Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
01 - NSF Danby Consolidated Submission Package 04_26_22
PA PASSERO ASSOCIATES engineering architecture April 26,2022 Town of Danby Attn: Mr.West 1830 Danby Road Danby,NY Re: NSF Danby Response Package —04/26/22 Dear Mr. West: On Behalf of our client,Norbut Solar Farms,LLC.Attached to this letter is the latest consolidated application package for the Norbut Solar Danby Project. Below are any revisions made to the materials since their original submission dates: SECTION 2: Long Environmental Assessment Form—Revised 03/29/22 Revisions to section E.2.0 regarding the northern harrier study. (12/06/21)Revisions to D.2.b,D.2.e.III &E.Lb are to match the new site design, avoiding all wetlands described in the BME Wetlands Report, as well as Wetlands generally described by Tompkins County Online Wetland Mapper. (11/05/21)Revisions are to various sections of the form due to satisfy the comments from the Tompkins County Soils and Water,Tompkins County Planning,TG Miller, P.C. comments, as well as town board members from previous meetings. SECTION 3: Solar Array Civil Design Plans—Revised 03/29/22 Revisions are to address the comments from the NYSDEC and TCSW (comments are provided in Appendices F& G) (01/04/22)Revisions are to address comments from the NYSDEC (those comments were provided to the town on 01/10/22). (12/06/21)Revisions are for new solar array layout to avoid wetlands described in BME Wetlands report. Array layout stays within setbacks ®ulated stream buffers set previously. The design also incorporates a new POI location that is set away from Danby Road and away from the ROE Family Barn. (11/05/21)Revisions are across the plan set to satisfy the comments received from the Tompkins County Soils and Water,Tompkins County Planning,TG Miller,P.C. comments, as well as town board members from previous meetings. 242 West Main Street,Suite 100 Rochester, NY 14614 T 585.325.1000 F 585.325.1691 www.passero.com SECTION 3a: Solar Array Additional Screening Plans—Revised 12/08/21 The screening plans have been revised to show the location of the most up to date proposed access drive. The driveway is farther west from the closest residence at 54 Bald Hill, maintaining a strip of existing vegetation compared to the original road location. SECTION 4: Subdivision Plan—Revised 12/10/21 The subdivision plan was revised to show the new driveway location.The plan was also updated to match the new solar array layout so all parcels have 5MW generative capacity or less; meeting the NYSERDA NY-Sun community solar program requirements. SECTION 5: Electrical Agregate Map— 12/06/21 The Agregate map was revised to match the new site layout described in sections 2 & 3 of this submission iteration above. SECTION 6:Tax Map—Revised 12/08/21 The Tax map in the submission package was not of the project location. The proper tax map of Danby has been placed in the package. (06/30/21) The Tax map of the site has been placed in this package to satisfy application requirement"g" showing actual access to the project site.The parcel is directly connected to Bald Hill Road. SECTION 8: Stormwater Pollution Prevention Plan—Revised 03/29/22 Revisions are to address the comments from the NYSDEC and TCSW (comments are provided in Appendices F& G) (01/04/22) Revisions are to address comments from the NYSDEC (those comments were provided to the town on 01/10/22). (12/06/22) Revisions are to match the described new solar array layout. The SWPPP makes notice of existing and not to be disturbed ephemeral drainage patterns to prevent alteration to existing drainage patterns. The SHPO Effect Finding Letter has been added to Appendix H of the SWPPP. (09/27/21) Revisions are to provide hydrological calculations and provide a diversion structure to protect the creek to satisfy the comments received from the Tompkins County Soils and Water,Tompkins County Planning,TG Miller, P.C. comments. SECTION 9: Contractor Information&Proof of Liability Insurance—To be Submitted Applicant will provide Name, address and contact information for the professional system installation company prior to start of construction. A system installer has not yet been selected for this project. NSF Danby Site 1,LLC;NSF Danby Site 2,LLC;NSF Danby Site 3,LLC of the Solar Energy facility shall provide the Town Clerk with liability insurance coverage prior to the start of construction and operation. Industry standards are that insurance certificates are generated and provided, to the authority having jurisdiction,prior to, but within reasonable proximity to the start of onsite construction or system operations. Page 2 of 3 Insurances are specific to each project and location and are not typically carried in formal policy until just prior to the start of operations. APPENDIX D: Noise Study—Revised 12/17/21 Revisions are to reflect the new solar array layout that avoids wetlands. APPENDIX E: Visualizations—Revised 12/07/21 Revisions include removing the visualizations for the POI location next to the ROE barn, these visuals are replaced with new ones showing the new proposed driveway&POI location. The visualizations also include showing the POI behind the Town Hall. (11/02/21)Revisions are to show the height of the panels from 16.5' to 18' to make sure all panels are still un-visible from all areas previously discussed. APPENDIX H:Wetland Delineation Report—04/26/22 A joint wetland delineation report in a coordinated effort between BME and Delta Engineers is included in this package. NSF has requested that the project be considered as submitted and that the Planning Board authorize installation of panels over new areas of lower quality wetlands identified in the joint report. The project has been designed to avoid wetlands identified in the previously submitted wetland delineation completed by BME Engineers. (09/02/21)At the request of the Town, an additional wetland delineation map and report is being created by a third party team and will be submitted when completed. The BME wetland delineation report has been previously submitted. Sincerely, DavidC�PE MBA Associate I Civil Department Manager Page 3 of 3 TABLE OF CONTENTS SECTION 1: Application Letter from Nixon Peabody — 6/30/21 SECTION 1a: Development Review Application — 6/30/21 SECTION 1b: Agricultural Data Statement — 6/30/21 SECTION 2: Long Environmental Assessment Form Part 1 (Revised) — 03/29/22 SECTION 3: Solar Array Civil Design Plans (Revised) — 03/29/22 SECTION 3a: Solar Array Additional Screening Plans (Revised) — 12/08/21 SECTION 4: Subdivision Plan (Revised) — 12/10/21 SECTION 5: Electrical Aggregate Plans (Revised) — 12/06/21 SECTION 5a: Solar Panel & Inverter Specifications — 06/30/21 SECTION 5b: Photovoltaic Simulation Report — 06/30/21 SECTION 6: Tax Map of Parcel Showing Direct Access to Site — 12/08/21 SECTION 7: Operation, Maintenance & Emergency Response Plan — 06/30/21 SECTION 8: Stormwater Pollution Prevention Plan (Revised) — 03/29/22 *SHPO Effect Finding Letter included in Appendix H of the SWPPP report. SECTION 9: Contractor & Proof of Liability Insurance (To be submitted at a later date) SECTION 10: Decommissioning Plan — 06/30/21 APPENDICIES APPENDIX A: Sample of Proposed Fence — 06/30/21 APPENDIX B: SHPO Historic Resources Report — 11/01/21 APPENDIX C: Phase 1 Environmental Site Assessment — 07/15/21 APPENDIX D: Noise Study (Revised) — 12/17/21 APPENDIX E: Visualizations (Revised) — 11/02/21 APPENDIX F: Response Letters to Tompkins County (Additional) — 03/29/22 APPENDIX G: Response Letter to TG Miller & NYSDEC — 03/29/22 APPENDIX H: Wetland Delineation Report by BME Associates& Delta Engineers — 04/26/22 NIXON PEABODY LLP Nathan E.Vander Wal,Esq. N I X O N ATTORNEYS AT LAW TN 585-263-1312 nvanderwal@nixonpeabody.com PEABODY NIXONPEABOBY.COM @NIXONPEABOBYLLP 1300 Clinton Square ' Rochester,NY 14604-1792 585-263-1000 June 30, 2021 Town Board Planning Board Town of Danby 1830 Danby Road Ithaca,NY 14850 RE: Application to the Town of Danby Town Board and Planning Board for the Establishment of a Planned Development Zone for Property Located at No Number Bald Hill Road, Town of Danby, Tompkins County,New York, Tax Parcel No. 10.4-21.122, to Accommodate the Development and Operation of a Solar Energy Generation Facility Dear Members of the Town Board and the Planning Board: Norbut Solar Farm, LLC; NSF Danby Site 1, LLC; NSF Danby Site 2, LLC; and NSF Danby Site 3, LLC (the "Applicant") proposes to construct three 5-MW(AC) ground-mounted photovoltaic (PV) electricity generation facilities (the "Project") on certain undeveloped land located at No Number Bald Hill Road in the Town of Danby, Tax Parcel No. 10.4-21.122 (the "Site"). The Project includes the construction of three(3)immediately adjacent PV facilities at the Site,with related improvements to include pad-mounted electrical equipment,overhead electrical interconnection to existing public utilities, a gravel access drive, perimeter security fencing, limited land grading, and stormwater management improvements. The Property is located in the Medium Density Residential (MD) Zoning District. The Project, a "Solar Energy Facility" under the Zoning Ordinance of the Town of Danby (the "Code"), is not a permitted use in the MD district. However,pursuant to the Code, and following discussions with the Town Planner, David West, Section 604 of the Code provides for the establishment of a Planned Development Zone("PD Zone")to accommodate certain development of land within the Town, including a Solar Energy Facility, and to establish appropriate standards pursuant to which such development shall occur. Accordingly, the following enclosures are submitted for the Town's review connection with the establishment of a PD Zone at the Property for the Project(collectively, the "Application"): • Town Development Application Form for Establishment of PD Zone, Site Plan and Subdivision Approvals for Project • Project Site Plan in compliance with Code Sections 800 (Rezoning) and 808 (Solar Energy Facility) 4822-9466-6992.1 Town of Danby Town Board and Planning Board June 30 2021 NIXON PEABODY LLP ATTORNEYS AT LAW Page 2 NIXON PEABODY.COM @NIXONPEABODYLLP • Long Environmental Assessment Form • Stormwater Pollution Prevention Plan • Project Operation and Maintenance Plan • Project Decommissioning Plan • Landscape Screening Plan • Agricultural Data Statement • Emergency Response Plan • PV Array Layout and Design Drawing • Three line Diagrams • Project Equipment Specifications As reflected in the above-referenced enclosures, the proposed PD Zone meets the regulations set out for a PD Zone under Section 604 of the Code, except as reflected in the Project Site Plan, for which regulations the Applicant will seek a waiver or alteration from the Town Board pursuant to Section 604(2) of the Code. Given the Site's location within 500 feet of a farm operation in the TOMP002 Agricultural District, the Project must be referred to the Tompkins County Department of Planning and Sustainability, as required under New York General Municipal Law Section 239-m, and the Applicant has submitted an Agricultural Data Statement(with adjoiner exhibit)pursuant to Town Law Section 283-a. The Applicant respectfully requests that the Town make the required GML 239-m referral and mail the written notice to the landowners identified in the adjoiner exhibit to the Ag Data Statement. Upon receipt and review of the enclosed materials, please place this Application on the next available meeting agenda for the Town Planning Board pursuant to Section 800 of the Code. If the Town requires any additional information or materials to deem this Application preliminarily complete, please let us know. We look forward to working with the Town in connection with this exciting opportunity. Thank you. Sincerely, Nathan E. Vander Wal 4822-9466-6992.1 Development Review Application Building Permit Number: Project Title: Norbut Solar Danby Project Address. 54 Bald Hill Rd, Ithaca, NY14850 Tax Parcel ID: 10-1-21 .122 Type of Application: Rezoning Site Plan& Subdivision Type of Development: non-residential Stage of Review: Sket Final X Additional meeting Estimated site improvement/ project cost: $24.7_MGII*OR _ (Exclude cost of land acquisition & professional fees) Total number of lots proposed (existing + new): 3 Are new roads or public utilities proposed? no Conservation Easement Acres Proposed 0 Applicant/Agent Name: Norbut Solar Farm, LLC Title: Developer Address: 1241 University Ave, Rochester, NY 14614 Phone: 585.504.2200 Email: pm@norbutsolarfarms.com Consultant Name: Passero Associates Title: Engineer Address: 242 W. Main St., Rochester, NY 14614 Phone: 585.325.1000 Email: dcox@passero.com Owner/ Lessee / Engineer/Attorney/ Other (circle one) Name: Russell Nitchman Title: Owner Address: 54 Bald Hill Rd, Ithaca, NY14850 Phone: 718.757.9624 Email: russellnitchman@gmail.com ALL APPLICATIONS: The information on this application form is submitted in addition to other information, plats, and plans required by the Town of Danby. I attest that all information so submitted is complete and accurate to the best of my knowledge. Also, by filing this application, permission is granted to members of the various Town Boards, Committees, Planning and Code Enforcement staff, other persons designated by the Town that may be involved in the review of this pplication, to er t pr y specified abov to i spect in connection with the review of this application. Lc,o78 I nsU �'te 06/29/2021 Owner's signature date pplicant/Agent signature date 2 AGRICULTURAL DATA STATEMENT Town of Danby Tax Parcel No. 10-1-21 .122 Tompkins County Agricultural District No. 1 or 2 NOTE: Section 283-a of the Town Law (effective July 1, 1993) requires that any application for a Special Permit, Site Plan Approval, Use Variance or Subdivision Approval on property within an Agricultural District containing a farm operation, OR on property with boundaries within five hundred (500) feet of a farm operation that is located in an Agricultural District, include an Agricultural Data Statement. ALL applications requiring an Agricultural Data Statement must be referred to the Tompkins County Planning Board in accordance with amended section 239-m and 239-n of the General Municipal Law (effective July 1, 1993). Part I: Agricultural Data Statement Name of Applicant Bald Hill Road, LLC Mailing Address 1241 University Ave, Rochester, NY 14614 Description of Project Proposed rezoning of MD land to PDZ. Construction of 3 solar arrays on 3 proposed lots totaling 15,000 kW. Solar Modules Will be ground mounted. Names and addresses of those owners of land within Tompkins County Agricultural District #1 or #2 that contain farm operations AND are located within five hundred (500) feet of the project property: 1 34 Michigan Hollow Rd, Ithaca, NY14850 2 38 Michigan Hollow Rd, Ithaca, NY14850 3. 4. 