HomeMy WebLinkAboutTC1.01TELECOM - LEVEL 1 DEMO PLAN21 3 4 6 7 8
5
Q
P
R
S
T
O
U
9
S1
R1
4A
Q1
5.1
WORK AREA
Room
100CK
Room
167F
Room
100CG
Room
100CJ
Room
167E
Room
167C
Room
167D
Room
168
Room
170B
Room
169
Room
165B
Room
152Room
156
Room
158
Room
158B
Room
167A
Room
170A
Room
167B
Room
160
Room
100SA
Room
162
Room
158A
Room
167
Room
170
Room
165
Room
100UA
Room
100JA
Room
100UB
Room
100CH
Room
100UF
Room
167G
Architect
Payette Associates Architects, P.C.
290 Congress Street, Fifth Floor
Boston, MA 02210-1005
Tel: 617-895-1000
Fax: 617-895-1002
MEP/FP Engineer
Vanderweil
274 Summer Street
Boston, MA 02210
Tel: 617-423-7423
Structural Engineer
SGH
41 Seyong Street
Building 1, Suite 500
Waltham, MA 02453
Tel: 781-907-9000
Fax: 781-907-9009
Drawing Scale
Project Number
Date Issued
Renovation of Olin Hall for
Chemical and Biomolecular
Engineering - Phase 1
Code Consultant
Hastings Consulting Inc
142 Hanlon Road
Hollister, MA 01746
Tel: 508-397-8417
Lighting Designer
Available Light
10 Derby Square #3
Salem, MA 01970
Tel: 978-744-6800
N
Cost Consultant
Dharam Consulting
745 Atlantic Ave Fl 8
Boston, MA 02111
Tel: 617-913-4345
Abatement Specialist
Delta
860 Hooper Rd
Endwell, NY 13760
Tel: 607-231-6600
Civil Engineer
T.G. Miller, P.C.
203 N. Aurora Street
Ithaca, NY 14850
Tel: 607-272-6477
1/4" = 1'-0"
TC1.01
29313.00
11/30/18
TELECOM - LEVEL 1 -
DEMO PLAN
1/4" = 1'-0"1 TELECOM - LEVEL 1 - DEMO
DEMOLITION NOTES:
CONTACT CORNELL IT, CIT, PRIOR TO DEMOLITION. REQUEST THAT CIT REMOVE ACCESS POINTS AND ACTIVE ELECTRONICS
WHERE AND WHEN APPROPRIATE TO ALLOW DEMOLITION.
PRIOR TO DEMOLITION, REVIEW DEMOLITION DRAWINGS WITH CIT AND REQUEST CONFIRMATION THAT CABLES TO BE
DEMOLISHED HAVE BEEN TAKEN OUT OF SERVICE AND PATCH CORDS REMOVED IN THE IDF ROOM BY CIT. OBTAIN CIT
CLEARANCE TO START DEMOLITION.
COORDINATE DEMOLITION ACTIVITIES WITHIN THE IDF ROOMS WITH CIT. CIT TO ESCORT CONTRACTOR IN IDF ROOMS AND TO
OVERSEE WORK WITHIN IDF ROOMS.
MAINTAIN EXISTING CABLE TRAY, DO NOT DAMAGE OR REMOVE CABLE TRAY.
LEVEL 1:
IDENTIFY AND REMOVE EXISTING DATA CABLING WITHIN THE PROJECT AREA, BACK TO THE SERVING IDF ROOM 165B. REMOVE
FROM PATCH PANELS IN IDF ROOM.
# DATE DESCRIPTION
1 11/30/18 ISSUED FOR CONSTRUCTION
2 12/18/18 ADDENDUM 01
2