Loading...
HomeMy WebLinkAboutTC2.30TELECOM - LEVEL 322282 222 22222 222222222 WAPWAP WAP WAP 6 6 4 4 4 4 4 4 4 4 4 4 4 4 222 2 2 2 222 22 22222W TV1 21 3 4 6 7 8 5 Q P R S T O U 9 S1 R1 4A Q1 5.1 RESEARCH LAB 367 LIGHT SCATTERING 367B SUPPORT 1 367D LAB WRITE-UP 362 E-BEAM DEPOSITION ROOM 367F LAB EQUIPMENT 367E SUPPORT 2 367C FLUORESCENCE MICROSCOPE 367A STAIRS 300SA Room 352 Room 354 Room 356 PURE WATER CLOSET 300JA ELECTRICAL 300UA PLUMBING 300UB Room 358 CONFERENCE ROOM 360 OSCOSCOSCOSCOSCOSC C C C C C C C C C C C C C C C C C C C C C C C C C DATA FOR SECURITY SYSTEM IDF 355 TC4.00 6 Architect Payette Associates Architects, P.C. 290 Congress Street, Fifth Floor Boston, MA 02210-1005 Tel: 617-895-1000 Fax: 617-895-1002 MEP/FP Engineer Vanderweil 274 Summer Street Boston, MA 02210 Tel: 617-423-7423 Structural Engineer SGH 41 Seyong Street Building 1, Suite 500 Waltham, MA 02453 Tel: 781-907-9000 Fax: 781-907-9009 Drawing Scale Project Number Date Issued Renovation of Olin Hall for Chemical and Biomolecular Engineering - Phase 1 Code Consultant Hastings Consulting Inc 142 Hanlon Road Hollister, MA 01746 Tel: 508-397-8417 Lighting Designer Available Light 10 Derby Square #3 Salem, MA 01970 Tel: 978-744-6800 N Cost Consultant Dharam Consulting 745 Atlantic Ave Fl 8 Boston, MA 02111 Tel: 617-913-4345 Abatement Specialist Delta 860 Hooper Rd Endwell, NY 13760 Tel: 607-231-6600 Civil Engineer T.G. Miller, P.C. 203 N. Aurora Street Ithaca, NY 14850 Tel: 607-272-6477 1/4" = 1'-0" TC2.30 29313.00 11/30/18 TELECOM - LEVEL 3 1/4" = 1'-0"1 TELECOM - LEVEL 3 - A # DATE DESCRIPTION 1 11/30/18 ISSUED FOR CONSTRUCTION 2 12/18/18 ADDENDUM 01 3 1/7/18 ADDENDUM 02 NOTES: IDENTIFY THE EXISTING CABLE TRAY WITHIN THE PROJECT AREA AND IN AREAS THAT WILL BE IMPACTED BY BUILDING SYSTEMS RELATED TO THE PROJECT. THIS INCLUDES AREAS WHERE MECHANICAL SYSTEM ALTERATIONS WILL IMPACT THE EXISTING CABLE TRAY. IDENTIFY LOCATIONS WHERE THE EXISTING TRAY NEEDS TO BE MOVED, ALTERED, OR REMOVED AND REPLACED, TO ACCOMMODATE NEW OR MODIFIED DUCTWORK, PLUMBING, ELECTRICAL SERVICES, AND OTHER BUILDING SYSTEMS. PROVIDE THE TEMPORARY CABLE SUPPORTS AND/OR NEW CABLE SUPPORTS TO ENSURE THAT THE COMMUNICATIONS CABLING IS PROTECTED AND SUPPORTED THROUGHOUT THE PROJECT. PROVIDE CABLE PROTECTION FOR CABLING WITHIN AFFECTED AREAS. IN CASES WHERE THE EXISTING CABLING DOES NOT HAVE SUFFICIENT SLACK TO ALLOW IT TO BE MOVED OUT OF THE AFFECTED AREA, COORDINATE SCHEDULING OF NEW CABLE INSTALLATION WITH CIT AND PROVIDE NEW CABLING, WITH SUFFICIENT SLACK, FROM THE EXISTING IDF ROOM TO REPLACE EACH OF THE AFFECTED CABLES. TERMINATE, LABEL, AND TEST NEW CABLING. COORDINATE CABLE TRAY MODIFICATIONS WITH CIT, THE CONTRACTOR, AND THE PROJECT SCHEDULE.COMPLY WITH CIT STRUCTURED CABLING SYSTEM STANDARDS AND REFERENCED STANDARDS IN THE DESIGN DOCUMENTS. RESTORE CABLE TRAY, IN COMPLIANCE WITH CIT STANDARDS IN THE AFFECTED AREAS. 3