HomeMy WebLinkAboutM8.20HVAC - CONTROLSC
C
R RR
C
VFD
R
C
VFD
VFD
LPS
HX-2
HX-3
LPC
P-5
P-6
DO
AI
AO
AO
AI
AIAIAI
DI
AI AI
DIDI
AI
DI
DI
(OPEN)
AI AI DI
DI
AI
DO
DI
AI
AIAO
AO
DO
AIAI
AI
AI AI
AI
AI
AI
AI
AI AIAI AI
DI
(CLOSED)
AI AI
ECM
DO
DI
(OPEN)
C
FCD
01
PDIT
01
FCV
01
FCV
02
FT
01
PT
01
TT
01
TT
04
PSL
01
MT
01
MT
04
PSH
02
TSL
01
PT
02
TSL
02
ZS
01
TT
02
TT
03 XT
01
FT
02
FCD
02
PSL
02
PDIT
03
PDIT
02
FCD
03
PT
04
PT
03
PT
05
TT
08
TT
07
FT
03
JI
03
JI
03
MT
03
TT
05
MT
03
TT
06
MT
03
TT
09
TT
10
FCD
04
ZS
03
EF-A.1 EF-A.2
SUPPLY FAN SPEED CONTROL
SUPPLY AIR FANS SHALL MODULATE IN PARALLEL VIA A VARIABLE FREQUENCY
DRIVE AS REQUIRED TO MAINTAIN THE DOWNSTREAM STATIC PRESSURE SETPOINT.
THE DOWNSTREAM STATIC PRESSURE SETPOINT SHALL BE RESET AS NEEDED TO
MAINTAIN THE CRITICAL ZONE DAMPER POSITION AT 95% OPEN.
EXHAUST AIR FAN SPEED AND BYPASS DAMPER CONTROL
EXHAUST DISCHARGE AIR PRESSURE SETPOINT SHALL BE DETERMINED DURING
TESTING AND BALANCING TO DELIVER THE SCHEDULED AIRFLOW. ONCE SCHEDULED
AIRFLOW IS ACHIEVED, CORRESPONDING AIR PRESSURE SHALL BE SETPOINT.
EXHAUST FANS SHALL SWITCH LEAD/LAG DESIGNATION WEEKLY. LEAD EXHAUST FAN
SHALL MODULATE VIA A VARIABLE FREQUENCY DRIVE AS REQUIRED TO MAINTAIN
THE DISCHARGE AIR PRESSURE SETPOINT.
BYPASS AIR DAMPER SHALL MODULATE TO MAINTAIN SYSTEM STATIC PRESSURE
SETPOINT. THE DOWNSTREAM STATIC PRESSURE SETPOINT SHALL BE RESET AS
NEEDED TO MAINTAIN THE CRITICAL ZONE DAMPER POSITION AT 95% OPEN.
SUPPLY AIR TEMPERATURE SETPOINT
DISCHARGE AIR TEMPERATURE RESET: THE AHU DISCHARGE AIR TEMPERATURE
SHALL BE ALLOWED TO RESET BASED ON THE FOLLOWING SCHEDULE:
OAT = 75 DEG F & ABOVE DAT = 55 DEG F
OAT = 55 DEG F & BELOW DAT = 65 DEG F
GLYCOL RUN AROUND HEAT RECOVERY AND TEMPERATURE CONTROL
EQUIPMENT CYCLING: WEEKLY, THE HEAT EXCHANGERS AND PUMPS SHALL
ALTERNATE LEAD/LAG OPERATION. LAG HEAT EXCHANGER SHALL HAVE HOT WATER
ISOLATION VALVE FULLY CLOSED AND LEAD HEAT EXCHANGER'S HOT WATER
ISOLATION VALVE SHALL BE FULLY OPEN. LAG PUMP SHALL REMAIN OFF.
WINTER MODE CONDITIONS: WINTER MODE SHALL BE INITIATED WHEN THE OUTSIDE
AIR TEMPERATURE IS BELOW THE SUPPLY AIR TEMPERATURE SETPOINT. THE LEAD
PUMP SHALL BE ENABLED AND OPERATE AT CONSTANT SPEED.
WINTER MODE GLYCOL TEMPERATURE SETPOINT: HEAT EXCHANGER HOT WATER
LEAVING TEMPERATURE SHALL BE RESET TO MAINTAIN AHU DISCHARGE AIR
TEMPERATURE TT-04.
WINTER MODE STEAM BOOSTER HEAT CONTROL: LEAD HEAT EXCHANGER STEAM
CONTROL VALVE SHALL MODUALTE TO MAINTAIN HOT WATER LEAVING
TEMPERATURE SETPOINT.
