Loading...
HomeMy WebLinkAboutTC1.02TELECOM - LEVEL 2 DEMO PLAN21 3 4 6 7 8 5 Q P R S T O U 9 S1 R1 4A Q1 5.1 WORK AREA ? ? ? Room 200SD Room 255A Room 270A Room 275A Room 275 Room 265C Room 278A Room 258 Room 275B Room 260 Room 200SA Room 265A Room 252Room 254 Room 256 Room 260A Room 272 Room 276 Room 278 Room 274 Room 270 Room 267 Room 265B Room 265 Room 200JA Room 200UA Room 200UB Architect Payette Associates Architects, P.C. 290 Congress Street, Fifth Floor Boston, MA 02210-1005 Tel: 617-895-1000 Fax: 617-895-1002 MEP/FP Engineer Vanderweil 274 Summer Street Boston, MA 02210 Tel: 617-423-7423 Structural Engineer SGH 41 Seyong Street Building 1, Suite 500 Waltham, MA 02453 Tel: 781-907-9000 Fax: 781-907-9009 Drawing Scale Project Number Date Issued Renovation of Olin Hall for Chemical and Biomolecular Engineering - Phase 1 Code Consultant Hastings Consulting Inc 142 Hanlon Road Hollister, MA 01746 Tel: 508-397-8417 Lighting Designer Available Light 10 Derby Square #3 Salem, MA 01970 Tel: 978-744-6800 N Cost Consultant Dharam Consulting 745 Atlantic Ave Fl 8 Boston, MA 02111 Tel: 617-913-4345 Abatement Specialist Delta 860 Hooper Rd Endwell, NY 13760 Tel: 607-231-6600 Civil Engineer T.G. Miller, P.C. 203 N. Aurora Street Ithaca, NY 14850 Tel: 607-272-6477 1/4" = 1'-0" TC1.02 29313.00 11/30/18 TELECOM - LEVEL 2 - DEMO PLAN 1/4" = 1'-0"1 TELECOM - LEVEL 2 - DEMO # DATE DESCRIPTION 1 11/30/18 ISSUED FOR CONSTRUCTION 2 12/18/18 ADDENDUM 01 DEMOLITION NOTES: CONTACT CORNELL IT, CIT, PRIOR TO DEMOLITION. REQUEST THAT CIT REMOVE ACCESS POINTS AND ACTIVE ELECTRONICS WHERE AND WHEN APPROPRIATE TO ALLOW DEMOLITION. PRIOR TO DEMOLITION, REVIEW DEMOLITION DRAWINGS WITH CIT AND REQUEST CONFIRMATION THAT CABLES TO BE DEMOLISHED HAVE BEEN TAKEN OUT OF SERVICE AND PATCH CORDS REMOVED IN THE IDF ROOM BY CIT. OBTAIN CIT CLEARANCE TO START DEMOLITION. REMOVE CABLES FROM PORJECT AREA INCLUDING REMOVAL FROM PATCH PANELS IN IDF. COORDINATE DEMOLITION ACTIVITIES WITHIN THE IDF ROOMS WITH CIT. CIT TO ESCORT CONTRACTOR IN IDF ROOMS AND TO OVERSEE WORK WITHIN IDF ROOMS. MAINTAIN EXISTING CABLE TRAY, DO NOT DAMAGE OR REMOVE CABLE TRAY. 2