HomeMy WebLinkAboutMN-IURA-2022-02-24Approved: 3/3/22
108 E. Green St. Ithaca, NY 14850
(607) 274-6565 MINUTES
ITHACA URBAN RENEWAL AGENCY
8:30 A.M., Thursday, February 24, 2022
Members: Chris Proulx, Chair; Tracy Farrell; Karl Graham, Vice-Chair; Eric Rosario; Laura Lewis; Rob
Gearhart, Common Council Liaison; Lisa Nicholas, Acting Director of Planning and
Development
Excused: None.
Staff: Nels Bohn; Anisa Mendizabal; Charles Pyott
Guests: Chuck Schwerin, Ithaca Area Economic Development (IAED)
I. Call to Order
Chair Proulx called the meeting to order at 8:31 A.M.
II. Agenda Additions/Deletions
Mendizabal announced the Catholic Charities of Tompkins/Tioga Counties (CCTT) representative just
notified her of a family emergency, so she will either need to present the Security Deposit Assistance
program proposal later than originally scheduled this morning, after the other presentations, or the
presentation may need to be re-scheduled for the second portion of the Public Hearing, on Thursday,
March 3rd, 2022.
Bohn noted, time permitting, the Board will need to hold an Executive Session under “Other Business”
to discuss a certain matter that recently came to his attention.
III. Public Comments
None.
IV. 2022 HUD Entitlement Grant ― Administrative Matters
A. Review of Projected Available Funds & Public Hearing Format Overview
Mendizabal explained the IURA currently anticipates receiving $668,000 in 2022 Community Development
Block Grant (CDBG) Program funding and $343,515.40 in 2022 HOME Investment Partnerships (HOME)
Program funding, based upon prior-year allocations since the FY2022 Federal Budget has still not been
passed by Congress. Today’s Public Hearing is the next step in the City’s HUD Entitlement Program funding
application process, as outlined in the 2022 Action Plan Schedule.
B. Disclosure of Potential Conflicts of Interest
Nicholas disclosed she serves on the Ithaca Neighborhood Housing Services (INHS) Board of Directors
(although she is a non-voting member of the IURA Board).
Lewis disclosed she serves as Chair of the Tompkins Consolidated Area Transit (TCAT) Board of Directors.
IURA Minutes
February 24, 2022
Page 2 of 14
V. 2022 HUD Entitlement Grant Action Plan: PUBLIC HEARING #1
On a motion by Rosario, seconded by Farrell , and unanimously approved, Chair Proulx opened the Public
Hearing.
― HOUSING APPLICATIONS ―
1. APPLICATION #1: 215 CLEVELAND AVE. REHAB ― ITHACA NEIGHBORHOOD HOUSING SERVICES (INHS)
Speaker Affiliation Comments-in-Brief
Leslie
Ackerman
Ithaca
Neighborhood
Housing Services
(INHS)
INHS has long history of rehabilitating distressed homes. 215
Cleveland Avenue was originally under tax foreclosure, so INHS
purchased it from the City to transform into a permanently affordable
home in INHS’ Community Housing Trust (CHT). The building,
however, is very distressed, so it will be a complex and costly
rehabilitation process. The project is still early in the development
process. INHS has conducted a structural inspection and
lead/asbestos surveys. The consensus was that the house would need
to be gutted. Internal demolition and lead/asbestos remediation have
been completed. The next step will be to draft plans for the interior
rebuild. The bathroom, kitchen, and stairs will need significant
redesigns, but the basic layout of the home and footprint will remain
unchanged. It will be a high-performing home in terms of energy-
efficiency (e.g., all-electric; highly insulated; air-source heat pumps;
flood-resistant retrofits to foundation) and safety. INHS is not yet sure
if it will be LEED-certified. The selling price will be in the lower mid-
$100,000s, affordable to a first-time homebuyer earning up to 80%
AMI. INHS hopes to begin work in Fall 2022, with completion targeted
for Summer/Fall 2023.
Graham asked for more detail about the timing of construction. He knows INHS is undertaking several
other significant construction projects at this time (e.g., 110 Auburn St., Founders Way, 511 S. Plain St.), so
he wonders how those projects may impact the 215 Cleveland Avenue rehabilitation project, as well as
ongoing supply chain and labor availability issues. He asked how confident Ackerman is the project would
be completed as scheduled. Ackerman replied the construction would begin sometime in Fall 2022, but
maintaining the proposed schedule would depend on the availability/cost of materials and contractors.
