfortunately 1 road away from the edge of your service map [in Groton]. We are sick and tired of being monopolized by [Our Cable Provider] internet and would very much welcome some competition in our area! I would switch over in a heartbeat if you would consider expanding your service a little further north. ▪We have fiber ran from [Our Cable Provider]. Could this be reused without having to run new wire? ▪We're hoping this service is better than [Our Cable Provider]. The rates are considerably less than [Our Cable Provider]. ▪We’re eager and in the Oct 2026 install area! Just got my $90 Internet bill from the monopoly. I was working on WiFi and Fiber broadband Internet products in 1980 at DEC Digital Equipment Corp. 45 years ago! ▪eagerly awaiting a better internet connection than my current DSL line from [Our Phone Provider] ▪Currently connected to [Our Fiber Provider] and ready to not be. ▪Please hurry to [My Road] - our current service is hideous and we can't take it!!!! Service Requests – Name Dropping, unique requests, lots of feelings, etc. ▪At one point, we had been told that this address *does* actually have service, even though it's outside the current zone, because it is next door to Jason Leifer's house, and there was a little "island" there. I'm not sure if that's still true, but if it is, I'd be eager to sign up! Otherwise, please let me know when service is available at our address. ▪Is it possible to cat-proof the setup of the modem/router? We will have 2 cats... ▪anxious to get this installed ▪No ▪We realize that service isn’t available yet, but wanted to get on the list since it should be soon. ▪When can I expect service to start  MIP Scoreboard – August 2026 As of September 10, 2026 291 DAYS TO GO (<11 months) 131.6 miles to build Municipal Infrastructure Program Grant must be completed by 6/30/27  MIP Scoreboard – August 2026 As of September 1, 2026 Months to go: 5.1 ---------- 147 (3.4%) MIP Miles Completed* 206 ---------- 2,711 (7.6%) # of Parcels Reached** 4 ---------- 470 (0.9%) # of Unserved Reached 1 ---------- 74 (1.4%) # of Underserved Reached 58 ---------- 400 (14.5%) # of MIP Installs 10 -------- 36 (27.8%) 44.1 ---------- 147 (30%) MIP Miles Built  Project Highlights Project Name:Dryden Fiber Expansion for Towns of Dryden and Caroline Applicant and Partner(s):Town of Dryden dba, Dryden Fiber and Town of Caroline Construction Miles (Fiber): 147 Total Locations Served:2,711 ConnectALL Grant Amount: $ 11,641,537.00 Local Contribution: $ 906,321.00 Total Project Investment: $ 12,547,858.00  Easement Map Green = Signed:47 Yellow = Accepted: 25 Red = Declined: 6 Gray = Actively Seeking: 172 Unique Neighborhoods: 46 •1 to 11 easements each (ave. 3.34) •We will be tracking 'completed' neighborhoods Support Needed: •Method to handle people who are declining the easement •Location of people we can't find (i.e. LLC owned by someone outside of Dryden or Tompkins or NY State) •Outreach to people who are undecided •Brainstorming on Messaging and Methods to communicate to property owners (special sub-group session)  Easement Map Green = Signed:75 Yellow = Accepted: 25 Red = Declined: 10 Gray = Actively Seeking: 101 Unique Neighborhoods: 46 •1 to 11 easements each (ave. 3.34) •We will be tracking 'completed' neighborhoods Support Needed: •Method to handle people who are declining the easement •Location of people we can't find (i.e. LLC owned by someone outside of Dryden or Tompkins or NY State) •Outreach to people who are undecided •Brainstorming on Messaging and Methods to communicate to property owners (special sub-group session)  #1. Emailed 7/7; 7/8 (new email); 7/13 (reply); 7/14 (reply, scheduled); 7/15 signed! Note: This person knew Cynthia from past experience #5. DEC Land / Yellow Barn State Forest: April 30 to August 19 (2 site visits, multiple applications, Temporary Revocable Permit (TRP),Concurrent Use and Occupancy Agreement (CUOA); 9/10/26 - Redesign and reapplication process started #14. No email, no phone, mailed, no reply; in-person: house empty, for sale, spoke to realtor, spoke to executor (brother), emailed easement, requested legal paperwork as executor #28. Yes! Definitely (Verbally); but didn't want to have to sign; but later did #36. June 29 email; June 30 scheduled (no notary / holiday week); July 7 signed #42. Work around parcel due to home sale; 30+ day deliberation; then wanted bank loan provider permission; waiting for them to come in #59. Prospect in rural area, six signers on trust, located in 3 states, lots of mailing #71. No email, No phone response; in-person, in-person, vacay, truck fire, came in #96. Happens to be 96 years old, no phone or email, package in mail, in-person, came to town hall with spouse to sign Easements Acquisition – First 106 Processed August 2026 (10 declines, 96 accepted)  NYDOT Permits We've applied for 16 NYDOT Permits 15 (+4) have been granted! 1 is in process These cover: Route 13 (Hanshaw to Cortland) Route 366 (Varna to Freeville) Route 392 (E. Main and Virgil Road) Route 38 (Harford to Groton) Route 79 (Slaterville Road) Route 34B (Peruville Road) 1.Parallel Runs 2.Aerial Road Crossings 3.Underground Road Crossings Key Items: Traffic Control Plans and Fiber Count  2026 Construction Plan (Gantt Chart) - As of September 11, 2026 Sep.Oct.Nov.Dec.Jan.Feb.Mar.Apr.May June Freeville Expansion PARTIAL HOLD PARTIAL HOLD PARTIAL HOLD PARTIAL HOLD BUILD BUILD LIVE LIVE LIVE LIVE Greater Dryden PARTIAL HOLD PARTIAL HOLD PARTIAL HOLD PARTIAL HOLD PARTIAL HOLD BUILD BUILD BUILD BUILD LIVE Caroline MIP (5)PARTIAL HOLD PARTIAL HOLD PARTIAL HOLD PARTIAL HOLD PARTIAL HOLD BUILD BUILD BUILD LIVE LIVE Status Definitions PARTIAL HOLD – Pole licensing, NY State Highway Permits, POP Server Upgrades, Easements, network design/redesign:Vantage is directing construction (aerial, underground) to limited parts of the map where we have permits,licenses, and easements. Splicing can be carried out under specific direction.Some installs can happen. BUILD - "Let it rip" - Construction partner has full access to licenses, permits, weather, inventory, materials, and POPs are ready for activating parcels in small bunches. Installations continue. LIVE – Residents in the zone can schedule and can have service installed.  ▪Static IP Addresses – Business Tier Feature o Current: ▪1 Static IP Address provided to each business account ▪No Static IP Addresses provided to residential accounts ▪Additional static IP Addresses sold for $40 per month for 5 static IP Addresses o Proposed: 1 Static IP Address provided to each business account No Static IP Addresses provided to residential accounts Additional static IP Addresses sold for $10 per month for 1 static IP Address Reason for Change: We pay for static IP addresses and most requests and usage is for 2-3 total addresses, not 6 We are assigning 6 when they get the additional 5 pack, but many are unneeded Previously we limited product expansion to tiers and 5 packs of Static IP for monthly on-going billing to keep things simple Policy Items  ▪Property Owner Declination Letter (aka Red Zone Letter): ▪We reached out to you;you have declined, or have not agreed to, the requested easement. ▪Your parcel will not be included in Dryden Fiber's construction. ▪Your parcel will not be eligible to connect to Dryden Fiber. ▪A future connection will be at the property owner's expense. ▪Your parcel's status will be reflected on Dryden Fiber's public service-availability map. ▪“This parcel is not eligible for Dryden Fiber service through the primary construction project because the required property access was not provided. Any future connection to the Dryden Fiber network, if technically feasible, will be at the expense of the parcel owner.” ▪This designation will inform current and future property owners that the parcel was not included in the primary network construction, and that additional construction and expense will be required before service can be provided. ▪Declining an easement may also affect neighboring properties. ▪If you wish to reconsider, please respond within 30 days. Policy Items  ▪Customer Base – Matthew Kinast – Dryden Fiber Accounting ▪Finance – Amanda Anderson – Dryden Fiber Accounting ▪Customer Service - Netegrity ▪Sales Operations/MDUs - Conor Hans, Account Manager ▪Installations – Clarity Connect, Netegrity, Conor