5. Attach to this form a copy of a tax map showing the site of the proposed project relative to the locations of farm operations identified above. Farm Operations are defined as "...the land used in agricultural production, farm buildings, equipment and farm residential buildings" according to Section 301, Article 25 AA of the Agricultural and Markets Law. Rev.June 27,2019 Agricultural District Review 2019 TOWN OF DANBY -------------------------- a f , j I ,I yl I I � I I � I j I - I I j I I I a I a I j I, �__—__—__—__—__— j� �I I I I I I i j , I � I j I I I � I I I R nbv A C � i f � � I � I j I I I ' I I - I - Removals I I - Additions I I Agricultural District 1 Agricultural District 2 N — Municipal Boundaries 0.5 0.25 0 0.5 1 1.5 2 2.5 3 Sources:Esri,HERE,Garmin,USGS, Intermap,INCREMENT P,NRCan, Esri Japan,METI,Esri China(Hong Kong),Esri Korea,Esri(Thailand), Miles NGCC,(c)OpenStreetMap contributors,and the GIS User Community Full Environmental Assessment Form Part 1 -Project and Setting Instructions for Completing Part 1 Part 1 is to be completed by the applicant or project sponsor. Responses become part of the application for approval or funding, are subject to public review,and may be subject to further verification. Complete Part 1 based on information currently available. If additional research or investigation would be needed to fully respond to any item,please answer as thoroughly as possible based on current information;indicate whether missing information does not exist, or is not reasonably available to the sponsor;and,when possible,generally describe work or studies which would be necessary to update or fully develop that information. Applicants/sponsors must complete all items in Sections A&B. In Sections C,D&E,most items contain an initial question that must be answered either"Yes"or"No". If the answer to the initial question is"Yes",complete the sub-questions that follow. If the answer to the initial question is"No",proceed to the next question. Section F allows the project sponsor to identify and attach any additional information. Section G requires the name and signature of the applicant or project sponsor to verify that the information contained in Part 1is accurate and complete. A.Project and Applicant/Sponsor Information. Name of Action or Project: Bald Hill Road,LLC;NSF Danby Site 1,LLC;NSF Danby Site 2,LLC;NSF Danby Site 3, LLC Project Location(describe,and attach a general location map): No Number Bald Hill Rd,Danby,NY 14850 Brief Description of Proposed Action(include purpose or need): Proposed rezoning of MD land to PDZ.Construction of 3 arrays on 3 proposed lots totaling 15,000 kW.Solar modules will be ground mounted. Name of Applicant/Sponsor: Telephone:585.504.2200 Bald Hill Road,LLC;NSF Danby Site 1,LLC;NSF DanbySite 2,LLC;NSF Danby Site 3,LLC E-Mail: operations@norbutsolarfarms.com Address:1241 University Ave,Rochester, NY 14614 City/PO:Rochester State:NY Zip Code:14614 Project Contact(if not same as sponsor;give name and title/role): Telephone:585.504.2200 Sean Greany E-Mail: sgreany@norbutsolarfarms.com Address: 1241 University Ave,Rochester,NY 14614 City/PO: State: Zip Code: Rochester NY 14614 Property Owner (if not same as sponsor): Telephone: 718.757.9624 Russell&Kim Nitchman E-Mail: russellnitchman@gmail.com Address: No Number Bald Hill Rd City/PO: Danby State: NY Zip Code:14850 Page 1 of 13 B.Government Approvals B.Government Approvals,Funding,or Sponsorship. ("Funding"includes grants,loans,tax relief,and any other forms of financial assistance.) Government Entity If Yes: Identify Agency and Approval(s) Application Date Required (Actual or projected) a. City Counsel,Town Board, ®Yes❑No Town Board-rezoning 6/30/21 or Village Board of Trustees b.City,Town Or Village ®Yes❑NO Town Planning Board-Site Plan&Subdivision 6/30/21 Planning Board or Commission c. City,Town or ❑YesmNo Village Zoning Board of Appeals d.Other local agencies ❑YesmNo e. County agencies ®Yes❑No County IDA-PILOT agreement, 6/30/21 County Planning f.Regional agencies ❑YesmNo g. State agencies ®Yes❑No SHPO(Consultation),NYSDEC(SPDES) 6/30/21 h.Federal agencies ®Yes❑No USACE(Wetlands) 6/30/21 i. Coastal Resources. i. Is the project site within a Coastal Area,or the waterfront area of a Designated Inland Waterway? ❑YesmNo ii. Is the project site located in a community with an approved Local Waterfront Revitalization Program? ❑YesmNo iii. Is the project site within a Coastal Erosion Hazard Area? ❑YesmNo C.Planning and Zoning C.I.Planning and zoning actions. Will administrative or legislative adoption,or amendment of a plan,local law,ordinance,rule or regulation be the ❑YesmNo only approval(s)which must be granted to enable the proposed action to proceed? • If Yes,complete sections C,F and G. • If No,proceed to question C.2 and complete all remaining sections and questions in Part 1 C.2.Adopted land use plans. a.Do any municipally-adopted (city,town,village or county)comprehensive land use plan(s)include the site mYes❑No where the proposed action would be located? If Yes,does the comprehensive plan include specific recommendations for the site where the proposed action ❑YesmNo would be located? b.Is the site of the proposed action within any local or regional special planning district(for example: Greenway; ❑YesmNo Brownfield Opportunity Area(BOA);designated State or Federal heritage area;watershed management plan; or other?) If Yes,identify the plan(s): c. Is the proposed action located wholly or partially within an area listed in an adopted municipal open space plan, ❑YesmNo or an adopted municipal farmland protection plan? If Yes,identify the plan(s): Page 2 of 13 C.3. Zoning a. Is the site of the proposed action located in a municipality with an adopted zoning law or ordinance. ®Yes❑No If Yes,what is the zoning classification(s)including any applicable overlay district? Medium Density Residential b. Is the use permitted or allowed by a special or conditional use permit? ®Yes❑No c.Is a zoning change requested as part of the proposed action? ®Yes❑No If Yes, i. What is the proposed new zoning for the site? PDZ CA.Existing community services. a. In what school district is the project site located? Ithaca City School District b.What police or other public protection forces serve the project site? Tompkins County Sheriff. c.Which fire protection and emergency medical services serve the project site? Danby Fire Dept d.What parks serve the project site? Jennings Pond Park and Dotson Community Park D.Project Details DA.Proposed and Potential Development a.What is the general nature of the proposed action(e.g.,residential,industrial,commercial,recreational;if mixed,include all components)? Solar Array b. a.Total acreage of the site of the proposed action? 111.59 acres b.Total acreage to be physically disturbed? 2.58 acres c. Total acreage(project site and any contiguous properties)owned or controlled by the applicant or project sponsor? 111.59 acres c.Is the proposed action an expansion of an existing project or use? ❑Yes®No i. If Yes,what is the approximate percentage of the proposed expansion and identify the units(e.g.,acres,miles,housing units, square feet)? % Units: d.Is the proposed action a subdivision,or does it include a subdivision? ®Yes❑No If Yes, i. Purpose or type of subdivision?(e.g.,residential,industrial,commercial;if mixed,specify types) Subdivide the 3 arrays on 3 separate lots ii. Is a cluster/conservation layout proposed? ❑Yes®No iii. Number of lots proposed? 3 iv. Minimum and maximum proposed lot sizes? Minimum 28.61 Maximum 42.59 e.Will the proposed action be constructed in multiple phases? ❑Yes®No i. If No,anticipated period of construction: 12 months ii. If Yes: • Total number of phases anticipated • Anticipated commencement date of phase 1 (including demolition) month year • Anticipated completion date of final phase month wear • Generally describe connections or relationships among phases,including any contingencies where progress of one phase may determine timing or duration of future phases: Page 3 of 13 f.Does the project include new residential uses? ❑Yes®No If Yes,show numbers of units proposed. One Familv Two Familv Three Familv Multiple Familv four or more Initial Phase At completion of all phases g.Does the proposed action include new non-residential construction(including expansions)? ®Yes❑No If Yes, i.Total number of structures Solar ii. Dimensions(in feet)of largest proposed structure: +-18' height; +-3.5'width; and +-6.5'length iii. Approximate extent of building space to be heated or cooled: None square feet h.Does the proposed action include construction or other activities that will result in the impoundment of any ❑Yes®No liquids,such as creation of a water supply,reservoir,pond,lake,waste lagoon or other storage? If Yes, i. Purpose of the impoundment: ii. If a water impoundment,the principal source of the water: ❑ Ground water❑Surface water streams ❑Other specify: iii. If other than water,identify the type of impounded/contained liquids and their source. iv. Approximate size of the proposed impoundment. Volume: million gallons;surface area: acres v. Dimensions of the proposed dam or impounding structure: height; length vi. Construction method/materials for the proposed dam or impounding structure(e.g.,earth fill,rock,wood,concrete): D.2. Project Operations a.Does the proposed action include any excavation,mining,or dredging,during construction,operations,or both? ❑Yes✓❑No (Not including general site preparation,grading or installation of utilities or foundations where all excavated materials will remain onsite) If Yes: i.What is the purpose of the excavation or dredging? ii. How much material(including rock,earth,sediments,etc.)is proposed to be removed from the site? • Volume(specify tons or cubic yards): • Over what duration of time? iii. Describe nature and characteristics of materials to be excavated or dredged,and plans to use,manage or dispose of them. iv. Will there be onsite dewatering or processing of excavated materials? ❑Yes❑No If yes,describe. v. What is the total area to be dredged or excavated? acres vi. What is the maximum area to be worked at any one time? acres vii. What would be the maximum depth of excavation or dredging? feet viii. Will the excavation require blasting? ❑Yes❑No ix. Summarize site reclamation goals and plan: b.Would the proposed action cause or result in alteration of,increase or decrease in size of,or encroachment ❑YesZNo into any existing wetland,waterbody,shoreline,beach or adjacent area? If Yes: i. Identify the wetland or waterbody which would be affected(by name,water index number,wetland map number or geographic description): Per Wetland Delineation Report created by Gene Pellet from Environmental Resources,LLC.No Wetlands are located within the development areas of the project.Per the Wetland Delineation Report created by BME Associates,No Wetlands are located within the development areas of the project. Page 4 of 13 H. Describe how the proposed action would affect that waterbody or wetland,e.g.excavation,fill,placement of structures,or alteration of channels,banks and shorelines. Indicate extent of activities,alterations and additions in square feet or acres: iii.Will the proposed action cause or result in disturbance to bottom sediments? ❑Yes❑No If Yes,describe: iv. Will the proposed action cause or result in the destruction or removal of aquatic vegetation? ❑Yes❑No If Yes: • acres of aquatic vegetation proposed to be removed: • expected acreage of aquatic vegetation remaining after project completion: • purpose of proposed removal(e.g.beach clearing,invasive species control,boat access): • proposed method of plant removal: • if chemical/herbicide treatment will be used,specify product(s): v. Describe any proposed reclamation/mitigation following disturbance: c.Will the proposed action use,or create a new demand for water? ❑Yes g]No If Yes: i. Total anticipated water usage/demand per day: gallons/day ii. Will the proposed action obtain water from an existing public water supply? ❑Yes❑No If Yes: • Name of district or service area: • Does the existing public water supply have capacity to serve the proposal? ❑Yes[--]No • Is the project site in the existing district? ❑Yes❑No • Is expansion of the district needed? ❑Yes❑No • Do existing lines serve the project site? ❑Yes❑No iii. Will line extension within an existing district be necessary to supply the project? ❑Yes❑No If Yes: • Describe extensions or capacity expansions proposed to serve this project: • Source(s)of supply for the district: iv. Is a new water supply district or service area proposed to be formed to serve the project site? ❑Yes❑No If,Yes: • Applicant/sponsor for new district: • Date application submitted or anticipated: • Proposed source(s)of supply for new district: v. If a public water supply will not be used,describe plans to provide water supply for the project: vi.If water supply will be from wells(public or private),what is the maximum pumping capacity: gallons/minute. d.Will the proposed action generate liquid wastes? ❑Yes mNo If Yes: i. Total anticipated liquid waste generation per day: gallons/day ii. Nature of liquid wastes to be generated(e.g.,sanitary wastewater,industrial;if combination,describe all components and approximate volumes or proportions of each): iii. Will the proposed action use any existing public wastewater treatment facilities? ❑Yes❑No If Yes: • Name of wastewater treatment plant to be used: • Name of district: • Does the existing wastewater treatment plant have capacity to serve the project? ❑Yes❑No • Is the project site in the existing district? ❑Yes❑No • Is expansion of the district needed? ❑Yes❑No Page 5 of 13 • Do existing sewer lines serve the project site? ❑Yes❑No • Will a line extension within an existing district be necessary to serve the project? ❑Yes❑No If Yes: • Describe extensions or capacity expansions proposed to serve this project: iv. Will a new wastewater(sewage)treatment district be formed to serve the project site? ❑Yes❑No If Yes: • Applicant/sponsor for new district: • Date application submitted or anticipated: • What is the receiving water for the wastewater discharge? V. If public facilities will not be used,describe plans to provide wastewater treatment for the project,including specifying proposed receiving water(name and classification if surface discharge or describe subsurface disposal plans): vi. Describe any plans or designs to capture,recycle or reuse liquid waste: e.Will the proposed action disturb more than one acre and create stormwater runoff,either from new point ®Yes❑No sources(i.e. ditches,pipes,swales,curbs,gutters or other concentrated flows of stormwater)or non-point source(i.e. sheet flow)during construction or post construction? If Yes: i. How much impervious surface will the project create in relation to total size of project parcel? 5209 Square feet or .12 acres(impervious surface) Square feet or 111.6 acres(parcel size) ii. Describe types of new point sources.Concrete Pads for Transformers.Alteration to existing shared access drive. iii. Where will the stormwater runoff be directed(i.e.on-site stormwater management facility/structures,adjacent properties, groundwater,on-site surface water or off-site surface waters)? Through existing wetlands,ephemeral drainage paths,then to an onsite stream. • If to surface waters,identify receiving water bodies or wetlands: existing drainage patterns will be maintained.There is a regulated stream on site that is not to be disturbed. • Will stormwater runoff flow to adjacent properties? ®Yes❑No iv. Does the proposed plan minimize impervious surfaces,use pervious materials or collect and re-use stormwater? ®Yes❑No f. Does the proposed action include,or will it use on-site,one or more sources of air emissions,including fuel ❑Yes®No combustion,waste incineration,or other processes or operations? If Yes,identify: i.Mobile sources during project operations(e.g.,heavy equipment,fleet or delivery vehicles) ii. Stationary sources during construction(e.g.,power generation,structural heating,batch plant,crushers) iii. Stationary sources during operations(e.g.,process emissions,large boilers,electric generation) g.Will any air emission sources named in D.2.f(above),require a NY State Air Registration,Air Facility Permit, ❑Yes®No or Federal Clean Air Act Title IV or Title V Permit? If Yes: i. Is the project site located in an Air quality non-attainment area? (Area routinely or periodically fails to meet ❑Yes❑No ambient air quality standards for all or some parts of the year) ii. In addition to emissions as calculated in the application,the project will generate: • Tons/year(short tons)of Carbon Dioxide(CO2) • Tons/year(short tons)of Nitrous Oxide(N2O) • Tons/year(short tons)of Perfluorocarbons(PFCs) • Tons/year(short tons)of Sulfur Hexafluoride(SF6) • Tons/year(short tons)of Carbon Dioxide equivalent of Hydroflourocarbons(HFCs) • Tons/year(short tons)of Hazardous Air Pollutants(HAPs) Page 6 of 13 h.Will the proposed action generate or emit methane(including,but not limited to,sewage treatment plants, ❑YesZ No landfills,composting facilities)? If Yes: i. Estimate methane generation in tons/year(metric): ii.Describe any methane capture,control or elimination measures included in project design(e.g.,combustion to generate heat or electricity,flaring): i.Will the proposed action result in the release of air pollutants from open-air operations or processes,such as ❑YesZ No quarry or landfill operations? If Yes:Describe operations and nature of emissions(e.g.,diesel exhaust,rock particulates/dust): j.Will the proposed action result in a substantial increase in traffic above present levels or generate substantial ❑YesZ No new demand for transportation facilities or services? If Yes: i. When is the peak traffic expected(Check all that apply): ❑Morning ❑Evening ❑Weekend ❑Randomly between hours of to ii. For commercial activities only,projected number of truck trips/day and type(e.g.,semi trailers and dump trucks): iii. Parking spaces: Existing Proposed Net increase/decrease iv. Does the proposed action include any shared use parking? ❑Yes[]No v. If the proposed action includes any modification of existing roads,creation of new roads or change in existing access,describe: vi. Are public/private transportation service(s)or facilities available within'h mile of the proposed site? [-]Yes[-]No vii Will the proposed action include access to public transportation or accommodations for use of hybrid,electric [-]Yes[-]No or other alternative fueled vehicles? viii.Will the proposed action include plans for pedestrian or bicycle accommodations for connections to existing [-]Yes[-]No pedestrian or bicycle routes? k.Will the proposed action(for commercial or industrial projects only)generate new or additional demand ❑Yes[ZNo for energy? If Yes: i. Estimate annual electricity demand during operation of the proposed action: ii. Anticipated sources/suppliers of electricity for the project(e.g.,on-site combustion,on-site renewable,via grid/local utility,or other): iii. Will the proposed action require a new,or an upgrade,to an existing substation? [-]Yes[-]No 1.Hours of operation. Answer all items which apply. i. During Construction: ii. During Operations: • Monday-Friday: 7am-7pm • Monday-Friday: 24/7 • Saturday: 7am-7pm • Saturday: 24/7 • Sunday: None • Sunday: 24/7 • Holidays: None • Holidays: 24/7 Page 7 of 13 m.Will the proposed action produce noise that will exceed existing ambient noise levels during construction, ®Yes El No operation,or both? If yes: i. Provide details including sources,time of day and duration: Normal construction equipment noise.See Noise Report for post construction conditions. ii. Will the proposed action remove existing natural barriers that could act as a noise barrier or screen? ®Yes❑No Describe: Some of the woods will be removed however woods around the perimeter of the property will be maintained. n.Will the