HomeMy WebLinkAbout2017-01-17Dryden Planning Board
January 17, 2017
Page 1 of 17
Dryden Planning Board
January 17, 2017
Members Present: Marty Moseley (Chair), Tom Hatfield, Marty Hatch, David Weinstein,
Craig Anderson, Joe Wilson and Hilary Lambert (John Kiefer was excused)
Guests: none
Town Hall Staff: Ray Burger, Planning Director
Liaisons: Deborah Cippolla – Dennis, Town Board
The special meeting to consider the Dryden Solar Law was called to order at 7:02pm.
No public comments were offered.
Review of Solar Law: D. Weinstein continued the review of the Solar Law
(The red-lined solar law is attached)
- The Board started from the beginning again.
- The County recommended deleting the 2MW designation but the Board decided to keep
that maximum.
- Solar Energy System Owner was added to the definitions
- Section C - Applicability
- #1 They added “greater than 10 square feet” to eliminate the need for small solar
panels (ie – sidewalk lighting, traffic lights, etc) to go through any permitting process.
- #2 They removed a sentence as it was redundant and unnecessary.
- #4 The Board added #4 to ensure the permits go with the facility not the owner.
- Section D – Building-Mounted Solar Energy Systems
- #2 – a height restriction of an additional 6 feet was added
- Section E – Ground-Mounted Small-Scale Solar Energy Systems
- #1b – the County recommended removing the citation of their mapping services but
the Board determined that should remain.
- #2a was increased to 18 feet to accommodate for systems that just exceed the 17 foot
limit
- Section F - Ground Mounted Large Scale Energy Systems
- #1 - the Planning Board was added to the language so they also get to review Zoning
officer comments.
- #3c – the recommended addition of complying with the standards of the solar energy
industry was removed. D. Weinstein pointed out that the Town of Dryden has their
own standards and although there may be industry standards out there, D. Weinstein
stated he is unaware of any. J. Wilson added that he was under the impression that
the Board had already determined not to include this part because it is self serving for
the solar industry and not necessarily in the best interest of the Town. M. Moseley
pointed out that standards required by this law should have a reference and since
there are not any known standards in the solar industry (to the extent of the Planning
Board’s knowledge), it is impossible to hold a developer to those standards.
- #3d – the part of referring to the Greenway Plan was removed and a phrase was added
holding developers to all of the existing or adopted plans in the Town of Dryden (the
Comprehensive Plan, the Recreation Plan, the eventual Natural Resources
Conservation Plan, etc). they discussed the potential of adding another subsection but
ultimately determined to simply change the language in #3d.
Dryden Planning Board
January 17, 2017
Page 2 of 17
- #3e – the Board reaffirmed their decision to add “the lot can be created via subdivision
in accordance with the Town of Dryden subdivision law.”
- An administrative subdivision results in four (4) lots or less.
- add language that requires any and all subdivisions associated with large scale solar
will be addressed using the major subdivision law.
- M. Hatch is concerned that the law is making it difficult for the development of solar in
Dryden. He sees a lot of hurdles and delays. He knows that there are concerns about
large scale solar farms but he does not understand those concerns.
- J. Wilson pointed out that the Planning Board and the Town Board both feel they can
address the issue of buffering/screening and appropriate siting for the solar facilities.
- instead of having the applicant come to the Planning Board for a public hearing
- D. Cippolla-Dennis asked why the Planning Board wants to treat a subdivision for solar
any differently than any other subdivision. A public hearing will be required for the
special use permit (SUP).
- One reason is to get the developer on record stating that they intend to install a solar
facility.
- A 60 acre lot being subdivided into four (4) 15 acre lots is a minor subdivision but the
impact of 50 acres of solar panels is different than the impact of four (4) homes.
- R. Burger pointed out that currently the process includes: two (2) public hearings and
a 3 month minimum for subdivision through the Planning Board and one (1) public
hearing and the SUP through the Town Board. The two processes can run
simultaneously but it still a minimum 3 month process.
- M. Moseley posed a scenario where someone subdivides their land this year with no
intention of installing solar but then 5 years later, they change their minds and wish
to put up solar panels. What would the process be then since the subdivision is
already done and legal?
- R. Burger recommended adding a phrase indicating that minor subdivisions
anticipating a solar project should come before the Planning Board for an informal
review.
- H. Lambert asked when neighbors are given notice. They are notified during the Special
Use Permit process.
- C. Anderson expressed concern that solar projects are permitted almost everywhere in
the Town.
- #3e has been changed to: Is located on a single lot and that lot can be created in
accordance with the Dryden Subdivision law. Any subdivision for a solar installation
must have a review by the Dryden Town Planning Board following mailed notification of
all properties within 250 feet.
- #3g was changed to 18 feet.
- #4c (x) was edited to require a document that clearly delineates the party responsible.
- #4c (xvii) was edited to remove unnecessary language.
- #5a (i) removed “minimally adverse” since it was unnecessary.
