Loading...
HomeMy WebLinkAboutTC0.01TELECOM - LEGENDW #F TV TV WAP WAP # # # 1 T-501 2 T-501 20 21 23 24 OSC WALL MOUNTED WIRELESS DATA1/DATA2 LOCATION - PROVIDE A SINGLE GANG, 4-11/16" SQUARE, 2-1/8" DEEP, OUTLET BOX WITH A SINGLE GANG PLASTER RING AND A 1-1/4" CONDUIT WITH CONNECTORS, BUSHINGS AND PULL STRING TO THE NEAREST ACCESSIBLE CEILING SPACE ON THE SAME FLOOR AS THE ROOM BEING SERVED BY THE OUTLET LOCATION. WIRELESS DATA LOCATION IS TO BE MOUNTED 6" FROM FINISHED CEILING TO THE TOP OF THE OUTLET BOX UNLESS OTHERWISE NOTED. STRUCTURED CABLING LEGEND CEILING MOUNTED WIRELESS DATA1/DATA2 LOCATION - PROVIDE A SINGLE GANG, 4-11/16" SQUARE, 2-1/8" DEEP, OUTLET BOX WITH A SINGLE GANG PLASTER RING AND A 1-1/4" CONDUIT WITH CONNECTORS, BUSHINGS AND PULL STRING TO THE NEAREST ACCESSIBLE CEILING SPACE ON THE SAME FLOOR AS THE ROOM BEING SERVED BY THE OUTLET LOCATION. CEILING MOUNTED WIRELESS DATA LOCATIONS ARE TO BE CENTERED IN THE ROOM AND MOUNTED TO THE BUILDING STRUCTURE ABOVE THE CEILING. THE CEILING MOUNTED WIRELESS DATA DEVICE BOX ASSEMBLY IS TO BE (UL) RATED FOR PLENUM. WALL MOUNTED DATA# LOCATION (# DENOTES THE NUMBER OF CABLES AT THE OUTLET LOCATION) - PROVIDE A TWO GANG, 4-11/16" SQUARE, 2-1/8" DEEP, OUTLET BOX WITH A SINGLE GANG PLASTER RING AND A 1-1/4" CONDUIT WITH CONNECTORS, BUSHINGS AND PULL STRING TO THE NEAREST ACCESSIBLE CEILING SPACE ON THE SAME FLOOR AS THE ROOM BEING SERVED BY THE OUTLET LOCATION. DATA# LOCATION IS TO BE MOUNTED 18" FROM THE FINISHED FLOOR TO THE CENTER OF THE OUTLET BOX UNLESS OTHERWISE NOTED. PROVIDE ADDITIONAL 1-1/4" CONDUIT WHERE THERE ARE 6 OR MORE CABLES AT ONE LOCATION. FLOOR MOUNTED DATA# LOCATION (# DENOTES THE NUMBER OF CABLES AT THE OUTLET LOCATION) - PROVIDE A 1-1/4" CONDUIT WITH CONNECTORS, BUSHINGS AND PULL STRING TO THE NEAREST ACCESSIBLE CEILING SPACE ON THE SAME FLOOR AS THE ROOM BEING SERVED BY THE OUTLET LOCATION. CEILING MOUNTED DATA# LOCATION (# DENOTES THE NUMBER OF CABLES AT THE OUTLET LOCATION) - PROVIDE A TWO GANG, 4-11/16" SQUARE, 2-1/8" DEEP, OUTLET BOX WITH A SINGLE GANG PLASTER RING AND A 1-1/4" CONDUIT WITH CONNECTORS, BUSHINGS AND PULL STRING TO THE NEAREST ACCESSIBLE CEILING SPACE ON THE SAME FLOOR AS THE ROOM BEING SERVED BY THE OUTLET LOCATION. WALL MOUNTED TV LOCATION - PROVIDE A TWO GANG, 4-11/16" SQUARE, 2-1/8" DEEP, OUTLET BOX WITH A SINGLE GANG PLASTER RING AND A 1-1/4" CONDUIT WITH CONNECTORS, BUSHINGS AND PULL STRING TO THE NEAREST ACCESSIBLE CEILING SPACE ON THE SAME FLOOR AS THE ROOM BEING SERVED BY THE OUTLET LOCATION. TV VIDEO LOCATION IS TO BE MOUNTED 18" FROM THE FINISHED FLOOR TO