Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
TC2.40TELECOM - LEVEL 4
M L K J I H G F E D C B A N 21 3 4 6 7 8 5 Q P R S T O 10 13 15 16 17 U 18 19 20 21 24 2523 26 9 11 12 14 S1 R1 4A Q1 22 5.1 23.1 26.1 Room 403C Room 400CA Room 403B Room 403D Room 400UA Room 400CC Room 400SB Room 403A Room 403 Room 400SC Room 400EA Room 4P0UA ? ? ? LAB WRITE-UP 401 Room 400UC Room 400SA TC4.00 4 Architect Payette Associates Architects, P.C. 290 Congress Street, Fifth Floor Boston, MA 02210-1005 Tel: 617-895-1000 Fax: 617-895-1002 MEP/FP Engineer Vanderweil 274 Summer Street Boston, MA 02210 Tel: 617-423-7423 Structural Engineer SGH 41 Seyong Street Building 1, Suite 500 Waltham, MA 02453 Tel: 781-907-9000 Fax: 781-907-9009 Drawing Scale Project Number Date Issued Renovation of Olin Hall for Chemical and Biomolecular Engineering - Phase 1 Code Consultant Hastings Consulting Inc 142 Hanlon Road Hollister, MA 01746 Tel: 508-397-8417 Lighting Designer Available Light 10 Derby Square #3 Salem, MA 01970 Tel: 978-744-6800 N Cost Consultant Dharam Consulting 745 Atlantic Ave Fl 8 Boston, MA 02111 Tel: 617-913-4345 Abatement Specialist Delta 860 Hooper Rd Endwell, NY 13760 Tel: 607-231-6600 Civil Engineer T.G. Miller, P.C. 203 N. Aurora Street Ithaca, NY 14850 Tel: 607-272-6477 3/32" = 1'-0" TC2.40 29313.00 11/30/18 TELECOM - LEVEL 4 3/32" = 1'-0"1 TELECOM - LEVEL 4- PARENT NOTES: MAINTAIN EXISTING CABLE TRAY, DO NOT DAMAGE OR REMOVE. # DATE DESCRIPTION 1 11/30/18 ISSUED FOR CONSTRUCTION 2 12/18/18 ADDENDUM 01 2