- C. Anderson returned to Section E #1 (a) – he suggested changing the wording to the
NRCS prime farmland soils map rather than the Town of Dryden soil analysis maps. He
suggested changing that under Section F #2 (a) which also deals with prime soils.
- Section F.2. Industrial Scale Systems:
- D. Weinstein estimated 43,000 megawatts of electricity is used in the Town of Dryden
per year. That does not include heating. He used the County’s energy road map and
Dryden Planning Board
January 17, 2017
Page 3 of 17
then did a proportional equation. M. Moseley used a different method and came up
with 69,000.
- J. Wilson asked why the Board was considering megawatts rather than acres based on
their concern about the number of acres covered by solar panels.
- The Board discussed what is appropriate to permit and should that be based on
acreage or megawatts. Based on the extrapolated information, the County encouraged
1.5% of Town land can be dedicated to solar which is about 1000 acres.
- Another question is whether to limit solar to the amount that the Town of Dryden
needs or is it going to go into the system to provide for more communities.
- The Town is using about 500 acres worth of solar power currently.
- D. Cippolla-Dennis was asked her opinion and she stated she doesn’t believe we need
a cap.
- M. Hatch said that he doesn’t expect heavy agriculture to occur in the Town anymore.
- The Board continued to discuss what they believe should be the cap and the pros and
cons of solar farms in Dryden. The point was made several times that the solar
installations will have to get a permit to build so the opportunity to limit them will
come up through that process.
- If a large solar project came to town, it can be dealt with separately.
- Several members feel there are enough provisions in the law to prevent unwanted
sprawl.
- C. Anderson explained to several members that ag is going strong in this town and ag
lands, even those with marginal soils, are in high demand right now. Ag lands are
selling for $3000-$5000 per acre.
- H. Lambert believes setting a limit sends a message.
- 3500 acres is the limit for now - it is a number that can be adjusted later.
- The PSC has raised the maximum MW permitted on a lot from two (2) to five (5).
- C. Anderson pointed out that until last month we were only looking at two (2) MW
systems, now we are considering large scale, industrial and where do we want that
permitted.
- Where do we want to allow large solar farms (industrial)? Should they be restricted to
industrial areas or permitted by SUP? Does the definition of Industrial-Scale Solar
System still apply?
- D. Weinstein stated that he doesn’t hear any real interest in restricting the location
of the solar systems. Guidelines can be created to encourage installation of large-
scale solar in certain districts.
- M. Moseley suggested a subsection in which the developer is encouraged to place
the systems in certain areas; for example, the law can include language to the effect
that these uses will be discouraged from being placed in rural residential zones.
- Fees and Deposits: a suggestion was to require a list of consultants and expected fees
but the Board determined not to include that part. They did change the number of
days for prior notice of outstanding fees from 30 to 10 days.
- J. Abandonment and Decommissioning:
- J1 – “for reasons other than for repairs or beyond the reasonable control of the Solar
Energy System Owner” - the Board didn’t see any reason to add this to the law.
Dryden Planning Board
January 17, 2017
Page 4 of 17
- The Board determined the second part only needed the first clause. The rest was
unnecessary. “The Town shall provide the Solar Energy System Owner thirty (30)
days prior written notice of a request for decommissioning.”
- J2 - “or other form of financial security acceptable to the Town” was a suggested
addition which was kept because the Planning Board isn’t sure yet what the legality
is of requiring a bond.
- J3 – the word “consecutive” was added to the term of six (6) months. The suggested
addition of “for reasons other than for repairs or beyond the reasonable control of
the Solar Energy System Owner” was not included.
Resolution #1 2017
D. Weinstein moved to accept the Planning Board’s Energy Systems Law draft as
modified and to forward the amended law to the Town Board for consideration.
J. Wilson seconded the motion which was unanimously approved.
Proposed Subdivision Local Law Amendment: M. Moseley
Article VII section 701 subsections would need to be amended for the applications
submittal time constraints.
Subsection B.1, of section 701, already indicates that there is a 14-day filing time table for
the sketch plan. "Submission of Sketch Plan. Seven (7) copies of the Sketch Plan and a
Full Environmental Assessment Form (EAF) shall be filed at least 14 days prior to the
regular meeting of the Planning Board at which the Sketch Plan will be first reviewed." This
could stay the same as it would appear to be a workable time line for the applicants.
Subsection C.7. indicates that there be a minimum of a 30-day filing for the preliminary
plat prior to the regularly scheduled Planning Board. I would recommend that this section
be amended and read as follows: "Number of copies. Seven (7) copies of the Preliminary
Plat and one (1) digital copy shall be filed at least 21 days prior to the regular meeting of
the Planning Board at which the Preliminary Plat will be reviewed."
Subsection D.3. indicated that the final plat be submitted 30 days in advance of the
regular Planning Board meeting. I would suggest that this be amended and read as follows:
"Number of Copies. Seven (7) copies of the Final Plat and one (1) digital copy shall be filed
at least 21 days prior to the regular meeting of the Planning Board at which the Final Plat
will be reviewed."
