HomeMy WebLinkAboutPB Packet SUB-2020-02 444 Jersey HillDevelopment Review Application
Building Permit Number: NA
Project Title: Hardesty Subdivision
Project Address: 444 Jersey Hill Rd
Tax Parcel ID: 8.-1-23.1
Type of Application: IMajor Subdivision I
Type of Development: Iresidential I
Stage of Review: Sketch Preliminary x- Final Additional meeting
Estimated site improvement / project cost:
(Exclude cost of land acquisition & professional fees)
Total number of lots proposed (existing + new): 3
Are new roads or public utilities proposed? no
Applicant / Agent
Name: trV�a C71 Title: nC,-')0k,�
Address: L414<1 .�°2�fS y �c�l �cj •
Phone: Email: k OY-A64 0 �(�-I W
Consultant J
Name: Title:
Address:
Phone: Email:
Owner / Lessee / Engineer / Attorney / Other (circle one)
Name: Title:
Address:
Phone: Email:
ALL APPLICATIONS:
The information on this application form is submitted in addition to other information, plats, and plans required by the
Town of Danby. I attest that all information so submitted is complete and accurate to the best of my knowledge. Also, by
filing this application, permission is granted to members of the various Town Boards, Committees, Planning and Code
Enforcement staff, and/or any other persons designated by the Town that may be involved in the review of this
application, to enter the property specified above to inspect in connection with the review of this application.
Owne s, gna a date Applicant/Agent signature date
2
4 e � �9.
760
Short Environmental Assessment Form
Part I - Project Information
Instructions for Completing
Part 1 — Project Information. The applicant or project sponsor is responsible for the completion of Part 1. Responses become part of the
application for approval or funding, are subject to public review, and may be subject to further verification. Complete Part 1 based on
information currently available. If additional research or investigation would be needed to fully respond to any item, please answer as
thoroughly as possible based on current information.
Complete all items in Part 1. You may also provide any additional information which you believe will be needed by or useful to the
lead agency; attach additional pages as necessary to supplement any item.
Part 1— Project and Sponsor Information
Name of Action or Project:
Hardesty Subdivision
Project Location (describe, and attach a location map):
444 Jersey Hill Road, Town of Danby
Brief Description of Proposed Action:
s U(� C)IVIO �S +l-1 Ac-Oc PSR&E WTV 3
4- %-� IkLJ� PAILC
Name of Applicant or Sponsor:
zt Ct, CL -U
Address: �)
Telephone: tJ '� 9� 2— q -7 O
E -Mail: l'l1aY�sPf l/, � � �a ►t � i� •��}7i
4 JL
City/PO: State: Zip Code:
q lwvy,UA I r�., I tq �}
1. Does the proposed action only involve the legislative adoption of a plan, local law, ordinancd, NO YES
administrativerule, or regulation?
If Yes, attach a narrative description of the intent of the proposed action and the environmental resources that
may be affected in the municipality and proceed to Part 2. If no, continue to question 2.
2. Does the proposed action require a permit, approval or funding from any other government Agency?
If Yes, list agency(s) name and permit or approval:
3. a. Total acreage of the site of the proposed action? acres
b. Total acreage to be physically disturbed? %j acres
c. Total acreage (project site and any contiguous properties) owned
or controlled by the applicant or project sponsor? acres
4. Check all land uses that occur on, are adjoining or near the proposed action:
5. ❑ Urban ❑ Rural (non -agriculture) ❑ Industrial ❑ Commercial ❑ Residential (suburban)
❑ Forest Agriculture ❑ Aquatic ❑ Other(Specify):
❑ Parkland
Paae I of
YES
5. Is the proposed action,
a. A permitted use under the zoning regulations?
b. Consistent with the adopted comprehensive plan?
6. Is the proposed action consistent with the predominant character of the existing built or natural landscape?
7. Is the site of the proposed action located in, or does it adjoin, a state listed Critical Environmental Area?
If Yes, identify:
S. a. Will the proposed action result in a substantial increase in traffic above present levels?
b. Are public transportation services available at or near the site of the proposed action?
c. Are any pedestrian accommodations or bicycle routes available on or near the site of the proposed
action?
