HomeMy WebLinkAboutP2.00UPLUMBING UNDERGROUND21346785QPRSTOU9S1R14AQ15.14" SAN UP TO FCO4" W&T UP4" W&T UP(TYP. FOR 4)4" W&T UP2" V UP4" SAN UP TO FCO4" SAN(U)1/8" / 12"4" W&T UP4'X4'X5' DEEP CONCRETE SUMP PIT4" SANINV. ELEV. = -2'-0" B.F.F.2" V UP4" SAN UP TO FCO2" V UP2" V UP2" V UP4" SAN(U)4" SAN(U)4" SAN(U)4" SAN(U)1/8" / 12"1/8" / 12"2" SAN UPArchitectPayette Associates Architects, P.C.290 Congress Street, Fifth FloorBoston, MA 02210-1005Tel: 617-895-1000Fax: 617-895-1002MEP/FP EngineerVanderweil274 Summer StreetBoston, MA 02210Tel: 617-423-7423Structural EngineerSGH41 Seyong StreetBuilding 1, Suite 500Waltham, MA 02453Tel: 781-907-9000Fax: 781-907-9009Drawing ScaleProject NumberDate IssuedRenovation of Olin Hall for Chemical and Biomolecular Engineering - Phase 1 Code ConsultantHastings Consulting Inc142 Hanlon RoadHollister, MA 01746Tel: 508-397-8417Lighting DesignerAvailable Light10 Derby Square #3Salem, MA 01970Tel: 978-744-6800NCost ConsultantDharam Consulting745 Atlantic Ave Fl 8Boston, MA 02111Tel: 617-913-4345Abatement SpecialistDelta860 Hooper RdEndwell, NY 13760Tel: 607-231-6600Civil EngineerT.G. Miller, P.C.203 N. Aurora StreetIthaca, NY 14850Tel: 607-272-6477 1/4" = 1'-0"P2.00U29313.0011/30/18PLUMBING -UNDERGROUND 1/4" = 1'-0"1PLUMBING - UNDERGROUND - Phase 1# DATE DESCRIPTION1 11/30/18 ISSUED FOR CONSTRUCTIONDocuSign Envelope ID: D6CBE973-BBA9-4BE0-861E-C2F6DD72B53912/10/2018