Additionally, Article IX section 900 subsections would need to be amended as well for the
applications submittal time constraints.
Subsection C.1, of section 900, already indicates that there is a 14-day filing time table for
the sketch plan. "Submission of Sketch Plan, Existing Conditions Report and
Conservation Analysis. Seven (7) copies of the Sketch Plan, Full Environmental
Assessment Form (EAF), Existing Conditions Report and Conservation Analysis shall be
filed at least 14 days prior to the regular meeting of the Planning Board at which the
Sketch Plan, Existing Conditions Report and Conservation Analysis will be first reviewed."
This could stay the same as it would appear to be a workable time line for the applicants.
Subsection D.3. indicates that there be a minimum if a 30-day filing for the preliminary
plat prior to the regularly scheduled Planning Board. I would recommend that this section
be amended and read as follows: "Number of copies. Seven (7) copies of the Preliminary
Plat and one (1) digital copy shall be filed at least 21 days prior to the regular meeting of
the Planning Board at which the Preliminary Plat will be reviewed."
Dryden Planning Board
January 17, 2017
Page 5 of 17
Subsection E. 9. indicated that the final plat be submitted 30 days in advance of the
regular Planning Board meeting. I would suggest that this be amended and read as follows:
"Number of Copies. Seven (7) copies of the Final Plat and one digital copy shall be filed at
least 21 days prior to the regular meeting of the Planning Board at which the Final Plat will
be reviewed."
Resolution #2 2017
J. Wilson moved to accept the proposed changes to the Subdivision Law. M. Hatch seconded
the motion which was unanimously approved.
There being no further business, the meeting was adjourned at 9PM.
Respectfully Submitted,
Erin A. Bieber
Deputy Town Clerk
Here is a list of potential changes as suggested in comments we received. The changes
that I would recommend are shown in red. The changes suggested that I would not
recommend are shown below in red with a line through them, as in “Don’t make this
change.”
TOWN OF DRYDEN
LOCAL LAW NO. OF THE YEAR 2016
A LOCAL LAW TO AMEND THE RENEWABLE ENERGY FACILITIES LAW
TO REMOVE ITS APPLICABILITY TO SOLAR ENERGY SYSTEMS AND TO
ADD SOLAR ENERGY SYSTEMS PROVISIONS TO THE ZONING LAW
Be it enacted by the Town Board of the Town of Dryden as follows:
Section 1. The Renewable Energy Facilities Law of the Town of Dryden, New York,
Article I (General) is amended as follows:
A. The definition of “Renewable Energy Conversion System (RECS)” in
Section 5 (Definitions) is amended to read as follows:
“RENEWABLE ENERGY CONVERSION SYSTEM (RECS) – means a Renewable
Energy Conversion System other than a WECS or a Solar Energy System (as that
term is defined in the Zoning Law) and includes but is not limited to geothermal
heat pumps, wood, wood pellet, hay and other types of biomass stoves.”
B. Section 7 (Applicability), subsection D is amended by deleting the phrase
“solar panels mounted to the building being se rved;” so that subsection D reads as
follows:
Dryden Planning Board
January 17, 2017
Page 6 of 17
“D. Notwithstanding anything to the contrary in this local law, no Special Use
Permit shall be required for mechanical wind turbines less than 50 feet tall;
tower, pole or other independently structurally mounted RECS with a total
height less than the structure served, or for geothermal heat pumps, wood, wood
pellet, hay and other types of biomass stoves.”
Section 2. The Town of Dryden Zoning Law, Article III (Definitions) is amended by
adding the following definitions:
BUILDING-INTEGRATED PHOTOVOLTAIC SYSTEM - Photovoltaic building
components integrated into building envelope components such as glass or
other building façade materials, skylights, or roofing materials.
BUILDING-MOUNTED SOLAR ENERGY SYSTEM - A Solar Energy System
located on the exterior of any legally permitted building or structure or integrated
into a building envelope for the purpose of producing electricity or providing
thermal energy for onsite or offsite consumption. This system may be mounted
to the roof or side of a Structure or be a Building-Integrated Photovoltaic System.
GROUND-MOUNTED SOLAR ENERGY SYSTEM - A Solar Energy System that
is anchored to the ground and attached to a pole or other mounting system,
that is detached from any other structure, and that has the primary purpose
of producing electricity or thermal energy for onsite or offsite consumption.
INDUSTRIAL-SCALE SOLAR ENERGY SYSTEM- A Solar Energy System
composed of adjacent or nearby lots, each containing a Large-Scale Solar
Energy System.
LARGE-SCALE SOLAR ENERGY SYSTEM - A Solar Energy System that
feeds electricity directly into the grid, is primarily for the purpose of onsite
or offsite sale or
electricity consumption, and is larger than two thousand (2,000) square feet in
area of solar collectors per lot (measuring the equipment surface area). This
system may be ground- mounted or building-mounted and shall be limited to
producing < 2 MWac (megawatts- alternating current). The County recommends
deleting 2 MW. Public comment recommends reducing the limit from 2000, but
2000 sq feet would accommodate local neighborhood systems shared by a few
houses.