proposed action have outdoor lighting? ❑Yes®No If yes: i. Describe source(s),location(s),height of fixture(s),direction/aim,and proximity to nearest occupied structures: ii. Will proposed action remove existing natural barriers that could act as a light barrier or screen? ❑Yes❑No Describe: o. Does the proposed action have the potential to produce odors for more than one hour per day? ❑Yes®No If Yes,describe possible sources,potential frequency and duration of odor emissions,and proximity to nearest occupied structures: p.Will the proposed action include any bulk storage of petroleum(combined capacity of over 1,100 gallons) ❑Yes®No or chemical products 185 gallons in above ground storage or any amount in underground storage? If Yes: i. Product(s)to be stored ii. Volume(s) per unit time (e.g.,month,year) iii. Generally,describe the proposed storage facilities: q.Will the proposed action(commercial,industrial and recreational projects only)use pesticides(i.e.,herbicides, ❑Yes ®No insecticides)during construction or operation? If Yes: i. Describe proposed treatment(s): ii. Will the proposed action use Integrated Pest Management Practices? ❑ Yes ❑No r.Will the proposed action(commercial or industrial projects only)involve or require the management or disposal ® Yes ❑No of solid waste(excluding hazardous materials)? If Yes: i. Describe any solid waste(s)to be generated during construction or operation of the facility: • Construction: 2 tons per month (unit of time) • Operation: 0 tons per year (unit of time) ii. Describe any proposals for on-site minimization,recycling or reuse of materials to avoid disposal as solid waste: • Construction: Packaging for panels/shipping materials will be recycled if recyclable. • Operation: N/A iii. Proposed disposal methods/facilities for solid waste generated on-site: • Construction: Dumpsters • Operation: N/A Page 8 of 13 s.Does the proposed action include construction or modification of a solid waste management facility? ❑ Yes 0 No If Yes: i. Type of management or handling of waste proposed for the site(e.g.,recycling or transfer station,composting,landfill,or other disposal activities): H. Anticipated rate of disposal/processing: • Tons/month,if transfer or other non-combustion/thermal treatment,or • Tons/hour,if combustion or thermal treatment iii. If landfill,anticipated site life: years t.Will the proposed action at the site involve the commercial generation,treatment,storage, or disposal of hazardous❑Yes ZNo waste? If Yes: i.Name(s)of all hazardous wastes or constituents to be generated,handled or managed at facility: ii. Generally describe processes or activities involving hazardous wastes or constituents: iii. Specify amount to be handled or generated tons/month iv. Describe any proposals for on-site minimization,recycling or reuse of hazardous constituents: v. Will any hazardous wastes be disposed at an existing offsite hazardous waste facility? ❑Yes❑No If Yes:provide name and location of facility: If No: describe proposed management of any hazardous wastes which will not be sent to a hazardous waste facility: E.Site and Setting of Proposed Action E.I.Land uses on and surrounding the project site a.Existing land uses. i. Check all uses that occur on,adjoining and near the project site. ❑ Urban ❑ Industrial ❑ Commercial ® Residential(suburban) ® Rural(non-farm) ❑ Forest ❑ Agriculture ❑ Aquatic ❑ Other(specify): ii. If mix of uses,generally describe: b.Land uses and covertypes on the project site. Land use or Current Acreage After Change Covertype Acreage Project Completion (Acres+/-) • Roads,buildings,and other paved or impervious surfaces • Forested 51 ac 18.2 ac -32.8 ac • Meadows,grasslands or brushlands(non- agricultural,including abandoned agricultural) 56.09 86.69 ac +30.6 • Agricultural (includes active orchards,field,greenhouse etc.) • Surface water features (lakes,ponds,streams,rivers,etc.) • Wetlands(freshwater or tidal) 4.5 ac 4.5 ac 0 ac • Non-vegetated(bare rock,earth or fill) • Other Describe: Pervious Access Road 0 2.2 +2.2 ac Page 9 of 13 c.Is the project site presently used by members of the community for public recreation? ❑Yes®No i. If Yes: explain: d.Are there any facilities serving children,the elderly,people with disabilities(e.g.,schools,hospitals,licensed ❑YesmNo day care centers,or group homes)within 1500 feet of the project site? If Yes, i. Identify Facilities: e.Does the project site contain an existing dam? ❑YesONo If Yes: i. Dimensions of the dam and impoundment: • Dam height: feet • Dam length: feet • Surface area: acres • Volume impounded: gallons OR acre-feet ii. Dam's existing hazard classification: W. Provide date and summarize results of last inspection: f.Has the project site ever been used as a municipal,commercial or industrial solid waste management facility, ❑YesONo or does the project site adjoin property which is now,or was at one time,used as a solid waste management facility? If Yes: i. Has the facility been formally closed? [-]Yes[-] No • If yes,cite sources/documentation: ii. Describe the location of the project site relative to the boundaries of the solid waste management facility: W. Describe any development constraints due to the prior solid waste activities: g.Have hazardous wastes been generated,treated and/or disposed of at the site,or does the project site adjoin ❑YesONo property which is now or was at one time used to commercially treat,store and/or dispose of hazardous waste? If Yes: i. Describe waste(s)handled and waste management activities,including approximate time when activities occurred: h. Potential contamination history. Has there been a reported spill at the proposed project site,or have any ❑Yes® No remedial actions been conducted at or adjacent to the proposed site? If Yes: i. Is any portion of the site listed on the NYSDEC Spills Incidents database or Environmental Site ❑Yes❑No Remediation database? Check all that apply: ❑ Yes-Spills Incidents database Provide DEC ID number(s): ❑ Yes-Environmental Site Remediation database Provide DEC ID number(s): ❑ Neither database ii. If site has been subject of RCRA corrective activities,describe control measures: W. Is the project within 2000 feet of any site in the NYSDEC Environmental Site Remediation database? ❑Yes®No If yes,provide DEC ID number(s): iv. If yes to(i),(ii)or(iii)above,describe current status of site(s): Page 10 of 13 v. Is the project site subject to an institutional control limiting property uses? ❑YesmNo • If yes,DEC site ID number: • Describe the type of institutional control(e.g.,deed restriction or easement): • Describe any use limitations: • Describe any engineering controls: • Will the project affect the institutional or engineering controls in place? ❑Yes❑No • Explain: E.2. Natural Resources On or Near Project Site a.What is the average depth to bedrock on the project site? >6' feet b.Are there bedrock outcroppings on the project site? ❑YesONo If Yes,what proportion of the site is comprised of bedrock outcroppings? % c.Predominant soil type(s)present on project site: Silt Loams 100 % d.What is the average depth to the water table on the project site? Average: 3' feet e.Drainage status of project site soils:❑ Well Drained: %of site O Moderately Well Drained: 15%of site O Poorly Drained 85%of site f.Approximate proportion of proposed action site with slopes: ® 0-10%: 97 %of site ® 10-15%: 3 %of site ❑ 15%or greater: %of site g.Are there any unique geologic features on the project site? ❑YesONo If Yes,describe: h. Surface water features. i. Does any portion of the project site contain wetlands or other waterbodies(including streams,rivers, DYes❑No ponds or lakes)? ii. Do any wetlands or other waterbodies adjoin the project site? DYes❑No If Yes to either i or ii,continue. If No,skip to E.2.i. iii. Are any of the wetlands or waterbodies within or adjoining the project site regulated by any federal, DYes❑No state or local agency? iv. For each identified regulated wetland and waterbody on the project site,provide the following information: • Streams: Name 898-339,898-338 Classification B,C • Lakes or Ponds: Name Classification 0 Wetlands: Name Federal Waters,Federal Waters,Federal Waters,... Approximate Size 0.4 ac • Wetland No.(if regulated by DEC) v. Are any of the above water bodies listed in the most recent compilation of NYS water quality-impaired ❑Yes ONo waterbodies? If yes,name of impaired water body/bodies and basis for listing as impaired: i.Is the project site in a designated Floodway? ❑YesONo j.Is the project site in the 100-year Floodplain? [-]Yes[Z]No k.Is the project site in the 500-year Floodplain? ❑YesONo 1.Is the project site located over,or immediately adjoining,a primary,principal or sole source aquifer? DYes❑No If Yes: i.Name of aquifer:Principal Aquifer Page 11 of 13 m. Identify the predominant wildlife species that occupy or use the project site: Deer,Squirrels,other native species n.Does the project site contain a designated significant natural community? W]Yes❑No If Yes: i. Describe the habitat/community(composition,function,and basis for designation): Rich Hemlock-Hardwood Peat Swamp ii. Source(s)Of description or evaluation: NYS Environmental Wetland Mapper iii. Extent of community/habitat: • Currently: acres • Following completion of project as proposed: 270.6 acres • Gain or loss(indicate+or-): 0.0 acres o.Does project site contain any species of plant or animal that is listed by the federal government or NYS as ®Yes❑No endangered or threatened,or does it contain any areas identified as habitat for an endangered or threatened species? If Yes: i. Species and listing(endangered or threatened): Northern Harrier p. Does the project site contain any species of plant or animal that is listed by NYS as rare,or as a species of ❑YesONo special concern? If Yes: i. Species and listing: q.Is the project site or adjoining area currently used for hunting,trapping,fishing or shell fishing? ®Yes❑No If yes,give a brief description of how the proposed action may affect that use: Open farmland can currently be used for deer hunting by the owner or those given permission by the owner.So long as they are not within 500'(firearm), 250'(crossbow),or 150' bow of any other residential homes businesses churches or community gatherings. E.3. Designated Public Resources On or Near Project Site a.Is the project site,or any portion of it,located in a designated agricultural district certified pursuant to W]Yes❑No Agriculture and Markets Law,Article 25-AA, Section 303 and 304? If Yes, provide county plus district name/number:TOMP002 b.Are agricultural lands consisting of highly productive soils present? ❑Yes WINO i. If Yes: acreage(s)on project site? ii. Source(s)of soil rating(s): c. Does the project site contain all or part of,or is it substantially contiguous to,a registered National ❑Yes ONo Natural Landmark? If Yes: i. Nature of the natural landmark: ❑Biological Community ❑ Geological Feature ii. Provide brief description of landmark,including values behind designation and approximate size/extent: d.Is the project site located in or does it adjoin a state listed Critical Environmental Area? ❑YesW]No If Yes: i. CEA name: ii. Basis for designation: iii. Designating agency and date: Page 12 of 13 e.Does the project site contain,or is it substantially contiguous to,a building,archaeological site,or district ❑Yes®No which is listed on the National or State Register of Historic Places,or that has been determined by the Commissioner of the NYS Office of Parks,Recreation and Historic Preservation to be eligible for listing on the State Register of Historic Places? If Yes: i.Nature of historic/archaeological resource: El Archaeological Site ❑Historic Building or District ii.Name: iii. Brief description of attributes on which listing is based: f.Is the project site,or any portion of it,located in or adjacent to an area designated as sensitive for ❑Yes W]No archaeological sites on the NY State Historic Preservation Office(SHPO)archaeological site inventory? g.Have additional archaeological or historic site(s)or resources been identified on the project site? ❑Yes W]No If Yes: i.Describe possible resource(s): ii. Basis for identification: h.Is the project site within fives miles of any officially designated and publicly accessible federal,state,or local W]Yes❑No scenic or aesthetic resource? If Yes: i. Identify resource: Danby State Forest,Jennings Pond,Bruce Hill Road ii.Nature of,or basis for,designation(e.g.,established highway overlook,state or local park,state historic trail or scenic byway, etc.): Danby state forest is a State Park,Jennings Pond is part of Buttermilk Falls State Park,Bruce hill Road is a scenic byway closed in winter. iii. Distance between project and resource: 1.15,0.23, 1.47 miles. i. Is the project site located within a designated river corridor under the Wild,Scenic and Recreational Rivers ❑YesZNo Program 6 NYCRR 666? If Yes: i. Identify the name of the river and its designation: ii. Is the activity consistent with development restrictions contained in 6NYCRR Part 666? ❑Yes❑No F.Additional Information Attach any additional information which may be needed to clarify your project. If you have identified any adverse impacts which could be associated with your proposal,please describe those impacts plus any measures which you propose to avoid or minimize them. G. Verification I certify that the information provided is true to the best of my knowledge. Applicant/Sponsor Name David Cox PE(Passero) Date 12/6/21 Signature Title Civil Engineer PRINT FORM Page 13 of 13 EAF Mapper Summary Report Saturday, June 26, 2021 10:30 AM Disclaimer: The EAF Mapper is a screening tool intended to assist - project sponsors and reviewing agencies in preparing an environmental assessment form(EAF).Not all questions asked in the EAF are answered by the EAF Mapper.Additional information on any EAF question can be obtained by consulting the EAF Workbooks. Although the EAF Mapper provides the most up-to-date digital data available to DEC,you may also need to contact local or other data sources in order Tow to obtain data not provided by the Mapper.Digital data is not a substitute for agency determinations. {Jtlrywn Monlreal Denby Taronta e - . .Is FtiJp-!r, `Ra ar JJ v Yr r Al"N Bastan GreaHaplp :Pfovlaence r I i i New York fin nPittabu-gh Phlladelphin ainrin. 1_ISCS: I1lt?imal].IN-'-'FEr-4NTP:NR-van:Es Japan::METT:Es China �.H.Drn_I Font(i:Esii IEIAErdTk'�'�?Can:Esii Japan,IA Ell.Esii China (Hong Koncj:Es I ]r33,Esr1 :Dp,9lS13,eetr-,1ap.:.]I7t111)Lit lI,.. 317iI th2 GI 1_I52r COMM Lilly �i.i;n�p217Sti'2�r 13p•:.]IYkli1)ZA Al] c� ,o ie GI User C011lln Linty B.i.i [Coastal or Waterfront Area] No B.i.ii [Local Waterfront Revitalization Area] No C.2.b. [Special Planning District] Digital mapping data are not available or are incomplete. Refer to EAF Workbook. E.1.h [DEC Spills or Remediation Site- Digital mapping data are not available or are incomplete. Refer to EAF Potential Contamination History] Workbook. E.1.h.i [DEC Spills or Remediation Site- Digital mapping data are not available or are incomplete. Refer to EAF Listed] Workbook. E.1.h.i [DEC Spills or Remediation Site- Digital mapping data are not available or are incomplete. Refer to EAF Environmental Site Remediation Database] Workbook. E.1.h.iii [Within 2,000' of DEC Remediation No Site] E.2.g [Unique Geologic Features] No E.2.h.i [Surface Water Features] Yes E.2.h.ii [Surface Water Features] Yes E.2.h.iii [Surface Water Features] Yes- Digital mapping information on local and federal wetlands and waterbodies is known to be incomplete. Refer to EAF Workbook. E.2.h.iv [Surface Water Features - Stream 898-339, 898-338 Name] E.2.h.iv [Surface Water Features - Stream B, C Classification] E.2.h.iv [Surface Water Features -Wetlands Federal Waters Name] E.2.h.v [Impaired Water Bodies] No E.2.i. [Floodway] Digital mapping data are not available or are incomplete. Refer to EAF Workbook. E.2.j. [100 Year Floodplain] Digital mapping data are not available or are incomplete. Refer to EAF Workbook. Full Environmental Assessment Form - EAF Mapper Summary Report 1 E.2.k. [500 Year Floodplain] Digital mapping data are not available or are incomplete. Refer to EAF Workbook. E.2.1. [Aquifers] Yes E.2.1. [Aquifer Names] Principal Aquifer E.2.n. [Natural Communities] Yes E.2.n.i [Natural Communities - Name] Rich Hemlock-Hardwood Peat Swamp E.2.n.i [Natural Communities -Acres] 0.0 E.2.o. [Endangered or Threatened Species] Yes E.2.o. [Endangered or Threatened Species - Northern Harrier Name] E.2.p. [Rare Plants or Animals] No E.3.a. [Agricultural District] Yes E.3.a. [Agricultural District] TOMP002 E.3.c. [National Natural Landmark] No E.3.d [Critical Environmental Area] No E.3.e. [National or State Register of Historic Digital mapping data are not available or are incomplete. Refer to EAF Places or State Eligible Sites] Workbook. E.3.f. [Archeological Sites] No E.3.i. [Designated River Corridor] No Full Environmental Assessment Form - EAF Mapper Summary Report 2 HORIZONTAL SCALE SITE PLANS FOR 200 0 100 200 400 SCALE:1"=200' F)A N O R B U T SOLAR DANBY PASSERO ASSOCIATES engineering architecture TOWN OF DANBY, TOMPKINS COUNTY, NEW YORK P. N. 20213129.0001 GUNOEFVAN ROAD 1qS —— o PROJECT LOCATION I N/F BALL TDWD Of DODby INSTRUMENT#2510 4234 LOCATION SKETCH cuene NORBUT SOLAR "' O \ 1241 UNIVERSITY AVE. SHEET C 11„0 . ROCHESTER, NY 14607 .:.:.:, T/N R IP knlp9�l2 i — i-) {ii2iii _SEi _ LIBER 6IV0►F PASSERO ASSOCIATES T/A10-1-19.12 'n, 2a2we:r Na�so-eer Suite la Isfisla21 ooD N/F ROE I reacnener rvew Ton 1ns14 faxlsesl szsls sl LIBER 610 OF DEEDS,PAGE 652 I Pnnc pal-inLharge Jess Sudol,PE T/A 10-1-19.2 N/F ROE T/A 10-1-19.12 Project Manager David Cox,PE LIBER 880 OF DEEDS,PAGE 25 N/F ROE C .I Designed by Austin Goodwin,ETT. LIBER 610 OF DEEDS,PAGE 852 ..:::::::: T/A9-1-11.2z N/F BRUCE/AUGE _ I �P y�p,NIEL S O 1 i/A F TIEFEL y INSTRUMENT#2018-0]355 T/A10-I-23 LIBER 859 OF DEEDS.PAGE 67 N/F S#201 5 1 N/ER245 OF DANBY I I LIBER 2450E DEEDS, PAGE 484 v'g, td SHEET C 103 SHEET C 105 SHEET C 107 SHEET C 109 T/A TO-,_2,,5 G T/A 9-1-11.42 N/F BEENERS N N/F BRUCE/AUGE \ INSTRUMENT#450507-001 I d LIBER 859 OF DEEDS,PAGE 67 h 1 Date ay ROVISIOnS ofi/ao/z1 ABG ACCESS I N1 DRIVE NovEt PER aENT 2 09/24/21 ABG PERTONPKINS COUNTY SOILI&WATER G PER TO L/J \ 4 11/01/21 ABG PER SHPOCOM.COMMENTS 5 11/08/21 ARG PER BME WERANO DELINEATION NAP (') W L \ l ] 12/01/21 ABG PER INCLUSION OF TCSW WETLANDS _ 6 1/30/21 ABG ER PO RENSONS 1 8 01/03/22 ABG PER NTSOEC—MINTS 9 a/zs/z AEG PER N i =� a Re■ \ --_—_— — \\\\ / ` o© Q YSDEc Tcsw coNNENTs urvAVrxoarzso uTs6Anorvs oa AIN—Es To Tws"A"' is \ ,� vlounox of HATE souunory—A-a.