9. Does the proposed action meet or exceed the state energy code requirements?
If the proposed action will exceed requirements, describe design features and technologies:
10. Will the proposed action connect to an existing public/private water supply?
If No, describe method for providing potable water:
11. Will the proposed action connect to existing wastewater utilities?
If No, describe method for providing wastewater treatment:
NO YES
N/A
❑
❑
❑ I�
❑
NO
YES
NO
YES
NO YES YES
IIST{ ❑
V1 ❑
NO YES
NO YES
19 ■
NO YES
12. a. Does the project site contain, or is it substantially contiguous to, a building, archaeological site, or district NO YES
which is listed on the National or State Register of Historic Places, or that has been determined by the ❑ F]Commissioner of the NYS Office of Parks, Recreation and Historic Preservation to be eligible for listing on the
State Register of Historic Places?
b. Is the project site, or any portion of it, located in or adjacent to an area designated as sensitive for ❑ ❑
archaeological sites on the NY State Historic Preservation Office (SHPO) archaeological site inventory?
13. a. Does any portion of the site of the proposed action, or lands adjoining the proposed action, contain NO YES
wetlands or other waterbodies regulated by a federal, state or local agency? ❑ ❑
b. Would the proposed action physically alter, or encroach into, any existing wetland or waterbody? ❑
If Yes, identify the wetland or waterbody and extent of alterations in square feet or acres: ISI
Pa' -Te 2 of
14. Identify the typical habitat types that occur on, or are likely to be found on the project site. Check all that apply:
E3 Shoreline ❑ Forest ❑ Agricultural/grasslands ❑ Early mid -successional
❑ Wetland ❑ Urban ❑ Suburban
15. Does the site of the proposed action contain any species of animal, or associated habitats, listed by the State or
Federal government as threatened or endangered?
16. Is the project site located in the 100 -year flood plan?
17. Will the proposed action create storm water discharge, either from point or non -point sources?
If Yes,
a. Will storm water discharges flow to adjacent properties?
b. Will storm water discharges be directed to established conveyance systems (runoff and storm drains)?
If Yes, briefly describe:
18. Does the proposed action include construction or other activities that would result in the impoundment of water
or other liquids (e.g., retention pond, waste lagoon, dam)?
If Yes, explain the purpose and size of the impoundment:
19. Has the site of the proposed action or an adjoining property been the location of an active or closed solid waste
management facility?
If Yes, describe:
20.Has the site of the proposed action or an adjoining property been the subject of remediation (ongoing or
completed) for hazardous waste?
If Yes, describe:
NO YES
�0 ❑�
NO YES
���
NO1,� YES
��I❑I
Iy ❑
NO ' YES
LGJ ❑
NO YES
0 1-1
NO YES
I CERTIFY THAT THE INFORMATION PROVIDED ABOVE IS TRUE AND ACCURATE TO THE BEST OF
MY KNOWLEDGE
Applicant/sponsor/name: N Date:
Signature: 1 C1C'q✓� �J �l/� Title:
PRINT FORM I Page 3 of
EAF Mapper Summary Report
Danby
ScLrces: Esri, HERE, Garmin, USGS,
Intermap• INCREMENT P,' NRCan, Esri
*�'4re fe rti, NIETI, Esri China (Hong Kong), Esri
Kcrea, Esri f Thailand), NGCC, (c)
OpenStreell0ap contributcrs, and the GIS
User Ccmm;nity
Part 1 /Question 7 [Critical Environmental
Area]
Part 1 / Question 12a [National or State
Register of Historic Places or State Eligible
Sites]
Part 1 / Question 12b [Archeological Sites]
Part 1 / Question 13a [Wetlands or Other
Regulated Waterbodies]
Part 1 / Question 15 [Threatened or
Endangered Animal]
Part 1 / Question 16 [100 Year Flood Plain]
Part 1 / Question 20 [Remediation Site]
No
No
No
No
No
Wednesday, January 08, 2020 2:47 PM
Disclaimer: The EAF Mapper is a screening tool intended to assist
project sponsors and reviewing agencies in preparing an environmental
assessment form (EAF). Not all questions asked in the EAF are
answered by the EAF Mapper. Additional information on any EAF
question can be obtained by consulting the EAF Workbooks. Although
the EAF Mapper provides the most up-to-date digital data available to
DEC, you may also need to contact local or other data sources in order
to obtain data not provided by the Mapper. Digital data is not a
substitute for agency determinations.
i3t t,sh'.) M1cnCcal
Tormnto
• 1 � Albazry
[7fr< it Boston
IevAmd _,Prwttlertce
-3tsittabtrgh Scu�s:Fs�ii. HERE. Garmin,
Is Columbus USGIS Unti3#A3i p. INCRELIENT
P, NRCan. EsriJapac., METl,
cfnnati Was ftyrt&a ;Hong Kong), Esri
Digital mapping data are not available or are incomplete. Refer to EAF
Workbook.
