Loading...
HomeMy WebLinkAboutP1.30PLUMBING - LEVEL 3 DEMO21346785QPRSTOU9S1R14AQ15.1PHASE 1 SCOPE BOUNDARYRoom365ARoom365DRoom355Room365ERoom365CRoom361Room365FRoom358Room300CDRoom378Room360Room300SARoom375Room362Room377Room352Room354Room356Room365Room379Room365GRoom300JARoom300UARoom300UBDEMO MSB AND ASSOCIATED PIPING IN JAN. CLOSETArchitectPayette Associates Architects, P.C.290 Congress Street, Fifth FloorBoston, MA 02210-1005Tel: 617-895-1000Fax: 617-895-1002MEP/FP EngineerVanderweil274 Summer StreetBoston, MA 02210Tel: 617-423-7423Structural EngineerSGH41 Seyong StreetBuilding 1, Suite 500Waltham, MA 02453Tel: 781-907-9000Fax: 781-907-9009Drawing ScaleProject NumberDate IssuedRenovation of Olin Hall for Chemical and Biomolecular Engineering - Phase 1 Code ConsultantHastings Consulting Inc142 Hanlon RoadHollister, MA 01746Tel: 508-397-8417Lighting DesignerAvailable Light10 Derby Square #3Salem, MA 01970Tel: 978-744-6800NCost ConsultantDharam Consulting745 Atlantic Ave Fl 8Boston, MA 02111Tel: 617-913-4345Abatement SpecialistDelta860 Hooper RdEndwell, NY 13760Tel: 607-231-6600Civil EngineerT.G. Miller, P.C.203 N. Aurora StreetIthaca, NY 14850Tel: 607-272-6477 1/4" = 1'-0"P1.3029313.0011/30/18PLUMBING - LEVEL 3DEMO 1/4" = 1'-0"1PLUMBING - LEVEL 3 DEMONOTES:1. CONTRACTOR TO DEVELOP PLAN TO KEEP PHASE 2 FIXTURES AND EQUIPMENT IN OPERATION DURING THE DEMO/ CONSTRUCTION OF PHASE 1. 2. ALL EXISTING EQUIPMENT AND PIPING THAT IS LOCATED IN OR SERVING PHASE 2 SHALL BE EXISTING TO REMAIN EXCEPT WHERE NOTED.3. DEMOLISH ALL PIPING AND ASSOCIATED COMPONENTS THAT ARE SERVING PLUMBING FIXTURES OR EQUIPMENT LOCATED WITHIN THE PHASE 1 BOUNDARY. 4.DEMOLISH ALL SANITARY, LAB WASTE, AND VENT PIPING AND ASSOCIATED COMPONENTS THAT ARE SERVING PLUMBING FIXTURES OR EQUIPMENT LOCATED WITHIN THE PHASE 1 BOUNDARY. 5. NOT ALL PLUMBING SCOPE TO BE DEMOLISHED IS SHOWN. 6. ALL RW PIPING IS EXISTING TO REMAIN.# DATE DESCRIPTION1 11/30/18 ISSUED FOR CONSTRUCTIONDocuSign Envelope ID: D6CBE973-BBA9-4BE0-861E-C2F6DD72B53912/10/2018