-sscnox T/A 9-1-13.22 TsoT TxEss ruxs AxEro mo nos Oa N/F NIT#20 'T INSTRUMENT#2024125]3 Y — ! eoyP �sOa, s�4P09T COVER O '• ...�w / G•... r aP2��brygry � \\ '#7o�"G 7 ,y F N ORBUT SOLAR G O _ SHEET E ET C 108 asptisG -- SHEET C 102 SHEET C 104 SHEET C 106 °FFe�z DANBY SITE V P F .. ..I T Town/ci ITHACA r/A 9-1-13.23 1 RL WS::S::S �� /A 10-1-21.124 ,` N: _,...... ......:..tip o• N/F MASTROBERTI N/F MONTGOMERY 1'Z`ry �. +% County.iOMPKINS State:NEW YORK INSTRUMENT INSTRUMENT#2018-10051 tyPU�# \ 2pJP Proect No. 92018-06188 4w44w �o? P? \ 20213129.0001 ��LOJV2s / Drawing No. Sheet No. DRAWING INDEX C 101 1 C 101 COVER Eddie: 3 T/A 10-1-57.11 T/A 10-1-57 T/A 10-1-56 �G tiT Jq N/F SHALLOWAV T/A 10-1-57.32 N/F RADIN REAL ESTATE LLC N/F MONTGOMERY \'yt,ly l? C 102-110 SITE PLANS 111— 200' w INSTRUMENT#590094-001 N/F RADIN REAL ESTATE LLC INSTRUMENT#591007-003 INSTRUMENT#2018-1.51 INSTRUMENT#2015-06571 1 o 1 100 C 201-202 NOTES&DETAILS Date OCTOBER 2021 NOT FOR CONSTRUCTION 1 as aM _i_ SOME-- am __ 1 �� MN ay sic �i. �� i • Ma as ra MM MM • as a� ! a! aM i♦M Ma w+a as i DISTURBANCE AREAS HOIIIONIAIL SCALEa! am IaM Ma oa aM M Ina Ya MM Na a! !M Ma ■I amMM M! !a ai a Ma aN Wli a if2 iM ME !! Ma aim as !nl ! !a i! =■� I■1 -in ■lM MM a\n as 1I as is am alp ai !! aM ! m! I■na ■•a Ma ra as al FENCELINE !a alM w�•1 ■•tea MM aM N nia rM M ■�! !i aY a ®I !M as Ji IM! am !iI 1■la ila ■■! !_M i !a PERVIOUS ACCESS DRIVE 96,717 SF SCALE:V�40' MM wM !M aM M a! am aN ala Ma tljM a as !a 1 Mr Ma am _!_ am ME MM M! i1a1 iY a as as aM ■I �11 ! a■s a! as MM Mw oa a! uwM M! Gia ar !MM a �I \ia -M ai -0 ' i.• a! as M! `nal vial as �yo ! as aM r1 TOTAL AC 2 58 AC 'ria cra aM as a! ■a Nla iM a as am MM ■I N NOTE: Y•a MM a as aM MM • Mr ��•'• I■Ia ! Gna aM an Ma nl • ■• • •'.a ! as MI(• MM Ma as =: I \tea 6nM MM ! ! W a! !M Ma Ma as aM 1: Iw".• a1i Glna Ma !i !M nl • ala aM MM aM MM aM Y a1a aJ.i as Gia as aM Mw nl - -- - - !M YM aM Ma MM ! \n■■ in1! M.•.I• Mla Sna aM YM Ma nl • • • MIM M! as rM a MM MM aM en as GnM Mw as as n TOWN OF DANBY REQUIRES�25%SITE COVERAGE(DISTURBANCE AREAS PERVIOUS ACCESS DRIVE SOUR ARRAYS) a� as M- ■n -M �� �M ■■I� �I a1C GSM a! Mr aM 'I aM ai ai iM Ma wa Y� I=Im !�■ -- aA am M! ��\ �I LEGEND: a as aM MM M! I■a a1M ! a1Y� MI- ME aN wa ra aM it t as !M aM MM as aM a iY Ii fAI MMI a! !a !M Mal it iM Ma as ai aM a !a Ia■• MIA la! a! !M Ma Ma it NOTE: aM wM \na aM M a! as aN nI.I ai IMM am Mr laa i as as aM M am a! MM a! !!1 aM iifM wa a\• a THE SITE IS NOT WITH IN A I 00-YEAR TREES TO BE REMOVED CrYP.)- a! aM a as as aM M !I! BRR- ■a as ai am i n FLOODPLAIN PER FIRM MAP am _!_ MM MM aM _a_ as !M IfM Nam\ Ma aM Y - EXISTING n I LINE ROAD as as aM MM aM Iu•M Ma 'am a a as as as aM i as a ■� as aM MM Mi r_■Y ■■ aN Ma am wa n a a as aM MM Ma ra no a !! a! aM ! aM i a i! !M MM Ma as aM a lea as aM a i! 1 CONTOUR Ou PROPOSED SOLAR ARRAY LAY !a M�a Ma aM !M am as ai as aM MM as aM MM i Ma as Ma a! aM as !M M! aM a as MM Mw as Ri CONTOUR ■I aM Ma as am MM ai ii� ��I■ M a! !M Mw rig !It• i a! as as Mla MY MM aM a � MM as MM M! Ma aM --0 PROPOSED FENCE i! aM Ma as aiI =a a !! MIi aM Ma a! as a i Sy PROPOSED SILT FENCE aM lai\ lii Ma aM a M! iM MM Ma as Ya M aM Mal M! as aM i !a a! Mq' Ma !a !a Mw ala IaY = PROPOSED SILT FENCE as an YM a as am am aZ a! am Ma !a as a•■ /SILT SOCK !a aM a a! as aM as aI■ iq MM �! !a MM a i aM ! !a aM aM M! is ME Ma ar !! a as aM i WE a1a iM am as a! !M Ma aM a! a1a am Mw Na as aM am -0 -- am ai aN !M MN i iM Ma M! !a ■ REMOVE TREES M MarM Mi MM ai Mal a! i Ma as a! aM Ma Mal ■IM \l!IM qa a! Mr Ma a\i aM as a! !! aY MY'-.�••. �a !a MM Ma as aM �.. ar aM Ma as M! !M rIA !! a aM M! as MM Mal a • aM aM as Ma aM Ma la! aM MM - a! aM Mli ar a MM !_!_ Ma aM ala as !M MN as i■•1 aM _a_ a! r\• a T TALL a! aM Ma !! am am Ma ala !a ' Ma aM ar as as lin am, a am MM MM am Na aM aS as as aM i\a A\! i ! am !! MM Ma Na am M as ra am M am aM i MaPRO OSED SOLAR N! !! as as a! aM MM ! N aN aM a as i! alANELS W WIRE FENCE WITH 61 CODENDOLES SET 10'O.C.SEEMa- MGn Ni !a \�■� ■IN a! aM OM MM as aM MM N! a ama as MM MM NM a! !a _=N as Mw MM Mla !a a a a! as MM oa !a aM Ma - M !a MM aia ra M. i !\i am -MM M! as aM Ma a\i am MM Ma !a aM M. a ♦ • aq asaa a! iM Ma ao as aN aM aM a1M aM •na a MY wa aM am as a! a! Ya .ia a! !M aM MY MY a M■■ as aM Ma ar a\n am M! !! am MM M! !a Y■• aN !M ! a! aw aM Ma aM MM MM as MM MM �Ia �■ ` aM �a �!_ !_� au •a�a sa a� !M �_�_ as as Ma a 1 a aY aM MM Ma Na ITM Ma Mli aM MM M! 1�12� ro MCI M- / / • !M MM Ma as aM as a! !a MM as am -- IaY am 1 - MY M! !a aM as a! as �N Ma as IaM MM a! !a a at■ a! !a Ma Ma a! YM _ a_a_ a_a iM MM as \t•i as i aM MM ai as aM Ma !a r! Ma as A_t_ as awl as aY !a aM Ma aY rM Ma Ma aM oM �a ! M M ••• 1• •1 I 1 a_�■■ Ma as as MM Ma a! on as L+■Y•--'1 �� �� 'tea a■:: aM am on as aM as as as :M Mnl !a WE aWE s • •I I I , , aw Ma as am MM a! am aM as Mali as -ass as ■!� ������. Ma Ma aM am as as iM 1 a a! aM MY MY Ma. !M //o W W�fy�■l•I■Y\■I�IfJ•II�fY�■■Ir.L►�r•■I\�4 • a! iM aM �a as aM Ma as aM Ma ate\ �!i i]M• M_M_ PROJECT •a + • •_�"•— �� as as aN Ma ai !a aM am as aM Ma aM �� le©ia • - !!I G'na Ma a! Iii Ma Ma !ii MM MM a! Na ■Ia as • alI■ ■•1! as Na !a Ma Ya aM MM Mr M! am Ma aI■ Ma as !i aM MII as ■■M MM MIS a\i nIM Ma aal InM Ma as Ma MM M! !a1 aM Ma ai ■a as MY aY aL7 am MM !! aM Ma a! !! MM as !a ■■M MM ala as YM Ma as aM MM as a! MM Ma a�I ■�I■ Mq Ma wa an Ma as a! !M aY !a aM Ma as a! aM Ma as aM MM as as aM Ma i\! !N =M Ma a! on ar as MM aM Mla as aM Ma ■a la! !M NM is aM MM Ma as is Ma Ma !M MM ■a !i. a! Ma ME !i aM Ma as -- MN ar a! r\■ M! am NM MM Ma a! !M Ma as as aN M! MM MM Ma as a! !M as as iM Ma Ma ali aM Iia aY aM MM as as aM Ma a! !a MM Mla as aM Ma as aM aM Ma a! !a MM Ma Ma aM Iia aY a■� MM MN as aM Ma �aa a! MM M! !! !al ■I•■ a! a! am Ma as MM MM Ni laa no Ma N! Ya MM Ma aY ■IM Ma as as aM Ma aN Mr. ;aM am a! !M �a as y� MM Ma as as as as •aa ■■M - • - M! !a aM Ma a! laa aM Ma a! aM M■■ ai as aM ra as am ai Ma M! Ma aM MM ra Ma •LOCATION !iI am Ma as !! !M u! !a aM MM MM ra au Ma wa _ as a! !■• Ma is 'aa Ma ai as rM ra M! !M In1M Mi a! 1•M Ma as !a as as as a! aM ai1 aM as Y! !M MMI iM MM MM Ma M i\a am Ma !a aM Ma aY !a MM aM M as a1M _M_ Client: Ma :n! MM Ma aM NM Ma Ma as aM Ma Ina a•■ aM M! !M ra is aM MM Ma as ra MM \ as oM Ma a! am MM Ma aN !M Ma aal wa aM N_a ai a! aM MM Ma !a � !M I�� �! laa oa as as !M MM ai !! am Ma a! _ Ma as aM aN MM is aM Ma as a! aM Ma !M aM as as as aM a_w_ i a! -a MN Ma ra iM Ma as ao aM am as !M MM =1M Ma as !M !M a'a a! !M Ma as IaM MM Ma as Ma rM Ma !a MM •': • ` IM am am MM N! a- aM Ma a! -a MN am ar as as a . !a iM MM Mom• as MM Ma am !a am MM !M a! M�� i iM MN am am aM as as as Ma MM as mm Ma as aM MM M!I M! i MM M! !a a �a am !_� sM M� !a I■� ��_ �! !� as i ala MM Ma as aM ra va ai !M Ma n�a aM =o i I• •/ 1 MM Ma a! !M Ma as as aM Mi. am am as Ma a! MM _ __ __ a! !I� aM MM a! !a aM Ma as oM MM Ma is aM Mr Ma a! !_a_ Ma ALONG CONTOURaN MM Ma as as as �+_ �_a -a aas as as as fa as as i MM ail am no as a MM Ma •�.M �IM Ma as as !M Ma aM Ma as as • as !i1 Ma aM aM =N am am aM ! as as M a I• ail Ma _a_a_ a_a_ a■� ■!_ !_a_ a_a_ M_M_ s_M_ a_a !M_ a_a_ ME ri MM illi MM aM MM M! am as a4 a'! aw a • Al \n! G^� O!�= as aM !a as !a am a aia as am M! I i wm aM am as Ma am rM Ma !li M! aM Na Ma - LLA aa MM MM Ma as MM Ma a! !w aM a= no aM LLJaM IIIM MN -aM aM am no as Mi a- M! r_w !M GnM ala n • • as Pnncipal�n-Chargc Jess Sudol,PE on ai am aM Ma a! as MM no as iM as as as a! am am as Ma aM as ai a_M_ Ma as as Iaa Ma _ manager __ n MM as am MM Ma as as MM as as aM a\ai ■r■■� a! Designed Ma am YM Ma a! !M MM Ma a! !M Ma as !a aM •• MM i e' aY M i ■a ar aM am r! is aM Ma as aY N■■ Na C MM Mr !M aM aN aM am aM Mla aM aM �iI oa i-.a MY a•■ i\M MM Ma a! aM Ma ar aM Ma Ia a! !a -.6- aM am MM !a !M Ma a! a\n =l.L as MW alb a' I MY Ma a! aM ra aM a! MM M! as �•■� n•l _■� aM aZ a ■.iM Mom• as aM Ma as as aM. Ma a! !M �� !Y ai• � !a =M Ma • ■e! !a am Ma as ra am Mi aIa\ as a■\ -- am Ma as !! aM aM as ar.. Ma Ma a! iiI Mlii a! MM M • a! Ma as as i01 M! a! !M Ma Ma -a aM \ia ar Ma as ai aM am as MM MM M! !a .Aa Ma ar a\iam am a! a! am Ma as aM MM as as !a Ma - Ifa Y\n Ma MII aM Ma !DO !M MN as as ME as a\a Cfft2 - yM iM ME ■ wy 257 aM Ma aM aM va M! !a YM Ma a:01 ail as M aiI • aM -- ! ■ �j• ,r Ma as aM MM Ma nI! !M is as a! !M ra -iYl a! •VWq'9 �� !a �M �� !�•• l�il tArA�. _ ■ G* `�_r• PROPOSED/TREELIME asa A a= as M! !M MM Ma Y! MM is as asa Ma a! !M MM Ma a ra rr Ma as aM MN Ma !a ai, Ma as it MM a !a aM M oa MM Ma !M Ma as R.et MM Na ai aM Mi as a! aM M! MM aM aM Ma \• l,� as as �- a! is aM as a! as aM as as as as Mi !a as MM Ma as N as as :a as am ra as Ma Ma as as as ap iM1a a! MME i Ma as a! MM ■ ' M! !w aM as aM !a aM ra as aM MM M! as !r as aM _ MM aM Ma as i as !M MM no a! aM Ma as YM MM Ma as aM Ma iM Mi±. !a Ma ai. MM ■ • aM MM Mi as zM Ma MS !M MM Ma !a Mr Ma as • MM MM as am a as iM MM M! !_!_ MM M'a a! !a Ma a! MM ii MM M! ■ _ • as as as ■ally `la on Ma WE !M MY as !a as as a! aM Ma !M Ma a! ■ PROPOSEDAli aM as loa am MM a! !a aM MM as as as Ma ai aM Mal iIa ra as ■ �0 n \• I _ I I pp PROPOSED SILT FENCE TO BE INSTALLED ALONG CONTOUR ------- SITE PLAN •': SOLAR - DAN BY SITE 111 - PENCE TOTAL TOTAL TOWN 24, 1 11 Project No. 20213129.0001 l�illi�ilill!lllll!lllll!lllm� Date OCTOBER HORIZONTAL SCALE 40 0 20 40 RO SCALE:1"=40' ;)A PASSERO ASSOCIATES engineering architecture LEGEND: PROPERTY BOUNDARY vT/A,JO-1'L19.4 v v v v \ \ \ \ \ EXISTING CENTER N/F\li\0 \ \\ LINEROAD I \ CAPPED\ \ \ \ \ \\ \ \ \ \ \ \ EXISTING MAJOR 1RE-6AR \ ` \ ` ` \ \ ` \ \ \ \ ` \ \ \ U ER,� 0 0 pEE4S,\ P�G� 25 ` \ --------520----- \ FOUND \ `\ `� \\ \\ \\ \\ \\ \\ \\ \ /�1 ` \ l\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ CONTOUR \ \ \ \ ` \\ \ \\ \ \\ \�\ \\ \ \ `\ \\ \\ \\ \ \ --------5Z1-----EXISTING MINOR —0.0' CONTOUR E —0.3'\ \ \ \ \ \ \ \_ // I \ \ \ \ \ \ \ PROPOSED FENCE \ \ \ \ \ \\ \ \ \ \ \\ \ \\ \\ \\ \\ \ \\ \\\ \\ \ \ \ \\ \ y PROPOSED SILT FENCE vv v vv v SS /SILTSOCK PROPOSED SOLAR ARRAY LAYOUT\ \ TREES TO BE REMOVED P.\ \ \\\\\\ \\\\ \ \ \\ \ EXISTING TREE LINE T TALL WIRE FENCE WITH 6"WOODEN POLES SET RY ) \ \ \\ \\ o\\ \ \ \\ \ \\ \ �\ \, \ H I 10'O.C.SEE DETAIL ON SHEET C201 \\ PROPOSED TREELINE \ \ \\ \\ \\ \ \\\ \\ \\ \ \ \ \ \ -PROPOSED TREE LINE \\ \ \ \\ PROPOSED SILT FENCE~1 \ / !� �J \ \ \ \ \ \ \\ \ \ \\ \ \ \ \\ REMOVETREES C� \n \ \ \ \ 1 \ I IN ` \ \ ` \ \ \ \ \ \ \ ® + PROPOSED SOLAR ��\v —_\1 \\\\ \\I\ PANELS W 'CD \> \ \ \ ---"_Q \v A \ y V l V v A / 00 3 \ \ 1 1 `\ \ I I I I \�\ W II \\ I\ J( PROJECT \ J'\ \ \ ` \\ \ \ \ \ / / 1 1 \ \ 1 I I 1 I \ LOCATION •^' — I r \ I 1 \ �\ AI A 5 I — 11 11 I ��V A j Town of Danby E-0.5' \ \ \ / \ E%ISTINGSLOPES>15%ITYPJ V\\ \I i \ \I \I \ \\\ \ \ \ `\ \ \ \ \ \ \ \\ \I \\ T / I I i i \ ,-' 1 `I LOCATION SKETCH Client: I � � \I I I V •A / � 1 1 NORBUT SOLAR v�nvLJv v v v 1241 UNIVERSITY AVE. ROCHESTER, NY 14607 V `v vv vvv v r PASSERO ASSOCIATES sell a2slooD ��J A I\\��, L\ CO/I (Vt \\\ \\ \\ \\\ b II PnnclPaHnLhar9e l� Jess Sudol,PE \�Z Project Manager David Cox,PE VI \ Designed by Austin Goodwin,ELT. v v v w Q v 6��_ ; '\\ w� v v v vv vv v v V v v n. or NEW Q(n W V V A V A A CJ L>_J ` Q \ \ \ \ Q \\\ \V `\\\ ` V AV 1 A Av ` —— A v v v v vv v vv vv `\ \V A \\ vvvv vv v v v v v �I Revisions ACCESS oR VE Move PER CLIENT \ No oe/ao/z1 AEc A I\�`�- J\ \ `\\ \ \\\ \ \\ \ \\\\ \\ J \\ \ \\\ \ \ \ \ \ \ \ \ \ \ 2 09/26/21 All FEE TOMPuws 1O 1 SOIL&WATER 1 p A A A A A A v V A A A A A A ( \ \ 1 1 \ \ \\ \ \\ \ \ \ \ \ 3 1'/'/21 All PER TG MILLER COMMENTS 11/01/21 All PER SHPO COMMENTS 11/0e/21 AEG P LINEATION MAP DE 6 11/30/21 ABS PER POLE RE_ONS \>\ \ \ �� 7 12/01/21 All PER INCLUSION OF TCSw ITTLANDS 3. `\� `\ `\ \ \\ E 01/03/22 All PER NYSDEC COMMENTS a/zs/z AEG PER r V v A vv A A V A V A A 17 ( >v>�A�i v A(\ _ v v I L vV���v `V A /[ ��v v AV A AVn \ v v v vv \ V v v v vv v v v v v----- v vv v v v v v v v v v v �1 �v v ` v v v v v vv v v ` v v ` `v v v v v ` vv v �© PIPE UND \\\\\ \ \ \ \\ \ \\ \ \ \ \ \ \ \ \ \ \ \ \ \\ SITE PLAN E \ \ \ \ \ \ \ \ vV 7 —* }T \ \\ \ \ NORBUT SOLAR DAN BY SITE v TREES TO BE REMOVED(TYP.) \ \ \ \\ \ \ I\ \\ \ \ \ ��— — \ \ \ \ \ I I \ \ A v l 1 \ \ \ l ( \ \ \ 1 \ \ \\ \ \\ \ \ t.\ \ sown/City: ITHACA \ \ \ \ \ \ \ \ PROPOSED SILT FENCE \ \ \ \ 1 \ \ \ \ \ \ \ \ I I I \ \ \ County:TOMPKINS State:NEW YORK \ \ \ \ \ \ \ \ \ \ \ Protect No. PROPOSED SOLAR ARRAY LAYOUT \ \ \\ \\ \ \ _^\\ \\ \\ \ \ `�\ `\\\\ \ \I\I\I \ \ v vvv �I vI n v vvv v 20213129.0001 EXISTING SLOPES>15%TYP. \ \ \ \ I (�) I ` ` Drawing No. Sheet No. ]'TALL WIRE FENCE WITH 6"WOODEN POLES SET 1D O.C.SEE DETAIL ON SHEET ZOI C 103 3 V A I A I v , tom\ v I I I I I I A v scale: l lr— 401 \\ I I II I 1 l\ I Date — MATCH LINE C 102 _ — \ — \ MATCH LINE C_102 \ \ \ \ LI -I v ` `v I v vv N o i I ;v v\ v v OCTOBER 2021 NOT FOR CONSTRUCTION .a !� �N ' 1 _ _ —_ = ! !i MATCH LINE C 105 li �.! N! !i _ _ !Y wr ■q !! rA Nf3il. I �= = ! �Qi nnr N J !i !� _ _ = o q! ai NNL�\ !i ail I •I � qq� ! i! iN Nrw \•J! !i i am !A !r rN .i qr rN NN CIIIJ! !N �iI am no. I! !N rN ii ■■i :SI ! !N r! Ni ii �_T. __ r IIN rN Y! ii ::w = -y,�_.. am rN N! !\� u! �A N! i! \i i •. NN N! !i iw �, NN N! I I. ! !! !! ■.! NN ii Ni !! 'a! !! - n! ! !! i! M.N N! lii �4 !N ii i� R1 i_! !! . ! Rai i= !! ■! !! rN 1 ! !! i! =! ! ! !! • • , • • ni i= iN NI! ■.! ilr \■1! ai !! =i i Ili IIIIIIIAM n� \- ICY mlr rN ili ! !! 4:IN r.■ N! ■. !! Yam\ tIN N! !F iI !\:_ a- \■1! i! -n =a =� W� ,, �_ LEGEND: Y !.w !M .wN l! !i IJi ' �:T INN N! !N �.■ i! iN Ni �.! iN {�! I•'II Nam\ -IN Yr NN Y= =1� =� �N i! il! ■.N NN r�.F.�'�■jI/fir •�i !i !� �`� �wli • \� �N ! i! !N :aN N! arr.I` ii 1 � A� �i it NN �I! ! !! ! i! \r r'N ■i !! C-�\\\( ii �N Y Y! !r rr N I �! iN NN N! ■■i =i !�1 =! !V !! �lr rN Ni !i �r NN N! !! ::I� ! �iA�: ! rY� !W nIN Ni d1A� -N iir r.. \�! =! EXISTING CENTER WN N! ME =N M !! ill/ i! rJ11� NN il! !i iN i NN Ni !! ! • IILINEROAD 1.! i! !w i ■.! !! N! !N -a N! !.! !N N! Y! N! !i !N i! � a! !N ! !i ■..v a! i��, r1� i i! !r NN i! ii !! ME N! \wlr � .IN Ni ii1 !i ':© ! �JL !A Jai iN NN i! N! =N !N rN i! NN CONTOU .IN !Y i! ai ! !! r! Nli Ma =\i ! NN !il !i! N! n! ln.I u! !r N! • �-a Ni 11.� N_i A !i =i !i � t! !_ ! \�i •ar ri !i1 I \..� !i !n. ! !Y iA !Y =i' li !r • �q ! rW !N IIN N! �i •!r YN A! {L !i ii \wIY i�I i !! rNCONTOUR �! !! W! NI.\ tli !i i NN -a ! a- !i ii NCI i i! !I. !i � i! rN \i ■.! WN Mi �! i N! !! ni WW WW !! U �! n.•li _ __ __ �! �\N NIA iil ■.N NN it1, �_i !_N !i i.l !i �\! !N i! i! N! !! �i N! !A !r ■.N M! !�- _ �! !i =N i ■.! i! !N ! i.1� i! aIw i !! it NN N! !A =! _!_ � - N! !i r \i ME i !!' \.!_ NN N! !\■I !.M of .l �! !r r.! Ni Ii! =Y 1 _ W W =N ! /SILT SOCK �� WY M� �w Win! !! !! iA !! ! !.l MN NN N! a! i !! i! 1 i! \�N 'i i! !n1 NN Ni !\� iq ! ii !! =! �! !!\ .�! NY ■.i iN Yi i MN it r!1 N! !i iw ai Ni !! �= ! i.. ■.\i rN ! ..i iI1 NN A! !! =! ! !i�. ! i! iN ■ N N! \! !il NN Ni ill !r N! Mi i! =! ` !_!_ !_ !!_ !N NN �!_ !i !! .IN NL9 !i Awl NN Y! \i \i i !! it r.vl�• - i! nlr rN Ni !i =i !! .■! !i. !N Nil !! .■! a! ! !i iN rN NY • i! •• .• , REMOVE TREES Ni ..—MIMI !N rN Nil !! �! ! i'! iq NN N! !.\ __ !i iN Nr N! !il ii ! il! !N I N N ! WN nl0 i! iN Mi LJ� !Y NAI N.. 1W! =i ! il! !! NN Ni !! ..r ! PRO OSED SOLAR nl! !N NN• i! rJ! r.I N! !! Y! N ME i! NN Nu Y! it NN !! �� N-, • !i ' no a !! �! i ..! !i !! Ni !! 1iN NN Ni 1 ME _ N N A _ =! =N ! i! i! ri Ni !! !Iq rN Ni !! =! i iN Ni ! NN i! !i =i ! !! MM�i i� ��� � ! Y !! !! =! N! !i �! i a !! =■. ! il! i! N! ANELS r! =! ! !! !n1 !i =! i ii !\� NN Ni nI! aw ! !i ME i! i! !! !! =�N i !! !! ! ■.! !N !! =u !i =! — A! !i !N NN =! :■! ! i i! ■.! NN =N ! !i !N NN �!M i \wli i! !\� NAI In! ! N! ! !i !! =! ! !! �= �= !i ii ■.q QI Ni i !i iY rN Nip ii ur \. !\� i! �l\! Ni !A ! i! !! !! !{. !Y ! i! !r ii =! i !Y rN 1�! !N' ■n! i! !r !! !w Nn■ !! iN �N i ■.! !N i! �N Y! _!� «•_T! rN �! �i W= i! !r !! i ! W i ii it ri .! M - i ill i� ! !! !! ! i! ••! =W ! l•.! .■N NN N! N! uN' i !i i! rii N!� !r =! =! i !i !! !r rN !! !! ii Ni !N Yi �! i !i C9r r! Ni i! �I■! ! "�i !i YNI ii !r rN ! _!_ !i !N !r NN !_!