NET METERING - A billing arrangement whereby the solar energy producer
receives credit for excess electricity generated and delivered to the power grid,
paying only for the power used in excess of that generated and delivered to the
power grid.
SMALL-SCALE SOLAR Energy System – A Solar Energy System that has the
primary function of serving the building(s) with which it is associated on the
same lot, but also may have the ability to sell small quantities of energy back to
the electric utility provider and does not exceed two thousand (2,000) square feet
in area of solar collectors (measuring the equipment surface area) per lot. This
system may be ground-mounted or building-mounted, and includes Building-
Integrated Photovoltaic Systems, other types of photovoltaic Solar Energy
Dryden Planning Board
January 17, 2017
Page 7 of 17
Systems, and Solar Thermal Systems.
SOLAR COLLECTOR - A photovoltaic cell, panel or array, or solar hot air or water
collector device, which relies upon solar radiation as an energy source for the
generation of electricity or transfer of stored heat.
SOLAR EASEMENT - A document recorded pursuant to NYS Real Property Law
335-b, the purpose of which is to secure the right to receive sunlight across real
property of another for continued access to sunlight necessary to operate a Solar
Energy System.
SOLAR ENERGY APPLICANT - Any person, firm, corporation or any other entity
submitting an application to the Town of Dryden for a Special Use Permit and/or
Site Plan Review for a Solar Energy Syste m.
SOLAR ENERGY EQUIPMENT – Sola r colle c tors , c ontr ols, inverters ,
e n ergy storage devices, a n d oth e r materials and hardware, associated with
the production of electrical or thermal energy from solar radiation.
SOLAR ENERGY SYSTEM OWNER – Any person, firm, corporation or any other
entity which owns a Solar Energy System which has been granted a Special Use
Permit by the Town of Dryden.
SOLAR ENERGY SYSTEM - An electrical or thermal energy generating system
composed of Solar Collectors, Solar Thermal Systems, and/or Solar Energy
Equipment.
SOLAR PANEL - A photovoltaic device capable of collecting and converting solar
energy into electrical energy.
SOLAR THERMAL SYSTEM – A system in which water or other liquid is directly
heated by the sunlight. The heated liquid is then used for purposes such as space
heating and cooling, domestic hot water and the heating of swimming pools.
Section 3. The Town of Dryden Zoning Law, Article V (Use Regulations), Section
501 (Allowable Use Groups Chart) is amended by adding “Solar Energy Systems” in the
Uses column of the chart and by adding the notation “See § 1312” for each zoning
district cell in the Solar Energy Syste ms row.
Section 4. The Town of Dryden Zoning Law, Article VII (Varna), Section 702 (Varna
Use
Regulations) is amended by adding “Solar Energy Systems” in the Uses column of the
chart and by adding the notation “See § 1312” for each zoning district cell and the
Minimum Lot Size cell in the Solar Energy Syste ms row.
Section 5. The Town of Dryden Zoning Law, Article XIII (Standards and
Requirements for Certain Uses) is amended by adding a new Section 1312 titled “Solar
Energy Systems” as follows:
“Section 1312: Solar Energy Systems
Dryden Planning Board
January 17, 2017
Page 8 of 17
A. Authority. This section is adopted pursuant to the powers granted by sections 261
and 263 of the Town Law of the State of New York, which authorize the Town of
Dryden to adopt zoning provisions that advance and protect the health, safety, and
welfare of the community, and “to make provision for, so far as conditions may
permit, the accommodation of solar energy systems and equipment and access to
sunlight necessary therefor.”
B. Statement of Purpose. This s e cti o n is adopted to advance and protect the
public health, safety, and welfare of the Town of Dryden, including:
1. Taking advantage of a safe, abundant, renewable, and non-polluting energy
resource;
2. Decreasing the cost of energy to the owners of commercial and residential
properties, including single-family houses; and
3. Increasing employment and business development in the region by
furthering the installation of Solar Energy Systems.
C. Applicability.
1. The requirements of this section shall apply to all Solar Energy Systems greater
than 10 square feet in collecting area installed or modified after its effective date,
excluding general maintenance and repair and Building-Integrated Photovoltaic
Systems.
2. The installation of any Solar Energy System does not carry with it a right to a
clear line of sight to the sun. A Solar Energy Applicant, installer, or developer
has the responsibility to make sure that the Solar Energy System is positioned
in such a way that it will achieve optimal energy production. It shall be the
responsibility of the Applicant, installer, or developer to gain any and all solar
easements or agreements to maintain a line of sight to the sun if necessary.
3. The Town of Dryden Planning Department shall review and determine the
correct path for all permitting requirements.
4. Any and all permits granted pursuant to this section shall follow the related
Solar Energy System and any and all obligations of the Solar Energy Applicant
described herein shall be binding on its assignee, including any Solar Energy
System Owner, if different from the Solar Energy Applicant, and such assignee
shall become the holder of the related permit granted pursuant to this section.
