Loading...
HomeMy WebLinkAboutSWTF 2026-08-24 approved minutesTown of Dryden Sewer and Water Task Force August 24, 2026 via Zoom Minutes Approved unanimously on September 28, 2026 Present:Jordan Betts, Scott Hopkins, Miles McCarty, Mike Murphy, Martha Robertson, Kate Supron, David West. Ex officio: Ray Burger. Public:Dustin Brunner Welcome: Martha welcomed SWTF members and reviewed basic expectations for this group. As it is a publicly-appointed body, we’re operating with the understanding that this is a public meeting which will be recorded. We’ll have minutes that have to be approved by the group, which will then be posted along with the meeting recording. Documents will be shared by email between meetings; she asked that if anyone has trouble opening any such documents, please communicate that with her. In addition, please let the group know if you are not able to attend an upcoming meeting. Minutes: Martha briefly recapped the August 6 meeting and referenced the draft minutes that had been emailed. There were no corrections and the minutes were approved unanimously. Member introductions: Martha asked that everyone providea brief summary of their background and relevant expertise, to get to know each other better. David West:Tompkins County Planning and Sustainability Housing and Community Development Director, with a focus on development focus areas and how infrastructure exerts major control and limitations on housing development. Miles McCarty: Mayor, Village of Freeville, previously working in manufacturing and has his own business. The village is now completely restructuring its wastewater treatment system with significant upgrades related to nitrate levels. The new configuration will eliminate the lagoons. Mike Murphy: Mayor, Village of Dryden. Since he came into office, he’s been working to improve the water and sewer systems for residents. He described significant work they’ve accomplished as well as the work that still needs to be done. Jordan Betts:Town of Dryden Deputy DPW Superintendent.Before coming to the Town, he worked eight years at Bolton Point and in the Village of Marathon’s water and sewer department. Hired at Dryden as a water and sewer maintenance supervisor, he has a 2B water license but not a sewer license. Scott Hopkins:retired engineer, worked at Pall Corporation for more than 40 years. Some experience with bioreactors on Dept. of Energy projects, has 20+ patents, and is a corporate trainer on problem solving processes. Kate Supron:Associate Director,Community Relations at Cornell University. Formerly Mayor of Cayuga Heights, she served on the Bolton Point Board and is often called upon to deal with problems Cornell has with sewer capacity. Martha Robertson:Retired Tompkins County Legislatorfrom the western half of the Town of Dryden (20 years in office, six years as Legislature Chair). Focused on housing issues. Dustin Brunner (public):Marthawelcomed Dustin, who recently joined to help with community projects. He works in emergency services at Cornell and is a past Assistant Chief for the Neptune Fire Company in the Village of Dryden. Ray Burger (ex officio member): Planning Director, Town of Dryden, for 11 years. 2020 Water and Sewer Evaluation: Review of 2020 TG Miller study: The group discussed the excerpts of the study that Martha had emailed. The consensus was that the numbers are now at least six years out of date and are quite misleading. Kate said it significantly overstates the sewer capacity for new housing. Mike noted that the water capacity numbers are out of date, considering with Inflow and Infiltration (I&I) work that’s been done as well as continuing problems. Capacity of the Ithaca Area Wastewater Treatment Facility (IAWWTF): The plant will need major capital investments, but Dryden only uses 2% of its capacity. The town is seeking an agreement to purchase another 1%, which would not be significant to the IAWWTF’s operations but would be a major benefit to the town. Pipelines are a major issue. Some specific pipelines are already at 80%-100% capacity, especially the Mitchell Ave. line. All Varna sewage is routed through Cornell, and that pipeline was upgraded from 10” to 12” for North Campus expansion. The peak flow estimates cited in the report assume that all I&I problems have been fixed. There is a need to examine the 2020 report in greater detail and update the numbers. David and Kate emphasized that addressing inflow andinfiltration must be prioritized before capacity expansion can occur. In that vein, Ray reported that the recent sewer and water projects in Varna have cleaned up a lot of I&I; the town relined a lot of the pipes through Varna and completely replaced some of the water lines. Both the water and the sewer systems are getting an overhaul. Emerging Node Around NYSEG (Rts. 13 and 366): Ray Burger presented detailed maps of the consolidated water and sewer systems, which center around Varna and the NYSEG area of Rt. 13. He highlighted recent infrastructure upgrades and potential expansion opportunities. Water map represents a two square mile block. Ray described the geographic boundaries of the consolidated district. Water sourcesare: Sapsucker Woods tank, owned by the Town of Ithaca, currently supplies most of our water. The Town of Ithaca wants us off it so they can use that resource for fire service. The system will eventually rely on the Bolton Point connection through the Apple Orchard PRV to Varna. NYSEG area: two tanks provide plenty of capacity, but the capacity of the pump station near the Fox bridge is a little low. Jordan added that a future project will remodel the Apple Orchard control valve to include two PRVs and manage pressure safely. Hanshaw Village Mobile Home Community: Water and sewer systems are slated for