HomeMy WebLinkAbout2021-04-16HUNTENGINEERS I ARCHITECTS I SURVEYORS
Meeting Notes
Date: 4/16/2021
Present: Jason Leifer (Town of Dryden), Daniel Lamb (Town of Dryden),
Ryan Garrison (Hunt EAS), Mark Wilson (Broadband Committee), Tony
Salerno (Broadband Committee), Karl Kolesnikoff (Broadband
Committee), Mike Perehinec (Broadband Committee), Sam Bouabane
(Broadband Committee)
From: Adam Monell (Hunt EAS)
Project: Dryden FTTH Design Phase 1
Project No.: 1122.042
Re: Broadband Committee Meeting
Summary:
The following items were discussed during the Broadband Committee Meeting held on 16 April 2021.
1. Recent Updates
a. ARC POWER 2021 Grant Opportunity
b. Bandwidth to 70 Henry St, Binghamton, NY
c. RFP Strategy
L Customer Service RFP Draft
d. Contractor meetings
i. Lightspeed Teledata
ii. Syracuse Utility
iii. NY Underground
e. Graybar and Omnia Partners Meeting
2. ARC Grant Review
a. Scope
i. Bandwidth connection to STN
ii. Extension to TC3
b. Value
L Approx $1.2 Mil
c. Details
i. TC3 Connection to STN and other organizations
HUNT ENGINEERS, ARCHITECTS, LAND SURVEYORS & LANDSCAPE ARCHITECT, DPC
AIRPORT CORPORATE PARK, 100 HUNT CENTER, HORSEHEADS, NY 14845
T. 607-358.1000 F: 607-358-1800 HUNT-EAS.COM
HUNTENGINEERS I ARCHITECTS I SURVEYORS
3. Schedule
a. Construction Phasing
L Walk-through with contractors will produce a deliverable in the form of a schedule
ii. This is the best way to inform the project
b. Operational Activities
i. Define
ii. Committee to review
c. Procurement
L When will RFPs be awarded?
4. RFPs
a. Prior to construction
L Customer Service Network Management RFP
1. This contractor will be able to speak to the subsequent items and offer
consultation.
2. We will seek this contractor first.
b. As construction begins
i. Network Equipment RFP
ii. IP transport RFP
iii. Customer installation RFP
iv. Billing RFP
1. Is this needed or should this be a less formal interview process?
2. Jason believes that we will need to put this out for RFP
v. Does the town have a Professional Services Agreement contract?
1. The Town does have a procurement process, but no Professional Service
Agreement Template.
2. Ryan maybe able to provide something to start from and have the Town
Attorney review.
5. Design
a. Phase 1
b. POP Locations
c. Contractor walkthrough
d. Permit Drawings
e. Quote from Lightspeed & Syracuse Utility
6. Procurement - Jason and Dan are reviewing these options and will share their findings.
a. Omnia Partners Review -widely used by municipalities
i. This would mostly entail the equipment and labor to install.
ii. It puts these items on a state contract pricing.
b. Graybar contract scenario
HUNT ENGINEERS, ARCHITECTS, LAND SURVEYORS & LANDSCAPE ARCHITECT, DPC
AIRPORT CORPORATE PARK, 100 HUNT CENTER, HORSEHEADS, NY 14845
T: 607-358-1000 F: 607-358-1800 HUNT-EAS.COM
HUNTENGINEERS I ARCHITECTS I SURVEYORS
7. Financials
a. Funding Strategy
L ARC POWER 2021 Grant
ii. American Rescue Plan
iii. Additional USDA Funding
1. Infrastructure
2. ReConnect - next phase
iv. Hunt will work with STN Financial Advisor (Tony) to discuss strategies
v. Potential bonding or monies needed - potential to stretch out funding
b. Cash Flow Strategy
8. Marketing Plan
a. Strategy
I. One page to present next meeting
ii. Committee to determine how to move forward
1. Internal?
2. Hire out this campaign?
iii. Identify competitive advantages
iv. Pressure points to lean on
v. Identify High-level schedule - target dates/delivery dates
vi. Website design subcontract
b. Phase 1 Initial Offering
c. Public Outreach for Village of Dryden
9. Website
a. Front End
i. Internal or subcontracted out?
ii. there is a feeling that it should be
iii. The strategy with speak to this to a point
iv. Domain name
v. Hosting
vi. Potential subcontractors
1. Eagle Creek
2. SIS
b. Backend/Billing
I. Should be dominantly handled by the billing contract
c. Implementation Strategy
I. Subcommittee to brainstorm @ 7pm on Tuesday
1. Karl, Sam and Mark
HUNT ENGINEERS, ARCHITECTS, LAND SURVEYORS & LANDSCAPE ARCHITECT, DPC
AIRPORT CORPORATE PARK, 100 HUNT CENTER, HORSEHEADS, NY 14845
T. 607.358-1000 F: 607-358-1800 HUNT-EAS.COM
HUNTENGINEERS I ARCHITECTS I SURVEYORS
10. Legal
a. Dryden's Utility Easement review Village Roads & Rail trail
i. Jason confirmed that this is a utility easement
b. NYSEG Agreement/Negotiations?
i. Contact for negotiations
ii. $20 per pole per year for aerial attachment is typical
c. Properties — Town Hall, Pinckney Rd, Splitter cabinet in Freeville
11. Next Meeting April 30th @ 10:30am.
a. Overview of Town Network Design
b. Phase 1-5