D. Building-Mounted Solar Energy Systems.
1. Building-Mounted Solar Energy Systems that produce electricity or thermal energy
for onsite or offsite use are permitted as an accessory use in all zoning districts
when attached to any lawfully permitted building or structure.
2. Height. Solar Energy Systems shall not exceed the maximum height restrictions
of the
zoning district within which they are located and are provided the same
height exemptions that apply to building-mounted mechanical devices or
Dryden Planning Board
January 17, 2017
Page 9 of 17
equipment. Systems installed on buildings already in existence must not increase
the overall height of the structure by six (6) feet or more.
3. All Building-Mounted Solar Energy Systems that produce electricity or thermal
energy for onsite or offsite use shall be exempt from Site Plan Review, unless
such Building- Mounted system increases the overall height of the structure by
six (6) feet or more, in which case Site Plan Review by the Planning Board shall
be required.
4. All owners of Building-Mounted Solar Energy Systems must file a building
permit application with the Planning Department, and obtain a valid
building permit, prior to starting their installation.
E. Ground-Mounted Small-Scale Solar Energy Systems.
1. Ground-Mounted Small-Scale Solar Energy Systems shall not be located in the
following areas, unless otherwise approved by the Planning Board in
conjunction with a Site Plan Review process as provided in Article XI:
a. Prime farmland soils as identified by the Town of Dryden soil analysis maps.
b. Areas of potential environmental sensitivity, such as Unique Natural Areas as
designated by the Tompkins County Environmental Management Council,
flood plains, historic sites, airports, state-owned lands, conservation
easements, trails, parkland, prime soils, and wetlands as identified by
Tompkins County Planning Department mapping services, the New York State
Department of Environmental Conservation, or the United States Army Corps
of Engineers. The County recommended not citing their Planning Department
mapping services.
c. Development is prohibited on slopes of greater than fifteen percent (15%)
unless the Solar Energy Applicant can demonstrate through engineering
studies and to the satisfaction of the Town Engineer that the proposed
development will cause no adverse environmental impact that will not be
satisfactorily mitigated.
d. Placement within the front yards of residential lots.
2. Ground-Mounted Small-Scale Solar Energy Systems are permitted as
principal and accessory structures in all zoning districts and shall adhere
to the following:
a. Height and Setback. Ground-Mounted Solar Energy Systems shall not exceed
seventeen
(17 18) feet in height, and the setback requirements of the underlying zoning
district shall apply.
b. Lot Coverage. The horizontal surface area covered by ground-mounted solar
collectors shall be included in total lot coverage and when combined with the
coverage of other structures, the total area shall not exceed the maximum lot
coverage as permitted in the underlying zoning district.
Dryden Planning Board
January 17, 2017
Page 10 of 17
3. Except as provided in subsection 1 above, Ground-Mounted Small-Scale
Solar Energy Systems shall be exempt from Site Plan Review.
F. Ground-Mounted Large-Scale Solar Energy Systems.
1. Ground-Mounted Large-Scale Solar Energy Systems are permitted as principal and
accessory uses through the issuance of a Special Use P ermit as approved by the
Town Board with prior review and recommendations on the Site Plan by the
Planning Board within Conservation, Rural Agriculture, Rural Residential, Mixed-
Use Commercial, and Light Industrial Zoning Districts, subject to the
requirements set forth in this section, including site plan approval. Applications
for the installation of a Ground -Mounte d Large-Scale Solar Energy System
shall be reviewed by the Zoning Officer and referred, with comments, to the
Town Planning Board and Town Board for its their review and action, which
can include approval, approval on conditions, or denial.
a. Ground-Mounted Large-Scale Solar Energy Systems that produce electricity or
thermal energy primarily for active farming or agricultural uses, where the
generation is less than one hundred and ten percent (110%) of the farm use,
shall be exempt from the requirement to obtain a Special Use Permit.
2. Ground-Mounted Large-Scale Solar Energy Systems shall not be located in the
following areas unless otherwise approved by the Town Board in conjunction
with the Special Use Permit approval process as provided in this section:
a. Prime farmland soils as identified by the Town of Dryden soil analysis maps.
b. Areas of potential environmental sensitivity, including Unique Natural
Areas, flood plains, historic sites, airports, state-owned lands,
conservation easements, trails, parkland, prime soils, and wetlands as
identified by Tompkins County Planning Department mapping services,
the New York State Department of Environmental Conservation, or the
United States Army Corps of Engineers.
c. On slopes of greater than fifteen percent (15%), unless the Solar Energy
Applicant can demonstrate through engineering studies and to the
satisfaction of the Town Engineer that the proposed development will cause no
adverse environmental impact that will not be satisfactorily mitigated.
