Loading...
HomeMy WebLinkAboutTC1.01TELECOM - LEVEL 1 DEMO PLAN21 3 4 6 7 8 5 Q P R S T O U 9 S1 R1 4A Q1 5.1 WORK AREA Room 100CK Room 167F Room 100CG Room 100CJ Room 167E Room 167C Room 167D Room 168 Room 170B Room 169 Room 165B Room 152Room 156 Room 158 Room 158B Room 167A Room 170A Room 167B Room 160 Room 100SA Room 162 Room 158A Room 167 Room 170 Room 165 Room 100UA Room 100JA Room 100UB Room 100CH Room 100UF Room 167G Architect Payette Associates Architects, P.C. 290 Congress Street, Fifth Floor Boston, MA 02210-1005 Tel: 617-895-1000 Fax: 617-895-1002 MEP/FP Engineer Vanderweil 274 Summer Street Boston, MA 02210 Tel: 617-423-7423 Structural Engineer SGH 41 Seyong Street Building 1, Suite 500 Waltham, MA 02453 Tel: 781-907-9000 Fax: 781-907-9009 Drawing Scale Project Number Date Issued Renovation of Olin Hall for Chemical and Biomolecular Engineering - Phase 1 Code Consultant Hastings Consulting Inc 142 Hanlon Road Hollister, MA 01746 Tel: 508-397-8417 Lighting Designer Available Light 10 Derby Square #3 Salem, MA 01970 Tel: 978-744-6800 N Cost Consultant Dharam Consulting 745 Atlantic Ave Fl 8 Boston, MA 02111 Tel: 617-913-4345 Abatement Specialist Delta 860 Hooper Rd Endwell, NY 13760 Tel: 607-231-6600 Civil Engineer T.G. Miller, P.C. 203 N. Aurora Street Ithaca, NY 14850 Tel: 607-272-6477 1/4" = 1'-0" TC1.01 29313.00 11/30/18 TELECOM - LEVEL 1 - DEMO PLAN 1/4" = 1'-0"1 TELECOM - LEVEL 1 - DEMO DEMOLITION NOTES: CONTACT CORNELL IT, CIT, PRIOR TO DEMOLITION. REQUEST THAT CIT REMOVE ACCESS POINTS AND ACTIVE ELECTRONICS WHERE AND WHEN APPROPRIATE TO ALLOW DEMOLITION. PRIOR TO DEMOLITION, REVIEW DEMOLITION DRAWINGS WITH CIT AND REQUEST CONFIRMATION THAT CABLES TO BE DEMOLISHED HAVE BEEN TAKEN OUT OF SERVICE AND PATCH CORDS REMOVED IN THE IDF ROOM BY CIT. OBTAIN CIT CLEARANCE TO START DEMOLITION. COORDINATE DEMOLITION ACTIVITIES WITHIN THE IDF ROOMS WITH CIT. CIT TO ESCORT CONTRACTOR IN IDF ROOMS AND TO OVERSEE WORK WITHIN IDF ROOMS. MAINTAIN EXISTING CABLE TRAY, DO NOT DAMAGE OR REMOVE CABLE TRAY. LEVEL 1: IDENTIFY AND REMOVE EXISTING DATA CABLING WITHIN THE PROJECT AREA, BACK TO THE SERVING IDF ROOM 165B. REMOVE FROM PATCH PANELS IN IDF ROOM. # DATE DESCRIPTION 1 11/30/18 ISSUED FOR CONSTRUCTION 2 12/18/18 ADDENDUM 01 2