_ i! !N ! ! !i !r NN Ni !1� =N ! ..! ii !li Ni !i NN N! !! !! NN !! =! - =1i !! !! it I ii �•! i! !r !i Ni Inl� =N ! !! i! I�r N! i! !N r! !! !! iN i! !i iq ! !i �1! �! Ni !! iN rr 2M �r �� !N Ni !! W W =i _!_ ii 1i! !i Ni Ni ii w! i! i\. ! !A no ii ! Yi it rN Ni N! !I� !N !! !! !! i! iA i! \ter rt11 Imo! !M =r ! i! \N NM �! i! Ni !! !! !i Wr_ r_I. i! !1i !! ii NN iW !! =.I \■1 !! !r Ni i w i! ila -- it =i iN r _! ��. - !r ii qw i! !! li! N !! !r NN i! i! ■fir q! !N `i ! !i i1! i _ AW„ N.. iw Y! !i Nil ri ii !w !iN N! !�! .wIN it i! iI. -i !_!_ i! i! !! �V !i Imo! i! !N WI., �! !i1 Mw !i !1� !i Ni Ii! ..! Ni !61 WW !N i! N! I W_! W_N �= !.■ !! M! il! !Y Y.f i! !i ii !i !r !N !! !i N! !i !i� - !i ■.N Ni i11 I�{f !i Nil ii !\. !I. !i !1! IiI. Ili !li Ni �_! Ni i! !! ii �i W! i! WW !N Ni N! i! !! ill• N! ii ii iM ii !Y iN NN ii NN !! !•■ !! !! Y! wi !! !IY q! i! !N Nli ii !w no i1� !i !I. !! !i !!I !_i� !! !W !! !N Ili i! !! !w 1-.ill i m Nw !! !! i! ii iN !! !i iN Ni !! ii ii ii !'i !! i! w �� AT 110- w! !! ii _ !_!_ ME N! N! r! !! i! Yw w! i! i! !i Ni w! !i Ni i! !! N! NN N! !! !i .. W_ an u! Y! !! !II IIw i! !Y Yr Ni i! !iW !r wi !i !! !! !! !w i! !! !! Ni ■fyN•• li it r-i !il iN WW i! =N r! !i i! iN NIA W! !i iN !i Nw iw iw wY !! W! iw wW !! Ni iN i Ni w! !! N! A !i i! !N ��! !i !! Ni N! !A i! N! N! !A !i i�i w! !! !R' ii ii !i !r ili !Y !i !N !! !r N! !i !.■ !i N! i! !! a.-. N Ni !! !! !N 1! ■i 'ICJCYJ om, !i !nI !i Ni N! !.{ ii ii !i MN Nli ili !! !w ii i! !! !! !■. !! !2 !! !! i! ■.i !i !� !w N! !M ii NN N! !! !! ME !! !! IIIW i.■ !! !! !N N! !A !! nr Ni i! !! ■.i !! !! iN Ni i! ME !w w! ii iN !! i! !! !il N! !_! !! !r N! !! !Y !w -a !! !_!_ �1� 1■I�p fW1! Ni M. i! !w wr-. !! !N !� �� v� �� �PWI- M! Ma iw w! !i !! !N i! !! !! !N N! nIN i! i! =w wi !n■ ii !I. ii !! IPIw \■IW �1! =i in!� !! !N !N N! !u ii !! !! !! !N ■.r w! n1! =i ■! !M t•w Nw !i i! uq NW �Y ii i! ■! !r.■ !N Ni N! !! !i -a Ni i! !! i! ■!i iil • !! ■! N! !In IJw i! !i IAwA W !! !�\ Nw Nall !! !�r !! !! !! !! !r i !! !! ii anby i1! ■.! !i i! Y! i! !N !! !! am 'YN i! !i !r w! !! ii ■lfi A! !! ii ii !Y !! !i Nw i! ii N SKETCH l.! !nI li! .■i Ni ii '!Y !! !! i! !! ii ii !i iN i1! �r! i! !N Ni !! AI�i !! !N i! !! !! rnN N! !! wi i! !I- 'Mo !! !li u! !w w! !A !A Ali !! !! !N N! \�! i! ii !i !! !! !i . I Imo! q.� !! !N Y! am !i 'ri i! !i Ni N! !! !i i! ii !! iN NN i! i! ii NCI il! !! !i !i ii IJi !i i! .■! i! !1� 'Ni i! !N .! i! !i ii ii !il 4wr A! !! !i i! �N !! !! !N ii i! • • _ !! G! !W am MN N! !i �!W !W W! AW !! !W WW WW �1W .l! !! Wi �� !N iN W !! !! Nr �Ii w! !II .I! !! !i 'ii r! nNY Yi ii i! !! !N NNI!J\� ii i 1 WW !! Client: N! IIW_ !! !W' N! !!_ !N 'rm !1! !N .■w i! !! iN r! -a .1i ii !_!_ WW !i iN Ni i! !i _r_ �M ��i !i !! IIN q! am �\W1� Ma r. �! !N N! N! i! I�IN Ni !! !! v= !N !! !! i! No i i! !i rI■I u.i ii !! r! N! iN Ai i■. �1i i! !! !! i! i1N \I6' i! !! Ni ilW !Y z! !i N! ii ! _ iA ■E !Y Nei i! ii ili 11! i! iil N! i! !! !N r! C.N !! !i w! W W !i. !.. w! !i !i = Ni A! i! ■.i !.I !! i! ii N! ll! ii q! i! !! !N ..! i! iil ii i! i! WW !u ii !! !i ii ■! NORBUT SOLAR iil �.�I �N !� Y� �� L9! �.� a! i! �� �� �� ii ii i! _!! _iN W\- •�— �� _i! i i !�1 ! ■�! -� !! YW !N Ni il! �Ii !N i! !! !N !i MM I�nM ii i! !i !i iN Ni !i !M !W ili NA 1241 UNIVERSITY AVE. ■.! !i • aM I.! N! !! Ni =w !! !i !! !! i! Nil w••1 !! !! !N �N NN !! !q N 1 MCI N ■.i ii !i ri i! llZ iN 1! iI! iI� N! !! !I! Ili _b I.! i! wn: :CJ ii !i iq i! w! !a i pi �! s i! iN !i ii iw ii !ll 01 Yi NA !! !! !! ii !r rliwl a! !! !M !w i! !! !! !! ri •• i r! !! iN LJi r! !N Nw wi i! !R r! M. VA !! N! !�! !! aM r A! 1 !N Nri wi !! !! !! am w CJi ..! !! ■! !�� !! i! M Ai !Y N! !! ww iww ii A! NN Ni ii i! !i Ni r! !! !! W �� ��• �Iw I.\wl i! ii �■!_ !N ii !_A_ w^I uq Y.■ !i !i r W ii ii 'i! !! !! !i A! A! ii iN i ®� w� �� iio �! Wr• wi ii !! !i �■ I�nwu wlilwWl �In �i� i! !� wo �� �� .Wi! ii i! WW I�1: ! !i N! N! ■.! !! !q w! !i !N N! Nil lir' �•! i! SIN^^^^ qr- i! !\= WSw1;`�, Ni !i iN N! N! !! !! N ii !i !! ■.! !i i! i! !I� Ni !! ii !I� �M !A 1N! NI.: ii NIJ !i !q Ni !�i !! ii iw W Ni \w1A it ■.! !i i! i! !i !! !i iN i! li.■ !N ii .1 OI i�I • !I. !w !! !! !! !i Ali TS.i ! !! ii q.. i.1 !i iN Ni !i !! iN ill !li li! aM i! a— 0M !q iY i! !! !r Ni NW :y= •. • . . • W !1i !il i! ■! i! Ni !u !! !N wi !i !i iq !! ..! !I� Nful ii wi !! !N Ni !i _ ! iN Ni i! ■.1i i! !! !i !i N! !! !i NN !\n !i iN ii iIY llf iY i! !! !! N! !i WN !i -- • W !i !i i��1 l.i ii i! !i N! !! i! !i w! !! iN' N! i�i ii� iI!• i.■ !.1 !! I Ni i! !w ii i! ii ! ii it 1ii I.w ii ii ri1 !_!_ !N ii ii !_!_ !.. lii il! ■.! i! N_.w !i !N !i !!_ !_!_ iY ii !! !i !! !! Y! !� � ,� • i! i! iw !i iN N! !.■ i! !! Y In ! i! �I� !i PrincipaHn-Charge le.Sudol,PE W! M! !! Ar i! iN !i !! N! !! !N M! !! !�\ AN wi li-•I !IN Ni ii W.. !N !! !! !il ii =i ME ProjectManager NN ii i! !i Y! !i !IL iN i! !il !i !! A! !! !! q _! ii \!_ iN ii ®��I rA !_ i! iN !_\� !! !i wi !� !@_ Designed _ N_Y • i • am A_ !W_ W\. !N_ !_!_ !_! !! i! !! iN i ! \, W Wi iN i! i! !i iN Nam. i! ii ii ! !! i! ii !N Ni Ni' i! • i =! it qN !! !! iw r! = i . �� �_i • In! !i ii r! li! !! ii • .v w= !N qII ' • ••• �, �� iv !N a! ii in11 !i1 i! A� iW _w_ !_ _ •- __ _ ..•-• • �- ' Ni !II i IIW !N li! i! !N qN w! a.—. Yf�i On !� ! V A !_! N i! _ ! i! !Y i! .1! Nli Ni ��! iN i! ! W !! ii i !! _� .l • • • • N !i ii ii q! !i ■.i�, ii ii --• • •w =! _ !N ii i ilw Y !i w\n i! ii ii Y! Y! !M ' Y W! am -0 .. r ii !! !q 'N! N! Y! !N NCI !i ! YID w Ni i ~ w !i• i !! !1� !I� i! !! YN !! !i ii i`C• !�\ IGl1 sir rN • !i �Ii !N ii !! iN .Ii i! !! �! 1 !! !�■ �N !� It`\� i! !i ii ii !i !il il! i! i! !il i! il! !i i! !N ACC iw !w r! !! !! !i !! !! !N wi A!• !_I. I ;r �1W1 ®a Ya Mi! • • , ` !Y NY w! i! !N Ni ii !! .■N wi am Y! • \wl�• i! iil N! !i !i i! M! !li _q_ Y � Y ` C !! qi i! i! A% vi !N q! a !i iN ! ' 1r 1111101111 IBM -- am!N !! iN !i _:��U� !i Ai �� !Y iN Ni ��\ !w !i _! Y _!_ am aQQ������. !q !A NW !! !N i! !i iN !N i! ! ! I y �Q�Zi=1 A.. NY !! i! NW ii !! I.\N ii i! i = i IRI��� ll�� wi i! !N N! !! WA iW N! iw \! il! w =m �= j= - ii n\\i NA i! i! !q N! !i �.i ii roll !! !N i! !! ii i! n\IN NN i! !\w1 iw N! !! �I! N! .• •, Yi iN r! !i !i qi i! !! !i !N !i iiN N!� •- i! !i Nw i! i! !N Nam �� �A �� Ai iw ri !i iN NN it •: .. .. n\N qi !i ii iq i! !! !i ii ii !! i iN om !I. .w! !! !i !i q! ISM iq i! Mr. Mw. Ni i! !i iw i! !! rnI rN i! !! i! rr !• iW !i Ni ii !! !! {.i i! !! i! i i i ii !i lii !i iq N! i! i! q! !!• ..il .wi ii ! !i _ iN iii i.■ !! ii i N, N! !! r! i! !i !1i i1� wing AN !i A! !q ii Y! ii ii N! !�\ iN 1ii .•ii-J SITE PLAN •'CSOLAR V V County:To 1: 1 111 ,I o .� 1 •. �1 /7 Date OCTOBER • •• • • Nw _r_ as ua MM Mw as am Ma as as MM fa _w_ MM Ma Ya a■w MM =Y _w_ tlN i! =a !M AM noM MM Ma as ■M am ■w■aal �M �� 6i 60 �� .Ml� oo �_- -� �� LME �� oo �® ww.aa-I �� �laa oal �- -� I�I� Ma I oM ME �� �-M MM II■M aM i YNI Ma MM ■■M as MM Ma.• =r M Ma MM Ma aN Ma Na ali aM MM no N rM MM -a I a= �� M� ::= wa is =a M MM MM =a as aM Ma Ya !a rM �a M MM Mi \�M aw ar oa M Ma MM nw MM a.� a ME Na1 =a M MM Ma as aN MM �a a am Ma as as MM Ma M MM as =a ■N Na Mo w� �■M Ma aM =N M MM Ma a! atl MM �a M MM aM 7a iM MM Ma aM MM MM �a N ■N aM MM Ma nM M aR a1a Ma as MM �a1 w ■fIM Mi as as wM Ma as Ma aw �a M MM YM as MM =a M aM Mri as aM Ma =a is 11\M MM Ma I!M MM a.! as MM aM -a M MM Ma YM ®- ��� Na MM M MM Ma as aM MM Ma M NM NR =a aIM aM Na a'a aN MM �a N Ms as as ■M 1 MM \wM Mo .a aM MM aR ra as aM MM =a wM M!I 0W =\\� i aM MM aM aL9 \w\ ja M MM Ma MAY as wM_ i oo o� Mo wwl� MM wi MY ■_ a aM Ma Ma M MM �M �a \w M■! ala Ya aM rw� �! a MM MM as aM IrM w — �r ■. �� ra aM as aM �i M iilwn MM ala aM MM Ma M Ma aM atl aM Ma Ma rM 1 Mr as ai RLM ww aM _c = tl ra MM Ma as al am Na au aM MM Mw wM MM MM as aM am Ma as wr MR t __ __ MM MM tlw wM aM tl■! as MM as =a wa MM Ra as am MM Ma Ma M w ■ as aM MM Na I __ ME Mw am ME Ma ra am MM MM r as aM �.w• aN am \wa MM aM MM ww wa Mr Ma Ma a\i a M Ma wN MM as ME ! alm Ma Ma aM ME =w M ■ aM Ma Ya ■.M wr Ma aM as aM atl \iY as as MM tlw wM aM MY as aM Ma =w a ■a oa as NA rho MM MM MM as a!I M■A wa MGi MM Mi wM iM Ma am aM MR �i M Ma wM - MM on ME MM Mw MM r■wl Iwla tlw wa as ua as atl !M Mw M aM MM wi ■ Mla a_M_ aii Rio MM oo laaa QN �i MO Ma o� �r MM Mw f."- �� _a=�! ■� �M MM ww �� • MM as r! MM aw iM MM MN ail B am Mw wM MN ■wM 'BED 1 �!M Ma as w.,c aN ISw i.! Ma MM ME ME is MM all ala �1r Mw MM aM aM Mr -.M MN MM =a as aM Mw a Y 1�a■ii Ma Mw ■.M as aM f•�i iM Oa MM as MM MM !Iw iM Ma iM Mr ad t a ME MM ■a aM Mw wa M ■ MY =a_ iN ■■M Ma =a ala NM Mi as MM Ma Ma aY NM Ma am ww\ MM M!l as aM MM Nw wM aM I / wa == oY Y= I I C fi-i• !\M Mi iM M! MM aiM IM w■ MM Mi wM Mtl MN MYf iM Ma !Iw rM MM MM .. wM MM M4l as MM QM Ma is Ma aM Mi as MM ME Yw■ M!l MM Mi ili Ma aM Ma M MM Ma ar aM MM ar as MM MM as is MM Ma Ma wa MM Nw �aa MM MM Mw aM ■a jl Yrj� M MM Ma Ma MM MM MM MM Mw wal NM as as aM Iam aw as aM wa Ri aN aM wa II I Ma ai as aM Mi YM .■ia Na MM aM NM Nw iM Ma MM Mi .wM MM as wa ra' aM Ma c.•a as aM as Nw w■a ■wM aN as aM MM tla wN MM Ma Mw a�M MM Ma Ma wa M o� as as ■iE aM MM om aM ra Ma aN aM Ma as as NM MM !Iw wM Ma ME as am wa aM Mw wi MM 11M 11li 'a■\\ RN Ya as MM I?I'3� Mi rM a�a Ma as MM M = Y Imo 00 �= ::� aw iQ aM MM Nw aM M'N aw Ma an Mtl Mill wa RN Ma a.e ar MM Mw M �M Ma am ME iM MM Ma MM ME ■\M Ma wM as aw ai aM aM NM wM wM iM MM aw MM W- 1!!l as iT� MM ww wa !IM MM a■■ MM NM Ma wM Ma M 1■ aw aN aM ■■■w ■I1M am Na NM MM ai aR NM am Ma MM Ma as aM MM MM NM MM MM =a �■ aY am ■■•M ■■a • Mi rM Mi is am R!I M■! Mw iM Ma aM ra iM lwtl ■�M Ma NM MM Mw M =� �= ill a�� am as as ME ■lM MR wa iM aIM Mw Ya MM r.a as Ma rM Ma wM lM S'L" MM as aM Na Mal wa Mo am Mw wM NM MM M! iM MM Ma wa aM ■la_ __ _ __ _ MM MM aM MM Ma ■lN ON ME Mi iM Mr as MM al:w aM Ma iM Ma MM Il ai MM NM ■.w 11 as aM ■�M MM ME NM MM Nw Ifa aM M.. as as Mw. Mo am, MM ME MM M • ■ n MM MM a! .M tlM w!I MM aM QM Ma ME aM RM Mw. rM NM MM as ale-• Mtl Qa' wM MM Mtl as as ltl ■ Ma as aM FILM Mw aal MM wM MM MM Da oa o0 00 0_ 0o 0 0 0o aM aM Ra as as MM Mi la • • ■ as MM as I.1y'1T! aii1M! ool �® MM Ma as aM MM aal as am MM M.1.� ra ai Mw as ME am on as la - ■ MM MM wM iaii•: am MM ' Y M as aM Ma Mi ME MM ME wM MM Ma as aM MM Mw Ma MM !M la o0 o■M■I on �� as a■rr as li Mr Na Mo ■■a MM aw ML aM Ma as am aN am wi aM Ma Ma la ■ aM C Mi ■■N Na .!�_ aM M47 as am MM Yw Ma as Ma as I.M_ OM MM ai MM MN Mw wM MM la ■ _ Y aw wa ao ego �� aal MM I' �a IaIM am rM ra tlM ME oM MM MM aal wl oM 7a aN Ma as as la • MM as MM i.a MM r�l� aM Ma Ma as aM w■a ai as am Ma as Mtl MM Mw M Mw Ma as as lM ■ as Ma as ea aM Ilal wa ', • I wa ME NM Nw aM ME as Il1i aM aR aw NM RM MM =a aM MM =a ■ MM Ma am ■.a Ma Nai tlM aM Ma MM w.a aM MM MM Mil la a\w wa \!a ra MZ MM ■M MM ME N ■ as MM aM ■■M as R!I Mw aM Ma Mo NM w■M Ma MM aa1 Ma Ma wa am Ma a.. Ma MM Ma iM !M aM an MM ■.a aM -_-_i Mo Ra l�i �� Ma ME ON MM Ma Mo as aM MM as aM as aM as aM !a •• •, Ma MM Ma ■a ME • 1:•lal a\� •MM • MM MN Ila Ma. NM as MM Mi iM wM rM Ma aR aM Ma as Ma a\wl !a is as aN \1■M Mi lial aM Ma aM Ma i� Mw Ma ME as as as aM ra as atl aN MM as an MM Mw la as iM MM Mw wM trial Ma Ma Mw wa r_'�a wa Mal MM Mw aIM is MM Ni aM MM aw a'a aM MM aw ar a MM Mi wM mM MM viol aM aM �� !� .lM MM aM ME ME Ra MN Mal aM MM Ma aw■ as aM Mw r N a as as aM mia Mw ■ai Ma aM Ma as raw MM Mal as as NM as as MM MM as aM MM Ma as as tla a as iM aM ■■w iM .ii as rM as aM �` == Ma QIM MM NN iM Ma MM ai il! MM as aM MM MM as a aM MN Mw ■.r MN bill aM w\M_ N_a_ a_a MM MM MI! ■1M MM as am wa RM Mi iR aM am Ma MM a as aM Mal iLM �■V l��in n� MN ME wa MM MM ■w1l �a MN Ma r.9 �a aM ME Mw ■.N MM iwal aM ME is as aM Mi Y.M MM AM MM MN .w1! MM as �w� �!�■ am a! a •. • • • • Ma Ma wM ■■M Ma •■al a1M ai aM MM MM ar MM Mw Mo am an Mw as aM Ma as MM 1-7 ■ww wM aM a Mw wa MM ■Ya Mw ■.al MM MM Mw wM as Ma as MM MM !1M Mw iM Ma aM ■w1l am Ra =iw wM MM tla a -- aM as MM ■nw aM ■.al MM aM 111a is !x Ma MM wM MN MM ME aw am Na a ra Ma as a aM Ma as ■.a aM ■all am MM ra aM Ma aw is aM wa Ira aM u\w MN NM a\w Ma as aM a MM ai aR ■■M MM Mal aM aM �� -M =■: MM MY: MM Mi iM MM wa ai aM ME w■w wM tlM aM Ma anw MM a ww wM aM ■.a ■wa w.al Ma aM Ma as Ma MM Ma MM MM Ma Ma aM ME Ma MN MM MM Ma' MM MM as a ra MM Ma ■.a MM w.al wN MM as ME __ as MM MM as ao Ma Mo iM aw ME as as MM MM as Na is as rla YM l•al aN as MM MM w_ Ma Ma wM am M■Y as wa wM MM Ma iM Ma as as wR i Ma as MM LJM !\a elial aM as am am M_w Ma Ma ai aM MM w1! MM MM Ma MM MM as Ma as M_M - aa aw MM ME as lial aw Ma ww wa _ 4 i aM Iw■a as as lw M\� iM lai ME Ma as aM Mo a ON Ma tla L1N NM !ia ME Mw MM as � ra MM Ra as MM wM ai MM Ma as Ma aM MM Mo as a MM Ma as ar MM a.YL^ MM as iM aM a\Mw awL Ma ra NM MM M.w wa ME Ma as aM •ZM Mi M NM MM as aM II■w\ Mw ai No aM MM aw _ as as aM 'aM am wM Mal Ma as aM MY =a wa aM MM a wa aM MM n■i ila a�i wa MM MN iM Mr as aM MM tlr iM Y■■ MN as aM MM Ma M MM ME Ma a aM RM Ma ■.a as air NM Mw aN aM wa MM MM Mw aN Ma MN as as a1w1 Ma aM MM 'a0 Y■2 wa a l MM �.w wi ■1M MR iil a1M ME MM MM Ma MrZ Mal w! MM MM =w. am aM MM as aM Ma eaw wM MM a MN iM M1! ■■M as Mil as MM Mw as MM Mi Y M aM MM Ma ■w■ MM Ma as MM MM =a i� aM as l a ai aM MN HE aM tlil as as ar am as wM -a aM as as MM Ma as aM !IM Ma M ow Ma on a � w aM MM Mr ■a Ma Mal aN MO aM iM ME MM MMI Mw aR Ma alal as a■Y aM Ma MM aM alwl as aM a w Ma Mi aM ■■M Ma aCl Ma aY Ma MM aM !M Mw wM MN Ma Ma as aM Mal iM Ma aM aR NM MM a w Ma ME am .■a wM a,al am aM MM Ma MM ar wa aM Ma as aN IaM laa aM aM ua as as aM as a .� w iM tla as YN aM aal as aM Ma as LM wa as wa aM MM as aal MN rla as aM Ma aw as a w tlM Ma is ■na ai iil wa aw as am \wla M170 wa MM a= Mi aM Ra MM as lIM MM is NM MN a w Mw wa MM MM Mw aal Ma a.. aM aM Ni MM MM Ma N_ wa \wM ■wa Ma aM MM Mw aM Mtl MN as w as aM MM Yw wM aal as aw MM Mw as MM MM am as MM !a wa rM tla rw wa Mr aM a a w MM NM Mi mtl MM �;al a■a MM =w wM wM aM =i aM Ma MM =a aM Mw Mw rM Ma Mw■ Mal aM a! .•• Ys; w MM Mw Mo ME BE Mi M MM MM Liw o MM Ma as ■M am Ma MM ME MM ar MM = Mw is MM ■Ya ai a�■i': Ma wM am Ma Ma wi I.\M MM as am Ma aw as ME Ma Mw a!1 MNI MM wM MN as n.a aM l_le Mo aM MM ai lIM MM !.� Ma aM MM !1a iM Na rM ME iM MM 'MM as a! w LM Ma wa .M MM l]eG MM MM w\w aM MM wa a4i aM MM MM aM MM MM ar wM aM MN ia_ a_a_ w MM as aM Y■M ra w9ln MM am aM MM Ma MM ar Ma Ma as aM MM Mw wa MM NM Mal •Um Mi a! f w as aM MM ■■a as w9al ai am Ma Ma as \\'Q Mw da as Ma am aw a1a MN is w aM MM MR lea Ma Ma wN MM MM as as \ww aM Ma aM MM Mw as aM Ma i w MM ME MM ■a MM Bit MM ME -a aM MM ..M ra aM l�.� Mi wM Mw Ma as MM M� ME Ml 1 w Mo Ma aM ■■M Ma Man aw as M tlM Mw ■■M Ma MM Mw wM MM Ma alwl aM NM aN w as iM ME ■■w wa Ma'. aY w•a !M Ma iM Ma as aM �w �� aM Ma as aw MM as a.. MM aai aw ! w aM ME Mw 1.tl NM aal aa1 Ma iw wa aM MM aM MM Y.a as ME MM MM as aM MY 3M as tlM MM Mw wM a■■ w MM Ma aM e■al YM aal MM ala an Mtl iM ar MM Mi MM wM Ma as aM a■. as Ma MM Mi wM MM M! w am wa aM ■■M Mw aal as Mo aM MM Mi Mai Ma Mo as aM aM MM MM aN aM rr aw wa aM Ma al - iM Ma aM n1•i aM aal Iwla aM Ma ass wM MM wN aM L7M aM MM Mo as aM MM Mi wM as as as a■■ l aM MM Ma .rla aR Mal Ma aR Mi iM Ma aM MM MM ■..M Mw Ma as as Ra ME wM aN MM as as M! l NM Mo wR [ 'M Mw. aal Ma Mi wM aM Ma aM Ma as aia wM as aM Ma \wi wa aM Mr Ma aM ME al �0 M_o oa EM t.� a■. May �w �� �� _a_M �a aM Mi iM i6l MM aM MM Mo am Na SM M 1 aM Ma as al aMi Ma dM _Mw �� rM N-_ f" M f� l MM aw wv MW 7� Mw iM MM MM aM as aM Ma Ma Ma i! MM Ma wa MM MM - = Ma aM MM ■■M as M■G .aaw a.. aM aM aw oa as as Ma aM MM .ea as Ma aM Mi iN MM MM ON aw wN aM aM Ua an S i�r MM a\M M■• iM aM MM MM Ra aM Ma aw Mo aM Ma as as aw l aM M! \Ea .M Mw aal atwl MM Ma wa MM Ma as MM MM as as aM MM am wa ME as as aM MM Mw l aM Mw aM ■Ya wa aal Mll Nw wa MN MM =� MM -= 1w r.•a as MM Mi is MM MM as aM MM Ma al = Mw wM MM ■■a tli aal M.. NM M\w as as __ I 'I=w■ IIM MM aw as am Ma as as MM MM Ma al wa MM Ma �.Y am Mal a am Mw aM aM aM as am wM am atl Ma aM MM Ma as aM al ! Ma Ma Ma .M Mw wal iM MM as as Ma wa Ma as Ma MM wa aM MM Na aM aM NM as aM MM Mw l ar NM Ma ■.w as Mai as as aM Ma aC MM as aM M.■■ �� .��1,1.1 IIM Ma ME \wal MM MM =a aM Mfi am ww - 1 aM MM MM ■.R Na ®al aM aM as as aM Ma aM MM w a M aM am iM wa as az i MM Ma as aw ! MN as wa Mtl MM al MM MR as as MM as MM '�� iia Mw wa aM Na as is as ME ili MM Mw ! as as aM IJM aN aal as I as aM MM Mw MM Ma _ aa_ I i'- •• aM MM MM oa iM Ma aw_ as ao M_a_ M_w _ • ..•.• . • ,. . {I Ma aal MM MM aw aM MM Na I'i+ as aw • ' .• ! MM Mo MM NM as M■L Ro alr. ME atl -w a a a 1 •• aM MM ME iM Ma am ai am MM a.. I as a■■ MM as iM MM MM wa '.a • -' .• ! Ma Ma am YM Ma Mi: •w■Y M MM Mo == MM as as Mw o� 6•• , • • MM Ml. MM aM MM Mw wa MM Is_ii MM aw , MY wM IIM Mr • • Ma MM as NM_ aM Mw a ■.M Ma __ rM MM Na --M • M �= +• 1 as aM Ma ME wa MM MM Mw a ! MM Ma as ■.a aM aal Ma 'atl a as • • 1 •' fn • Ma aN a ar Mw ! MM M _ _ M MM Mw ! Mw aM Mtl ■■w as __ aM MN am w■w aM Ma as aM laM Ma ww • aM am iN lwla iM ra . . aM as wa MM Ma as aM ME I!a pLL Mw ! aM Ma iM ■■a NM aal Ma as wN i3• MM Mw =LYE NM MM Ma •ii wIa MM MM as aM Md as IlM Ma aw Mo MY NM Na Ma _ M_w_ w_M_ M_!• uM_ M_a Ma •a a_ ME Ma_ a_ri M_M_ MM M_a_ am a aM aM as NO so ==I � i aM Mw wi NM aa! Ma aM wa MM e � � az wa_ a_M_ a_M_ am- � Ma M_a_ a as Mo aa) i■M_ u^^..�' as YGia1 ■na aM M\w am as aM MM aM MM ro oM Mw wa am or am A oM MM laa i.a as �� �lA o0 oa aM aM as a� �� IM RM Mi iM MM aM Ma al■ ! a aM Mo. as E MM ball R\w m- Mr Ma aM Ma as a1! l�M ala no wa aN wa rw as aM ua a Ma Ma aM FJM as O as w\M 'a!