3. No Special Use Permit or renewal thereof or amendment of a current Special
Use Permit relating to a Ground-Mounted Large-Scale Solar Energy System
shall be granted by the Town Board unless the Solar Energy Applicant
demonstrates that such Ground-Mounted Large-Scale Solar Energy System:
a. Conforms with all federal and state laws and all applicable rules or
regulations promulgated by any federal or state agencies having
jurisdiction.
b. Is designed and constructed in a manner which minimizes visual impact to
the extent practical.
c. Complies with all other requirements of the Town of Dryden Zoning Law
Dryden Planning Board
January 17, 2017
Page 11 of 17
and the Commercial Design Guidelines as applicable, in accordance
with generally accepted commercial standards of the solar energy
industry, unless expressly superseded herein.
d. Is situated on the lot on which it is to be developed in such a manner and
location as to allow for development or conservation of any resource identified
in the town’s plans. of any portion of the Town’s Greenway that is also to be
located
on such lot in accordance with the Town’s Greenway Plan or any modification
thereof as determined by the Town Board.
e. Is located on a single lot (see additional regulations for systems developed on a
series of contiguous or nearby lots in the section “Industrial scaled Energy
Systems”).
f. Complies with a fifty-foot (50) front yard, rear yard, and side yard
setback unless mounted on an existing building.
g. Does not exceed seventeen (17 18) feet in height.
h. Has a solar collector surface area (as measured in the horizontal plane) that,
when combined with the coverage of other structures on the lot, does not
exceed the maximum lot coverage as permitted in the underlying zoning
district, unless the Town Board authorizes the exceedance through the Special
Use Permit process.
4. Special Use Permit Application Requirements. For a Special Use Permit
application, the site plan application is to be used as supplemented by the
following provisions and shall include, but not be limited, to the following:
a. A completed project application form in such detail and containing such
information as the Town Board may require.
b. In fulfilling the requirements of the State Environmental Quality Review Act
(“SEQRA”), the Town Board may require a Full Environmental Assessment Form
(“EAF”) for the proposed Ground-Mounted Large-Scale Solar Energy System. The
Town Board may require submittal of a more detailed visual analysis based on
the information in, or analysis of, the EAF.
c. Site plan in accordance with the requirements of Article XI and this section
including, without limitation:
i. Name, address and phone number of the person preparing the reports.
ii. Postal address and Tax Map parcel number of the property.
iii. Zoning district in which the property is situated.
iv. The exact location including geographic coordinates of the proposed Ground-
Mounted Large-Scale Solar Energy System including any solar arrays,
equipment and anchors, if applicable.
Dryden Planning Board
January 17, 2017
Page 12 of 17
v. Identification on site plans of areas of potential environmental sensitivity,
including onsite or nearby Unique Natural Areas, slopes greater than 15%,
flood plains, historic sites, airports, other government lands, conservation
easements, trails, parkland, prime soils, and wetlands as identified by
Tompkins County Planning Department mapping services, the New York
State Department of Environmental Conservation, or the United States
Army Corps of Engineers.
vi. The maximum height of the proposed Solar Energy System,
including all appurtenances.
vii. A detail of solar collector type including but not limited to equipment
specification sheets for all photovoltaic panels and collectors, significant
components, mounting systems, and inverters that are to be installed; and
proposed solar energy production capacity design level proposed for the
Solar Energy System and the basis for the calculations of the area of the
Solar Energy System’s ’capacity.
viii. The location, type and intensity of any lighting on the site.
ix. Property boundaries and names of all adjacent landowners;
x. If the property of the proposed project is to be leased, legal consent
between all parties, specifying the use(s) of the land for the duration of the
project, including easements and other agreements, shall be submitted. The
lease document must clearly delineate the party responsible and the
procedure for decommissioning at the end of the life of the system and in
the event the owner of the system abandons the system for any reason. It
was suggested that since leases are confidential documents, the applicant
could fulfill this obligation by submitting a Memoranda of Lease or Letter of
Agreement.
xi. The location of all other structures on the property.
xii. The system shall be designed to accommodate emergency vehicle access.
The design may include, but not be limited to, items such as the height,
access ways for vehicles, fire fighting capabilities, and other prominent
features.
xiii. Blueprints and a site plan showing the layout of the Ground-Mounted
Large-Scale Solar Energy System, which must bear the seal of a design
professional licensed to practice in New York State.
xiv. Description of continuing Solar Energy System maintenance and property
upkeep, such as mowing and trimming.
xv. The location, nature and extent of any proposed fencing, landscaping and
screening.
xvi. The location and nature of any proposed utility easements and access roads or
drives.
Dryden Planning Board
January 17, 2017
Page 13 of 17
xvii. A glare assessment survey and any mitigation efforts that may be utilized to
minimize glare on contiguous parcels of land, based on the review of which
Planning Board may require a glare assessment survey
xviii. A Decommissioning plan as set forth in the below provisions titled
“Abandonment and Decommissioning”.
