Loading...
HomeMy WebLinkAboutP2.40PLUMBING - LEVEL 421346785QPRSTOU9S1R14AQ15.1Room400UCRoom400SA3" LV DN & LVTR3" LV DN & LVTR3" V DN & VTR3" VE DN & VETR4" V DN & VTR2ArchitectPayette Associates Architects, P.C.290 Congress Street, Fifth FloorBoston, MA 02210-1005Tel: 617-895-1000Fax: 617-895-1002MEP/FP EngineerVanderweil274 Summer StreetBoston, MA 02210Tel: 617-423-7423Structural EngineerSGH41 Seyong StreetBuilding 1, Suite 500Waltham, MA 02453Tel: 781-907-9000Fax: 781-907-9009Drawing ScaleProject NumberDate IssuedRenovation of Olin Hall for Chemical and Biomolecular Engineering - Phase 1 Code ConsultantHastings Consulting Inc142 Hanlon RoadHollister, MA 01746Tel: 508-397-8417Lighting DesignerAvailable Light10 Derby Square #3Salem, MA 01970Tel: 978-744-6800NCost ConsultantDharam Consulting745 Atlantic Ave Fl 8Boston, MA 02111Tel: 617-913-4345Abatement SpecialistDelta860 Hooper RdEndwell, NY 13760Tel: 607-231-6600Civil EngineerT.G. Miller, P.C.203 N. Aurora StreetIthaca, NY 14850Tel: 607-272-6477 1/4" = 1'-0"P2.4029313.0011/30/18PLUMBING - LEVEL 4NOTES:1. ALL PIPE PENETRATIONS SHALL BE FIREPROOFED IN ACCORDNACE WITH SPECIFICATIONS & LOCAL CODE. 1/4" = 1'-0"1PLUMBING - LEVEL 4 - A# DATE DESCRIPTION1 11/30/18 ISSUED FOR CONSTRUCTION2 12/18/18 ADDENDUM 01DocuSign Envelope ID: 934A8599-03FD-4A73-BE43-DDC4ED06E6FA12/18/2018