With construction scheduled to begin in Fall 2022 (a less busy construction season), it should be somewhat
easier to secure construction labor for the project, compared to other times of the year.
Rosario asked how INHS would proceed, if it did not receive IURA funding. Ackerman replied INHS would
need to consider purchasing lower-cost (and likely less sustainable) materials, extending the project
timeline, and/or identifying a pool of its own funds that could be used.
IURA Minutes
February 24, 2022
Page 3 of 14
Lewis asked if flood insurance will be an issue for the project, given the recently updated Federal
Emergency Management Agency (FEMA) flood maps. Ackerman replied, it probably will be an issue,
although INHS does not yet have any definitive information about the situation, since the flood maps are
still provisional. She does know that Tompkins Financial is expecting flood insurance to be required in the
new flood zones. INHS will also investigate the possibility of installing flood vents for this project to protect
the foundation, similar to what it did for 511 S. Plain Street.
2. APPLICATION #2: HOMEOWNER REHAB ― ITHACA NEIGHBORHOOD HOUSING SERVICES (INHS)
Speaker Affiliation Comments-in-Brief
Delia Yarrow Ithaca
Neighborhood
Housing Services
(INHS)
The INHS Homeowner Rehab funding request to the IURA is a little
larger this time, than in recent years, both to keep pace with the ever
increasing need for these kinds of services in the community and to
try to reach a greater number of households in need. INHS is in the
final stages of hearing about funding from the NYS Affordable Housing
Corporation (AHC). INHS hopes pairing IURA funding with AHC
funding would allow it to address issues beyond the scope of what it
has historically been able to do. If the full funding request were not
awarded to it, INHS could certainly scale the project back.
Farrell asked if INHS has a current list of people who would need homeowner rehab loans and if most of the
loans have been forgiven in the past. Yarrow replied, yes, in the vast majority of cases, the loans have been
forgiven. INHS has a waitlist of about 23 people waiting for repairs.
Graham asked about the status of the PY2021-22 Homeowner Rehab project and if it is on schedule.
Yarrow replied INHS just executed the PY2021-22 contract, but had already identified the homeowners in
advance. It is currently waiting for environmental reviews to be completed, before beginning any work.
Bohn observed that homeowner rehabilitation is both a CDBG- and HOME-eligible activity. He asked if
Yarrow could explain how the project would be impacted if it were solely to receive CDBG funding or HOME
funding. Yarrow responded INHS definitely prefers to receive CDBG funding, since CDBG regulations do not
prohibit the post-rehabilitation property value from exceeding 95% of the area median purchase price.
Bohn asked how many of the 8 proposed units INHS could rehabilitate using only HOME funds. Yarrow
replied, INHS could rehabilitate all 8 units, but it would have to forgo performing certain repairs.
IURA Minutes
February 24, 2022
Page 4 of 14
3. APPLICATION #3: MINOR REPAIR PROGRAM ― ITHACA NEIGHBORHOOD HOUSING SERVICES (INHS)
Speaker Affiliation Comments-in-Brief
Delia Yarrow Ithaca
Neighborhood
Housing Services
(INHS)
There is a constant need for the services the program provides. LMI
homeowners need assistance to maintain and stay in their homes, so
they can age in place. The program provides labor at no cost to the
homeowner, with occasional INHS funding for materials. Most clients
fall between 40%-60% AMI. A comprehensive safety check (e.g.,
expired smoke detectors) is the first step in the process, followed by a
survey to determine if additional maintenance is needed. INHS
conducts door-to-door outreach to identify people who do not know
about the program. Many materials used by the program are funded
by the County’s Office for the Aging (e.g., grab bars, plumbing
supplies). The program has recently seen more requests for
accessibility-related improvements (e.g., walk-in showers).
Lewis observed it appears 41 households were served in 2021 and the current request would serve 40
households. She asked if INHS receives funding from other sources for staffing costs. Yarrow replied INHS
does receive some funding from the Office for the Aging and it has also historically provided some funding of
its own.
Graham asked what the impact to the project would be if it did not receive the full funding amount
requested from the IURA. Yarrow replied INHS would need to reconsider its long-term staffing structure for
the program. INHS does not currently have the resources to fund 2 full-time Minor Repair Specialists, so it
would likely need to cut the services it provides.
