Loading...
HomeMy WebLinkAbout2021-01-15      Meeting Notes     Summary: The following items were discussed during the Broadband Committee Meeting held on 15 January 2021. 1. ​Project Updates: a.SEQR Complete b. ​Utility Mapping has begun. i.Town maps have been scanned in and are being utilized to shape the design of the network backbone. c.Dig safe requests have begun to be submitted. d.Pole Data collection Complete e.STN Coordination f.Billing Systems 2.Schedule Update – See Master Schedule 3.Other Items a.Newsletter Mailer b.Village Mayor Meeting c.Website d.Village of Dryden Marketing Campaign e.Permitting 4.Incoming Administration changes to FCC a.What will be the standard for broadband? 5.We are looking at connecting STN from their Binghamton hub to source our main pipe.   HUNT ENGINEERS, ARCHITECTS, LAND SURVEYORS & LANDSCAPE ARCHITECT, DPC  AIRPORT CORPORATE PARK, 100 HUNT CENTER, HORSEHEADS, NY 14845  T:​ 607-358-1000 | ​F:​ 607-358-1800 | HUNT-EAS.COM  Date: 1/15/2021 To: Jason Leifer (Town of Dryden), Daniel Lamb (Town of Dryden), Ryan Garrison (Hunt EAS), Karl Kolesnikoff (Town of Dryden), Sam Bouabane (Town of Dryden), Ray Burger (Town of Dryden) From: Adam Monell (Hunt EAS) Project: Dryden FTTH Design Phase 1 Project No.: 1122.042 Re: Broadband Committee Meeting     6.Miscellaneous a.Matrix for Billing System options b.Website and Billing system meeting setup   HUNT ENGINEERS, ARCHITECTS, LAND SURVEYORS & LANDSCAPE ARCHITECT, DPC  AIRPORT CORPORATE PARK, 100 HUNT CENTER, HORSEHEADS, NY 14845  T:​ 607-358-1000 | ​F:​ 607-358-1800 | HUNT-EAS.COM