WINTER MODE VALVE CONTROL:THE 3-WAY VALVE SHALL NORMALLY DIRECT ALL
GLYCOL FLOW THROUGH THE EXHAUST AIR COIL. IF LEAD HEAT EXCHANGER STEAM
CONTROL VALVE IS FULLY CLOSED AND SUPPLY AIR DISCHARGE TEMPERATURE
EXCEEDS SETPOINT, 3-WAY VALVE SHALL MODULATE TO MAINTAIN SUPPLY AIR
DISCHARGE AIR TEMPERATURE. CHILLED WATER VALVE SHALL BE FULLY CLOSED.
ANTI-FROST MODE: ANTI-FROST MODE SHALL BE INITIATED WHEN THE EXHAUST AIR
RECOVERY COIL LEAVING AIR TEMPERATURE FALLS BELOW 34 DEG F. THE 3-WAY
VALVE SHALL MODULATE TO MAINTAIN THE EXHAUST AIR RECOVERY COIL LEAVING
AIR TEMPERATURE ABOVE 34 DEG F.
INTERMEDIATE MODE: INTERMEDIATE MODE SHALL BE INITIATED WHEN THE OUTSIDE
AIR TEMPERATURE IS ABOVE THE SUPPLY AIR SETPOINT AND BELOW THE EXHAUST
AIR TEMPERATURE PLUS AN OFFSET TO ADJUST FOR THE COST OF RUNNING THE
PUMP VERSUS THE AMOUNT OF RECOVERED HEAT. THE OFFSET SHALL INITIALLY BE
SET TO 7°F AND SHALL BE RE-EVALUATED AFTER ACCUMULATED 1 YEARS WORTH OF
ENERGY DATA. BOTH PUMPS SHALL BE DISABLED. HEAT EXCHANGER STEAM
CONTROL VALVES SHALL BE FULLY CLOSED. CHILLED WATER CONTROL VALVE
SHALL MODULATE TO MAINTAIN DISCHARGE AIR TEMPERATURE SETPOINT.
SUMMER MODE: SUMMER MODE SHALL BE INITIATED WHEN THE OUTSIDE AIR
TEMPERATURE IS ABOVE THE EXHAUST AIR TEMPERATURE PLUS THE OFFSET
DESCRIBED ABOVE. THE PUMP SHALL BE ENABLED AND OPERATE AT CONSTANT
SPEED. THE 3-WAY VALVE SHALL DIRECT ALL GLYCOL FLOW THROUGH THE EXHAUST
AIR COIL. HEAT EXCHANGER STEAM CONTROL VALVES SHALL BE FULLY CLOSED.
CHILLED WATER COIL CONTROL VALVE SHALL MODULATE TO MAINTAIN DISCHARGE
AIR TEMPERATURE SETPOINT.
WHEN THE AHU DISCHARGE AIR TEMPERATURE RISES ABOVE THE DISCHARGE
SETPOINT, THE PRE-HEAT COIL CONTROL VALVE SHALL BE CLOSED, THE GLYCOL
COIL PUMP SHALL BE OFF, AND THE CHILLED WATER CONTROL VALVE SHALL
MODULATE AS REQUIRED TO MAINTAIN THE DISCHARGE AIR TEMPERATURE
SETPOINT.
SYSTEM DESCRIPTION
100% OUTSIDE AIR HANDLING UNIT (AHU-A)
EXHAUST AIR FANS (EF-A.1 AND EF-A.2)
GLYCOL PRE-HEAT AND ENERGY RECOVERY COIL
CHILLED WATER COOLING COIL
GENERAL
SYSTEM SHALL BE CONTROLLED THROUGH THE BUILDING AUTOMATION
AND CONTROL SYSTEM (BACS).
POWER FOR THE TEMPERATURE CONTROL PANEL SHALL BE FED FROM
STANDBY POWER.
CONTROLLED EQUIPMENT POWER SHALL BE FED FROM NORMAL POWER.
ALL SET POINTS SHALL BE ADJUSTABLE.
THE BACS SHALL BE CAPABLE OF RETAINING ITS PROGRAMMING AND TIME
SETTING DURING A LOSS OF POWER FOR AT LEAST TEN HOURS.
ALL SAFETIES SHALL BE HARD WIRED INTO THE FAN MOTOR POWER CIRCUIT, AND
SHALL REQUIRE MANUAL RESET.
DURING HEATING MODE, THE HEATING CONTROL VALVES SHALL CONTINUE TO
CONTROL WHEN THE FAN IS OFF FOR CONTINUED FREEZE PROTECTION.
DESIGN INTENT: THE AHU GLYCOL HEAT EXCHANGER IS SIZED TO PROVIDE FULL
HEATING IF THE HEAT RECOVERY SYSTEM FAILS.