• aM Mo MM as rM aN M� alb •l W ■� M MM Ma as MM a an Y_ IMJo ��� ®� oli! wM C\� M� �� ®■M1 Mo atl •l N i1a aM Ma Ii Ma aM M N a MM Ma aM ■■R MM waF I�IwI ■ca Mi a.-c Ma MN as aM wa ai �:_a MM Ri �M as aM wi a Mai is RM uM Ma am Mw Ma as Ma aN w MM MM MM a wa i\� Ra ■■w w.� Na ar ali9 MM Mw rM MM MM as ar wa MM wM MM aM MM MM a aM IMM Mi ■.M MM Mii aM Mf•S Mo wa MM NM Ma �M MM as i.. Ma aM Ma MM Mw a MM Ma am ■■M Ma is aM Ma M.L" as aM is aM Mw• Iwa Ma MM MM aw as ... iM �o I • • • a Ma wa aM ■■M Ma Mali \tea tla ME Ma Mr as a iR MM aM :.a as aM as iM MM Mw wa MN M■w MM Mo MN I l as a aM Ma as ■a a■� wal aM M! MN iM rM Mw MM a aM Mw EM ■■M aw Ma MM Nr wa aM Ma al! aw. laa am a.-. a Ni aM MM ■■a as Ma Ra aM MM as Ma H. MM a 1 a as NM MM 111.i am as rM aM as Na ME H. MR \Mwa Md MaMI ���� • __ __ _ �� �■s •Ja wM �MM �� iM M� �a ��! MM Mw 1M al a- A-17,' ri' ®�1 �a aM Mal i1.� �s.l R� ■.a M • M _ 0 0o i T� oo ■moo IMlo !� �� Mo i`fM Ma am owa oo laia aM Rw ��� �..• i_M_ Ma as as • •- a as a— am ■■a Ra ai Ma i.. iaa MM as aM w■M alw MM ■ww■ a as Mfg as ..a MM as wa aM ■.M as aM MM aw iM as N 1 NN as M rM wa aM_ w.M as aM am Ma am aM MM am as aM Ma aM a as ae' no i.a Mo o0 Mal aM a.•M1 Ma wM �_� �o as Ma Mw =� MM MM as == =o ii�` •, • ,,, oo A.Mj.,� ��� MwM. a_ai aM a�:. mW Ma aM ai wM MM o �� 1la aM ■■w aM Ma ao 'J�YIM� MM tlw C.M M! as III Ma Ma a as llR ai ■■a NM as ate. aM Nill as filM Ma Iva_ Ma Ma Mw Ma M ww :♦L•M MM Ya as \awaNl o.M•. a� on an Mi aM ii I �lY� 'M_a __ Y'l�•� �® a Y_a_ aM MN ma as Ma !■PJ NM Ma Ma aN aM wa -�1 a Mw Ma �� fao owal �1L � o® s i Ma as MM aM IMl o0 0® oo its �� of o� Do io M Mtl Mw • NN l a��S>F M Na as as NM MM O is MM Ma Na aN MM Ma is MM Ms__ a as 'za aM uM aw aa� Md aM aM aN Mi wa MM Mw-�Mi iio 00 00 lnf3T. l as MM MR ' I • •i • • •• • • MATCH�J MATCH LINE C 107 , / HORIZONTAL SCALE \ \ / LINE C lO7 PE 0:PR PMIX 50'STRIPACE 5 / I 14.66 / / -\ I SLOPE OF PROPOSED PADS.PLACE 5' 40 0 20 40 BO / \\ / \ ( $TO NE DIAPHRAGM ADJACENT TO PADS / \ \ 1 ON DOWN.SLOPE SIDES.SEE SEEDING I / i� / ! 12T`- 2 2"CPR \ \ \ 1 NOTE ON SHEET C201.COMPACTION BY I - �`r�� IN 3.20 \ \ I HEAVY EQUIPMENT TO BE PREVENTED.IF II I I \ _�/ \ /y�\l/�^ \�� ` ,\\ )\� --- \ SCALE:1"=40' �) \ IMPACTED,PERFORM SOIL RESTORATION I / �� \\ ) _ --- -- �\ ACCORDANCE WITH SECTION 5.30E - \ THE STORMWATER DESIGN MANUAL PRIOR I i \ \✓(I \y/ / �� / \ \ \\ \\\1 / \\ - \ TO INSTALLATION OF FILTER STRIPS. L � INV.=1286.64' (`(` (`(` (` / ^ \ / I I 1 1 1 1 PROPOSED TREELINE \' \\ \ / 15 L.F.181,C \\ \\ \ \ PASSERO ASSOCIATES / \TREES TO BE REMOVED(TYP.) I \ I \ \ \`- \ TWO PAD MOUNTED SWITCHBOARDSW/XFMRB I I 1 I - \ \ \ , \ \ \ \ \ \ s engineering architecture PVEQUIPMENT(TYP.) engineering LEGEND: PROPOSEDSILTFENCE I - \ \ - \ I .. •---{ - I- Q /\ \ l_ PROPERTY BOUNDARY INSTALLED ' ALONG CONTOURR.O.W. EXISTING CENTER LINEROAD EXISTING MAJOR ________52f1_____CONTOUR 10?OLC SWIRE EE DETAIL ON SHEET C 201N POLES SET PROPOSED SILT FENCE / 11 \\ J \\ \\\ \\\ --------521-----EXISTING MINOR CONTOUR TO BE INSTALLED / / 1 \\ \\\ \\ I L/� \I f I \ "� / N \ \ \\ �-' \ �\ \\ PROPOSED FENCE ALONG CONTOUR I \ \ /Y/ / 23 $F PROPOSED SILT FENCE PROPOSED ACCESS •\\ \ - '/ / / , , , / _`, ' / / @(pI4.P / \ / n --- EXISTING TREE LINE INTERMITTE TRIBUTARY efp4 \ C/ i -\-`- � \ \\ ��� 'ems NON - \ \1\\ \\\\ , 1 1 1 1 1 I PROPOSED TREE LINE I I /. 1R/ // \ - ---- \\\ \\ \\ \ i \✓\ \ \\ \ �l�/�l�/�l�/ REMOVE TREES FR4c-\ --- �� ��� + + + $LOPES> % //W - PROPOSED SOLAR ARRAY LAYOUT, \ I // l l K / �� ) / / PROPOSED SILT �\ I ---- I\ \ \ \ ` ® PROPOSED SOLAR \ \•., t$iO '\� �A/' \ \\ \ R! /J- I l \, J // FENCE \\ \ I \I \ PANELS 391LF 65CMP ARCH STM.®3.31% \ \- I INV=10"END J / / �' _ INV=1295.10 65'X40"END./ j PROPOSEDSOLAR \ I ro$ I �\ _ / / / INV=1296.40 /v �- / ARRAYLAYO L \\/�N '\ \ \ \ \ I I 64"X/O"END \ \ \ \ �657(4("END � INV-1304.35 \ \ INV=1303.10 PROJECT LOCATION 39LF65"X40"CMP ARCH \ - / STM.B 3.20% $F SF\ \ \\ -- _- J \ SF SF SF - -SF I \ / / S v SF vv '-/SF SF 1 PROPOSED CH ECK \ \\ \� /LE/ _<�� - \ a PR P 5 DT E LI E \ \ 1 DAM PER DETAIL \ \ CAPPE \ / \ \ \\ s� \\ \\ \ \ / PRO OS \REI TOWO Of Danby RE- LOCATION SKETCH o D_\ __ �— y� s r N \` G= —`\ _ / / ----N83°18'34"W 1049 08' \ — t Client: Q \ \ \ \ W 1�.2 � // PROPOSED SILT FENCE - ' -' � 1/ // \ss \ \\\ \\ \ ]'TALL WIRE FENCE WITH 6"WOODEN POLES SET \I \ TO BE INSTALLED % \ I I 11 \ AIONG CONTOUR�� -Nj�/' PROPOSED TREELINE PROPOSED SILT \\\ --_/ N79�O4'Z5'�((DEED) \ \ \ \ I I `\\ \\ \_ IVO.C.SEE DETAIL ONSHEET C 201 U I \ \ \ \ \ \ ---_ - ---- FENCE \\\ - ��' \ '� 1 I I \ ENCROACHMEtN AGREEMENII \ I I / 3 NORBUT SOLAR \ \ \ 6Cp - \ \ \ / \ \ ' 1.7' / TREES TO BE REMOVED(TYP.) \ \\ \\ - I I I �� \ \ PASTURE FENCE PE \ \ W, II \ ry / \ ) / NAMR AI SCREENING AREA OF HONEYSUCKLE- I I I \ \ \ \ 1241 UNIVERSITY AVE. 1307.20 \ \ / � \ / SHRUBAND NATURAL VEGETATION TO REMAIN I I \ JNST./j 2018-10053 \ \ Z - UNDISTURBED.MAINTAINTOAHEIGHTOFNO l ROCHESTER, NY 14607 \ \ w -1.9' FNC. I r \\\/ \ (`//�\ `/\\ MORE THAN 25" I I 1 NYSDEC APPROVED PERVIOUS ACCESS DRIVE BY \ \ \ \ \ \ \ / 1 I TRC ENGINEERS.SEE DETAIL ON SHEET C 201 \ \ \ 1 1:3 MAX SLOPE U. FOR SWALE BANKS Qj Z PASSERO ASSOCIATES 1307.20 - \\\---- I / 1 I \ \\\ \ \ \ I \ \ \ \\ \\ \\ \ \T reaches erMNew ran iaci4 Isaslsulaao z3' M I / \ \ \ 1 I I 1 I \ \ fax:Is6sl szslsPl _B PrinclpaHnLnarge Jess Sudol,PE Project Manager 1 David Cox,PE Designed by Austin Goodwin,EIT. I ----7 \\ \ I / PROPOSED SILT I \ \ / FENCE Lam✓..�...> A vi307.20 // I_ v, A----� / A I/' I I I A I I V A A V OF NEW VI NIEL O / S / I r O k i O `h '\PROPOSEDCHECK DAM PER DETAIL O 23 f/A 10 1-21.124 N�/F MOf TGOMERY/\__; \W � A // 1 / �_� i ) I I I I I A V AV A A I I1307.2D vTo O/ v-_A i / / A 1 I A V A yr in INSTR�IMENT \#2018-1dfl_51 \ \ \ Revisions I I i Hale By ,oe/ao/v ABc A eINIVE saRa�aa 2 09/26/21 AEG PER TocourvTVEsoiL x wATER \\\ \ \ \ I 1 \ \\ \ \ \ �� 3 10/6/21 ASO PER TO MILLER COMMENTS ABc PER SHPO COMMENTS"NEATION MAP NYSDEC APPROVED PERVIOUS ACCESS DRIVE BY / 1 �\ \\ \\\ \ \ \ \\ \l\ \ 6 11/0/2t AEG PER PoiE REVI5i0N5 of O, S \ \ \ m / / TIC ENGINEERS.SEE DETAIL ON SHEET C 201 / I / \ \ \--- \\\ \ \ \ 30 o / / / \ / \ \ \ \ \ \ -\ \ \ �\ �\ ) 11/01/21 ABG PER INCLUSION OF NTS WETLANDS \ \ \ \ \ \ \ \ \ \ \\ a o1/03/22 Aec PER rvrsoEc coMMErvTs u / aowv V A A A A v m �1 �1 �1 a/is/z A 11 11 11 I I I r' I `70'TIO.PROPOSE i l I I//1 \�/ \ \\ \\ \\ J \\ \\ \\ �� \\� \\\ \\\\\ MucA O1 1 , , I \ CLEARING LIMIT -_630^ mop y 1 \\ \ 8.1 \\ FNC. 1 SITE PLAN p9s\\ \\ \\ vvvv v %' v NORBUT�/SOLAR O PRO\OSED SI LT FEN E I \ \ \\ 11 1\ / ` \\J /, \ \\\ \\ \\ 1.-��✓/ \ / 1 \\\\ \\\I `\\ \\\\ \\\ \I DANBI SITE U \ \ \ CAPPED RE-BAR iO BE I STALL D \ \ ALONG ONTO R 1 \ \ 1 \ FOUND (T'IP.) 1 v A 1 A �s-D.t' 1-'' >If\-----v / I v v ✓/ I 1 ) I I A V Town/City: ITHACA \ \ \ \ \ W1 0.3 \ /' \ \\ // I 1 / \\ \ \I I County: oun TOMPKINS State:NEW YORK r \ 1 \ 1 \ I �/ Protect No. 20213129.0001 -- \ Drawrng No. Sheet No. \ I � ) A A V A I v✓ / ��� ' , ,�1 --- ---- C 106 6 —1 I 1 ` Scale: \ � -57 l/A 10 N/F RADTN REAL ESTATE,LLC 1"= 40' \ \ / —I—L — NSTRIJMFNrl, #.,)qln07—n0N Date OCTOBER 2021 NOT FOR CONSTRUCTION . • , "_ '•.... II -i:,,.f� T-'-'-'-'_ -.'��Dr� .y ,ems-�r----iilf-�1I�_______." ------------ a■ri �r.,� � � � � -- tea--- _-'•'tl�j� _ •.. 1• • • as MM MW !! !_! w wW !@ NM i1W !! =N M !! !! NMI MM MW WN W !! Ww sN w !! WN VM • r.1 !! =! M MW !! Wtl W W! !N NM Mr MM =! M !! !! NM MW !! MN NM !! !! =N W Wr MN NM MW !! =! M i IM !! s= =M !_ MW WN NM MM !.• =.I W !! !! WM MW MM WN NM !! !! =! M YW WM NM MW �.Iwi •nlnn W wM ■IM M! i M M rIM MW !! �! w MW !! !! MW !! MN NM MW !! =! M !! MN NM MM !! ... =� !! MN .IM Mli WM aN i !! rW =N MW !! MN NM MW !! =N W !! WN NN MW !! =N ! =N W WN NM MM !! MM W WN !! =1N ! !! WN NM MM !! aN W !! WN NM MM !! WN I. iIR1r isri 1.a.l r ■IM NM MW YM MN M !! !! =N W !! WN NM MW !! =N M !! !! NM MW WM MN Nw W■■. - am .�r1 • a !! ■IN MW MM !! NN !M II.W MW aN i !! MN NM MW WW =M W wM !! WM MW !! MN NM WM !! am Y Yi WN IM WN WM WN NM !! iW =N Y. !.� W\r NL M! !! =N W !! tlW WN MW !! WN NN iM MM =•-7. N 11�J raN NM IW MN NM MW !a w_M W !! Wi NM Mr, Ww =N w !! !! =N MW !! WN NM MW MM =N Ir � rII9 � ♦IC.'ail =nM MW ■IW M • MM MM MW aN W MM WN NM MY Mir WN M !! MW =N ! !! MN NM MW !! =N W WY Mu N�1 W WM ■;N ME no MM wW !N M MM MW WM NM MM M! NM WW !! =N W Mr WN NM MM MW aN r !! !! �Td Md MM WN ■ W == WM =N MM iW Nr WN NW MM MN NN WW WM =N W !! WN NM MW WM MN M Mi MM NM dYlfl '• ice\ WN wM ■IM M WM M MM Ww GN Ni MM rN NM MM MW WN W WM MN NM MW MM =N YM rM MW MM MW iY iY NN tl ■1 W\_ MY MM M! NN NM !! MN iM MW WM MN NM MW WN MM Mi MW =N M YM .tea =M MW MW f!Ir N•S.• NM MW Y;N WW MM MN MM MM ME WM MM MW MN NM WW WW WM MW WM =N M !! !! =N W iW ON -- •\r. WM MN M =� wM !_@ NW MW Wi WN NM EZ MN NM WW MW NN NM Ww MN W WM MW MN W !M MN NM M.il Wr WN NW 11 IM !N M MW MW WN iM MM MN ME MM WM WN NM !! WN WW !! !! WN NM MW !W WM NM iM !N NW Wi ■IW M� NM !M MN MN NM WW WN NW W! MM WN NW WM MN ON WW MM =N NM WM WN =N NM MM �11r/ N..I MW Wi - WN WN NW !M MN NM MW wM MN tlM !! WW WN NM !_!_ MN NM !_!_ MW MN N! MM =N M_M_ WW !_!_ WM Na ■Ia =� as Ma as Ma as `� -N �= WE !� o= am MW I�N NW �! _!! �N =M f� _!Y �� �� _M! �� �� M= _Mi aN - MN MM MM !W NN MM MM WN NM M_ rW No WE MM MW NM tlW Wi MN M WM WW WD NM WW MN NM MM ■;i �����. NM NW WM rW rN N! Mi MN NM tl! M! MN NM MW MW ME MM MM WN NM WM MW WN NW !! WN M ! r ■ N _r_ rW !W NN NW MN WN NM NM W! W.F N! MM .\W MM M! !! !@ NM M! !W WN NM M! no NM M! r! WN • Mi WN NM MW WN NW !M WW WN Nip W! MN WM ..W WM WN NW WW WW WN NW MM MN NM MW WM MN NM ■IM MW WN No 11■■W WN NW WW MW WN NM Wrll WN WN MM MW WN ME WM iW NN NW WW WN NW WM MW MN NM Ww ■;W MW Nr WW rN NM MW WM =N NM WM !r WN NM WM MN NM !W WW WN NM MW WN NW WW WW WN NM r i WIr NSW MM tlW MW WN i MM MW Nrl NM WW WN NM WW WW WN NW WM MW NM WW WM WN NW WW aN WN IM ••' Wi NW WM WM MN NM M! Mi WN Nrl .[I11. MN NM WM WW NN NW WW WW WW WM MW WN NW WM MN n.. NW ■Ir =® iM MM Mr M@ NW WW WW NN NW W■■I ri1. ME MM Ww WN NM MW MW WN WW MM MN NM MW WW WN Ni•1 wW ■;@_ __ WM MM WN NW WM MW WN NW wW Wrl NW WW WM WN NW Wr MW WN MW WW MN NM WM WW WN NW M Y a _ W! MN MM MW MW WN MM !M MN Nrl WW WW WN ON ME M.I WN NM MM WN NW WM WW NN NW MW W.I • ■■ ®a WD NM MW !W NN NM WM MN Ntl Mrl WM MN NW ME ME WN NW WM� MN NM MW WW WN NM wW WW Ntl MW ■■W rM NW MM MW NN NM MM WN NSW Wes\ Mrl MN ME ME MW WN NM WW WN NW ME MW WN NM WM rW NM M.I WM I;N OW rM W Y N! MM rW ME W! Wi wrl NW MM WW WN NM MW MN Nr1 WM MM NN NM WM WW iW MM MM MN I i i-= .fE iN N! WM MW WN !W M! iN Mrl MW WW WN NW WW MN NM MM MM MN NW MM MW WN MW MM Mr1 MM I Iw NM MN NW MM wW MN W! Mr MN NW WW MW NN NW WW MN NW WW MM WN NM MM ME WN NW WM MN N! MW 1■i NM MW MW WN NW Wr WM NM !W !L tlN NM MW WN NW WW WW W.f NW MM WW WN NM MW WM ■.a WM WW Y IN MM W! MW WN NW Mw MN NM WW MN W.. NW WM MW MM MW MM WN MM MM WN WN NW MM MN Ni rW WW WN ■W • ■ MN WW NN NM MW WM NW W! MW WM Nl- MM NN NW WM MW WN NW Wr WW NN NW MM WN NW WIr am WN I I■ NM WN ME WW MN NM wM WM WM N! M.Y. MN ME ME MW WN NM MM ME MN NM MW WN NW MM W! wN NW M! I Ii • • !W =N NM NW MW WY NW Wi Mrl WN MW WW WN NM WW WW WN NW iM MN NM MW WM WN YW WW W! ;■N WN • !W MN W MM WM MN N! WM M\. Wrl NM MW MN NW MM WW NN NW WW WN NW WG MW WN NW ■.M Mi ! ■ NM MN NM �W MW WN N! Wr ME N! Wrl WN NN NM MW MW NW WM MW WN NW MW Mi NN NM MW !N NW MM I■W MM NM WW MN WN NW WM N■. MM MM Wrl WN MM Mw !W MM MM MM MN NM MM MW iN NW MM WN NW Wrl .IM i■N _ WM WW NN NW MW WN MM YM MrI W.I NW WW WW MN WM WW WN NW WM MW WN NW WM MN NM MW WM MN .M WW NN NW MW rN ME ...I -- MN N.I WE WW WN tlM WW MN NW WW MW NN NM MW WN NW WM 2 M.I YM 1■a WM N NM MM MN N! ME MM MN ME — rW WN NW M! MN NM tlM WW MN NW WW WW NM MW WM MN Nw ME 1■i !W NW MM MW Ntl Wr MM MN NM WW Mr1 WN NW WW NM NW WM MW WN NW MM MW NW WW WM WN NM am ME ;■M •• • MW WN NW MW WM MM NM YM WW i.l Nw MM MN Ntl WW WW WN NM ME WW itl WM WW NN NW MW WN NN ■.■ =a !N WW Mi MM MN ME MM ME WN ..rl WM wN NM WM MM WN Nr MW MW WN !W WM MN NM WW MW WN NW I■M , am WN WM MM MN NM !W WN NN NW Mrl MN ME WM MW WN NW Wi MW NN WW MW WN NW WM MW NN N! MM MM ME MN N! MM rW Ww ON MW MW NW WM MM MN MM MW MW .fN NM WW MN NW WW WN WN ME MM WN ; ! WN WW rN ME W! MW iN NM MM MW NL WM Wi rN NM WW !W WN NW WM MN NM WW WW WN NW WW WN NM ■Y WN ME MM WN WN Nw MW wW ME WAR' MW WN NW MW WN NN NW MW WN NW MM MM WN NW WW WN NM WW 1■■. NM WM MM NN NM WM MW NM !W W■L' MN NM MM WW WN NM WW WN NW WN iM WN NM MW WW WN WW MM 1�N ' •• �= !M MW WN NW Ww Mi Wi. Wi Ww W.n NW WW MW NN NW WM MN Ntl MW WW rN NW WW MW WN MM MM MN Ww WN N! MM Wi WN WM MM WN N.1 wW WW NN NW MW WN NW WM MM ON iW WW WN NN N! MW !N NW ■M =� • MM NM WW Mi NN NM ME MN NM Mrl MW WN N! MW WN NW MW WM M@ NM MM WW WN NM WM MN NW WW 1 N MW NW WW WW NN ow M! WN MW MM Mrl WN NW WM MW NM WM WW WN NW MM MN WN NW WM WN NM rIW WM '■N MW Mr WN NM MW WN a— MW wM N.1 N! MW WW W! tlM WW WN NW MW WN NN NM MW WN NM WM MW NN ■M NW MW WN NW WM MN Ntl MW WM =N Nrl Wr MW WN ME W! MN NM wW WW WN NW !M WN NW tlW WM .■N MW MN NM MM MM NY ME MM MY W Mrl ME NN WW Mr MN ME WM !W MN ME WM W@ NM WW !W WN NW MM N NW WW W@ NW MW rM MN N! MM M.1 WN NM WW MN NW WW MN WN NM MW WN NW WM MM WN NW YW MN N WM MN NM rdiW wW MN ME MM MN W.1 NW MM MN NM MW WW WN NM wW WW NM MW WM MN NM MW wW WN M •� • . � • � _WW _YW _WM _MW _iN NM _W■. _MW _WY _N.1 _WW �N �� no _MW �N dW _Wi _MW _WW �M . M MM WN NN Nr WM MN N.f MW WW a.e NW Wr wN NW WW MM MN NM MW MW WN NW WW MN NW WW M WN M MW WN NW MW wN NW iM MN NN NW MM MW MM WW WW MN Nr WW MN WN NW WM MN uM WW ME NN NM W WW WN NM ME wN Ntl MM .■M NN NW M.J rW NW iM MW WN NW W! MW Nlr NW WW WN NW YM MW N N i _ NM MM Mi NM !W W! NN NN wW W.. MN WW W! !N NM MM WW WN NN WW MN NW WW MM MN N! MW MW N MW MN NW WM MM MN WW M! rW r 1 Ww WW WN NW MM ME WN NM M[f. MN NM WW MW .IN NW WM MW W d _ MN NW WM MW MN NW MM MW W N N..a MW WN Ntl tl! MW NN NW MW Wl•. NW WM MW WN MW WW MN NN NM W •• •• - WM NM WW WM WN ME MM MM ..N NM i.1 MN 1 M WM MN WN NW WW MW Nw WW WM MN NM rW WW iN NM MM N _ WM MM WN NW WM WN NN NW WW W.I NM MW MW WN NW WM MW NM WM WW WN NM WM .■W NN NW WM Mi W MM MN NM MW !W WN Nr MW WM N.I WM ..W NN NM MW WW WW WM W! WN NW Mr WW NN rM MW MN MW M �= • WN NW MW MN wN NW MN NW M.a WW !N NW WW WW WN MW WM MN NM MW MW WN MM MW iN MW ME it WM NW MW WW WN NW rW .•N Ntl WM M.I MN NW WW WW NN WW WW WN N! MM MW WN NW WM MN N■C\ iW W! N _ MW WW WN NM MM rN NW W! iW M.I NM MW WW WN NM WW WN NW WW WN NN NM MM WW ■.W WM Mi Ww W MW WN NM WM MM NM MW WMI MN M.I MW MW WN NW ME MN NM MW WW NN NW WM WW NM MW !M MN NiM W rYa NN NM MW WW Nw MM MW iN ME !.■ Wr NN NW WW WN NW MM MW WN NM WM WN NM WW YW MN !i MM i• NW WW MW WW Wr WW wN uM MM W.I WN N! NM WN NW !W CL.W iN MM Mi WW WN WM MM Y N M M tl =!_ WM MW NN tlW i! iN NW ..a MN a.I Nr MM !N NM MM rM YN NM ME WN WN MM WM MN NM W! iW WN i WW WN CO MM \.IN N! MM Mi NN N.A ME WN NW YM MM MN NM am MW WN NM MM WN NW WM MN WN M N! WN NW WM MN MM tlM r.. NN NW Wtl MW NW WW iM MN NW M! NW WN N! MW WN N! WW WW WN Nd rW NW WW MN N! MM MW rN NM WM E_ NM MW WW MN Ntl W.a MN .■N NW WM rN NM MM MW WN !W !i MN MM WN S•W WM WM MN N! YW Mi W.11f tlM !M WN NM WW MN NN MM MW WN NW WM ME WN Ni dW WW WN W . WN wN NM Mw WW WN Nw MMI ME NN Er ME MN NM MM MW WN Ni ME MN NW W! M! MN NM MW Mi WN WM W _ •� Nr MW WM MM WN NM WN WW NN tlW MN WN NM MM MW WN NW WM .IN NW WW Wr MM WM WW NN NM !W iM W Ww MW M.■ NW MW MN NW WM MW MN ME WM !W WN Nr .e• :.r iW WN WN ME MW MN uM !M W! WN N.■ MW ME Wtl WW WW MN am WW WW iN N! Mr■ 1 NW WN NW WW MN MM .\W rW WNI Ntl M.! rW WN MW WM MN NW WM MW WN • • • MN1 t.*'''- - tlM NM MW WN NR !M MW !N NW W! W.■ WN W! MW MN NW WM MW =N NW N.■ Vp•.9 ��.��`', WM ME MN ME MW W! MN NM MW WW W.■ N! MW MN N9.. NW WW WN IM MW WM 1 =� • wN NW WW WW MN NM a— MW WN N.■ WM !N @M W■Ei !W WN NW !M MW •NM MW MM • • ' % W■. ME WM ME MN MN MM Wr \�N NM !.■ MN MW WM MM NN NW WW MW NW W! MW _.. _ WW WM MN NM WM W.a WN MM rM M-'A MM !_!_ WM WN N! WM WW WW MW WW !_� ■ W WN MM aW Mi iN NM !M MN N! W.■ MM MN rM MW MW iN NM Mi WN NW W Ntl rM MW WN am ME MN N! MM a.■ MM NM dW MW WN NW WW WN NM MW wM MW WN NW ■■IW !W NM W� MM WN NW MM wW iN Ni ■.W WN NM WW WW WW ■ Wa NM WN N! ME !W Ntl MM WM WN NY WW Mi NN NM MW MN NW Wlr !oa WN MM ,•• ■ WN rN NM Mi MW WM Mr MMj Mu NW Mm MW NN NM W1� MN Ma MW WM MN NM ■ NY NW WW WW NN Ww MM WNI Mtl MM MF] NN NW !W MN NW rM MW MM �W no MW Wi 1I ■ MM MW ME WN ME WW WN NR Mi wi WY NM WM MN am WW !W WN M WN NM C•,•I ■ MN ..a WN ME M! MN N! W! Mr. NN N.■ rM MN NON Mw WM MN NW Wi NW WM 0�• iN NM MW WN @W WM M! N.. NW W.■ MW NY WM MM WN NW WM Mi WM MW ■ Wr1 ME WW WN NM MM !M i.[ Nw r1W M.■ Wi WM Wr MN NW !W WW WN WW WN '®m WM MN ME MM WM MN NRI it !W W.■ MM MW Wa ME MW am WN NW WN NW iN NW WM MM !i NW W.I M.I WN W.■ MM WN Ntl WM MW NN N! WW NW WW • • .IM MM MM MM YM ME M!I W! Ni W.■ WN NM Mi WW WN NM MM _!W MW MW �f� _WW �N ��\ MM Y■:•1 �M �W _WM _MW �I MW W 1 as NN NW MM WN NW tlM WYl M__ �� Mt■ MN MW MW WW WN NW W.. rIW WN NM __ N! CO 'N NM iW MN a.. Nw MM N.■ NM WW MM =N NM MW Wi NN MM WM Mi WN W WM MW WN N■P Mi rW N.. MW MIN rN W ME \.W WN NM WW WM MN ME tlW WM iN N! W■. MW am - WY WW WN MW l.W rW WN NM M! WN N.f NW WW MW WN NW rW M•. MN MN WV MN a.. WW YW NN NM MW MN NM M Yi a- ME MW WN NW Ww WN NI. Mr M! aT Ntl WM ME iN NM MM MN NM WW r • - ■ WN WM MN NM ME ME =N NI11 M! M_N_ _N_ Wr ME WN NM MM Wi NW MM WW WI. ■ NM MW M_W_ MN NN NM — Qia aa. WM WY NN WE W■.�. Ww NM WM MW _M_ ■ MW MN WN NM Mw WN NW is ' �� as ��� aM !W WN MM WM MN NM Y ■ MN WN Ni MW WM NW tlM air !N NM W.