Bohn observed the current funding request is more than $5,000 over the 2021 request. He asked if Yarrow
could provide more details about the need for the funding increase. Yarrow replied INHS has been grappling
with certain financial challenges associated with the COVID-19 pandemic (e.g., increased cost of materials,
losses in its rental property portfolio, increased time required to fulfill some of its grant obligations), so it is
not currently in a position to subsidize the program, as it has done in past years.
4. APPLICATION #4: ENERGY EFFICIENT LIGHTING ― BLOCPOWER, LLC
Speaker Affiliation Comments-in-Brief
Claire Dowd BlocPower, LLC BlocPower is a Black-owned Brooklyn-based climate technology
company, which has completed energy projects in 1,200 buildings
since 2014. BlocPower customers typically save 20-40% on their
energy bills each year, most often in LMI communities. The City
recently selected BlocPower as the manager of its Energy Efficiency
Retrofitting and Thermal Load Electrification Program (EERTLEP).
IURA Minutes
February 24, 2022
Page 5 of 14
Speaker Affiliation Comments-in-Brief
Claire Dowd BlocPower, LLC The proposed project would meet the IURA 2019-23 Consolidated
Plan’s “Homeowner Rehab/Repairs” (#3) and “Rental Rehab/Energy
Efficiency” (#8) Priority Needs. The project would benefit LMI
homeowners and renters in Ithaca, by replacing conventional lighting
fixtures with LED fixtures at no cost to the homeowners and tenants,
thereby increasing energy-efficiency and lowering energy costs. The
project will also serve as a potential employment opportunity to
workers entering the green workforce, in the form of on-the-job
training, which would also help keep project installation costs low.
Gavin Gratson BlocPower, LLC When BlocPower operated a New York City program, called
Community Retrofit, it completed over 800 LED lighting energy-
efficiency projects over three years. Many building owners benefiting
from the program returned to implement other energy-efficiency
projects, when they saw the value of the original lighting upgrade; so
the program was able to leverage its initial investment to persuade
building owners to undertake more capital-intensive energy-efficiency
projects, using their own money. The $101,366 funding request
would bring a number of benefits to the 50 proposed LMI households,
by reducing their electric bills and providing opportunities for paid on-
the-job training and workforce development.
Farrell observed the proposed budget includes $55,264.00 for acquisition of buildings. She asked for more
detail about how that would be spent. Gratson replied it would be used to conduct outreach to building
owners and engage in educational efforts, in order to identify buildings needing upgrades. Farrell
wondered if “acquisition of buildings” might not be the wrong term for the use of those funds. Gratson
agreed that was probably misphrased in the application.
Proulx noted it would probably be helpful to obtain further clarification of the precise uses of the
$55,264.00 in funds.
Lewis asked for clarification of the “Project Operations Associate” ($9,215.00) funding and proposed
$36,888.00 in construction funding. In other words, she would like to know exactly what the role of the
“Project Operations Associate” would be and receive more detailed information about how the $36,888.00
in construction funding would be used. Gratson responded the construction amount is for equipment and
labor, as well as permitting costs and any other costs associated with installing new lighting fixtures. The
“Project Operations Associate” position would assist with administrative tasks, coordinate construction,
and communicate with residents and tenants.
Graham asked for further explanation of collaboration with other organizations. Gratson replied BlocPower
is putting together a community advisory board of 10-20 local organizations, to assist in community
outreach and messaging.
IURA Minutes
February 24, 2022
Page 6 of 14
5. APPLICATION #5: AURORA ST. & MORRIS AVE. REVITALIZATION ― HABITAT FOR HUMANITY
Speaker Affiliation Comments-in-Brief
Shannon
MacCarrick
Habitat for
Humanity
Habitat for Humanity of Tompkins and Cortland Counties has not
applied for IURA funding since 2016, when it was granted $75,000 for
the “Morris Avenue Homes” first-time homebuyers project at 208-210
Third Street. The Aurora Street and Morris Avenue Revitalization
project would rehabilitate two single-family homes, creating 2 units of
owner-occupied affordable housing for LMI first-time homebuyers.
Both homes would be placed in Habitat’s Community Land Trust (CLT).
The $70,000 in funding would be divided between the Aurora Street
and Morris Avenue homes, with the bulk of it going to the Aurora
Street home. Habitat is committed to moving forward with the
project, even if it were not awarded the full $70,000.
Graham asked how the homeowners build equity in the land trust. MacCarrick replied it is exactly the same
model as INHS (i.e., 2% equity per year), except the annual land lease fee is slightly less.