5. Special Use Permit Standards.
a. Appearance and Buffering:
i. The Ground-Mounted Large-Scale Solar Energy System shall have the least
visual minimally adverse effect practical on the environment, as determined
by the Town Board. Based on site
specific conditions, including topography, adjacent structures, and
roadways, reasonable efforts shall be made to minimize visual impacts by
preserving natural vegetation, and providing landscape screening to
abutting residential properties and roads, but screening should minimize
the shading of solar collectors.
ii. Any glare produced by the solar array shall not impair or make unsafe the
use of contiguous structures, any vehicles on or off the road, any airplanes,
or uses by other possible impacted entities as determined by the Town
Board.
iii. Any exterior lighting installed shall have the least visual effect
practical on the contiguous properties and shall be approved by the
Town Board.
iv. The Town Board may require additional information, such as line-of-sight
drawings, detailed elevation maps, visual simulations, before and after
renderings, and alternate designs to more clearly identify adverse impacts
for the purpose of their mitigation.
v. Equipment and vehicles not used in direct support, renovations, additions
or repair of any Ground-Mounted Large-Scale Solar Energy System shall
not be stored or parked on the facility site.
b. Access and Parking:
i. Ground-Mounted Large-Scale Solar Energy Systems may be enclosed by
fencing to prevent unauthorized access. Warning signs with the owner’s
name and emergency contact information shall be placed on any access
point to the system and on the perimeter of the fencing. The fencing and
the system shall be further screened by any landscaping or decorative
fencing needed to avoid adverse aesthetic impacts as approved by the
Town Board.
ii. Motion-activated or staff-activated security lighting around the equipment
area of a Ground-Mounted Large-Scale Solar Energy System or accessory
Dryden Planning Board
January 17, 2017
Page 14 of 17
structure entrance may be installed provided that such lighting does not
project off the site. Such lighting should only be activated when the area
within the fenced perimeters has been entered.
iii. A locked gate at the intersection of the access way and a public road may
be required to obstruct entry by unauthorized vehicles. Such gate must be
located entirely upon the lot and not on the public right-of-way.
c. Engineering and Maintenance:
i. Every Solar Energy System shall be built, operated and maintained to
acceptable industry standards, including but not limited to the most
recent, applicable standards of the Institute of Electric and Electronic
Engineers (“IEEE”) and the American National Standards Institute
(“ANSI”).
ii. The Town, at the expense of the Solar Energy Applicant, may employ its
own consultant(s) to examine the application and related documentation
and make recommendations as to whether the criteria for granting the
Special Use Permit have
been met, including whether the Applicant’s conclusions regarding safety
analysis, visual analysis, structural inspection, and stormwater
management aspects are valid and supported by generally accepted and
reliable engineering and technical data and standards.
d. The Town Board may impose conditions on its approval of any Special Use
Permit under this section in order to enforce the standards referred to in this
section or in order to discharge its obligations under the State Environmental
Quality Review Act (SEQRA).
6. Any application under this section shall also meet all provisions contained in
Article XI for site plans that, in the judgment of the Town Board, are applicable
to the system being proposed.
F. 2. INDUSTRIAL SCALE SYSTEMS (TO BE ADDED SHORTLY)
Here are some possibilities:
• Create a limit to the total amount of wattage in the town, let’s say 2x the sum
total of what his company is planning, which would make a total of about 50 MW for
the whole town, or some 750 acres (assuming 2MW per 15 acres (wow, that seems
like a lot).
• Create a rule that says no more that 10 (or 12 MW) can be located within a mile
(or two, or three) of existing or planned facilities within a 10 year period.
• Allow these systems to go into effect wherever, but create a more involved
procedure to scrutinize projects involving more than 10 MW located within a mile to
assess whether the environmental effects of each proposal would be too great, and
therefore a SUP should be disallowed.
Dryden Planning Board
January 17, 2017
Page 15 of 17
• Allow these systems to go into effect wherever there is no impact to any
viewshed identified on an official map. (We’d have to figure out what map to use,
and what constitutes a viewshed impact).
• Don’t allow any large scale installation on any lot within a given distance (a
mile? 2 miles? Etc.) of an existing or planned 2MW installation.
G. Fees and Deposits.
1. The fees for a Special Use Permit, Site Plan Review and Building Permit for a
Solar Energy System shall be set from time to time by Town Board resolution.
2. The Solar Energy Applicant shall deliver with its application an amount equal to
one percent (1%) of the estimated cost of the project (the “Initial Deposit”). This
sum shall be held by the Town in a non- interest bearing account, and these funds
shall be available to the Town to pay consultants engaged by the Town to assist in
review of the application. The Town shall provide the Solar Energy Applicant a list
of expected consultants and costs prior to engaging any such consultants to
provide the Solar Energy Applicant the opportunity to withdraw its application
based on the review of such costs. Following grant or denial of the application,
the Town shall return to the Applicant any excess re maining in escrow. If the
escrow account has been depleted prior to grant or denial of the application, the
Applicant shall deposit such funds as are then necessary for the Town to pay any
outstanding fees to said consultants. The Town shall provide ten (30) days prior
written notice to the Solar Energy Applicant in the event the outstanding fees to
said consultants shall exceed the amount of the Initial Deposit
H. Building Permits.
1. A holder of a Special Use Permit from the Town Board granted under this
section shall obtain, at its own expense, all permits and licenses required by
applicable law, rule, regulation or code and must maintain the same, in full
force and effect, for as long as required by the Town or other governmental
entity or agency having jurisdiction over the Solar Energy Applicant.
