Minutes of September 20, 2017 Meeting
Dryden Town DPW
Attendance: Bob Beck, Chuck Geisler, Judy Pierpont, Dan Lamb, Steve Winans,
James Miner, Alice Green, Ted Schiele, Susan Ashdown, Rich Kugler, Diann Zeigler,
David Bravo-Cullen, David Fogel, Dean Russo, Bruno Schickel, Diane Tessaglia-
Hymes, Chris Tessaglia-Hymes, Todd Bittner
Call to order (7:09 p.m.) – Bob Beck
Bob opened the meeting with thank yous for recent work to team members,
mentioning especially Alice, Bruno, Todd and Dan. The group thanked Bob for his
ongoing work as task force chair
Game Farm/Dept. of Environmental Conservation (DEC) negotiations
Dan reported that he contacted DEC officials last month for help expediting a trail
agreement in time for the state parks grant application. He said DEC officials agreed
to write a letter of conditional support, which arrived in time to include in the grant
application. This was a significant breakthrough, after years of attempts to secure
permission to start the trail at the point where the East Ithaca Recreation Way ends
at Game Farm Road and connect it across the original rail bed and easement
sections into Varna. Dan said Task Force members are on track to communicate
with DEC officials again by the end of the month to work out a signed agreement.
Follow-up from Community-Design Workshop: Trail name and logo ideas –
David Fogel, Diane, Bob, Alice, Todd
David presented a proposed trail logo design, using the name “Dryden Crossings
Trail,” with the Town of Dryden map as a background. A tagline “Connecting
Communities” could be added, depending on the context for using the logo.
Much discussion of both the name and logo details, and possible modifications,
followed. There were also suggestions on what to call the various subsections, or
neighborhoods where the trail will pass, such as the Dryden to Freeville village
“stretch” or “link.’ Todd suggested reviewing the process for deciding on the final
name and trail logo with the June design workshop committee and facilitators.
Suggestions for Kiosk design and Leopold bench plan (via Roger Hopkins of
Lansing) – Bob noted that the recent clearing at the George Road crossing harvested
many locust trees with wood that could be used for amenities along the trail—with
the landowner, the William George Agency’s, permission. He circulated plans for a
kiosk design, used at the Von Engeln nature preserve, and a Leopold bench design.
Both could be built by volunteer crews. Bruno said logs could also be used for
parking lot bollards and edges, adding that he doesn’t think all the trail amenities
necessarily need to be the same in different locations. Some prototypes could be
built at the new George Road crossing. Benches could be placed on a concrete block
and secured in place.
Smoke-Free designation – Ted Schiele, Coordinator of Tobacco Free Tompkins,
County Health Dept.
Ted presented a request that the Task Force consider designating the Rail Trail a
“tobacco and smoke free outdoor area.” Citing other local efforts in Ithaca, Ulysses,
Lansing, and Newfield, he said his group promotes smoke free areas to insure access
for people with disabilities, and for sustainability and fire and litter prevention, and
as a public health issue. He distributed examples of possible signage. Todd Bittner
explained that the town of Dryden does not own the rail trail, but is securing
easements through privately held land. There is no reference to smoking rights in
existing easements, and adding the issue could complicate and impede the process
of obtaining the rest of the easements. Bob thanked Ted for his presentation and
said the issue of smoking could be addressed in the rules of etiquette that will be
posted at kiosks along the trail.
George Road crossing: Update on progress (with major donations of time and
equipment) – Bruno
Bruno circulated a list of contributors, volunteers and dollar values of donated work
and materials (attached) which made it possible to create a new gently-sloped trail
up to an at-grade trail crossing at George Road. Most of the clearing was completed
in two sessions, with 10 volunteers helping at the first session. Many loads of fill
have been delivered and placed. This will be topped with gravel donated by RMS.
Bruno said fill is also necessary for another 600-foot section towards Freeville,
which has 6-inch deep mud. The section will need ditches excavated and two new
culverts for drainage. He said the next trail project will be trimming in a section east
of Mt. Pleasant Road.
The list of the value of contributions led to talk of recognition for the many kinds of
donations to the trail. Chuck suggested establishing different levels (including in-
kind work) for recognition.
Freeville trail section – David F.
David Fogel noted that the Village of Freeville has completed repairs of the trestle at
Johnson Road, and that Village DPW staff is ready to install railings.
Update on Trail Easements and pledges – Bob, Bruno
Bob circulated a chart depicting progress in our first year in securing easements on
parcels and miles of trail, relative to the totals needed (attached). Bruno said the
Saunders Concrete Company (with 600 feet of rail bed west of Pinckney Road) has
been sold to Hansen Aggregate. They’re positive about the trail, but won’t negotiate
about the easement until the end of the year. The NYSEG section easement is in the
hands of officials at Rochester regional headquarters, he said. He added that he has
purchased a trail section east of Route 366 at Etna (behind the former Phoenix Book
Barn), and donated a trail easement to the town.
