Page 1 of 7
TOWN OF DRYDEN
SPECIAL PLANNING BOARD MEETING
December 6, 2018
Present: Chair John Kiefer, Martin Hatch, Deborah Cipolla-Dennis, Joe Wilson, Jim Skaley, David
Weinstein, Craig Anderson
Absent: Tom Hatfield
Liaisons: Dan Lamb (Town Board), Craig Schutt (Conservation Board)
Chair Kiefer called the meeting to order at 7:00 p.m. and appointed alternate James Skaley to serve as
full voting member in absence of Tom Hatfield.
Ray Burger explained the Trinitas application and associated documents are on the web and are being
reviewed by TG Miller and town staff. TG Miller will probably issue their comment letter next week
about data gaps in the environmental analysis and what is still needed. When a response to that letter
is submitted TG Miller will evaluate whether the application is complete and move forward. There will
be no action by the Town Board on December 20.
The Planning Board tonight will review Part 1 of the Full Environmental Assessment Form submitted and
identify things that it feels are missing. Those concerns will be passed along to the developer. Individual
members may also comment.
J Wilson stated he believes there is missing information in Part 2. For instance, there is no specification
about the amount of megawatt hours of electricity they will use.
1A - Brief Description of Proposed Action – Does not list the number of stories. The number is important.
Four story buildings are in conflict with the design guidelines for Varna. R Burger will check “stories” as
defined in the building code.
1B – Government Approvals – no comments
1C - Planning & Zoning –
1C.2(a) Is answered yes. Should a statement be added that identifies that the plan shows use of the
location that is different and in conflict with the proposed use? The board decided the answer is
sufficient because they must address it later.
1C.3(c) – Is a Zoning change requested as part of the proposed action? Applicant indicates no. The
Planning Board questions the green space calculation and what is included in that calculation. The
answer might be yes because of that.
1C.3(c) – What police or other public protection forces serve the project site? – This should say NYS
Police and Tompkins County Sheriff.
1C.3(d) -What parks serve the project site? Should state Cornell Botanic Garden, Monkey Run Natural
Area, Ellis Hollow Nature Preserve and Dryden Rail Trail.
PB 12-6-18
Page 2 of 7
D.1 Project Details
D.1(a) - parking garage should be added.
D.1(f) - 219 is listed under multiple family and indicates the number of dwelling units. Planning Board
would like this broken down into the number of 1 bedroom, 2 bedroom, 3 bedroom and 4 bedroom
units according to the Town Board resolution. Note: It is a decision of the Town Board whether to grant
LEED or redevelopment bonus and these numbers take that into consideration.
D.1(g) – Does the proposed action include new non-residential construction (including expansions)?
The number listed is 2. Planning Board believes this is incorrect and the whole section should be
updated and corrected.
D.1(h) – The source of water to be impounded is not just stormwater runoff. The Planning Board noted
two streams on the site that should be listed. Any study should include offsite water from nearby creeks
and other places and percolation/infiltration calculations need to be made correctly.
D.2 Project Operations
D.2(a) Does the proposed action include any excavation, mining, or dredging, during construction,
operations, or both? Applicant answered no. The Planning Board notes this should potentially be yes.
There appears to be a need for dredging of a pond and significant excavation on the site that needs to
be elaborated in this section.
D.2(b) Would the proposed action cause or result in alteration of, increase or decrease in size of, or
encroachment into any existing wetland, waterbody, shoreline, beach or adjacent area? Applicant has
checked yes and talks about a .5-acre wetland area. Planning Board states because a wetland will be
reconstructed to a size of .9 acres applicant should give more details on reconstruction of the wetland.
D.2(c) – Will the proposed action use, or create a new demand for water? Applicant answered yes.
Planning Board disagrees with the computation (boarding school) used to reach listed figure of 47,250
gallons per day. The manual says it should be 110 gallons per person per day (not the 75 gallons per day
used by the applicant. J Wilson suggested a range of use would be more appropriate.
Note: A population increase means an increase in town services and a burden on the rest of town to
pay for this. The board should think about cumulative impacts.
D.2(d) – Planning Board has same concerns with sewage as with water above. Further, since sewage
quantity generated is likely to exceed the 63,500 gallons per day that the town’s engineering
consulting firm, T.G. Miller, indicated in 2016 was Dryden’s available excess capacity, a detailed
plan for how the additional capacity is going to be obtained, or how the depletion of this
capacity by this one owner will affect all of the other owners wishing to propose projects in the
future
D.2(e) – Will the proposed action disturb more than one acre and create stormwater runoff? Planning
Board would like the applicant to justify the statement that it is minimizing impervious surfaces.
PB 12-6-18
Page 3 of 7
D.2(f) – Does the proposed action include, or will it use on-site, one or more sources of air emissions,
including fuel combustion, waste incineration, or other processes or operations? Is marked No.
Kimberly Hansen of Trinitas stated there will be no gas and they will be using heat pumps (model has
been supplied to the Planning Department).
