Loading...
HomeMy WebLinkAboutAddendum-1 CORNELL UNIVERSITY CENTRAL ENERGY PLANT (CEP) FACILITIES CONTRACTS PHYSICAL SECURITY IMPROVEMENTS 121 HUMPHREYS SERVICE BUILDING ITHACA, NEW YORK 14853-3701 ADDENDUM NO. 1 October 30, 2018 This Addendum contains changes to the requirements of the Contract Documents and Specifications. Such changes are to be incorporated into the Construction Documents and shall apply to the work with the same meaning and force as if they had been included in the original document. Wherever this Addendum modifies a portion of a paragraph of the specifications or a portion of any Drawing, the remainder of the Paragraph or Drawing shall remain in force. NOTE: Provisions of all Contract Documents apply. DRAWINGS Item 1. Drawing C-101, General Notes DELETE Note 1.0 in its entirety. REPLACE with 1.0. Swing gates shall be equipped with locking mechanism. All locks and chain for swing gates provided by Cornell. Item 2. Drawing C-102, Detail 1 – Outer Areas Protection Plan REVISE callout note, “4’ Wide Swing Gate with Lock” REPLACE with “4’ Wide Swing Gate” Item 3. Drawing C-102, Detail 3 – Lower Gate Detail REVISE callout note “12’ Double Swing Gate with Lock” REPLACE with “20’ Double Swing Gate” Attachments: Pre-bid Meeting Agenda Pre-bid Sign-in Sheet ****END OF ADDENDUM**** Cornell University is an equal opportunity affirmative action educator and employer. Facilities & Campus Services Alex Chevallard, PMP,CCM, LEED Green Associate Project Manager 102 Humphreys Service Bldg Ithaca, New York 14853-3701 c. 607.793.7322 f. 607.255.1968 e. SC285@cornell.edu Central Energy Plant: Physical Security Improvements Project Pre Bid Meeting Agenda October 24, 2018 1. Introductions – Project Team a. Project Architect Jim Tofte, 607-222-4787, jt743@cornell.edu b. Project Manager Alex Chevallard, 793-7322, sc285@cornell.edu c. Construction Manager Alex Chevallard, 793-7322, sc285@cornell.edu d. Facilities Director Josh LaPenna, 607-255-9968, jjl334@cornell.edu e. Facilities Contracts Brenda Frank, Breanna Brann, Wendy Hackett 2. Contract Details – Facilities Contracts a. Bid Form & Instruction to Bidders b. All RFI’s submitted 10/29/18 before Noon c. Final Addendum Issued 10/31/18 d. Bid Opening 11/7/18 @ 2:00 pm; Room B26A Humphreys Svc Bldg. 3. Project Overview a. Project Description – Scope of Work i. Install security fence around central energy plant assets a. No alternates / Brief description of scope b. Building Permit i. The successful bidder will be required to obtain all necessary building permits. 4. Communication / Correspondence a. All RFI’s will be submitted electronically to the attention of Alex & Jim at the email addresses referenced above. b. All RFI’s must be submitted before noon on Monday, 10/29/18; a final addendum will be issued on 10/31/18 to all bidders of record 5. Access to Site / General Conditions a. The Central Energy Plant will be occupied throughout the construction period; access for interior work to be coordinated through Cornell Construction Manager. b. Field Office –If required, Cornell CM will find an office space for the contractor c. Contractor parking – Offsite parking will be at Palm Road and at the contractor’s expense. All on onsite supervisory vehicles will need to obtain necessary permits; contact Bartt Smith for rules & regulations & permits. d. Staging – Staging area is likely to be limited, however space in the lower CEP area can be coordinated. 6. Project Schedule a. Construction approximate Start - December 15th, 2018 b. Completion of Enabling Work is January 20th, 2019 7. Questions? 8. Site Walk-Through