THE CENTER OF THE OUTLET BOX UNLESS OTHERWISE NOTED. PROVIDE TWO DATA CABLES. FLOOR MOUNTED TV VIDEO LOCATION - PROVIDE A 1-1/4" CONDUIT WITH CONNECTORS, BUSHINGS AND PULL STRING TO THE NEAREST ACCESSIBLE CEILING SPACE ON THE SAME FLOOR AS THE ROOM BEING SERVED BY THE OUTLET LOCATION. WALL MOUNTED WALL PHONE VOICE LOCATION - PROVIDE A SINGLE GANG, 4-11/16" SQUARE, 2-1/8" DEEP, OUTLET BOX WITH A SINGLE GANG PLASTER RING AND A 1-1/4" CONDUIT WITH CONNECTORS, BUSHINGS AND PULL STRING TO THE NEAREST ACCESSIBLE CEILING SPACE ON THE SAME FLOOR AS THE ROOM BEING SERVED BY THE OUTLET LOCATION. WALL PHONE VOICE LOCATION IS TO BE MOUNTED 48" FROM THE FINISHED FLOOR TO THE CENTER OF THE OUTLET BOX UNLESS OTHERWISE NOTED. FEED LOCATION (# DENOTES THE NUMBER OF CABLES AT THE FEED LOCATION) PROVIDE A 2-GANG MUDRING WITH GROMMET FACEPLATE AT FEED LOCATIONS AS IDENTIFIED ON PLANS. PROVIDE POLYETHYLENE SLEEVE FROM GROMMET TO MODULAR FURNITURE ENTRY POINT. 1. THE WORK REQUIREMENTS DESCRIBED WITHIN DIVISION 20 SPECIFICATION SECTION "COMMON MECHANICAL / ELECTRICAL REQUIREMENTS" FORM COMPLIMENTARY REQUIREMENTS TO THE SCOPE OF WORK CONTAINED WITHIN DIVISION 27 AND 28. 2. CONDITIONS OF THE CONTRACT AND DIVISION 1, GENERAL REQUIREMENTS APPLY TO WORK OF THIS SECTION. EXAMINE DRAWINGS AND OTHER SPECIFICATIONS FOR REQUIREMENTS THAT AFFECT WORK OF THIS SECTION. 3. PROVIDE ITEMS REFERRED TO IN SINGULAR OR PLURAL NUMBERS IN CONTRACT DOCUMENTS IN QUANTITIES NECESSARY TO COMPLETE WORK. 4. PERFORM WORK AS REQUIRED BY CODES, REGULATIONS AND LAWS OF LOCAL, STATE AND FEDERAL GOVERNMENTS AND OTHER AUTHORITIES WITH LAWFUL JURISDICTION. 5. MATERIAL AND EQUIPMENT SHALL BE UL, NEMA, ANSI, IEEE, ADA & CBM APPROVED FOR INTENDED SERVICE. MATERIAL AND INSTALLATION SHALL MEET REQUIREMENTS OF NATIONAL AND STATE ELECTRICAL CODE. 6. MAINTAIN RECORD DRAWINGS ON SITE. RECORD SET MUST BE COMPLETE AND CURRENT AND AVAILABLE FOR INSPECTION WHEN REQUISITIONS FOR PAYMENT ARE SUBMITTED. 7. GUARANTEE WORK IN WRITING FOR ONE YEAR FROM DATE OF FINAL ACCEPTANCE. REPAIR OR REPLACE DEFECTIVE MATERIALS OR INSTALLATION AT NO COST TO OWNER. CORRECT DAMAGE CAUSED IN MAKING NECESSARY REPAIRS AND REPLACEMENTS UNDER GUARANTEE AT NO COST TO OWNER. 8. SUBMIT GUARANTEE TO ARCHITECT BEFORE APPLICATION FOR FINAL PAYMENT. 9. STATEMENT OF GUARANTEE REQUIREMENTS SHALL NOT BE INTERPRETED TO LIMIT OWNER'S RIGHTS UNDER LAW AND THIS CONTRACT. 10. DRAWINGS ARE DIAGRAMMATIC AND INDICATE GENERAL ARRANGEMENT OF SYSTEMS. PROVIDE INFORMATION AND COMPONENTS SHOWN ON RISER DIAGRAMS BUT NOT SHOWN ON PLANS, AND VICE VERSA, AS IF EXPRESSLY REQUIRED ON BOTH. 11. ALL WIRING SHALL BE RUN CONCEALED UNLESS SPECIFIED OTHERWISE. 