2. A holder of a Special Use Permit from the Town Board for a Solar Energy System
shall construct, operate, maintain, repair, provide for removal of, modify or
restore the permitted Solar Energy System in strict compliance with all current
applicable technical, safety and safety-related codes adopted by the Town,
County, State or United States, including but not limited to the most recent
editions of the National Electrical Safety Code and the National Electrical Code,
as well as accepted and responsible workmanlike industry practices and
recommended practices. The codes referred to are codes that include, but are not
limited to, construction, building, electrical, fire, safety, health and land use
codes. In the event of a conflict between or among any of the preceding, the more
stringent shall apply.
3. Unless waived by the Town Board, there shall be a pre-application meeting for
the building permit application. The purpose of the pre-application meeting will
be to address issues which will help to expedite the review and permitting
process. A pre-application meeting
may also include a site visit, if required. Costs of the Town’s consultants to
prepare for and attend the pre-application meeting will be borne by the Solar
Energy Applicant.
4. The Solar Energy Applicant shall furnish written certification that the Solar
Energy System, foundation and attachments are designed and will be
constructed (“as built”) to meet all local, county, state and federal structural
requirements for loads, including wind and snow loads. If the Solar Energy
System is subsequently approved and constructed, similar as-built
certification indicating that it has been constructed in accordance with all
standards shall be furnished prior to the Town issuance of any certificate of
occupancy or compliance.
5. After construction and prior to receiving a certificate of occupancy or
compliance, the Solar Energy Applicant shall furnish written certification
that the Solar Energy System is grounded and bonded so as to protect
persons and property and installed with appropriate surge protectors by a
certified and approved NYS Licensed Electrical Inspector.
I. Right to Inspect.
1. In order to verify that the Solar Energy System’s owners and any and all
lessees, renters and/or operators of the Solar Energy System place,
construct, modify and maintain such Systems, including solar collectors and
solar inverters, in accordance with all applicable technical, safety, fire,
building and zoning codes, laws, ordinances and regulations and other
applicable requirements, the Town may inspect all facets of said System’s
placement, construction, modification and maintenance.
2. Any inspections required by the Dryden Planning Department that are
beyond its scope or ability shall be at the expense of the Solar Energy
Applicant.
J. Abandonment and Decommissioning.
1. At the time of submittal of the application for a Special Use Permit for a
Ground-Mounted Large-Scale Solar Energy System, the Solar Energy Applicant
shall submit and agree to the performance of a decommissioning plan that
includes the removal of the Solar Energy System and all associated equipment,
driveways, structures, buildings, equipment sheds, lighting, utilities, fencing,
and gates. If such System becomes technologically obsolete or ceases to
perform its originally intended function for reasons other than for repairs or
beyond the reasonable control of the Solar Energy System Owner, for more
than six (6) consecutive months, the Town may require its removal in
accordance with the decommissioning plan. The Town shall provide the Solar
Energy System Owner thirty (30) days prior written notice of a request for
decommissioning, and in the event a reasonable explanation for the delay is
not provided within such thirty (30) day notice period, the Town may require
the removal in accordance with the decommissioning plan. Upon removal of a
Ground-Mounted Large-Scale Solar Energy System, the land shall be restored
to its previous condition, including but not limited to the seeding and sodding,
as appropriate depending upon the season of the work, of exposed soils.
2. At the time of obtaining a building permit, the Solar Energy Applicant may
be required to provide a financial security bond or other form of financial
security acceptable to the Town for removal of the Ground-Mounted Large-
Scale Solar Energy System and property restoration, with the Town of Dryden
as the obligee, in an amount approved by the Town Board. Upon any
amendment of the Special Use Permit, the Town Board may adjust the
required amount to the financial security bond to adequately cover increases in
the cost of removal of the Ground-Mounted Large-Scale Solar Energy System
and property restoration. If the Ground-Mounted Large-Scale Solar Energy
System is not decommissioned after being considered abandoned, the Town
may remove the system and restore the property and impose a lien on the
property pursuant to Section 1802.B to recover these costs to the Town.
3. All other Solar Energy Systems shall be considered abandoned after 6
consecutive months without electrical energy or thermal energy generation
for reasons other than for repairs or beyond the reasonable control of the
Solar Energy System Owner and must be removed from the property. The
Town Board may consider and grant, for good cause shown, an application
for one extension not exceeding 24 months for Solar Energy Systems other
than Ground-Mounted Large-Scale Solar Energy Systems.”
Section 6. This local law shall take effect upon filing in the office of the Secretary
of State.
Section 7. The provisions of this local law are severable. If any court of
competent jurisdiction decides that any section, clause, sentence, part or provision
of this local law is illegal, invalid, or unconstitutional, such decision shall not affect,
impair, or invalidate any of the remaining sections clauses, sentences, parts, or
provisions of the Local Law.
Section 8. This local law shall supersede or repeal any prior inconsistent Local
Law.