D.2(j) – Will the proposed action result in a substantial increase in traffic above present levels or
generate substantial new demand for transportation facilities or services? Is marked No. The Planning
Board questions this response and recommends an independent study or mark it Yes. Any traffic study
should include the intersections of Freese Road/Route 366, Game Farm Road/Route 366, Turkey Hill
Road/Mt Pleasant Road, Turkey Hill Road/Stevenson Road, Stevenson Road/Game Farm Road, Turkey
Hill Road/Route 366 and the exit from the development and address shift times.
D.2(k)(i) – Estimate annual electricity demand during the operation of the proposed action. Planning
Board would like this item completed.
D.2(l) - Hours of operation. This appears to be office hours. Planning Board believes this should be 24
hours per day, 7 days a week. People come and go all the time in an apartment complex.
D.2(n)(i) – Outdoor Lighting – It was noted that the Conservation Board has suggested yellow lighting.
D.2(n)(ii) – Applicant says minimum tree removal, but it has been stated all trees would be removed.
A landscaping plan is being submitted by the applicant.
D.2(r) – Again there was some confusion about whether the project qualifies as commercial. The
Planning Board would like the questions in D.2(r) i, ii, and iii answered because it is a large project.
E.1 – Land Uses on and surrounding the project site
E.1(d) – Facilities serving children, the elderly, people with disabilities – Planning Board believes the
daycare facility at the Varna Community Association should be noted.
E.2 – Natural Resources on or Near Project Site
E.2(e) – Drainage status of project site soils. Planning Board notes that nearly 50% of the project site
being poorly drained is a red flag for potential flooding and management of stormwater and is a
concern.
E.2(f) – Slopes – Planning Board notes that 30% of the site being greater than a 10% slope is a red flag.
E.2(h)(i) and (iv)– Does the project site contain wetlands? Should be Yes. It was noted the Conservation
Board commented about the stream on the property. Planning Board noted there are two streams and
a wetland on the property.
E.2(m) – Identify predominant wildlife species that occupy the property. There is more than those
listed. Applicant has submitted a report.
E.3 – Designated Public Resources on or Near Project Site
PB 12-6-18
Page 4 of 7
E.3(f) Is the project site, or any portion of it, located in or adjacent to an area designated as sensitive for
archaeological sites on the NY State Historic Preservation Office (SHPO) archaeological site inventory?
This was left blank and should be marked No.
E.3(h) – correct (i) to read Cornell Botanic Gardens. Planning Board would like the following also listed:
Fall Creek Corridor Unique Natural Area, Monkey Run Unique Natural Area, Federally designated Fall
Creek Wetland, Cayuga Trail, Federally designated Freese Road Bridge (eligible for listing on the National
Register of Historic Structures).
Additional Information – Requested by Planning Board
Detailed information about the anticipated use of energy and emissions.
It was suggested the correct place for the requested information on energy and building efficiency
(County 239 answers) was in Trinitas’ FEAF Part 1, Section “F. Additional Information” because the
directions read: “Attach any additional information which may be needed to clarify your project. If you
have identified any adverse impacts which could be associated with your proposal, please describe
those impacts plus any measures which you propose to avoid or minimize them.”
D.2(e)(i) - Conservation Board notes that impervious surface is too high; maximum permitted in town
zoning is 6.5 acres. Ray Burger will investigate that and respond to the Conservation Board.
Site Plan comments by Planning Board:
1. Title of drawing, including name and address of applicant and person responsible for preparation of
the drawing. No comment.
2. Boundaries of the property, plotted to scale, and including north arrow, scale and date. No comment.
3. Identification of public highways. No comment.
4. Existing watercourses and wetlands. No comment.
5. Grading and drainage plan showing existing and proposed contours. Drainage is a concern and may
be addressed in the SWPPP.
6. Location, design and type of construction, proposed use and exterior dimensions of all buildings. No
comment. Planning Board would like more detail and dimensions in the renderings, the view from Mt
Pleasant Road and more detail on construction of the buildings.
7. Location, design and type of construction of all parking and truck loading areas showing ingress and
egress to the public highway. There should be sight lines at points of egress.
8. Provisions for pedestrian access including sidewalks along public highways. The only sidewalk on Mt
Pleasant Road is along the property edge. There should be a sidewalk with designated entrance for
pedestrians to the parking garage. Planning Board would like detailed drawings for the inside of the
garage with respect to pedestrians. There is a parking area for the garden and applicant should be
PB 12-6-18
Page 5 of 7
responsible for connecting to the sidewalk at that location. Sidewalk construction should be coordinated
with DOT and their plan for sidewalks along Route 366. There should be benches along the sidewalks
and in the garden area in accordance with the design guidelines for Varna.
9. Pedestrian facilities shall be ADA (Americans with Disabilities Act) compliant. No comment.
10. Sidewalks must be constructed continuously across all driveways. No comment.
11. Provisions for bicycle parking, such as bicycle racks or bicycle lockers as appropriate. All bicycle
parking devices shall be provided in accordance with guidelines published by the Association of
Pedestrian and Bicycle Professions (APBP). Some portion of the bicycle parking should be provided in a
covered area protected from the weather. Applicant states there is designated bicycle parking in the
parking garage. There are several bicycle racks around the property.