Farrell asked if 60% AMI is Habitat’s maximum threshold for its homebuyers. MacCarrick replied, yes. The
applicants for this project range from 40%-55% AMI.
Graham recalled when Habitat first approached the IURA for funding in 2016 there was some concern with
Habitat’s ability to afford lots in the City. MacCarrick replied, yes, that has been a challenge in the past. In
this case, however, Habitat was fortunately able to acquire both lots as part of the tax foreclosure process.
It would not have been able to afford them otherwise. Graham asked which of the 2 proposed homes
Habitat would consider the most critical to rehabilitate. MacCarrick responded, 417 Aurora Street, since it
needs far more work than the other.
6. APPLICATION #6: SEARS ST. DEVELOPMENT ― ITHACA NEIGHBORHOOD HOUSING SERVICES (INHS)
Speaker Affiliation Comments-in-Brief
Leslie
Ackerman
Ithaca
Neighborhood
Housing Services
(INHS)
The $200,000 in funding would go towards construction of four new
permanently affordable for-sale Community Housing Trust homes for
1st-time homebuyers earning up to 80% of AMI. The project is still
very early in the planning and design stages, with 2 potential site
layout plans being considered, using either modular or stick-built
construction. INHS anticipates breaking ground in second half of
2023, with completion in mid-to-late 2023.
IURA Minutes
February 24, 2022
Page 7 of 14
Proulx asked if it is possible the funding INHS would need from the IURA would slip into the next funding
cycle. Ackerman replied that is certainly possible, although it is a very expensive project, partly because of
the cost of acquisition. INHS is currently seeking other funding sources, which if it is successful in obtaining,
would enable the project to remain on schedule.
Graham asked if he understood Ackerman to say the project design is limited due to the zoning regulations
for the site. Ackerman responded it is limited only in the sense that the regulations constrain the size of the
lots and set-backs. INHS could conceivably build more than 4 units, but they would have to be designed in a
tighter, townhouse-like configuration, not in character with the rest of the neighborhood.
Bohn asked if a partial funding approach by the IURA would provide any value to the project. Ackerman
replied she is not sure how that would work within the HUD Entitlement Program structure. That approach
could conceivably work. It would certainly far preferable to being awarded less than the full $200,000
request.
8. APPLICATION #8: GENO LEGACY PROJECT ― UNBROKEN PROMISE INITIATIVE (UPI)
Speaker Affiliation Comments-in-Brief
Jordan Clemons Unbroken
Promise Initiative
UPI seeks to promote economic independence, housing security,
neighborhood safety, and socio-economic development of Ithaca’s
most disenfranchised adults and families. The project would enable
UPI to assist at least 3 LMI first-time homebuyers with down-payment
assistance of up to $25,000. For homes needing rehabilitation, UPI
would also provide up to $15,000 for repairs and improvements.
Yasmin Rashid Unbroken
Promise Initiative
Lewis asked about UPI’s efforts to partner with other organizations, like INHS. Clemons responded UPI has
contacted Alternatives Federal Credit Union (AFCU), one of the few local Community Development
Financial Institutions (CDFI), besides INHS. Joe Bowes, formerly from INHS, is also on the development
team, as well as Vecino Group New York, LLC.
Lewis asked if those organizations would also provide financial support. Clemons replied, no. Project
financing would be through the conventional lending process, with UPI providing downpayment assistance
and funds for minor repairs.
Proulx asked if, when the first-time homebuyers approach conventional lenders, they would essentially be
‘pre-approved’ for downpayment assistance from UPI. Clemons replied, yes.
Graham asked if UPI has secured the funds listed on its 2022 budget. Clemons replied, yes. It has secured
$50,000, raised $30,000 from the community, and secured some funding from the Park Foundation and
Community Foundation, bringing the total to approximately $100,000.
IURA Minutes
February 24, 2022
Page 8 of 14
Graham noted Clemons mentioned working with INHS and AFCU, but since those organizations already
operate similar programs, he wondered why UPI felt it needed to launch an entirely new program of its
own. Clemons replied UPI actually recommended both INHS and AFCU to some 1st-time homebuyers, but
after initial consultations, those homeowners indicated they were not interested in either organization. As
a result, UPI launched a series of discussions which gave birth to its new program, in order to give people
more options in the community.
