Loading...
HomeMy WebLinkAbout06-28-2021 SEQR Negative Declaration-SmithN`rD Agency Use Only 11f applicable] Project: Date: Short Environmental Assessment Forni Part 2 - ImpactAssessinent Part 2 is to be completed by the Lead Agency. Answer all of the following questions in Part 2 using the information contained in Part I and other materials submitted by the priject sponsor of otherwise available to the reviewer. When ansNvering the questions the reviewer should be guided by the concept "Have my responses been reasonable considering the scale and context of the proposed action?"' PR[NT FORM I Page I oft No. or Moderate small to large impact impact, may may occur occur 1. Will the proposed action create a material conflict with an adopted land use plan of zoning r,771 El regulations? LIni 2. Will the proposed action result in a change in the use or intensity of use of land? (�( LAJ El 3. Will the proposed action iinlaair the character or quality of the existing community? 0 4. Will the proposed action have an impact on the environmental characteristics that caused the establishment of a Critical Ew6ronrnerital Area (CF -A)" 5. Will the proposed action TCSI.Ilt in all adverse change in the existing level of traffic or infrastructure for affect existing triass transit. biking or walkway? 6. Will the proposed action cause an increase in the use of energy and it fails to incorporate reasonably available energy conservation or renewable energy opportunities? L11 -hi 7- Will the proposed action impact existing: a. public / private water supplies? b, PUbk / private wastewater treatment utilities? 8. Will the proposed action iirpair the character or quality of important historic, archaeological, F�,-;j 1^1 architectural or aesthetic resources? i 1 9, Will the proposed action result in an adverse ebange to natural resources (e.g., wetlands. waterbodies. flora fauna)? r—, --I &J groundwater, air quality, and 10. Will the proposed action result in an increase in the potential for erosion. flooding or drainage rVI E�� El problems? IL Will the proposed acTiou create a hazard CO environmental resources or human health? PR[NT FORM I Page I oft Agency Use Only [If applicable] Pro.jedl Date; I Short Environmental Assessment Form Part 3 Determination of Significance For every question in Part 2 that was ansm cred "moderate to large impact may occur', or if there is a need to explain why a particular element of the proposed action may or will not result in a significant adverse environmental impact, please complete Part 3, Part 3 should, in sufficient detail, identify the impact, including any measures or design elements that have been included by the project sponsor to avoid or reduce impacts. Pail 3 should also explain bo -w the lead agency determined that the impact may orwill not be significant. Each potential impact should be assessed considering its setting, probability of occurring, duration, irreversibility., geographic scope and magnitude. Also coi.i si der the potential for short- term, long-term and cumulative impacts. Cl Check this box if you have determined, based on the information and analysis above, and any supporting documentation, that supporting the proposed action may result in one or more potentially large or significant adverse impacts and an environmental impact statement is required, F-.�, Check this box if you have deter pined, based on the information and analysis ;above, and any supportingdocumentation., L^j t at the poroUose action will n result in any significant g i cant ad verse en vironmenta I imp acts. JLO L/ 'game of Le aJ Agency Date Print or e of R onsiL* fffiler in Lead Agency e of P, V-1-p0n, ibl- Icer' , "ff, C e 1 4 - 1; -%rer (if different from Respons.-ible Officer) r S ble ffic- in Lead Agency Sign,,wir of Prel V4 EPRINT FORM Page 2 oft