12. Location, type and screening details of waste disposal containers and outdoor storage areas. They
are located on the plan, but no details. Design guidelines call for them to be similar in design of the
structures.
13. Location, design and construction materials of all existing or proposed site improvements, including
drains, culverts, retaining walls and fences. Culverts and drains need to be clearly shown on the plan.
14. Description of the method of sewage disposal and location. Sewage from this project will join with
sewage from the new Cornell North Campus dorm facility through a joint valve. Town of Ithaca
engineers responsible for this valve have reportedly indicated in a public meeting that this value is
incapable of handling the sewage production from both the Trinitas complex and the North Campus
facility. That needs to be looked into.
15. Description of the method of securing potable water and location, design and construction
materials of such facilities. No comment.
16. Location of fire and other emergency zones, including the location of fire hydrants. Fire Chief should
approve the plan.
17. Location, design, and construction materials of all energy distribution facilities, including electrical,
gas and solar energy. There is no central distribution on site. Applicant should confirm there is
sufficient electrical supply.
18. Location, height, size, materials, and design of all proposed signage. No comment.
19. Identification of street numbers(s) in accordance with any applicable 911 numbering system, and
method for ensuring that building identification numbers are installed in a manner that will be visible to
emergency responders during the day and night. Not until final design.
20. Location and proposed development of all buffer areas, including existing vegetation cover. There is
a landscape drawing. Planning Board believes it is under-planted and recommends they meet the
landscape design guidelines.
21. Location and design of outdoor lighting facilities. Planning Board would like a detailed lighting plan.
PB 12-6-18
Page 6 of 7
22. Location, height, intensity, and bulb type of all external lighting fixtures. See 21 above.
23. Direction of illumination and methods to eliminate glare onto adjoining properties. See 21 above.
24. Identification and the location and amount of building area proposed for retail sales or similar
commercial activity. No comment.
25. Proposed limit of clearing showing existing vegetation. Individual trees with a diameter at breast
height (DBH) of 12 inches or greater within the clearing line shall also be shown, if the Board finds that
there are uniquely beneficial species on the site and/or exceptionally mature trees. We have that.
26. Landscaping plan and planting schedule. Has been addressed.
27. Estimated project construction schedule. Schedule needs to coordinate with NYS DOT construction
to avoid traffic complications in the area.
28. Record of application for and approval status of all necessary permits from state and county
agencies. This is missing.
29. Identification of any state or county permits required for the project. We have that.
30. Other elements integral to the proposed development as considered necessary by the Board.
Consideration of design guidelines for the Varna Hamlet.
31. Stormwater Management Plan as required by local law. Applicant will prepare and submit an
approved Stormwater Pollution and Prevention Plan for approval by the Town Engineer.
32. Full Environmental Assessment Form or draft Environmental Impact Statement as determined by
the Board at the sketch plan conference. This is a Type 1 action because it exceeds 25% of the threshold
of constructing 250 new residential units.
The board discussed the redevelopment bonuses potentially available under LEED. They will need to
review that criteria.
TINY TIMBERS
A revised site plan was submitted by the applicant. Differences include the sidewalk and lot line
realignment and the addition of 15 parking spaces. Board members reviewed the revised plan. The
HOA will grant public access through the site and down the stairs to the parking area. A revision to the
area around the dumpster was suggested and discussed for pedestrian safety and access by the hauler.
The lighting plan and location of sewer mains was explained. It was brought to the attention of the
applicant that zoning law requires an island for every ten spots in a parking lot. The split rail fence on
the Cornell boundary was changed to a board fence. Planning Board favors the split rail fence. The
board discussed providing designated parking space(s) for persons with disabilities because this is a
conservation subdivision with communal parking, or alternatively designate a space as a priority spot of
some sort. Applicant indicated he could possibly provide one space. C Anderson is concerned that
PB 12-6-18
Page 7 of 7
infrastructure including lighting should be in place prior to commencement of construction of any
buildings.
RESOLUTION #29 - APPROVE AMENDED SUBDIVISION PLAT FOR TINY TIMBERS
M Hatch offered the following resolution and asked for its adoption:
RESOLVED, that the Town of Dryden Planning Board hereby conditionally approves the amended
subdivision plat submitted for Tiny Timbers subject to the following items being included and approved
by the Town of Dryden Planning Director:
• A lighting plan (temporary during construction and final after construction) must be in place prior to
construction of the first house;
• That the new parking area meets the zoning requirement for an island;
• Revision to the area around the dumpster to provide for pedestrian safety;
• Parking space(s) designated as priority or for persons with disabilities; and
• A split rail fence (not a stockade fence) on the Cornell boundary.
• A means of securing access for the lower parking area;
FURTHER RESOLVED, that the Planning Board Chair is authorized to sign the plat when deemed
complete and satisfactory by the Planning Director.
2nd D Cipolla-Dennis – all in favor
There being no further business, on motion made, seconded and unanimously carried, the meeting was
adjourned at 10:20 p.m.
Respectfully submitted,
Bambi L. Avery