■ on rN NM MM WN NW tlM M.I ' -- .• iWW WW WW NM WW MW WA !fa an as a �� �� �� aM MW WW NN Ni ■ WN WW WW WW WW WN NM rIW ri W N N.■ MM WN NW !M rM NN NW _M_ ■ ME • MM MM MN ME WM !W — aINr �rM Mid as aM aW MN �� �� aW W •on am MM NN NW WM Wi so YW Nr MN N.■ WN Mi YN ..M NM WN YN N! WN WN NM WW WW NN WE if!_ !.. MM M.■ WW Mlr .■M .■M MW -- ME MM MM WN ON .YAM MW M Mi WIC QY Ma aM as .MIa IaW rN NM { � • �= ME WN NW W! MW WN .rM Wr1 MM NR7 Wrl WN NN NW I.M !N MM Mrl �� '• . . tlW WN NW MM MN NN WM 1N WN N.f WI�I MN NM .■a MM MN M� ME MW WM NW MM MW N.I NIr i! MY NM am .IM MN MW % _ _ MM MN NM MW WM NN NM W! rW WN■ WW W! MN NM MW �_ NM WN i! WW MW WN NW Mi MW NN W.■ WW Mu NW YW ME WW NM WW WW WN NW MM WW WN NM M■■ WN N.. .■W I.W NN WW WW WN NW WW MN WY WM Wi - ■. ME M.. MW WN NM MM MN NW WM WW NN N.. W.■ NM a.■ WM M.. a NW WM • S MW MN NM MM WW MN NY WM WM Ntl !■. !W NN NM �W W� WW i.-G NW r in- WW WW WN Nr MW WN NW WM MW oii aNa �� �'� NW MM aW WM MQ '� •-: • WW j� i MW WN ON WY MN Ni rW MW MN a.■ MM !i WN MM WN NW Mr WN NW MM Mr NM MM IrW MN NM W.. WN NN NW NN NW I • NM MW MW Ntl WM !W MN NW M! M■. NN —a MM NW WW WW MW ■.W WW MW MN wM wW rW NM NM MM WN ■.W WW MW rN ME WW rN NW WM !W iN NYaI MM .■N �I_ MW N ;_� NW NM NN NM MW MN Wr a® Wa W 1 Na as WIr iM MN NW WM MN WN NM WM MW NY MW MIW WN _ �� WW �� r NM W W !M WN ME Wr MW WN MW !■. WN N N O no a,!W WN NW WM !W NN MW !W WI. MW WM . MN Nr ..W MN NIN MW MW WN NM MW MN N.. MM Mr W■� • _ WW WW NM aM ME ��r _WW AN W Mr MN �� M■._ Mi �N �. MW WN N! MM !W01. �W WM NM WW M_W_ MM ME MR WN Y.. WM M_v_ w_i. NW WW Nw Wr WN WN Nr WY MW NM NW M■. WN NW MI. MM Y� WM WY N! WW WN W! MM MW MN NI. Mi MW iI. ME Wr NW WW WN N. •1 • III MN NW MM MW WN MW MM rN MN WN Nlr MW WW MW WN NW M. -- • NW WM WW WN NM MM WM NM Wi WGa NN NM Wlr as WW WW WN NW WM IrN NM MM !i WN1. N.. W\.1 -. NM MW WM MW NN N. WW WN NW ME WN NM WM MW NN NL. IrN MW wM MN WM MN MN NM MM MN NW I..f MM NN NW \.! MW WM Wi• NW MN NW NW WM MN NM MW !'M MN NW r\W N■. MN MM WN •TW WM WW WN NW WW WW W 1 rW WN NW WM !W 4aN Nr Nw S NI. NM wM NM MN WM MN NW ME WW N! MM MM MN N! WW J.N WN NW rN11� MN NM rM MM WN NW WM MW WN N! M. Wr rM MN ME d.•s r1.^ WN NM MW Yu'e.: NW N_M_ . MN ME WW MW WN NW WM MN N. MN ME MW WW WN G.W W= NNMII. W— __ NW MM MW @N NW WW WN NW NW WM ..W WN NW WN w_ MW WM MI. MY MR MW MW WN .aa MW WN NW -- �- Nw WW MW NM MM MM MI. NM �_ MW NN NW WM MN NM MW MM M_. NN iW WN NI. MM 'wN ' YM MM WW NW WW WW WM WM M. - W W 1■ �� �� �� NN Nam• �o v �i�•f rla��.M NW i MW �I __ _ - WN NW W! M� WN Nrl WW If • • • MIN N.1 • • •: • , MATCH LINE C 109 SF PROPOSED SILT , \ \ \ HORIZONTAL SCALE o / -- \-- \ \. FENCE \ \ , - H LINE C 109 \ \ ��_ pO y \ 45 \ \ IN APPROVED PERVIOUS ACCESS ` \ \ \ ' F�I .IV80 4 .�LI' ^' `\ \\ S \\ \\ DRIVE PER DETAIL.PERVIOUS ACCESS \\ \\ \\\ \ �i SCALE:1"=40' 6 DRIVE ENDS AT PROPOSED GATE N78'29'29"W (DEED) \ -'-- IO �— \ 1 \ ��� � \ [� �1] - -PROPOSED SILT--� --\ ^t\ IN %rye6 m +'.".'.•'.\ 1 I I // 1� �� -> \ cEC 7'A-2 \ \ SV�. 8• FENCE \ , \ / /�/.` _`a I / / \ U'-'0-�� \\ 2S(•^1��'<C \\� �PROPOSED 20'DOUBLE SWING BARRIER GATE WITH LOCK AND /�1, PASSERO ASSOCIATES RE-BARS I \ \ \\ \ `\ C4•• 2 \\ OPTIONAL ARM GATE S POST SAFETY TAPE KR.PRODUCED BY \ _ ---�' /,(\, r \ 8 \ BARRIER GATE BRANDS OR APPROVED EQUAL. \ __ •f J\ __ _ _ \ F// I) C� �� �\ engineering architecture W-0.3' \\ \\ \ \O� I LOF 8S MARKER\ \\\ / S\ F \ --_ F� �' LEGEND: S-0.3• \ I \ \ O 1 EXISTING ACCESS DRIVE FOR#54 BALD \ \\ '� --_ \ / \ \`a / HILL ROAD TO MAINTAIN EXISTING \ --_ T O CHARACTERISTICS. \\ \-�\ .,_.-- --_ �q 2p -- ` F �\ -�-- ��y�(�] PROPERTY BOUNDARY \\ \ \ \ \ \\\\ 1\\ \•` ` / ' / // /'' \\ 1' \ \ \ �� ' ��\`_-- \\\\\ INV.=1258.32\ \ \\ \-\ ✓\\ __ -_ V ` _-_ _-EXIR.Q$NG CENTER \ \� \ 1 \\ \ \ \ \" .�/ // \\ \ \ \TORE REMOVED �\ \ \ �\ \ �QS� 6 _-_ _-LINE ROAD \ \ PROPOSED SILT -� \ . XI / / \ \ 1 �YF 1 \ \ V \ \ FENCETO BE \ \ TLAND AREA / / \ \\ D-5 \ \ -\ i / / \ _ \ EXISTING MAJOR \ \ / 1s• GHT OF AY PER / \ �. 1 _ \'\ \ _ ___ _ ________520_____ INSTALLED \ ' // /' /' INSTRUME�P R LI ER 98s I \�•` �� 12"END RE-BAR \\\ ALONG I,r1.�0' ` B \` 4. ' /' /I/C� INV=1258.32\ \ \\ �J _-_- ________ ____ \\ �\ CONTOUR CONTOUR (FLAGGED) \ \\ III/ / / / OF DE DS�PA E si & V ` ✓ \ FOUND \ \ \ �O --------521-----EXISTING MINOR \\ 0.095 AC \ - \ // /' /' INSTRUMENT$s 7907-11 I /,/ 7o�8r \� '.✓, \ l\ \\\ _I \ „\ \ \ \\\\ \ CONTOUR \ \ EXISTING SLOPES>15%(TYP.)` \ \\ \\\ \\\\\ '/// - -(.PART OF 60'IRIG�IT OF WAY) s�2 \\ \\ \ \ \ PROPOSED FENCE #54 BALD HILL ROAD 4`�•• ) \\ \� -\,'\\ \ \\\ \ \\ - _----- _-- \\ $F PROPOSED SILT FENCE 2�S �� \• \ \\ \ `J\ �_ ,\\ -J� \ EXISTING TREE LINE \ ly rOF \NY G 7A-1 \ �I \\ PROPOSED TREE LINE PROPOSED iREELINE \ \ POLE LINE EASEMENT TO NYSEG PER LIBER \ D-4 \9\ \\ \\\ \ REMOVE TREES 12"ENp \ \ 1 635 OF DEEDS,PAGE 635 ------� \\) \ \�;,ids\1 INV. \ \ \ \ ! \ \v\ -_ \ I �i1, / , \ + + + + L=70.93' / \ 1258.82 \ _ •! / \ SLOPES>15% \ \ / /) \ �\ 23 LF 12"HDPE \ \ \ / L'5 �, /�_ PROPOSED SOLAR \ \ \\ IT' \ \ R=150.00'\ \\ 1/ \\ ; STM.®2.20% \ \ \ ! J ® + PANELS \ - 1 \ \�\ \ ` INV.12"CPP=1257.55' P /1� 0 �V / o ,1 -r z1 L.F.1T cPP A d �/- v TREES TO BE0=Z7 OS'34" / TO BE REMOVED \ ,�\REMOVED TYP.) �Ny',^�/�\ PROPOSED SILT FENCE TO BE / I -% TO BE R "\ INSTALLED ALONG CONTOUR(TYP.) / \ / 1 0 UP CLEARI // �v ,vRJ \ s. TTALL WIRE FENCE WITH 6" \ \ \ \\ PROPOSED SOLAR \1 \' /I `\ /I I\ / / \\/ �VO /F \ \\\ \ \\\ \ `\ \\� \\�DO9�'' --------_ \Ss\\ PROJECT \ WOODEN POLES SET 10'O.C. \ \ \ \ \ ARRAY LAYOUT /JII e/� ti \ \\ \ SEE DETAIL ON SHE ET C 201 \ \ h \ \ I > I \\ 1_ )r, ,\ \ \ \ \ �' 6x \\z \ -' ---,\ PROPOSED SILT FENCE TO BE �- \\ / \ Q� '`` ��'•ix,� \ / % II / \ \ \ \ \\ \\\ \ \ F _ s LOCATION \ \ INSTALLED ALONG CONTOUR YP. / \ <\ �- '\` / _ \ `\ \ \ \\ �O �0 -------- v F R w,,, v SF —� V A V v /-, -_ A=- \V vv �J_ -��C�' � I /' II �,I�Iy I �Sp v v `v A c,P�• vv / ___. �A \ \\ \V vv l vv / v vv , I 1� v vv A / /' \\ 11 Town of Dar-by m v v v v /v v` v� v vv �Y 7 ti� �.; A v v v /iF / LOCATION SKETCH cAPPED RE-BAR vv wIvr. '<_/ vv vv vv - ��d� �v S. v v v v A .�v v v/// FOUND \ -\ 1 \ \ \ \ �'/" - 45'EASEMENT TO NYSEG PER O h A J 7 1 v , v Av v y Client S-o.2• \ /^\ \ Lp L \ \v \ \ I ( \ �' ji• \ \ \ \ \ \\ \ p IN q 2018-11659 r NATURALSCREENINGAREAOFHONEYSUCKLE \ , \ L \ 7 \ 1 \,\ -^\ \ % T O / \ yF, SHRUB AND NATURAL VEGETATION TO REMAIN E-0.0 \ \ I \ I C// "1 W \ \� I \ , \ U I / I �J/ �R,,R� \\ \\ \\`�1-\\ 60'COMMON RIGHT OF WAY U UNDISTURBED.MAINTAINTOA HEIGHT OFNO NYSDEC APPROVED PERVIOUS I� Q \I / \\ r NORBUT SOLAR ACCESS DRIVE TIC ENGINEERS. \ \ \/ o ff \ \ ) \ \1 I / /7 'A \ \ \ \ �\ PROPOSED SILT FENCE, RD SOLAR MORE THAN 25" ,(\ > '\ \ \ \ \ 1\ SEE DETAIL ON SHEET C 201 \I '' I I ,(��2 r \ \ \ \ \\ \ 1s'EASEMENT TO W I ` \ \ _ \\` / ` \ \\\\\ \ \\ V NYSEG PER LIBER 675 1241 UNIVERSITY AVE. Z �I= S \ \ OF DEEDS,PAGE 1 _ , r APP oxIMATE AREA YTALHwc EASEM�r \ `a_\ p 0 F`( c \ \ , , ROCHESTER, NY 14607 PERJ ST.#2.E-11659`\ \ \ �� '' / \ C C \ \ \ \\ \\ \i / \ °3� NYSEG 7A!k, _ \V - ` vv � v `- ' , \ `\ \ \\ \ \\ .\ --> PASSERO ASSOCIATES Q \J1 (nl INV.=1256.8E \`\ \\ . nener.rve�,ron lase ela flood LC \ \ \ 1 \ I \ \ \\ \ \ \ \ EXISTING I2"CPP TO BE z«weir rna=so-eerswre ax;lsesl szslssl ass\ \ \ \ 1 \ EXTENDED BY II'.INV=1256.68 30 L.F.12"CPP \\ \\ �_., / Principal-in-Charge Jess Sudol,PE \\ 1\ / \\ ( \ I) I L\ _ -\ \ \\\ \\ \ / \ \\ \. \. \\ Project Manager David Cox,PE I / � \ / \\_ I I \\ ` \ % \ \ / \ J INV.=1257.42' `� / , \\ >G`a� /� Designed by Austin Goodwin,ER. \, I \�\ 1 cz I \`� \\ �� \_ I \ ' \\\\\ \\\\\ \ o % 5.� T�5 GAS MARKED \ / of NEW \ _ I CID , \ \ \ Co .--1 laY. \ I \ \ \ I \ \7 I 1 1 \ \\ ` \\ \I ) _\ I \ \ , I-- \hW;oo¢-..Ah•4i ?° / a3 \\ \ \\ �\ \\ 1 \\ \l \ \ \ 1 It 1 \ \ n� \ / \ V /POLE LINE EASEMENT TO NYSEG PER LIBER \ //�\ \ 0k 4.�2�, `O40J0 ' y \ \ \ 1 \ \ I \ L \ \ �/ / \ ,t➢'\ '' - 218 OF DEEDS,PAGE 386 I \ \ ��OV' eA� r� '` / 'u 23 \\ w \ I N, / yyQ 4� ,_- y` - ( \` tia.ti� oPPh•� (oM� 1\ \ \ 1 \ I lL \ \ 1 I \ I \CO 2w V A �\ /`L \ V (\ /' Imo_ _ A I ` 9 g 4, '•�. a' 1 II /\V -- A I V / d \ \ \\ \ \I \ I / /\\ \/l \\'/"_ �" '\ I ) > O'��� / I g°P¢ 1 \\ Revisions \ \ \ 1 \ © / / ` \ \ \ "1� '` `L \ J \ J ' / Q-' No dale BY o��nPamN , ee/ae/z,Aec Acc ss c.vE MILL IEa CLIENT_ 09/26/21 ABC FEE TOMPKINS COUNTY SOI & TER \ I 1 •C/ \ / \\ .- '�\ \ \ \ I ) I 3 10/6/21 All PER TG MILLER COMMENTS �v A v I I 11•• A A /���---, / A A / I ^��w V , a v/O/z1 Aac PER SIR E coMMErvTs /ea/z1 Aac vEe eME w,=TLArvo oeuNEAnory MAP Q \ / \ \ \ I I I 6 11/30/21 ABG PER POI REVISIONS 11 m N a`= 1 \ \ \ \ \ \ \ \ \\ \Gj \\ '\\ �� \ \ \ \ \ ] 1z/o1/z1 Aec PER INcwsloN or Tcsw wrTLANos 0 1 /I a m V' T I / / /' / 1 \ \\ \I \ I \\ \\ CAPPED RE-BAR \ \\ \ / \ \ '\• -� \I r// \\ \\ \ e o1/oa/zz All PER NMEC COMMENTS v N i C L v , v 1 yF O 3/25/z A \`� \ \ \ FOUND \ \ /_ /\ \ \ \ \ \ O /,c / �\ 4 \ \ \ y \\ \V AV AnNo© \ V ) � / II 1 I AV A A V � v v A A\ \V A A\ II \V ` � f' � / AV �A�P�1 I I / \I ����• V A V \ ax soz THE a>�MSAxE mrrn �A SITE PLAN NORBUT SOLAR _ , \ / DANBY SITE L\ \V A A\ \V ��/' , A A A vv A A tv A V `\ \V /'/ram IV <v "v vv A / ✓ -�-_-��� ��� /I \ V ` A\ Town/City: ITHACA I \) County:TOMPKINS State:NEW YORK \ PIPE FOUND \ JL_ \\ I \ \CAPPED RE-BAR \, y / / \ 5-0.1 \!> I_ \ / /' 7 I \ Project No. \ \ FOUND- 3s}?'W/ 7� O.QO'o = \ W_G.,' \ 20213129.0001 S-G.r' `\ \ /r Rb79'07iL5",(DEED) \\ / 8 / \ _ \ I // /AI I \ (_ (O \ // Drawing No. Sheet No.o \ \\ \\ \ \ \\ \\ \\ \\ \ 1_ PIPE FOUND \ \\ \\ \ T/fA 10-1,756 s-o.z' / I Scale: N F ION vGO ERY/ vv c(' i vO G O 1"= 40' Date OCTOBER 2021 NOT FOR CONSTRUCTION HORIZONTAL SCALE 40 0 20 40 BO SCALE:1"=40' ;)A PASSERO ASSOCIATES engineering architecture LEGEND: PROPERTY BOUNDARY 875.40'1 v vv vv vv vv vv v v v v __ v _ as°Dssa'w \h I --T� I 1 I \ -�- -C I —R.O.W. -_- -_ - ,�_� �_-- V 1 OG uG 1E I \ \ \ \--- \ -C \ \ \ \ Y E UCE — I��Uc-E r EJ_---� EXISTING CENTER LINE ROA PROPOSED SOLAR ARRAY LAYOUT \ T TALL WIRE FENCE WITH 6"WOODEN POLES SET \ \ \ I \ UG E 2 BUG E Y L/G E IIG E —- - -— 1 10'O.C.SEE DETAIL ON SHEETC 201 _\ \� G _ MAJOR I \ \ \ > \ -1 \ UG E \ UC E�w E UG E \ UG EST LIG E\ U4L E TO U E -UG E UGCE —`^�-€ UG �'� E UG ��--F�—UG \ TREES TO BE REMOVED YP. v' T UG E r UO E'er > W\E - `----- UG E W E-- UG E UGIE I IE ___--- 521-----EXISTING MA OR I R ) )n I TUC E \ UG E UCE E • T \ COMOUR PROPOSED I PROPOSED SILT \ \ Ily W I UG E UG E UG E UG E—�11 'c-UG E-� "E' E' \ UG E UG E I I I _ I I --520----- \ �� \-- _ \ \L-_\ \�_-\> N8�°Q5'60"E'`�-\f c�-_ --__ _�._��-___TT ) \ \ Ir--I-�I I EXISTING MIN TREELINEI I FENCE \ \ I1 Ou \ 1 \ \ CONTOUR \ \ —MATCH LINE C 110PROPOSED FENCE \ \ \ r N89051'55'IW EXISTING SLOPES PI 6%(TYP.) / / / / \ IM \ \ SF PROPOSED SILT FENCE N89°07'8"W 3.04' 5.10' 3687.30' (DEED&MEAS.) _ ---___—===_==__=_ --�r-----7-- ---, --- -- x—\— _ _ __ _ \ \ \ I EXISTING TREE U N E I o 1.4 j / / // i J PROPER�fY LINE PER DE 9 IN�T.v 4� �= ( � - / / �J-PROPOSED TREE LINE FNC. \ / j % i / / /\I \;� �_-� / // /// / \// / I REMOVE TREES / // __-___ SLOPES>15% PROPOSED SOLAR / PANELS RE-BAR FOUND S-11835' ^ryya (S-18.05'REI'l) PROJECT LOCATION PROPOSEDTO BEINSTALLED LENCE I I SHED / `" 1 / -/ ALONG CONTOUR /�J II \\ 11 // / / /// / / l /� \\\ - \ --\\ < I I\� / Town of Danby LOCATION SKETCH TLANISAREA �/ \ Y/. w--_-__ �� ---- (FLAGGED) / .�� ��` w --___/\ \\ NORBUT SOLAR I / 0280 AC �___ ,(_—____ `\ ` \\ \ v \ \ 1241 UNIVERSITY AVE. \ '\ / ROCHESTER, NY 14607 EXISTING SLOPES>15%(TYP.) \ \ 1 \\ SPACINGVARIES�e \�\ DEPENDING ON X PASSERO ASSOCIATES \ \� \\ \ / �'� // / / •.• - _ _ -\� \" \ \\`\ \ ` L\\ \\ CUTOFF TRENCH SAME ELEVATION A CREST reocnes erMrvew ron iasie f Isfisl a2fioo0 e.:Is6sl szslsPl / \ /� �.�• '� \ �'�•�` / \ \ \ 18"WIDE / TOE SLOPE H 24"MAX 6"DEEP A CENTER ProjePrincct Mana9e9e Jess Sudol,RE DavidCx,PE PROFILE \ 14 L.F.18"CPP 1 1 B NOT TO SCALE Designed>n Austin Goodwin,ELT. INV.-12 .03 \ / i// /• '\ \ �---- FNC.- \���\ \ \\1 I Ir I /.7,A'lG 1 21\1-Sc_ X� N(H) PROPOSED SILT FENCE / / W // /• 1 _----_ _- " �' - � �-_ \ \ \\I \ \ I I J \ F�F�C� 9•'MIN SLOPE(FT/FT) \\ \ TO BE INSTALLED _ \ \\ \\ \ "I I N F BEENLI\J--_ MI OF NEW\ ALONG CONTOUR // -_ \ z I \ \ 1 / ^ — --- — —'\ \_ !- INSTRUMENT— 454503T FILTER 2 z NIEL yo - --__ -'/ \ \\ `I // I \ I I \\ FABRIC CUTOFF TRENCH r 1 24"MAX a / ry -— --_- .�_ \� /-1 B DESIGN BOTTOM 0CENTER y��J _------_ / \ FNC. \ ( f( \ l � I \ SECTION A-A F- 3 NOT TO SCALE FILTER FABRIlal tQ� 3 - - \\` // _ % / /• // --/ // _ �\ !\ � \ Q \�\ \\i \ \\ \ \ \\ 1\ 1 �\ --�.i \ SECTION B-B `O 23• � � / // \ / /�' I. \ 01 WLL, ,\ \ \ I \\ \ \\ \ ,1 NOT TO SCALE ( ' i� /• / �� -_---- \ \ \\ CONSTRUCTION SPECIFICATIONS f r / / \ / �/ \ I \ \\\\ -I 1.STONE WILL BE PLACED ON A FILTER FABRIC FOUNDATION TO THE LINES.GRADES \\ \ ^\ I AND LOCATIONS SHOWN IN THE PLAN. REV51011$ d Z INTERMITTENT TRIBUTARY„ / l \/ / \ j/'��' ' i-' \\ "t \/� I� �k \\� \ \\\\\ \ �_ 2.SETSPACINGOF CHECK DAMS TO ASSUME THAT THE ELEVATIONS OF THE CREST OF Date ey RI I �/ // / •/ •\ \\ I \ \ In O \I \ 1 \ I I \ \�\ \ THEDOWNSTREAM DAM IS AT THE SAME ELEVATION OF THE TOE OF THE UPSTREAM rvi 08/30/21 AEG ACCESS oav o—pt..'MOW CLIENT DA N \�•••—••• / •••—_••�•,•�{�•'•/ \\\\ /// /////�//�i'// \`� \\ J \\\\ ^ M \ \\-\ (\\\/�) \I I\ - \ \ \\\\\\\\ -III III 3.EXTEND CUTT NG AROUND THE D MINIMUM OF I.S FEET BEYOND THE DITCH BANKS TO PREVENT 3 �6/212 09/24/21 ABG PERETGAEG PER NMiLN5 c0UNtt 50I �\I \ \ \\ \ I TSAT&WATER TECT THE CHANNEL DOWNSTREAM THE LOWEST CHECK SCOU COMMEN /11/21 N JI \\ J\\�\ \\P\\� / \\~ \ \\ / \I( \\ \\\\ \ I I `\s I �� 5.ENSSOUDREROSION WITH STONEORLIAER ASFSP ROPRIATE. AEG PER ULVERT ENDTR NCEOS BELOWR 6 >>/3n/2t ABG PER PMEREVISAND lElIWLION NAP p ER THAT H AS NI iorvs O \ \ \ \ / / \ \ \ \ \ 1 / 1\ \ I l , / / 1 CHECK DAMS ARE NOT SUBJECT TO DAMAGE OR BLOCKAGE FROM DISPLACED > 12/01/21 AEG PER INCLUSION OF TCEW WETLANDS o \ \ \ \ a \ TREES TO BE REMOVED YP. i' / \ \ \ m I e C \ STONE. \ \ \ \ \ Q ) I / / / / /--_---__-_-_ \ \ s i \ \ / \ 1 / I 1 / I STONE CHECK DAM a of/oS/22 AEG PER Nl SO COMMENTS m \\PROPOSED$OIAR \ N � _PROPOSED SILT E WITH \ N.T.S. 3/zs/z A 5 y10?O CWSEE DENAIL ON SHEET CO20EN POLES SET % \\ \\ \ �\ \ \ �\ \ \\_-, \s 11 ARRAY LAYOUT\ \ m FENCE PROPOSED SILT FENCE \\ \ \ \ \\ 1 TO BE INSTALLED \\ \ \ \ \ \ I ^\ \ / I 1 ALONG CONTOUR. \ \ \ \ \-I �\ \ \ / !/ I IU© PROPOSED TRUCK/CONCRETE DOUBLE SILT FENCE IN \\ �\ ,\\ I \ \ \ ( I I \ WASHOUT AREAS.AREAS TO PROXIMITY TO I / \ \ ---\ \\ \ Tzs3� I \ \ 1 \ \ NOTE:A 10 MIL LINER IS REQUIRED ALONG •n - \\\ TRUCK/CONCRETE / I _ \ \ I / BE INSTALLED PER DETAILS AND ) \ / \ \ ( �\ \ \sx \ / \ \ \ \ �! \ WASHOUT AREA. / I \\ \ \ \ 1 \ THE SIDES AND BOTTOM OF CONCRETE REMOVED WHEN \ ( \ 1 ) -1 ` \ \ \ \ - SITE PLAN CONSTRUCTION COMPLETED. \\ WASHDOWN AREA.WASHDOWN AREA \ \ AREAS TO BE RETURNED TO TO BE CLEANED OUT AT 75%CAPACITY. EXISTING CONDITIONS. \ / / \\ \ / I I \ o _ / \ I \ \ \ \ \ l \ \ 1 '^ \\ \ ^, I I 3'DEEP NORBUT SOLAR v �28, v v v DANBY SITE \ \ \\\ 1 \ NN 8'WIDE 1- \ \ \ 315•TO PROPOSED CLEARING LIMI \ _ \ \ / n\ \ \ \ \ \ > \ \/ `( _ \\\ \ \ \ •\ \ \W' \ \ -126I- \\ \\ \\ \\ MIN. _I sown/City: ITHACA \ \ >\ I J ! PROVIDE 12"THICK I Coun TOMPKINS State:NEW YORK N: STONE BASE WITH 7 _i ProjectNo. - - - - - - 2%MIN.CROSS SLOPE 20213129.0001 PROPOSED TREELINE TRUCK WASHDOWN AREA Drawing No. "set No. r WETLAND AREA N.T.S. �+ [� [1 (FLAGGED)', RE-BAR FOUND'\ / \\ / \\ \\ \\ \\ \ '\ \ .\ , C 1 07 7 \ \ W-0.1' \ F II 1 \ \ \ \ \ \ \ _-- Scale: s D.G27 AG _ s S88 44 09 E 12.16 \\ \\ ----- _ / \ --- FNC. \ N-6.18' \\ \ __---- 1 Ir- 40' RIGH1 r: A PER INSTRUMENT PER LINER 985 OF \ (N-6.21'REFA) \ p 50 RIGHT OP WAY.PER'INST.\ \ GE 51 &INSTRUMENT$5179507-1 A�,�' \ 'S78°30'00"E (DEED) V A�//46050YF001A\ MATCH LINE C 108 — -- — MATCH LINE C 108 — ---- Data _ ---- ---- ---- — OCTOBER 2021 > 77 / IrF.'� - \ \''D SF�_ PROPOSED SILT \ \ 1 ✓ I \I \ \ NOT FOR CONSTRUCTION HORIZONTAL SCALE 0 20 40 80 SCALE:1^=4D' PA I PASSERO ASSOCIATES engineering architecture LEGEND: \T/� 10\}1 \1941 C \ PROPERTY BOUNDARY \ \ \ \ \ N1'{ B\ALL\ \ \\ \\ \ /' \\\\\�\/'/^\\\�I/�/ II \ \\ \\ \\\l I / p /j/ _ EXISTING CENTER \ \ \ \ \\ �\ \ / \ //, \ LINEROAD INS\TRIJOENT\# �510 4234\ \ \I \/ \ / o \I --520-----EXISTING MAJOR / (^' CONTOUR v I ------ 521-----EXISTING MINOR \\ \\ \ \ \\ \ \ \ \APPROXIMATE LOCATION\l� j \\\\ \ %\ -- CONTOUR \ \ \ \ \ \ \ \ \ BUTTERMILK PROPOSED FENCE SF PROPOSED SILT fENCE EXISTINGTREELINE \55S PROPOSED TREE LINE / /• �� \•�\ / / \ / J / 1\\\\ \ REMOVE TREES f y SLOPES>15% PROPOSED SOLAR + + PANELS i�.V. NYSEG L-314 NYT 186 PROJECT LOCATION O Town of D—by LOCATION SKETCH / / \) .`. --_ • - \\ I I II I I r\ g23 \\ � Client: 'PO NORBUT SOLAR 1241 UNIVERSITY AVE. r`-'-'-`-`- '-`- . ... :` � -� _ _ ROCHESTER, NY 14607 10 1 ' WETLAND AREA`,. I / \ \ \ I H•• , , vv II�� �BUTTERMILB v PASSERO ASSOCIATES �\ I \. W W/ I I CREEK / \ \ -I \ am \ (FLAGGED) �4.` ` 1 \ I 6 2a2 wesr rna°so-eerswre Is6sI a2fl FLAGGED \ \ I 2.00 AC -�_ \ 1 1 , , \ \ \ rexnester.rvex,ron lade fax:lsesl szslsPl \\ - \ 1 \ I / / I I ' PdnclpOHnLharge 1a Jess Sudol,PE `.`.`.`. .`.`.`.`.`.`.`. I THREE OVERHEAD WIRE CONNECTIONS Project Manager David Cox,PE / TO PUBLIC GRID Designed by Austin Goodwin,ETT. i r_I . . .�.� . vIvAy T /V 10—1—n19,�2 `.`.'.'.` ` f / N F' R of New . . . . . . \A LIBER �10 �3F DEEDS/,/ \ �P�OP NIELS ye) THREE ARRAY POWER LINES \ i\\1s"I\ D-7 h GB' 8.L / $87°i6'OS"W y4,yy CARRIED BYO HE PO LE \ �� /'i y.