Loading...
HomeMy WebLinkAboutP5.04PLUMBING - DETAILSP-TRAPLAB SINKCEILING25MM PWS2" LVW /1/2" INSULATIONLAB SINKPIPING DROP WITHINENCLOSURENOTE:1. COORDINATE PIPING TO FIT WITHIN CHASEPIPING IN CHASEEPOXY COATED UNISTRUTWITH PIPE CLAMPS ONALL SERVICESREMOVABLE ACCESSPANEL W/SHUT-OFFVALVESESCUTCHEONS PLATESAT ALL PENETRATIONSNOTE: PROVIDEMIN. PIPE SPACING 1"IN THE ENCLOSUREPURIFIED WATERSTAINLESS STEEL USE-POINT FAUCETEYEWASH/DRENCHHOSE UNITCOUNTERFRONT VIEWSIDE VIEW25MM PWS1/2" LHW1/2" LCWPROVIDE TMV-2 MIXING VALVE UNDERCOUNTER. 1/2" CW1/2" HWMILLIQCONNECTORUCD-11/2" CW1/2" HW GROUTNEMA CONTROL PANELCOORDINATE PANEL LOCATIONWITH OTHER EQUIPMENTPUMP REMOVAL SYSTEMCONTROL PANEL SUPPORTLAG PUMP ON (LSHH) AND ALARM LIGHTLEAD PUMP ON (LSL)SLOPE BOTTOM TO PUMP INLET.BOTH PUMPS OFF (LSLL)ALSO ALTERNATE LEAD LAG SEQUENCELIQUID LEVEL CONTROLCABLES TO BE IN ONECONDUIT. PUMP POWERCABLES TO BE INSEPARATE CONDUIT.AUDIBLE ALARM (LSH)JUNCTION BOXES W/PLIABLEGAS TIGHT SEALSLIFTING ROPEGAS TIGHT EJECTOR PIT COVER(SEE SPECIFICATIONS)ALUMINUM STEPFLANGE ANCHOR BOLTSWATERTIGHT SLEEVEPUMP DISCHARGELIQUID LEVEL CONTROLSEFFLUENT PIPEINV.: -2'-0" B.F.F.POWER CABLECONCRETE PIT ORPRECAST REINF. CONCMANHOLE SECTIONCONFORMING TO ASTM C478.(SEE STRUCTURAL DRAWINGS)PROVIDEWATERTIGHT SLEEVEPUMPNOTES:1. REFER TO PLANS AND SPECIFICATIONS FOR PIT DIMESIONS.2. REFER TO PLANS AND SPECIFICATIONS FOR PUMP TYPES AND CAPACITIES.3. REFER TO SPECIFICATIONS FOR PIPE MATERIALS.SEWAGE EJECTOR PUMP SYSTEMCOMPONENTS:1. One sump.2. One level control w/ four points level setting , LSHH (90%), LSH(70%), LSL(40%) & LSLL(10%), level setting shall be field adjustable and will be finalized later.3. Two sump pumps w/ local panel.SEQUENCE OF OPERATION:1. On sump pumps local panel faceplate, there are two H/O/A switches, one for each sump pump; operator can manually start sump pumps by setting H/O/A to hand position.2.In normal operation, the H/O/A switches shall be in Auto position, pumps shall be controlled by level.* LSLL shall shut down both sump pumps for both hand & Auto positions and alternate pumps.* LSL shall start lead sump pump.* LSH provides dry contact (SPDT) for remote HIGH level alarm indication.* LSHH shall start lag sump pump.3. The ejector pumps lead lag control shall be automatic so as to equalize the pumps run time.ArchitectPayette Associates Architects, P.C.290 Congress Street, Fifth FloorBoston, MA 02210-1005Tel: 617-895-1000Fax: 617-895-1002MEP/FP EngineerVanderweil274 Summer StreetBoston, MA 02210Tel: 617-423-7423Structural EngineerSGH41 Seyong StreetBuilding 1, Suite 500Waltham, MA 02453Tel: 781-907-9000Fax: 781-907-9009Drawing ScaleProject NumberDate IssuedRenovation of Olin Hall for Chemical and Biomolecular Engineering - Phase 1 Code ConsultantHastings Consulting Inc142 Hanlon RoadHollister, MA 01746Tel: 508-397-8417Lighting DesignerAvailable Light10 Derby Square #3Salem, MA 01970Tel: 978-744-6800NCost ConsultantDharam Consulting745 Atlantic Ave Fl 8Boston, MA 02111Tel: 617-913-4345Abatement SpecialistDelta860 Hooper RdEndwell, NY 13760Tel: 607-231-6600Civil EngineerT.G. Miller, P.C.203 N. Aurora StreetIthaca, NY 14850Tel: 607-272-6477As indicatedP5.0429313.0011/30/18PLUMBING - DETAILSSCALE:NTS2TYPICAL LABORATORY SINK SERVICESSCALE:NTS1LAB BENCH CONNECTION3/4" VAC 1/2" N2 1/2" CADROP FROM PLBG MAIN & CONNECT TO MODULAR ALUMINUM FRAMING SYSTEMMODULAR ALUMINUM FRAMING SYSTEM BY ARCHITECTFLEXIBLE TUBING BY ARCHITECTLAB TURRETS BY ARCHITECTFLEXIBLE HOSESWAGELOK 1/4 TURN BALL VALVE W/ COMPRESSION CONNECTIONSFLEXIBLE HOSESCALE:NTS3DUPLEX SUBMERSIBLE SUMP PUMP# DATE DESCRIPTION1 11/30/18 ISSUED FOR CONSTRUCTIONDocuSign Envelope ID: D6CBE973-BBA9-4BE0-861E-C2F6DD72B53912/10/2018