No
Short Environmental Assessment Form - EAF Mapper Summary Report I
AGRICULTURAL DATA STATEMENT
Town of Danby Tax Parcel No.
Tompkins County Agricultural District No. 1 0cD
NOTE: Section 283-a of the Town Law (effective July 1, 1993) requires that any
application for a Special Permit, Site Plan Approval, Use Variance or Subdivision
Approval on property within an Agricultural District containing a farm operation, OR
on property with boundaries within five hundred (500) feet of a farm operation that is
located in an Agricultural District, include an Agricultural Data Statement. ALL
applications requiring an Agricultural Data Statement must be referred to the
Tompkins County Planning Board in accordance with amended section 239-m and
239-n of the General Municipal Law (effective July 1, 1993).
Part L Agricultural Data Statement
Name of Applicant
Mailing Address
Description of Project .5 U (3 D 1 V1 DC- (,S- i+ %—> A -C R E-
S- ( 4 -
Names and addresses of those owners of land within Tompkins County Agricultural
District #1 or #2 that contain farm operations AND are located within five hundred
(500) feet of the project property:
L `SCE
2.
3.
4.
5.
Attach to this form a copy of a tax map showing the site of the proposed project
relative to the locations of farm operations identified above. Farm Operations are
defined as "...the land used in agricultural production, farm buildings, equipment and
farm residential buildings" according to Section 301, Article 25 AA of the
Agricultural and Markets Law.
Rev. June 27, 2019
Address
Tax ID
Owner
390 Jersey Hill Rd
8.4-21.8
Julie Menardi, Myles Menardi
394 Jersey Hill Rd
8.-1-23.222
Raymond A Seely, Mabel Seely
Raymond A Seely, Mabel Seely
400 Jersey Hill Rd
8.-1-23.3
Jersey Hill Rd
8.-1-23.226
Jacob Jordan
450 Jersey Hill Rd
8.-1-25
Lloyd Sheffield
Paul & Harriet Moore Trust
423 Gunderman Rd
8.4-24.2
80 Bruce Hill Rd
8.4-24.1
William Cuyle, Judith Cuyle
84 Bruce Hill Rd
8.-1-24.4
Peter Moore
Farm Operations? (Y/N)*
N
Y
*farm operations are "the land used in agricultural production, farm buildings, equipment and farm
residential buildings"
(1) Tompkins County Natural Resources Inventory Map
833.3 0 416.67 833.3 Feet
WGS_1984_Web_Mercator Auxiliary_Sphem
C Tompkins County GIS 2011
Legend
Address
Open Water
Streams
Int—ni tseeems
PerennialSt.—
❑ Watershed Resources Council
PARCELS
Building
Ag District 2012
Ag Dist 1
■ Ag Dist 2
13 Municipalities
Citations
1: 5,000
This map is a user generated static output from an Internet mapping site and Notes
is for reference only. Data layers that appear on this map may or may not be Th ls map was eutomahcaly generated
accurete, cunenl, or otherwise reliable. using Geocodex Essentials. Your tax dollars
THIS MAP IS NOT TO BE USED FOR NAVIGATION at work)
4w 4w ft- s aw 4m 41111111,
211
-
..
1
hi
4,4. 01111, 1111111, alls 40& jis AM 40P
833.3 0 416.67 833.3 Feet
WGS_1984_Web_Mercator Auxiliary_Sphem
C Tompkins County GIS 2011
Legend
Address
Open Water
Streams
Int—ni tseeems
PerennialSt.—
❑ Watershed Resources Council
PARCELS
Building
Ag District 2012
Ag Dist 1
■ Ag Dist 2
13 Municipalities
Citations
1: 5,000
This map is a user generated static output from an Internet mapping site and Notes
is for reference only. Data layers that appear on this map may or may not be Th ls map was eutomahcaly generated
accurete, cunenl, or otherwise reliable. using Geocodex Essentials. Your tax dollars
THIS MAP IS NOT TO BE USED FOR NAVIGATION at work)