Hans, Account Manager ▪Easements – Exec. Dir. Dave Makar; Cynthia Brock ▪Legal – Dave Makar ▪Government Relations and Reseach – Dave Makar, Dan Lamb Team Reports  Customer Base As of September 1st, 2026 (billing date is 1st of month) Speed Number of Subscriptions Billed Monthly Revenue Net Change from Prior month Average Monthly Revenue Residential Silver ($45)400 Mbps 441 19,845 +10 / -2 Gold ($75)700 Mbps 78 5,850 3 Platinum ($90)1 Gbps 46 4,140 1 Total Residential Customers 565 29,835 12 52.81 Commercial Standard ($75)500 Mbps 22 1,650 -2 Preferred ($150)1 Gbps 5 750 Enhanced ($250)2 Gbps 1 250 Total Commercial Customers 28 2,650 -2 94.64 Total of ALL Customers 593 32,485 54.78  0 200 400 600 800 1000 1200 1400 Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec 2026 Dryden Fiber - Customer Count Projected Customer Count Actual Customer Count   Financial Reporting as of August 31, 2026 Revenue and Expenses 2026 Budget and Actual 1-1 to 8-2026 2026 Budget Remainder Revenue Customer Subscriptions 237,660.00 461,950.00 224,290.00 MIP Grant Revenue 1,191,525.96 2,793,968.88 1,602,442.92 Other Revenue Sources 5,135.94 69,200.00 64,064.06 Total 1,434,321.90 3,325,118.88 1,890,796.98 Expenses Construction 6,209,598.96 11,537,893.41 5,328,294.45 Installation 187,497.78 710,000.00 522,502.22 Operations 276,877.60 505,123.01 228,245.41 Total 6,673,974.34 12,753,016.42 6,079,042.08  - 10,000 20,000 30,000 40,000 50,000 60,000 70,000 Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec 2026 Budgeted and Actual Operating Budgeted Expenses Actual Operating Exp Budgeted Revenue Actual Revenue  - 2,000.00 4,000.00 6,000.00 8,000.00 10,000.00 12,000.00 14,000.00 16,000.00 18,000.00 20,000.00 22,000.00 24,000.00 26,000.00 28,000.00 30,000.00 32,000.00 34,000.00 36,000.00 38,000.00 40,000.00 42,000.00 44,000.00 46,000.00 48,000.00 50,000.00 52,000.00 54,000.00 Sept 2025 Oct 2025 Nov 2025 Dec 2025 Jan 2026 Feb 2026 Mar 2026 April 2026 May 2026 June 2026 July 2026 Aug 2026 Dryden Fiber Revenue and Operating Exp. - 12 months Series3 Series1 Series2 Trend Operational Expenses Customer Service As of September 1st, 2026 (billing date is 1st of month) Helpdesk Call Report August 2026 •Bandwidth Complaint (Speed Concerns) •1 •Billing Related Call •6 •Downed Drop (Damaged Service Line) •0 •Email (Calls related to email difficulties) •0 •No Connectivity •4 •ONT / Power Cycle (Calls related to the ONT where unplugging or rebooting equipment was necessary) •1 •Other / Unrelated (Calls looking for unrelated departments or information) •31 •Outage •0 •Install Orders / Create Service •21 •Router Issue •5 •PC / Laptop Issue •1 •Sporadic Connection •0 •Streaming Related Issue •0 •User Error / Education •17 •Wireless •7 Total Service Call Dispatches: 2 Tickets: 94 Customers: 593 June: 68/554 July: 196/567 Aug: 94/593 Ticket / Customer Ratio: 16%June: 12% July: 35% Aug: 16% Note: Install Orders denote an incoming install scheduling request – not a completed install One caller can generate numerous tickets for a single issue (i.e. calls in 5x for same problem) Support@drydenfiber.com 607-391-3500 (direct support number) User Error / Education: User Error / Education: Service inquiry (non-green) Hardware Q's Range Extenders  Account Management – MDUs – Mobile Home Parks -As of: Sept. 1, 2026 Current Task Owner MDU Name And Zone (Green, Yellow, Orange: Could be) Initial Property Owner Outreach Property Owner Paperwork signed Engineering Design Complete Eng. Plan approved by property owner Construction Scheduled Construction Completed Residents Notified Unit Count NEXT STEPS Acct. Mgr Ithaca Estates Yes Yes Yes Yes Yes Yes Yes 9 / 74 None at this time Acct. Mgr Shady Grove MHP (Pinckney) Yes No Yes Yes Yes Yes Yes 0 / 17 Conor: Acquire access agreement. Emailed property owner to set up a meeting(7/9/26) Dave / Acct. Mgr Mott Road Mobile Home Park Yes Yes Yes No No No No 24 Dave: Call Reggie Dave / Acct. Mgr Fall Creek Parke (Etna) Yes Yes Yes Yes Yes Yes Yes 4/38 Live, installs scheduled, door hangers left VPS – plan needed Little Creek MHP (North Road) Yes Yes; however new signature needed No No No No No 100 Conor: Setup meeting