12. ALL RACEWAYS RUNNING THROUGH BUILDING EXPANSION JOINTS SHALL BE EQUIPPED WITH EXPANSION FITTINGS. 13. CONTRACTOR SHALL REVIEW ALL TRADES' CONTRACT DOCUMENTS TO DETERMINE SPECIFIC MOUNTING HEIGHTS AND LOCATIONS FOR TELECOM EQUIPMENT. COORDINATE EXACT MOUNTING LOCATIONS WITH THE ARCHITECT. 14. ALL GROUNDING SHALL BE PERFORMED IN ACCORDANCE WITH THE NATIONAL AND STATE ELECTRICAL CODES. 15. REFER TO SPECIFICATION FOR CABLE COLORS 16. ELECTRICAL CONTRACTOR SHALL PROVIDE ALL CONDUIT, JUNCTION BOXES, CABLE TRAYS, PANELS, PULL STRINGS, ENCLOSURES, FLOOR BOXES, POWER CIRCUITS, TELCOM GROUNDING SYSTEM, POWER CABLE AND POWER CONNECTIONS UNDER THIS SECTION. 17. CONDUIT SHALL NOT EXCEED 100'-0" OR A TOTAL OF 180 DEGREES IN BENDS BETWEEN PULL BOXES FOR DISTRIBUTION OF TELE/DATA CABLE. 18. VERIFY ALL DEVICE PLATE FINISHES WITH ARCHITECT AND/OR OWNER. 19. LABEL ALL CABLE, CONDUIT AND BACK BOXES FOR EASE OF IDENTIFICATION. 20. ALL CABLE RUNS MUST BE CONTINUOUS FROM SOURCE TO DESTINATION. NO EXCEPTIONS. 21. PROVIDE A SERVICE LOOP OF 15'-0" MINIMUM AT ALL BACKBONE TERMINATION LOCATIONS AND SPLICE POINTS. 22. INTERBUILDING AND INTRABUILDING OPTICAL FIBER CABLING SHALL BE CLEARLY AND VISIBLY IDENTIFIED BY THE CONTRACTOR IN ALL MANHOLES, PULL BOXES, ENTRANCE POINTS, SERVICE ENTRENCES AND 3'-0" BEFORE ENTERING A FREE STANDING RACK, WALL MOUNTED ENCLOSURE OR SURFACE MOUNT FIBER CABINET UTILIZING AN OPTICAL FIBER CABLE MARKER TAG SYSTEM. 23. WHEN ROUTING COMMUNICATIONS CABLES USING OPEN CABLING METHODS, MAINTAIN A MINIMUM SPACING OF 1'-0" FROM ELECTRICAL FEEDERS, BRANCH CIRCUIT WIRING AND AUXILIARY SYSTEM CABLING. 24. WHEN ROUTING COMMUNICATIONS CABLES USING OPEN CABLING METHODS, MINIMUM SPACING FROM ELECTRICAL APPARATUS SUCH AS MOTOR DRIVEN EQUIPMENT AND TRANSFORMERS SHALL BE 4'-0". SPACING REQUIREMENTS SHALL APPLY TO OPEN CABLE PATHS WHERE EQUIPMENT IS LOCATED ON THE SAME FLOOR, FLOOR ABOVE, FLOOR BELOW OR IN ROOMS ADJACENT TO SUCH EQUIPMENT AS THOUGH WALLS AND FLOORS DID NOT EXIST. EXCEPTION: BUILDING CONSTRUCTION THAT RESULTS IN METALLIC BARRIER BETWEEN ELECTRICAL APPARATUS AND CABLE PATHWAYS SHALL BE CONSIDERED SUITABLE SEPARATION.C - MOUNT 6" ABOVE COUNTER TOP BACK SPLASH ETR - EXISTING TO REMAIN N - NEW R - RELOCATE X - REMOVE GENERAL NOTES OUTLET LOCATION DESIGNATORS 1. THIS SHEET IS A GENERAL LIST OF SYMBOLS AND SHALL BE USED AS A REFERENCE TO DEFINE ITEMS INDICATED ON THE DRAWINGS. NOT ALL SYMBOLS ARE NECESSARILY USED ON THIS PROJECT. LEGEND NOTES DETAIL CALL-OUT - PLAN VIEW. DENOTES DETAIL "1" ON DRAWING "T-501". KEY LEGEND VANDERWEIL PROJECT INFO PROJECT NUMBER PROJECT NAME 29313 CORNELL OLIN HALL 125 VOLT, 2 POLE, 3 WIRE, 20 AMP, DUPLEX RECEPTACLE. D - DEDICATED CIRCUIT GF - CONNECTED TO GROUND FAULT CIRCUIT BREAKER GFI - WITH INTEGRAL GROUND FAULT INTERRUPTER IG - ISOLATED GROUND ELECTRICAL LOCATION DESIGNATORS ELECTRICAL LEGEND DETAIL CALL-OUT - ELEVATION VIEW. DENOTES DETAIL "2" ON DRAWING "T-501". DRAWING NUMBERING SYSTEM T-0## - GENERAL (SYMBOLS LEGEND, NOTES, SPECIFICATION, ETC.) T-1## - PLANS (HORIZONTAL VIEWS) T-2## - ELEVATIONS (VERTICAL VIEWS T-3## - SECTIONS (SECTIONAL VIEWS) T-4## - LARGE SCALE DRAWINGS (PLANS, ELEVATIONS OR SECTIONS THAT ARE NOT DETAILS) T-5## - DETAILS T-6## - RISERS, SCHEDULES AND DIAGRAMS 125 VOLT, 2 POLE, 3 WIRE, 20 AMP, DOUBLE DUPLEX RECEPTACLE. GROUND BAR WITH INSULATED #6 CONNECTED TO GROUND IN ELECTRICAL ENTRANCE ROOM L5-20R - 20 AMP, 125 VOLT, 2 POLE, 3 WIRE TWIST LOCK RECEPTACLE L5-30R - 30 AMP, 125 VOLT, 2 POLE, 3 WIRE TWIST LOCK RECEPTACLE L6-20R - 20 AMP, 250 VOLT, 2 POLE, 3 WIRE TWIST LOCK RECEPTACLE L6-30R - 30 AMP, 250 VOLT, 2 POLE, 3 WIRE TWIST LOCK RECEPTACLE 125 VOLT, 2 POLE, 3 WIRE, 20 AMP, DUPLEX RECEPTACLE FLUSH FLOOR MOUNTED 125 VOLT, 2 POLE, 3 WIRE, 20 AMP, DOUBLE DUPLEX RECEPTACLE FLUSH FLOOR MOUNTED 1. THIS EXISTING FLOOR PLAN HAS BEEN DEVELOPED UTILIZING EXISTING DOCUMENTS AND READILY OBSERVABLE SITE CONDITIONS. ALL DEVICES, CONDUITS,TELECOMMUNICATIONS EQUIPMENT, ETC. SHOWN ARE FOR REFERENCE ONLY AND MAY NOT INDICATE CORRECT IDENTIFICATION, AND SIZE; AND TOTAL QUANTITIES OF ITEMS SCHEDULED FOR DEMOLITION. VISIT SITE AND FIELD VERIFY THE NUMBER OF DEVICES WITHIN THE CONSTRUCTION PHASE AREA PRIOR TO THE BID AND REMOVAL. THE DRAWINGS DO NOT LIMIT THE AMOUNT OF DEMOLITION WORK REQUIRED. THE TELECOMMUNICATIONS CONTRACTOR MUST PERFORM THE DEMOLITION WORK AS INDICATED ON THE DEMOLITION DRAWINGS AND AS REQUIRED FOR THE NEW WORK. 2. DEMOLITION WORK MUST FOLLOW THE CONSTRUCTION PHASING SEQUENCE AND MUST BE COORDINATED WITH THE CONSTRUCTION DRAWINGS AND CONTRACTORS. 3. REMOVE ALL DEVICES, EQUIPMENT, MATERIAL, AND ASSOCIATED CABLING IN THEIR ENTIRETY, WHICH INTERFERE WITH THE NEW CONSTRUCTION AS DIRECTED BY THE CONSTRUCTION MANAGER. ALWAYS FIELD VERIFY SYSTEM PRIOR TO STARTING WORK AT SITE. THE TERM ASSOCIATED CABLING SHALL MEAN CONDUIT, FITTINGS, SUPPORTS, JUNCTION BOXES, CABLES, ETC. BACK TO THE RESPECTIVE EQUIPMENT ROOM. 4. MAINTAIN AND RESTORE, IF INTERRUPTED BY REMOVALS OR IN PATH OF NEW CONSTRUCTION, ALL CABLES AND CONDUITS PASSING THROUGH AND SERVING UNDISTURBED AREAS (SHOWN OR NOT SHOWN). VERIFY CABLES, DEVICES, AND EQUIPMENT SCHEDULED FOR REMOVAL TO ASSURE THAT THEIR REMOVAL WILL NOT ADVERSELY AFFECT ADJACENT AREAS NOT BEING RENOVATED. 