upgrades (with$1.5 M grantfor sewer and water $1 M grant for water; park owner will share costs). Pipes will go from industrial park south of Rt. 13, directly adjacent to Cornell land just east of Hanshaw Rd. Sewer map: Ray presented a map of our sewer systems. Sewer district extends from the town border at Game Farm Rd. through Varna to the 366/13 intersection near NYSEG. There are offshoots along Turkey Hill Rd. and to the commercial district south of the airport near Hanshaw Rd. Ray noted the location where the Rail Trail bridge is being built, which is where the utility lines cross Rt. 13. New lines will become town-owned (originally were private for Wilcox Press), so will open up new opportunities for expansion north of Rt. 13. Varna Capacity: With new lines installed through Varna, it’ll be possible to accommodate growth. Small area inSapsucker Woods feeds into the Town of Ithaca and Cayuga Hts. plant. Expansion there not possible unless I&I is fixed in the northeastneighborhood of the Town of Ithaca. Peregrine Rd. is another small sewer district served by the Town of Ithaca. Jordan raised concerns about water capacity across Hanshaw Rd. Given the pump capacity at the Fox bridge on 366, if there’s a main break, the NYSEG tanks will empty faster than they can be refilled. The town is looking for state grant to increase pump capacity, as it’s already an issue at times, with existing demand. Opportunities for housing development:David said there are great opportunities for expansion, if the Hanshaw Rd. grant comes through for water service,as well as near the Rail Trail at NYSEG. Ray agreed, andshared the map of the NYSEG intersection from the “Dryden Development Focus Area”(DFA) study by T.G. Miller, pointing out where the water and sewer lines going past the Knickerbocker plant will now be public.The DFA study estimated that it would costabout$7M to extend water and sewer to the Leonardo parcel east of Pinckney Rd., and identified some possible sources of funding. That 50-acre parcel could support approximately 450 housing units. Challenges:The task force discussed specific challenges we know about: IAWWTF may have to invest to meet new nutrient load standards fromNYS DEC. The project is estimated to cost $200M but the Board is pushing back, based on dynamics of Cayuga Lake. Varna’s recent water and sewer upgrades were done with a grant of about $1.5 million plus zero-interest loans. How much should we focus on areas where septic systems might fail soon (e.g., out Lower Creek Rd.), vs. creating new housing units? Our report to the Town Board can include both. The Leonardo parcel is of such interest to the Housing Committee that we got a small county grant to help pay for a consultant to do a development study about what could be done there. The potential was mapped out for about 450 housing units in a very attractive plan (“Fisher report”). David mentioned that the Fisher report is the kind of analysis the county is looking for, and would be interested in supporting studies of other opportunity areas. Future meeting topics and schedule: The group agreed to meet monthly instead of bi-monthly andto extend future meetings to 90 minutes to allow for more comprehensive discussions. They established the following meeting schedule for the coming months: September 28 focused on Freeville and Cornell Miles briefly described Freeville's sewer system, which is undergoing a complete restructuring with new technology. Sewer rates are projected to increase dramatically from $610 to $1,050 annually for current users. He agreed to provide information about potential expansion areas (increasing the number of customers),for the new sewer system. The group discussed the rationale for enabling new housing development to share these costs. Kate asked for clarification on what we’re looking for from Cornell. Ray responded that it would be helpful to get a general picture of which lands are committed to research projects so that we shouldn't even look at them. October 26: Village of Dryden water and sewer November 23: Town of Dryden December on additional opportunities and recommendations, aiming to complete a draft report by January. We’ll need to find an alternative meeting date for December. Next steps Jordan Work with engineers to address the pump capacity and tank filling issues for the water system extension across Route 13 on Hanshaw Road. Kate Check with Jeremy Thomas (Cornell Real Estate) about the status of the Varna parcel and any other Cornell-owned land within the town of Dryden that could be considered for development. Martha Coordinate with Miles to determine if funding is needed to bring in the Freeville project engineer for the September meeting. Miles Prepare to give an update on the Freeville sewer system reconfiguration.Miles agreed to ask Jeff if he can attend the September 28 meeting. Ray Send meeting invitations for the upcoming task force meetings (September, October, November, December) to all participants. ScottScott raised questions about a recently listed parcel on Hilton Road, which led to a discussion about water and sewer line limitations and pressure issues that may have deterred previous developers. He will send the real estate advertisement link for the parcel at the top of Hilton Road to the group. Task Force goals: Review and update the 2020 TG Miller report for the town and villages, focusing on correcting and updating the capacity numbers. Identify other areas in the town, similar to the Leonardo parcel, that warrant a detailed feasibility study for water and sewer extension to enable housing development. Consider “lessons learned” from places where infrastructure has been available, but housing development has not followed. Why not? Submitted, Martha Robertson September 23, 2026