with park owners after Fall Creek Parke Acct. Mgr County Acres MHP (McLean) Yes No No No No No No 102 Dave: Follow-up with owner / manager​; Vista Management (Fall Creek Rd./Rt. 366)  Current Task Owner MDU Name And Zone (Green, Yellow, Orange: Could be) Initial Property Owner Outreach Property Owner Paperwork signed Engineering Design Complete Eng. Plan approved by property owner Construction Scheduled Construction Completed Residents Notified Unit Count NEXT STEPS Acct. Mgr Pleasant View (Southworth Rd.) Yes Yes Yes Yes No No Yes 49 Property owner signed agreement Dave / Acct. Mgr Country Manor Estates (Wood Rd.) Yes No Yes No No No No 14 Karel Westerling's property; Yellow zone; plan created Acct. Mgr Hanshaw Village (Hanshaw Road) Yes No; needs engineeri ng review first No No No No No 149 Dave: Follow-up with Cook properties VPS Cook Street (Freeville) Yes No No No No No No 12+Dave: Follow-up on engineering plan to reach park Acct. Mgr Hillside Acres*Yes No No No No No No 150+*Low priority, due to not likely to be built to until 2027 (Poles potentially needed); new owner Account Management – MDUs – Mobile Home Parks -As of: Sept. 1, 2026  Current Task Owner MDU Name Initial Property Owner Outreach Property Owner Paperwork signed Engineering Design Complete Eng. Plan approved by property owner Construction Scheduled Construction Completed Residents Notified Unit Count Notes Account Manager 1062 Dryden Rd. Apts. (Varna) Yes No Yes Meeting Scheduled No No No 21 Conor: finishing touches needed on agreement Account Manager 12-14-16 Lake Street Yes Yes Yes Yes Yes No No 20 Agreement signed, construction started VPS Willow Brook Apartments Yes No No No No No No 50 Service via North Rd (Rt. 13), State Permit (Sept. '26) VPS Willow Brook Office Only Yes No Service via North Rd (Rt. 13), State Permit (Sept. '26) Account Manager 194 Lower Creek Road (Apartments) Yes No No No No No No 28 Conor, Eric: outreach and investigate Account Manager Creekwood Apartments at 200 Lower Creek Rd. Yes No No No No No No 57 Conor, Eric: outreach and investigate Account Management – MDUs – Apartments -As of: Sept. 1, 2026  Account Management – MDUs – Apartments -As of: Sept. 1, 2026 Current Task Owner MDU Name Initial Property Owner Outreach Property Owner Paperwork signed Engineering Design Complete Eng. Plan approved by property owner Construction Scheduled Construction Completed Residents Notified Unit Count Notes / Steps / Blockers Account Manager Freeville Cottages Yes Yes Yes Yes Yes Yes Yes 12 Conor: Marketing / Outreach​. Doorhangers left and postcards sent Dave / Account Manager George Junior Republic Yes N/A (no tenants) Yes Yes Yes Yes Yes 1 Live! Account Manager 1279 Dryden Road (Wawak) Yes No No, TBD N/A No No No No 18 After 1062 (Same owner) Account Manager 1 Etna Lane Yes Yes Yes Yes Yes Yes Yes 3/16 Live!  Account Management – MDUs – Apartments -As of: Sept. 1, 2026 Current Task Owner MDU Name Initial Property Owner Outreach Property Owner Paperwork signed Engineering Design Complete Eng. Plan approved by property owner Construction Scheduled Construction Completed Residents Notified Unit Count Notes / Steps / Blockers Account Manager 9 East Main Yes Yes Yes Yes Yes Yes Yes 1 Community Center Account Manager 2 East Main Yes Yes Yes Yes Yes No No 3 Agreement signed, Construction Started Account Manager 6 East Main Yes Yes Yes Yes Yes No No 7 Agreement signed, construction started Account Manager 1 West Main Yes No Yes No No No No 9 Blocked by NY DOT Permit (Rt. 13) Account Manager 8-10 West Main Yes No Yes No No No No 6-8 Blocked by NY DOT Permit (Rt. 13) Account Manager 12-14-16 West Main Yes No Yes No No No No 6 Blocked by NY DOT Permit (Rt. 13) Account Manager 18-20-22 West Main Yes No Yes No No No No 6 Blocked by NY DOT Permit (Rt. 13) Background ▪We have over 1,000 parcels between Dryden and Caroline where we have service requests outside of the green zone ▪The blockers: NY DOT permits to connect their street; Calix upgrade; construction ▪The good news: MPT / MST locations identified or in-place for hundreds of these locations ▪We will begin "exterior" or "pre-installations" this month ▪Yellow Zone Roads with