5. IN ANY AREA REQUIRING THE PERFORMANCE OF ANY TRADE'S WORK, THIS CONTRACTOR SHALL CAREFULLY REMOVE AND STORE ANY OR ALL TELECOMMUNICATIONS ITEMS IN PATH Of WORK, REINSTALLING AND RECONNECTING SAME AS REQUIRED, AFTER COMPLETION OF OTHER TRADE'S WORK IN THAT AREA, IN ACCORDANCE WITH THE PLANS AND/OR AS DIRECTED. 6. IN ALL EXISTING OR NEW AREAS SPECIFIED OR SHOWN TO BE PAINTED, THIS CONTRACTOR SHALL REMOVE BAG AND PROTECT DURING WORK ALL TELECOMMUNICATIONS ITEMS AS REQUIRED INCLUDING BUT NOT LIMITED TO DEVICE PLATES, DEVICES, ETC., REINSTALLING SAME AFTER COMPLETION OF PAINTING. ANY ITEM NOT REMOVED AND PAINTED OVER SHALL BE SUITABLY CLEANED OR REPLACED WITH NEW ITEM BY THIS CONTRACTOR. 7. INVENTORY MAJOR TELECOMMUNICATIONS ITEMS THAT ARE REMOVED AND PROVIDE A LIST TO THE OWNER FOR THEIR SELECTION OF ITEMS TO BE RETAINED. ALL ITEMS REJECTED BY THE OWNER SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND SHALL BE REMOVED FROM THE SITE. 8. DISCONNECT, MAKE SAFE AND REMOVE ALL TEMPORARY AND ABANDONED WIRE WITHIN THE SPACE. SPECIFICALLY BUT NOT LIMITED TO LOW VOLTAGE CABLING SERVING THE MAILBOX DISTRIBUTION SYSTEM. 9. FLAG, LABEL AND CLEARLY IDENTIFY CABLES AND ITEMS TO REMAIN IN PLACE, AND OR SERVICE, THROUGHOUT THE PROJECT OR ANY PORTION OF THE PROJECT. REPAIR AND/OR REPLACE ANY CABLE OR DEVICE DAMAGED DURING THE PROJECT, WITHIN 24 HOURS OF NOTIFICATION OF DAMAGES OR DISRUPTION. GENERAL DEMOLITION NOTES OVERHEAD SERVICE CARRIER. SEE SHEET TC4.01 FOR DETAILS. Architect Payette Associates Architects, P.C. 290 Congress Street, Fifth Floor Boston, MA 02210-1005 Tel: 617-895-1000 Fax: 617-895-1002 MEP/FP Engineer Vanderweil 274 Summer Street Boston, MA 02210 Tel: 617-423-7423 Structural Engineer SGH 41 Seyong Street Building 1, Suite 500 Waltham, MA 02453 Tel: 781-907-9000 Fax: 781-907-9009 Drawing Scale Project Number Date Issued Renovation of Olin Hall for Chemical and Biomolecular Engineering - Phase 1 Code Consultant Hastings Consulting Inc 142 Hanlon Road Hollister, MA 01746 Tel: 508-397-8417 Lighting Designer Available Light 10 Derby Square #3 Salem, MA 01970 Tel: 978-744-6800 N Cost Consultant Dharam Consulting 745 Atlantic Ave Fl 8 Boston, MA 02111 Tel: 617-913-4345 Abatement Specialist Delta 860 Hooper Rd Endwell, NY 13760 Tel: 607-231-6600 Civil Engineer T.G. Miller, P.C. 203 N. Aurora Street Ithaca, NY 14850 Tel: 607-272-6477 1/8" = 1'-0" TC0.01 29313.00 11/30/18 TELECOM - LEGEND # DATE DESCRIPTION 1 11/30/18 ISSUED FOR CONSTRUCTION