Farrell noted UPI appears to be limiting the program to the Southside neighborhood. She asked if UPI
would also be limiting it to Southside residents, or if it would be open to city-wide residents. Clemons
responded it would not be limited to residents of any single section of the City, but it just so happened the
housing UPI was focusing on was in Southside.
― PUBLIC FACILITIES APPLICATIONS ―
10. APPLICATION #12: CATHOLIC CHARITIES BUILDING ― ITHACA NEIGHBORHOOD HOUSING SERVICES, INC. (INHS)
Speaker Affiliation Comments-in-Brief
Chau Pham Ithaca
Neighborhood
Housing Services
(INHS)
The goal of the project is to address critical inherited deferred building
maintenance issues at 324 W. Buffalo Street to allow Catholic
Charities (CCTT) to continue operating on the site. Deferred building
maintenance issues include: roof, gutter, and downspout
replacements; vermiculite abatement; installation of new blown-in
cellulose attic insulation; and repair of existing stained glass windows.
The repairs would stabilize the building, while INHS seeks funds for a
more comprehensive refurbishment. 72% of the building area is used
to serve CCTT clients.
Lewis asked which portions of the project scope INHS would prioritize, if it did not receive all the requested
funding. Pham replied INHS would focus on replacing the roof, since it has already been patched twice and
will not last another year. The second priority would be the gutters and downspouts.
Proulx asked if any of the deferred maintenance issues had been identified at the time of purchase. Pham
replied, yes. It was originally INHS’ intent to include all that work as part of the larger Founders Way
project; however, NYS Homes and Community Renewal informed INHS that any deferred building
maintenance funding would need to be part of a competitive application process, so the deferred
maintenance issues were not included in the Founders Way project. INHS has since applied to NYS HCR and
is exploring other funding sources.
IURA Minutes
February 24, 2022
Page 9 of 14
11. APPLICATION #13: BUS STOPS & SHELTERS ― TOMPKINS CONSOLIDATED AREA TRANSIT, INC. (TCAT)
Speaker Affiliation Comments-in-Brief
Matt Yarrow Tompkins
Consolidated
Area Transit, Inc.
(TCAT)
TCAT has been frequent IURA funding recipient. This funding
application is for installation of 9 bus stops, including two shelters, in
the West End (Rte. 30) corridor, along Taber Street, Cherry Street, and
Cecil A. Malone Drive. With the increase in retail and residential
spaces in this section of the city, TCAT anticipates a growth in
ridership. The project would improve the safety and quality of life for
LMI persons and people with disabilities, making the bus system more
accessible, with more frequent service, and enabling LMI residents to
use additional bus stops/shelters throughout the full extent of TCAT’s
transit system.
Farrell asked if TCAT is reaching out to real estate developers, as they come up with plans to develop new
properties, to encourage them to incorporate bus stops/shelters at those locations. She also asked if there
are specific locations for the bus stops/shelters. Yarrow replied TCAT does try to reach out to developers,
before they begin building a project (e.g., they had very initial conversation with Visum Development
Group, LLC). If that effort were successful, TCAT would have a conversation with the IURA about
potentially not using the entire funding award as originally proposed, but reallocate some of it to
somewhere else on the corridor. Yarrow referred to the map in the application that clearly identifies the
stop locations.
Farrell asked if TCAT also approaches the Planning and Development Board when projects are being
approved. She knows the Board requires certain developers to install bicycle parking or Carshare
opportunities, for example. It seems that bus connections are also a very important part of the planning
process. Yarrow responded TCAT does review the monthly Planning and Development Department’s
“Projects Memorandum” to identify some of the larger proposed developments.
Graham observed, as Yarrow mentioned, there will be a considerable amount of development in the West
End corridor, possibly resulting in sidewalks being installed and even potential roadwork. He asked how
that may impact TCAT’s work on bus stops and shelters. Yarrow replied TCAT maintains consistent
communication with the City; and it would actively aim not to build stops/shelters that do not align with
planned sidewalks.
Nicholas remarked the City has an opportunity in the West End corridor to establish sidewalk alignment
and amenities (e.g., bike lanes) on Cecil A. Malone Drive. The City is currently in the process of doing that.