Requests (and known MPT locations) ▪Rt. 38N from Freeville, West Dryden Road, Peruville Road, Leisure Meadow, Cricket, Palmear ▪Outreach ▪Email to confirm with these future customers ▪Forwarded lists to Clarity Connect for exterior installations ▪Clarity to conduct by neighborhoods ▪Saves us time and winter underground construction hurdles Pre-Installations Pre-Installations Status ▪Outreach Zones (Pilot) ▪Roads: Ocean Drive, Ed Hill, West Dryden Road, Peruville Road, Groton Road, Meadow Drive,Leisure Lane, Cricket Lane, Palmear Road, Hile School Road ▪Service Requests: 43 ▪Confirmation: 27 ▪Not interested: 1 ▪Maybe(asked for details): 1 ▪No response: 14 ▪Timing: ▪September 14 Week – Begin Pre-Installations ▪Outreach to next batch of 56 locations ▪Tracking: ▪Online Spreadsheet Pre-Installations  o Construction ▪Empire Access Overlash Agreement (6 miles of fiber) – Approved by Town Board (9/10/26) ▪Easements: We're processing over 100 locations on -going Operational ▪Dryden – Caroline IMA (Intermunicipal Agreement) for project – with Dryden Town Attorney ▪INHS Varna Project – with Executive Director Legal Update August 2026  o Research ▪Survey Project – Delayed due to easements project Government Relations ▪“THE MUNICIPAL BROADBAND FINANCING MODERNIZATION IMPROVEMENT ACT OF 2026” ▪We will try again in 2027 Government Relations and Research August 2026 APPENDIX A  o Total Addressable Market: 18,000 people; 7,200 households ▪Green Zone:1,815 ▪Live:560 ▪Green Zone Adoption: 31% ▪TAM Adoption: 8% ▪Signed Up: 1,560 22% of households ▪Wait List: 1,000 14% of all households; 18% of non-green zones o Goal: ▪50% or 3,600 households (9,000 people) ▪15% of the way to the goal Goals: Total Addressable Market  Discussion Topics New Signs - February 2025 New Sign Requirements – MIP Grant ▪"This deployment of internet service is supported by a grant awarded to [insert Grantee name] by New York State through the ConnectALL program.” ▪Example from Livingston County / Empire Access Meeting Schedule ▪Dryden Fiber Public Broadband Committee – Public reporting on project o 1st and 3rd Friday morning, 10:30am-11:30am (except July and August, 2nd and 4th Friday morning) ▪Dryden Fiber Operations Team Meeting – Construction and Install Collaboration o Every other Wednesday, 10am-11:15am ▪Dryden Fiber MIP Status Call – Meet with Connect All Office to stay on track o Every Tuesday, 1pm-1:45pm ▪Dryden Fiber MIP Steering Committee – Implementation of the Grant o Monthly (Town of Dryden, Town of Caroline) ▪Dryden Fiber Policy Committee – Advise and Recommend on Policy o Monthly  Financial Reporting Review of Construction Costs from beginning of project Subcontractors (Syr. Util., Lghtspd, etc.), 50%Equipment Purchases, 28% Professional Fees (Leg., Eng., etc.), 13% Permit and Pole Applications, 5% Loan interest, 2% Misc Constru ction Exp, 1% Construction Costs 1/1/21 to 12/31/24 Subcontractors (Syr. Util., Lghtspd, etc.) Equipment Purchases Professional Fees (Leg., Eng., etc.) Permit and Pole Applications Loan interest Misc Construction Exp Permitting Steps 1.Final Design Edits = Survey has occurred and Prelim in is design edits 2.Prelim Sent = Sent to Engineering Firm (VPS) to review/approve and then to NYSEG/Frontier to review 3.Final NYSEG Design Sent = NYSEG reviewing final design before sending the Final Make Ready Package 4.Telco Recon = Telco Review prelim design 5.Frontier Billing Outstanding = Frontier awaiting payment to proceed 6.RFB = Request for Bid sent to contractors 7.MR Construction = Make Ready Contruction - Moves are in progress Other Statuses (from slide 8): ▪Attached – definition... ▪Elec make-ready in process – definition... ▪Telco make-ready in process – definition... ▪Final ELEC Design Input – definition... ▪Avant Grid is NYSEG Permitting Map Colors 1.Green = Conditional license to attach 2.Yellow = non-billable quote approved, quotes back from electrician sub- contractors (i.e. HRS, Davella), when NYSEG gives ok, this moves to Green 3.Red = Design submitted to joint pole owner 4.Orange = make ready work package approved, heading to bid 5.Pink = out for make ready construction 6.Purple = design input (LaBella)