Route 13 Crossing
• Meeting with NYSDOT Region 3 officials from Syracuse w/Fernando, Todd,
Bob, Ray Burger and Barbara Lifton.
• Route 13/DOT Resolution (discussion and vote) – Todd, Bob
Todd reported that State Assemblywoman Barbara Lifton helped get a response
from the Department of Transportation (DOT) regarding the FH Fox Bridge crossing
at Route 366 and the crossing at Route 13.
Recently, she joined DOT, Task Force and other local officials at an on-site visit at
the Route 13 crossing. Bob had suggested that the DOT consider installing a user-
activated “hawk signal” at the crossing. But DOT officials instead favored either a
bridge over (at least 16 feet high), or tunnel under the busy highway section,
because the crossing is on a curve, and it’s near the Route 366 and Route 13
intersection.
A recent DOT traffic study showed backups already exist at that intersection at peak
times. Funding for the bridge or tunnel could be requested in another proposal for a
federal/DOT transportation alternative (TAP) grant in next year’s funding cycle.
Barbara also offered to seek state funding for the project. Todd noted that when the
Task Force applied for an earlier DOT grant, it was thought that the entire project
had to be built to federal handicap accessibility standards. However it was learned
that only the funded section needs to meet those standards. DOT officials at the site
visit offered a quick estimate of $100,000 for design and $250,000 for construction.
The town share might be around $70,000. And DOT offered to provide more cost
details.
Bob and Todd proposed a Task Force resolution requesting the DOT to conduct a
preliminary cost analysis for the two crossing alternatives, bridge over and tunnel
under. Discussion focused on whether the timing is right to conduct the study.
Bruno felt it might be premature, and that it might deter acquisition of remaining
easements. Todd pointed out that the study and then a possible funding request
would probably take many months, and that hopefully the remaining easements will
be in place before then. He said the Route 13 crossing is the “heaviest lift we have. If
the DOT offered to study the alternatives, I’m for getting that information.”
David F. moved, and Bruno seconded the motion to request the DOT study. A
quorum of six of the eleven Task Force members being present, the following
resolution passed unanimously:
Resolution to Region 3 NYSDOT requesting a Preliminary Costing Exercise for Dryden
Rail Trail ove r and under crossing alternatives at NYS Route 13.
WHEREAS, success in establishing a 10.5 mile rail-trail extension connecting the Jim
Schug Trail at the Village of Dryden to the East Ithaca Recreation Way requires a safe trail
crossing at NYS Route 13,
WHEREAS, extensive trail detours (that could enable crossing at the Route 366
intersection or at the Route 13 bridge at Fall Creek) are considered less desirable than a direct
crossing,
WHEREAS, a direct at-grade crossing, even with installation of a pedestrian-operated
traffic signal, may be undesirable on a busy highway for reasons of safety and traffic flow,
WHEREAS, either a trail walkway passing under the highway or a pedestrian bridge over
the road would provide a desirably direct and safe trail crossing without interference of traffic flow
at Route 13,
WHEREAS, Mark Frechette, Planning Program Manager, NYSDOT Region 3, has
provided time and advice to our project, and has recommended further study of over and under
crossing alternatives at Route 13,
WHEREAS, NYS Assemblywoman Barbara Lifton has expressed strong support for the
Dryden Rail Trail project and has offered her ongoing support to provide for a safe and direct
Route 13 crossing,
WHEREAS, the Dryden Rail Trail Committee needs to understand the full design and
construction costs associated with over and under crossing alternatives at Route 13 in order to
seek prospective funding opportunities,
NOW, THEREFORE, BE IT RESOLVED THAT the Town of Dryden Rail Trail Task Force
requests of NYSDOT Region 3 a Preliminary Costing Exercise for over and under rail-trail
crossings at NYS Route 13, near Varna in the Town of Dryden; and
BE IT FURTHER RESOLVED THAT the Town of Dryden Rail Trail Task Force requests
of NYSDOT Region 3 a timely response by December 31, 2017.
September 20, 2017: Approved 6-0-0
Discuss potential change of monthly meeting day (to Monday?)
Bob asked the Task Force to consider moving the meeting because of conflicts with
the Wednesday time. Members agreed to the switch
Next meeting was set for 7- 9 pm MONDAY Oct. 16, 2017 at the Dryden Town
DPW building
Adjournment at 9:20 pm Prepared by Alice Walsh Green
See attachments below:
Cost report prepared by Bruno Schickel:
(continued)
Chart prepared by Bob B.