IURA Minutes
February 24, 2022
Page 10 of 14
12. APPLICATION #14: WEST END PEDESTRIAN IMPROVEMENTS― CITY OF ITHACA
Speaker Affiliation Comments-in-Brief
John Licitra City of Ithaca The project will construct ADA curb ramps, sidewalks, and cross-walks
at 2 locations, benefiting pedestrians, especially LMI populations who
are less likely to have access to a vehicle, and persons needing ADA-
accessible walkways. Phase 1 will comprise Elm St./ Chestnut St.
intersection improvements (e.g., 6 curb ramps, 3 cross-walks, 2 curb-
bump-outs, ADA compliant concrete sidewalk). Phase 2 will comprise
improvements to the 200-block of Cecil A. Malone Dr. (e.g., 2 curb
ramps, 600 linear feet of ADA-compliant sidewalk). The entire project
would serve to significantly increase pedestrian mobility and safety.
Farrell noted the City has a sidewalk budget that is implemented every year. She asked how much of the
project’s proposed work would get implemented this year with the current funding available and how many
years would it take to complete if depended entirely on the City’s sidewalk funding. Licitra replied the
Sidewalk Improvement District (SID) is spending $50,000 on the Elm St. and Chestnut St. area, which would
pay for 3 ADA crossings, but the remainder of the proposed work is not included in that budget. Using only
SID funding, it would probably take 3+ years to complete the work.
Farrell asked if there would be any benefit in the City’s doing one part of the proposed project entirely with
the funds it has available. Licitra responded that would be very difficult, since the District 5 budget is only
approximately $70,000/year.
Graham asked if Licitra could discuss the timing of the project with the proposed development on Cecil A.
Malone Drive and if that developer contributes any funds towards sidewalks. Licitra replied the City will be
asking the developer to build the entire sidewalks along its property; however, the south side of Cecil A.
Malone Drive is an existing building, so it is not in an area with propose new construction.
13. APPLICATION #15: SPLASH PAD & BATHROOM BUILDING ― FRIENDS OF STEWART PARK (FSP)
Speaker Affiliation Comments-in-Brief
Rick Manning Friends of
Stewart Park
The project would expand accessible recreational and public
bathroom facilities in the City, enabling disabled adults and/or
children to play alongside one another without barriers. It has been
specifically designed to serve disabled adults, children and caregivers,
consistent with the project’s vision of serving as a playground for all.
It would also serve thousands of other LMI park visitors. FSP will be
working with Taitem Engineering, PC, Sciarabba Engineering, PLLC,
and STREAM Collaborative on the building design. Parkitects, Inc. will
be working on the splash pad.
IURA Minutes
February 24, 2022
Page 11 of 14
Speaker Affiliation Comments-in-Brief
Rich
Cunningham
Thoma
Development
Friends of Stewart Park (FSP) estimates the project would serve
approximately 25,000 people, based on current usage. Past surveys
have shown that approx. 30% of users are from the City, approx. 30%
from the County, and approx. 30% from outside the County. Based on
those figures, the project’s funding request to the IURA represents
30% of the $300,000 match required by the NYS Environmental
Protection Fund (EPF).
Graham asked if the County had been approached for funding. Manning replied, yes. The County provided
$50,000 three years ago. Since the County’s principal interest was in winterized bathrooms, FSP applied
that funding to the DPW/Wharton building’s bathroom.
Special Note: Application #7, “Security Deposit Assistance for Vulnerable Households,” by Catholic Charities
of Tompkins/Tioga Counties, will be presented on March 3, 2022.
On a motion by Farrell, seconded by Lewis, and unanimously approved, Chair Proulx suspended the Public
Hearing.
VI. Neighborhood Investment Committee (NIC)
A. Committee Chairperson Report
None.
VII. Economic Development Committee (EDC)
A. Shared Commercial Kitchen Feasibility Study
Proulx explained the Committee discussed the $5,000 funding request to conduct a feasibility study for a
shared commercial kitchen project in Ithaca’s West End. The Committee unanimously voted to
recommend approving the funding request, which is a modest investment on the IURA’s part.
Bohn noted the resolution incorrectly lists a $70,000 balance in the Section 17 account, instead of the
actual $63,000 amount.
Schwerin explained the proposed site contains approximately $500,000 of equipment ideal for a
commercial kitchen, for which he believes there would be significant demand. The challenge will be to
demonstrate that it can be genuinely sustainable; and it was agreed that prospective operator, Rod
Rotondi, would be ideally suited to conduct the feasibility study. Rotondi would also be interested in
operating the kitchen and provide $16,000 in ‘sweat equity’, for a total cost of $21,000. Schwerin has also
been in discussions with the Friends of Ithaca Farmers Market (IFM). The key to the success of the project
will be to examine best practices around the country. IAED will monitor the feasibility study.