- \ `/ \ `- 6s'x4o"EN D \ \ ( / 356.78' O \ PROPOSED SILT FENCE�`A� \4'BOX WIRE FENCE - o yz` II INV•1207.85\ ``+`+`-```.`+` TO REMAIN \: " " APPROXIMATE EASEMENT, \ — a _ • FOR ELECTRIC LINES AND _��= - _ \ `Q 23• ' INTERCONNECTION" \ - - () .`.`�` .`. .`. ACCESSRYP),.` • '� 1 36 LF 65"x40"CMP ARCH STM.0 0.42% ( l P:12)1.9A u PROPOSED NINE(9)NYSEG OWNED POWER POLES,3 PER \ '\ SITE CONNECTION..I.u\{' 120 1'21 \ �• REVISIOns \\\\��• .W• .`v}N\\ �o �,\ o N \I N87°16'O5"E By pt \ "t oe/ao E ac ACCESS CRIW MOW PER GLEN \J .• - `j;r_ - m Ci --I21I\ /spy 234.33' \ 2 09/26/21 ABS PER TOMPKINS COUNTY SOIL&wAMR 3 10/6/21 ABC PER TO MILLER COMMENTS -ram= .`.`.`.�\`.`.`.`. "lT \I1 \ \ 1 I j 4 T \ \ \\\ \ \ \ I PROPOSED20ER GATE s t1/01/2t ABG PER 5MEwETLAENTSLINEATory MAP T. \ I SWING BARRIER GATE WITH tt/oa/2t ARc P ,`('; \\ ` \ \ \ PROPERTY LINE LOCKANDOPTIONALARM \ PER SME WETLAND of `+`�`�`�`�`�`�`�``\\���� 1\ \ 6 11/30/21 ABSABG PER POI REYSIONS \.\ I \ D-6 \\ I RUNS ALONG GATE&POST SAFETY TA PE 7 12/01/21 AK PER INCLUSION OF TCSW WETLANDS o \\ \\\ \ _ \\ \ \\ \\ \\ \ \ \ \ \ \ Ir\ \ \ \ \ \ PROPOSED NYSDEC APPROVED PERVIOUS ACCESS��•4'-^ 65"X4tl'END III 1 " I I CENTERLINE OF \ KIT.PRODUCED BY BARRIER \ 8 Ot/03/22 ABG PER Nv50EC COMMENTS \\\ DRIVE PER DEfAIL. INV=1208.00 I I I CREEK \ GATE BRANDS OR APPROVED EQUUAL. \ I \ 3/25/z A / / l i A�I \ \\ \ \ \ \ ( \ \ \ / -_, -� \ \ \ ! ti- ,`. I I / / ox sm.—E Puxs AR�mPrn \ \\ \ ` \ ` ` \ \ ✓ ' i ° ---- / % i \\ LL.` .,. \`.y.;.LL.'p.'.'. 3 / /' / / T/%/X 1 -1 23 SITE PLAN \\\ TEA 19 1—`1.9.1'2 `\ \ J I zD ) i /' ' /fN, F/ TOk OF DANBY \\ \\ \\ I`��+�����`���PROPOSED SIX OWNED"L`�' � _ 1 \1N / % /// / / o \ \ \ \ i I N/E\ROE O - - / / / �d��FR/2/15 OF D DS, PAGE \*II \ \\ \\ \ \ \ \\ \\ \\- \\ f6 I \\ POWER POLES,2 PER SITE CONNECTION. \\ y.)z / / / / \ 'y of ER 1610\oF DE�Qs, PA9E a52\ ' ,\ '; / 484 NORBUT SOLAR mlw \ ;Ln /' ; ; DANBY SITE ---_ \--192.96''-_ \ \ \\ \ Town/City: ITHACA \ �.`.`-'S55°16'16"E.`.`.`.`.�.�.`.`.'.' I - _������>/i/ Couoty:rOMPRINs state:New vORK R 1, _ \ \ \ \ I I I I I \ \ - - NO°00'00"E - / / V v v V A A I l A vV A V I I I E U. lq E V A 133.69' _ v -rN v�1V(- E UG E UG E . . . . . . 86.29' __ 1 1 1 J• \\\1 \ \ Project No. \ \ \ \ \ \ \\ \\ 1 I I Iw1 UG E \F\ `i� '4'-' . 4 _ ' 20213129.0001 dIR\\ \\ III W\\\ \\III\ �I \I l MATCH LINE C w 53.58' 109 \ `..' ..`..`..' ' Q / \ 1 11 I Drawing No. Sheet No. /' y\ \ !_'- POST nlll S89°53'58'E. \\ I o \ BT5.40' \ \ \ \ \ �__+ f-- -1__ �\ I r, .�'• / / I I \ \ 83.28 I E \ REMAINS \II Ir II/I �+ .�--T I 1 1 I \ L9 IrrI ���� P ��'+'.`'��' �,E UC' \) \ \,\ I( / l_. ��0 �0 Y` 1 R 1 -r'' 1 / APPROXIMATE I TYPICAL I t--- Scale: UCE M BUG E E \ \ E G E '�VG \\ ( E—�r-UG —�� �/^�) \ $U°UU•UU^E`y+\ \ / UNDERGROUND , ( N \ \ UGE UE �Ej� "'J\ ELECTRIC LINES / \\- Y•-\\ /� \\ I / / UG FiT I� I lE�-_t_U.IE S. 52.24' \/ / . UG' I \ l APPROXIMATE LOCATION w \ U$E I I1G E UG E I 1 UG, I I 1 O I I RYPJE 6'1 3"9 GC __ _ o ___ --` _ 1/� BUTTERMILK CREEK M_ 401 ' v v ----- -_- F I--F- -L_-��ZQ r / I I. .`. .I�y.` l I v V AV o A A J vv II jlll% A\ - Date `.� APPROXIMAT 1 \ �`" 11G,� 1/B E \ I //// 30-FT WI EUTILITY{ASEMENT , \ �fF 10 00'00"W_\ / I ,�///(( \_- u f UG E Solo \( v Z i, uo E DG E 1G6.ao' /v v v OCTOBER 2021 NOT FOR CONSTRUCTION CLA S 5 DEN POLE. ET 1S0.0'OCOALL POLES TO BESETAPLUMB.ERN YELLOW PINE OR DOUGLAS FIR. SEEDING NOTE EROSION AND SEDIMENT CONTROL NOTES: WOVEN WIRE FENCE SOLIDLSIO PR020 50'MIN. EXITING (MIN.14 GAUGE TO PROVIDE THE FOLLOWING SEED MIXTURES DURING CONSTRUCTION: SPACING) PROFESSIONAL STRENGTH FIXED KNOT FENCE TEMPORARY SEEDING: g PAVEMENT SPACING) ) MESH OR APPROVED EQUAL 1. THE CONTRACTOR SHALL REVIEW THE EROSION AND SEDIMENT CONTROL PLAN INCLUDED IN THE 57 10'MAX. .TO RYEGRASS(ANNUAL OR PERENNIAL)V 3gLBS.PER ACRE OR 0.]LBS.PER CONTRACT DOCUMENTS,AND IF NECESSARY,MODIFY THE PAN WITH THE CONTRACTOR'S 1Y' IF 100OS UARE FEET. INTENDED SEQUENCE AND TYPES OF OPERATIONS.THE CONTRACTOR'S MODIFIED EROSION AND EXISTING �� FILTER �� MOUNTABLE BERM 36"MIN.LENGTH FENCE PERMANENT EEDING: SEDIMENT CONTROL PLAN SHALL BE SUBM17ED TO THE ENGINEER FOR APPROVAL,ALONG WITH POSTS DRIVEN MIN.16" GROUND CLOTH PROFILE (OPTIONAL) INTO GROUND. 65%XENTUCKY BLUEGRASS BLEND BSLBS.PER ACRES OR 2.0-2.6 LBS.PER A PROGRESS SCHEDULE THAT ADDRESSES THIS WORK. "4 1000 SQUARE FEET ;)A 203'PERENNIAL RYE GRASS 026-35 LBS.PER ACRE OR 0.6-0.8 LBS.PER 1000 2.THE CONTRACTOR SHALL DESIGNATE AN"EROSION AND SEDIMENT CONTROL SUPERVISOR"FOR 50'MIN. •, HEIGHT OF FILTER PASS E R O ASSOCIATES SQUARE FEET THE PROJECT.THE SUPERVISOR SHALL BE RESPONSIBLE FOR IMPLEMENTING THE EROSION AND 16"MIN. 15%FINE FESCUE B 19-26 LBS.PER ACRE OR 0.4-0.6 LBS.PER 1000 SQUARE SEDIMENT CONTROL PLAN AND FOR INSPECTING AND MAINTAINING THE CONTROL MEASURES. EXISTING - O'MIN. FEET THE NAME AND QUALIFICATIONS(TRAINING AND EXPERIENCE)OF THIS INDIVIDUAL SHALL BE GROUND E +' 'ISO 'P•• +' p•��♦ B"MIN. engineering architecture FOR ALL SEEDING S STABILIZATION MEASURES IT IS THE RESPONSIBILITY OF THE SUBMITTED TO THE ENGINEER FOR APPROVAL PRIOR TO STARTING EARTHWORK. .. / W OWNERBDEVELOPER TO ENSURE THAT FINAL STABILIZATION OCCURS AS 12'MIN' EXISTING REQUIRED BY THE NYSDEC.AREAS WHERE CONSTRUCTION ACTIVITY 3.THE DESIGNATED"EROSION AND SEDIMENT CONTROL SUPERVISOR"SHALL NOTIFY THE ENGINEER 15 IN. PAVEMENT PERSPECTIVE VIEW TEMPORARILY CEASES FOR MORE THAN]DAYS WILL BE STABILIZED WITH A IN ADVANCE OF ANY FIELD CHANGES TO THE EROSION AND SEDIMENT CONTROL MEASURES 36"MIN.FENCE POST_ TEMPORARY SEED AND MULCH WITHIN 7 DAYS OF THE AST DISTURBANCE. INDICATED IN THE CONTRACT DOCUMENTS.THE ENGINEER MAY REQUIRE THE CONTRACTOR TO PAN VIEWWOVEN WIRE FENCE LMIN.14 ONCE CONSTRUCTION ACTIVITY CEASES PERMANENTLY IN AN AREA,THAT SUBMIT A MODIFIED EROSION AND SEDIMENT CONTROL PLAN FOR APPROVAL PRIOR TO [.'MIN. GAUGE W/MAX.6"MESH AREA WILL BE STABILIZED WITH PERMANENT SEED AND MULCH.AFTER THE IMPLEMENTING ANY FIELD CHANGES. SPACING)WITH FILTER CLOTH ENTIRE SITE IS STABILIZED,THE ACCUMULATED SEDIMENT WILL BE REMOVED CONSTRUCTION SPECIFICATIONS 20"MIN. 4.THE SITE SHALL AT ALL TIMES BE GRADED AND MAINTAINED SUCH THAT ALL STORM WATER F=OW FROM THE SEDIMENT BASIN(,). RUNOFF FROM DISTURBED AREAS IS DIVERTED TO SOIL EROSION AND SEDIMENT CONTROL UNDISTURBED DEVICES BEFORE LEAVING THE SITE. 1.STONE SIZE-USE 2"STONE,OR RECLAIMED OR RECYCLED CONCRETE EQUIVALENT. COMPACTED Sol ROUND CONSTRUCTION SEQUENCE FOR 5.EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSTALLED PRIOR TO ANY SOIL 2 FOOT MINIMUM LENGTH WOULDENGTH-NOT LESS THAN 50 FEET(APLY)T ON ASINGLE RESIDENCE LOT WHEREA30 A MBED IN.OFT 6"INLOTH GROUND. 16"MIN. GRADING AND EROSION CONTROL: PERMANENCE FOR WHICH THEY ARE INTENDED AND SHALL REMAIN IN PLACE UNTIL SOILS ARE 4. IF THICKNESSWIDTH- NOT LESS THANOT TWINIMUMELVE INCHES.NOT THAN THE FULL WIDTH AT POINTS SECTION VIEW 1. INSTALL STABILIZED CONSTRUCTION ENTRANCE. 6.UNDER NO CONDITION SHALL DISCONTINUED CONSTRUCTION ACTIVITIES IN AREAS WITH SOIL WHERE INGRESS OR EGRESS OCCURS.TWENTY-FOUR(24)FOOT IF SINGLE ENTRANCE CONSTRUCTION SPECIFICATIONS 2. CONSTRUCT EROSION CONTROL MEASURES AS SHOWN ON THE PLANS. DISTURBANCES BE LEFT FOR A PERIOD OF GREATER THAN 7 DAYS WITHOUT TEMPORARILY TO SITE. S.FILTER CLOTH-WILL PACED OVER THE ENTIRE AREA PRIOR TO PLACING OF STONE. 3. GRADE IMPROVEMENTS AREAS WITHIN THE PROJECT SITE.AREAS WHERE STABILIZING THOSE AREAS WITH TEMPORARY SEED AND MULCH,MAINTENANCE OF THOSE 6.SURFACE WATER-ALLLL SURFACE WATER FLOWING OR DIVERTED TOWARD 1.WOVEN WIRE FENCE TO BE FASTENED SECURELY i0 FENCE POSTS WITH WIRE TIES CONSTRUCTION ACTIVITY TEMPORARILY CEASES FOR MORE THAN]DAYS AREAS SHALL INCLUDE RESEEDING AND REMULCHING AS NEEDED TO ESTABLISH A CONSTRUCTION ENTRANCES SHALL BE PIPED ACROSS THE ENTRANCE.IF PIPING IS OR STAPLES.POSTS SHALL BE STEEL EITHER'T'OR"U"TYPE OR HARDWOOD. WILL BE STABILIZED WITH A TEMPORARY SEED AND MULCH WITHIN 7 DAYS SATISFACTORY STAND OF GRASS.THERE SHALL BE NO ADDITIONAL PAYMENT FOR RESEEDING IMPRACTICAL,A MOUNTABLE BERM WITH 5:1 SLOPES WILL BE PERMITTED. 2.FILTER CLOTH TO BE TO BE FASTENED SECURELY TO WOVEN WIRE OF THE LAST DISTURBANCE. AND REMULCHING. 7.MAINTENANCE-THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL FENCE WITH TIES SPACED EVERY 24"AT TOP AND MID SECTION. 4. SEED ALL DISTURBED AREAS WITHIN 10 DAYS AFTER FINAL GRADING, PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC RIGHTS-OF-WAY,ALL FENCE SHALL BE WOVEN WIRE,14 GAUGE,6"MAXIMUM MESH OPENING. CONTRACTOR IS RESPONSIBLE TO RESEED IF GRADING IS NO WET OR FRESH CONCRETE,LEACHATE,MATERIAL,OR DEBRIS SHALL BE ALLOWED TO ESCAPE SEDIMENT SPILLED,DROPPED,WASHED OR TRACKED ONTO PUBLIC RIGHTS-OF-WAY 3.WHEN TWO SECTIONS OF FILTER CLOTH ADJOIN EACH OTHER THEY SHALL BE OVER- UNSATISFACTORY. INTO A WATER BODY OR WETLAND,NOR SHALL WASHINGS FROM CONCRETE TRUCKS,MIXERS MUST BE REMOVED IMMEDIATELY. UPPED BY SIX INCHES AND FOLDED.FILTER CLOTH SHALL BE EITHER FILTER X, 5. UPON APPROVAL OF THE TOWN,REMOVE ALL TEMPORARY SILTATION OR OTHER DEVICES BE ALLOWED TO ENTER A WATER BODY OR WETUND.ANY MATERIAL OR B.WHEN WASHING IS REQUIRED,IT SHALL BE DONE ON AAREA STABILIZED WITH STONE MIRAFI 100X,STABILINKA T140N,OR APPROVED EQUIVALENT. CONTROLS. DEBRIS ACCIDENTALLY DROPPED INTO THE CHANNEL SHALL BE IMMEDIATELY AND COMPLETELY AND WHICH DRAINS INTO AN APPROVED SEDIMENT TRAPPING DEVICE. 4.PREFABRICATED UNITS SHALL BE GEOFAB,ENVIROFENCE,OR APPROVED EQUIVALENT. 6. ADDITIONAL EROSION CONTROL MEASURES MAYBE REQUIRED BASED REMOVED AND DEPOSITED IN AN UPLAND AREA. 9.PERIODIC INSPECTION AND NEEDED MAINTENANCE SHALL BE PROVIDED AFTER EACH UPON ACTUAL FIELD CONDITIONS AOBE.CONTRACTOR SHALL PROVIDE RAIN S.MAINTENANCE SHALL BE PERFORMED AS NEEDED AND MATERIAL REMOVED WHEN FOR THIS COST IN HIS CONTRACT. 7. AT THE VERY MINIMUM,EROSION CONTROL SHALL BE AS SHOWN ON THIS PAN.EROSION "BULGES"DEVELOP IN THE SILT FENCE. 7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL SILTATION AND CONTROL MAY CONSIST OF SEDIMENT TRAPS AND/OR ENVIRONMENTAL FENCES.THE EROSION CONTROL MEASURES FROM INSTALLATION THROUGH CONTRACTOR AND THE DEVELOPER SHALL BE RESPONSIBLE FOR THE INTEGRITY,MAINTENANCE STABILIZED CONSTRUCTION ENTRANCE SILT FENCE DETAIL MAINTENANCE AND REMOVAL AFTER REVEGETATION HAS BEEN AND REMOVAL OF EROSION CONTROL MEASURES UNTIL NO LONGER DEEMED NECESSARY BY ESTABLISHED. THE TOWN OR IT'S REPRESENTATIVE.THE CONTRACTOR SHALL MAINTAIN THE STORM SEWER N.T.S. N.T.S. cu OE va//ROAO 11S 8. ALL EROSION AND SEDIMENT CONTROL METHODS WILL BE DESIGNED AND SYSTEM UNTIL THE PROJECT IS DEVELOPED AND APPROVED BY THE TOWN AND OWNER. INSTALLED IN ACCORDANCE WITH THE LATEST EDITION OF THE NEW YORK STATE STANDARDS AND SPECIFICATIONS FOR EROSION AND SEDIMENT CONTROL SPACING VARIES DEPENDING ON NYSDAM DECOMISSIONING NOTES. 10.•LESSTHAN 48-INCHES:ALL UNDERGROUND DIRECT BURIED ELECTRIC L CHANNEL SLOPE _ CONDUCTORS AND CONDUCTORS IN CONDUIT AND X I LASSOCIATED CONDUIT WITH LESS THAN 48-INCHES OF COVER MUST BE A 1.DECOMMISSIONING REMOVED,BYMEANIS OF CAUSING THE LEAST CUTOFF TRENCH SAME ELEVATION CREST PROJECT 2.IF THE OPERATION OF THE GENERATION FACILITY IS PERMANENTLY 12,AMOUNT OF DISTURBANCE AS POSSIBLE. 18"WIDE TOE�///S(ppE x 2q"MAX LOCATION DISCONTINUED,REMOVE ALL ABOVE GROUND STRUCTURES 13,ACCESS ROADS IN AGRICULTURAL AREAS MUST BE REMOVED.UNLESS 6"DEEP CENTER FENCE SUPPORT POLE INSTALLATION DETAIL 3.(INCLUDING PANELS,RACKING,SIGNAGE,EQUIPMENT PAD,SECURITY OTHERWISE SPECIFIED BY THE LANDOWNER.IF ACCESS IS TO N.T.S. FENCING)AND UNDERGROUND UTILITIES IF LESS THAN 48- 14.BE REMOVED,TOPSOIL WILL HAVE TO BE RETURNED FROM RECORDED PROFILE A 4.INCHES DEEP.ALL CONCRETE PIERS,FOOTERS,OR OTHER SUPPORTS MUST BE PROJECT EXCESS NATIVE TOPSOIL DISPOSAL AREAS,IF NOT TO SCALE REMOVED TO A MINIMUM DEPTH OF 48-INCHES 15.PRESENT,OR IMPORTED TOPSOIL FREE OF INVASIVE SPECIES THAT IS B S.BELOW THE SOIL SURFACE.THE FOLLOWING REQUIREMENTS APPLY TO CONSISTENT WITH THE QUALITY OF TOPSOIL ON THE AFFECTED _ H(R) TOWD O1 DOf1by ELECTRIC CONDUCTORS LOCATED AT THE RESPECTIVE RANGE 16.SITE.RESTORE ALL AREAS INTENDED FOR AGRICULTURAL PRODUCTION, 9"MIN. X SLOPE(Fr/FT) LOCATION SKETCH 6.OF DEPTH BELOW THE SURFACE: ACCORDING TO RECOMMENDATIONS BY THE CURRENT M� 7.•48-INCHES PLUS:ALL U NDERGROU ND ELECTRIC CON DUITS AN D DI RECT 17.AN DOWN ER OR LEASING AGRICU LTU RAIL PRODUCER,AN D AS REQUI RED BY BURIED CONDUCTORS MAY BE ABANDONED IN ANY APPLICABLE PERMIT,THE SOIL AND WATER FILTER �� 2 2 Client: 8.PLACE.APPLICABLE CONDUIT RISERS MUST BE REMOVED,AND ABANDONED 1g,CONSERVATION DISTRICT,AND NYSDAM. FABRIC CUTOFF TRENCH r 1 24"MAX CONDUIT MUST BE SEALED OR CAPPED TO 19.MONITORING AND RESTORATION REQUIREMENTS IN ACCORDANCE TO THE DESIGN BOTTOM Q CENTER 9.AVOIDA POTENTIAL TO DIRECT SUBSURFACE DRAINAGE ONTO PRIOR SECTIONS OF THESE GUIDELINES,WILL BE REQUIRED B NORBUT SOLAR NEIGHBORING LAND USES. 20.FOR THE DECOMMISSION SECTION A-A NOT TO SCALE >�� 1� 1241 UNIVERSITY AVE. FILTER FABRIC ROCHESTER, NY 14607 SECTION B-B NOT TO SCALE CONSTRUCTION SPECIFICATIONS 1.STONE WILL BE PACED ON A FILTER FABRIC FOUNDATION TO THE LINES,GRADES AND PASSERO ASSOCIATES IMPORTANT LOCATIONS SHOWN IN THE PLAN. n1n61e Bs1a IooO MAINTAIN 12•CENTERS BETWEEN BOLT HOLES 2.SET SPACING OF CHECK DAMS TO ASSUME THAT TH E ELEVATIONS OF THE CREST OF THE Afro.ew o fax:(585)3-691 DOWNSTREAM DAM IS AT THE SAME ELEVATION OF THE TOE OF THE UPSTREAM DAM. (GAP BETWEEN CHANNELS IS NORMAL) 3.EXTEND THE STONE A MINIMUM OF 1.5 FEET BEYOND THE DITCH BANKS TO PREVENT Pdncipal-in-Chalge Jess Sudol,PE cif CUTTING AROUND THE DAM. Project Manager David Cox,PE 3• 4,PROTECT THE CHANNEL DOWNSTREAM OF THE LOWEST CHECK DAM FROM SCOUR AND Designed by Austin Goodwin,ElT. N FIELD THEN 7N1T 90 g• BEND KNOCKOUT ANCHOR PERPENDICULAR TO C"AN J- -ram EROSION WITH STONE OR LINER AS APPROPRIATE. BO ae ae ee a 1-1a1g• 3' H S.ENSURE THAT CHANNEL SUBJECT TO D SSUCH AS CULVERT EFROMDSBELOW CHECKDAM ARE ee ee as a ee 1' AGE SEE PUNS y PAVEMENT SECTION TONE.MAXIMUM DRAINAGE AR A 2 ACRES.OR BLOCKAGE FROM ISPUCED o f NEW 1,3 7/e•KNOCKOUr ANQIORS /18. CHECK P NIEL S y0 �-1r_rm STONE CK DAM 'LENGTH or ARCH �� CHANNEL SECTION .. N.T.S. CO .I N.T.S. .. , - - - r 0 UNBALANCED CHANNEL DETAIL PLATE ARCH.. .....'.,�::.:.: "'`. - . ;. ,•.,'..;;_'." 25 T-/R BSM9GAUGE= �SPACING a' 2 1 MIN.(TYP.) SELECT GRANUAR FILL / �• NYSDOTITEM 203.07 i Revisions " II -l. No D,1e a9 -pt- -- III = �wA / - - / 65 - - " 2 09/26/21 ABG PER NS COUNttE 50L ENT 1E1 3: / } 10/6/21 All PER TG MLLER COMMENTS ( -III Z - ''III-III- 11/01/21 AEG PER SHPO COMMENTS I EXTEND RIP RAP END PLACE URGE STONES SIDE BY -III- 18"�Tn CREEK BOTTOM _��` :. -III- 11/oa/2t uNEAnoN MAP //\ TREATMENT 'ABOVE THE TOP SIDE ON THE BEDDING `-IIrT r Tr rT 7'} �^ - - 6 11/30/2t ABG PER POIE REVISIONS of / ','�,i OF ARCH NYSDEC CUSS III, MATERIAI WITH SMOOTH -III %• V -III -III-III I- III-III: 7 12/01/21 ABG PER INCLUSION OF TCSW WETLANDS FROM TABLE 5B.3 FROM NYS SURFACES FACING UP. PROPOSED 6 01/0}/22 ABG PER NTSOEC COMMENTS STANDARDS AND ~-A ^T`• RIP RAP SCOUR PROTECTION 9 3/25/2 A.0 PER P S DE ATIONSFOREROSION ALUMINUM STRUCTURAL PLATE BOX CULVERT DETAILS NYSDEC CLASS III,FROM TABLE N o© AND,,SSEDIN IMENT 5B.3 FROM YS STANDARDS AND CONTROL N.T.S./\ SPECIFICATIONS FOR EROSION CLASS III RIP-RAP PER TABLE AND SEDIMENT CONTROL(TYP) %\ FROM THE NYS STANDARDS AND PECIFICATIONS FOR ON AND SEDIMENT OR APPROVED EQUAL CONTROL NOTES & DETAILS g :MIN TENCATE MIRAFI H2Ri NOTE:PROVIDE ALUMINUM BASE 10 CHANNEL ANCHORS 9"x2-1/2"ALUMINUM \\ Y EVERY I2'PER STRUCTURAL PLATE ARCH m \/_0k\�\\j\\�\ / NOTES: DETAIL BELOW 2 BY TANEENTERPRISES)OR NORBUT SOLAR ;~T5> 1. SLOPE SHALL BE GRADED TO 2:1 OR FLATTER PRIOR TO PLACING RIP RAP. B"Oxl APPROVED EQUAL DANBY SITE 2. PACE THE FABRIC DIRECTLY ON THE PREPARED FOUNDATION.OVERLAP THE EDGES BY AT O 1, LEAST 2 FEE1.BURY THE UPPER AND LOWER ENDS OF THE FABRIC A MINIMUM OF 12 INCHES 1"x3%" / W FABRIC KNOCKOUT i f.;• / BELOW GROUND.TAKE PRECAUTIONS NOT TO DAMAGE THE ABT E BY DROPPING THE RIPRAP.IF DAMAGE OCCURS,REMOVE THE RIPRAP AND REPAIR THE SHEET BY ADDING ANCHORS 4 BARS(TYP) BEND DOWN 1}`y" Town/City: ITHACA ANOTHER LAYER OF FILTER FABRIC WITH A MINIMUM OVERLAP OF 121NCHES AROUND THE ) County:iOMPKIN$ State:NEW VORK DAMAGED AREA. AND TWIST 2' CEMENT OF PLC ERIPRAP SHOULDTHAT IT FORMSIMMEDIATELYDSE,WELL-GRADED DEDPLA MASS OF STONE E CONCRETE Project No. STRUCTURAL PLATE x .` \\/\j\\j\\j FILTER FABRIC. RIPRAP SO THAT IT FORMS DENSE,WELL-GRADED MASS OF STONE FOUNDATION #4 BARS @24"O.C.PP) •1 ,,".:-: /\j\\�\\// WITH A MINIMUM OF VOIDS.THE DESIRED DISTRIBUTION OF STONES THROUGHOUT THE MASS (4,000 P51) 20213129.0001 ISOMETRIC DETAIL \\\\\j\/ MAYBEOBTAINED BY SELECTIVE LOADING AT THE QUARRY AND CONTROLLED DUMPING DURING FINAL PLACEMENT.PLACE RIPRAP TO ITS FULL THICKNESS IN ONE OPERATION.DO31 N.T.S. / NOT PLACE RIPRAP BY DUMPING THROUGH CHUTES OR OTHER METHODS THAT CAUSE Dravnng No. Sheet No. r SEGREGATION OF STONE SIZES.BE CAREFUL NOT TO DISLODGE THE UNDERLYING BASE OR ARCH TO FOUNDATION FILTER WHEN PLACING THE STONES. C 2O1 11 RIP-RAP SCOUR 4. ENDS OFTHE RIP RAP SHALL BE KEYED INTO A STABLE BANK.WHEN TYING INTO OTHER CONNECTION DETAIL 3 PROTECTION STRUCTURES,URGER RIPRAP CAN BE LAID IN STEPS OR STACKED AS NEEDED TO FIT.STONES Scale: URGER THAN THOSE DESIGNATED FOR FLOW(12)SHALL BE USED FOR THIS PURPOSE. N.T.S. N/A i CONCRETE FOUNDATION U FOUNDATION RIP-RAP INSTALLATION DETAIL Date p SUB-BASE N.T.S. OCTOBER 2021 NOT FOR CONSTRUCTION