IURA Minutes
February 24, 2022
Page 12 of 14
Proulx moved, seconded by Graham:
Shared Commercial Kitchen Feasibility Study
WHEREAS, the IURA received a $5,000 funding request to conduct a feasibility study for a shared
commercial kitchen project in Ithaca’s West End, to be matched by a $16,000 pro-bono consultant
contribution, and
WHEREAS, in March 2021, the IURA provided match funding for ReCast City services to assist the City of
Ithaca develop a small-scale manufacturing strategy and action plan for the greater downtown area,
and
WHEREAS, a collaborative effort including the City Economic Development Office, Ithaca Area Economic
Development (IAED), the Downtown Ithaca Alliance (DIA), and Rev:Ithaca Startup Works led research
and development of the strategy, and
WHEREAS, the strategy and action plan are now in draft form with the final Growing Small Scale
Manufacturing in Downtown Ithaca: An Action Plan document scheduled for release in March 2022, and
WHEREAS, the draft strategy and action plan find there is a strong need for shared kitchen facilities to
support food-product businesses start and grow, and recommends pursuing feasibility of such a facility,
and
WHEREAS, the available lease of an appropriate commercial kitchen facility presents a time-sensitive
opportunity for evaluating feasibility of the project, and
WHEREAS, identification of both a potential non-profit sponsor and a qualified local consultant, who
agrees to conduct much of the feasibility analysis on a pro-bono basis, overcomes two major obstacles
for the project, and
WHEREAS, a feasibility study is not an eligible CDBG economic development project as the study does
not directly create jobs for low- and moderate-income (LMI) persons, or directly assist microenterprises
owned by LMI persons, though establishment of a shared commercial kitchen it is anticipated to lead to
job creation for LMI persons, and
WHEREAS, development of a feasibility study for a shared commercial kitchen facility is an eligible use
of program income from the closed-out Section 17 small landlord rental assistance program, which
allows the funds to be used for activities authorized at 24 CFR 570, including planning activities at 24
CFR 570.205, and
WHEREAS, as of February 2022, the balance in the Section 17 account was approximately $63,000, and
WHEREAS, at its February 8, 2022 meeting, the IURA Economic Development Committee reviewed this
matter and recommended the IURA approve the funding request as a means to expand economic
opportunities for City residents and diversify the economy; now, therefore, be it
IURA Minutes
February 24, 2022
Page 13 of 14
RESOLVED, that the IURA hereby allocates up to $5,000 for a feasibility study for a shared commercial
kitchen project located in the West End neighborhood, and be it further
RESOLVED, the IURA Chairperson is hereby authorized, upon review by IURA legal counsel, to execute
an agreement with Ithaca Area Economic Development (IAED) to secure professional consulting services
to prepare a feasibility study for a shared commercial kitchen facility, and be it further
RESOLVED, the source of such funds shall be derived from the Section 17 account, and
RESOLVED, that the IURA shall be provided with a copy of the feasibility study.
Carried Unanimously: 5-0
B. Committee Chairperson Report
None.
VIII. Review of Meeting Minutes: January 27, 2022
Farrell moved, seconded by Rosario, to approve the meeting minutes, with no modifications.
Carried Unanimously: 5-0
IX. Other Business
A. IURA Chairperson Report
Proulx reported he is exploring ways to improve the process for seeking and appointing new Board and
Committee members, including an interview process and improvements to the application, since the City’s
online application form is not ideally suited to the IURA’s own needs and mission.
B. Common Council Liaison Report
None.
C. Staff Report
Bohn reported the Federal budget should be adopted in March 2022, but the IURA should nonetheless
consider possible contingent 2022 Action Plan funding decisions, since President Biden’s proposed budget
increases HOME and CDBG funding, while the Senate’s reduces it.
D. Executive Session (to discuss the financial, employment, or credit history of a particular corporation)
― EXECUTIVE SESSION ―
Proulx moved, seconded by Farrell, to open the Executive Session at 11:06 a.m.
Carried Unanimously 5-0
IURA Minutes
February 24, 2022
Page 14 of 14
Farrell moved, seconded by Lewis, to close the Executive Session at 11:29 a.m.
Carried Unanimously 5-0
No action was taken during the Executive Session.
X. Adjournment
The meeting was adjourned at 11:30 A.M.
— END —
Minutes prepared by C. Pyott, edited by N. Bohn.