SETPOINTS
AHU DISCHARGE AIR TEMPERATURE (DAT): SEE RESET SCHEDULE
FREEZESTAT LOW LIMIT TEMPERATURE 38 DEG F
FILTER DIFFERENTIAL PRESSURE HIGH LIMIT: TWICE THE SCHEDULED INITIAL
PRESSURE DROP.
INITIAL SUPPLY DOWNSTREAM STATIC PRESSURE: 2.0" W.C.
INITIAL EXHAUST UPSTREAM STATIC PRESSURE: -2.0" W.C.
SUPPLY FAN DISCHARGE HIGH STATIC PRESSURE LIMIT: 6" W.C.
EXHAUST FAN INTAKE LOW STATIC PRESSURE LIMIT: -6" W.C.
SUPPLY FAN SUCTION LOW STATIC PRESSURE LIMIT: -4" W.C.
SUPPLY FAN MINIMUM SPEED: 30%
EXHAUST FAN MINIMUM SPEED: 30%
SYSTEM OCCUPANCY SCHEDULE: 24/7/365
START/STOP
AIR HANDLING UNIT SUPPLY FAN SHALL BE INTERLOCKED WITH THE ASSOCIATED
HEAT RECOVERY EXHAUST FAN. AND SHALL OPERATE CONTINUOUSLY.
SHUTOFF DAMPER CONTROL
WHEN THE SYSTEM FANS ARE OFF, THE OUTSIDE AIR, DISCHARGE, AND ASSOCIATED
EXHAUST DAMPERS SHALL BE CLOSED.
WHEN THE SYSTEM FANS ARE INDEXED TO START, THE OUTSIDE AIR AND
ASSOCIATED EXHAUST DAMPERS SHALL PROVE OPEN VIA AN END SWITCH PRIOR TO
STARTING THE SYSTEM FANS.
SAFETIES
FREEZE PROTECTION: UPON ACTIVATION OF THE LOW LIMIT TEMPERATURE SWITCH, THE
SUPPLY AIR FAN SHALL SHUT DOWN, THE OUTSIDE AIR AND SMOKE ISOLATION DAMPER SHALL
CLOSE, THE CHILLED WATER CONTROL VALVE SHALL OPEN, THE PRE-HEAT LEAD PUMP SHALL
RUN CONSTANT VOLUME, AND THE LEAD HEAT EXCHANGER SHALL MAINTAIN THE HOT WATER
LEAVING TEMPERATURE AT 100°F.
HIGH SUPPLY FAN STATIC: THE SUPPLY AIR FAN SHALL SHUT DOWN AND THE OUTSIDE AIR
DAMPERS SHALL CLOSE UPON ACTIVATION OF THE HIGH FAN DISCHARGE STATIC PRESSURE
SWITCH.
LOW SUPPLY FAN STATIC: THE SUPPLY AIR FAN SHALL SHUT DOWN AND THE OUTSIDE AIR
DAMPER SHALL CLOSE UPON ACTIVATION OF THE LOW FAN SUCTION STATIC PRESSURE
SWITCH.
LOW EXHAUST FAN STATIC: THE EXHAUST AIR FAN SHALL SHUT DOWN UPON ACTIVATION OF
THE LOW FAN SUCTION STATIC PRESSURE SWITCH.
SMOKE DETECTION: THE FAN SHALL SHUT DOWN AND THE OUTSIDE AIR/RELIEF/SMOKE
ISOLATION AIR DAMPER SHALL CLOSE UPON ACTIVATION OF A DUCT SMOKE DETECTOR.
ENERGY RECOVERY MONITORING
BAS SHALL CALCULATE AND RECORD TOTAL SITE ENERGY SAVED FROM ENERGY RECOVERY
SYSTEM. TOTAL ENERGY SAVED SHALL BE CALCULATED USING THE FOLLOWING FORMULA
BASED ON THE SENSIBLE-ONLY RECOVERY DONE BY THE GLYCOL RUNAROUND COIL:
Q = TOTAL ENERGY TRANSFER AT COIL - PUMPING - STEAM BOOST HEAT
Q = (1.08*SA_CFM*(HRC_LAT - HRC_EAT)) - 3.41*P_KW - 950*STM_LBS
Q = TOTAL SITE ENERGY SAVED (BTU/HR)
SA_CFM = SUPPLY AIR TOTAL AIRFLOW (CFM) *SUM OF AIRFLOW MEASURED AT FANS
HRC_LAT = HEAT RECOVERY COIL LEAVING AIR TEMPERATURE (°F)
HRC_EAT = HEAT RECOVERY COIL ENTERING AIR TEMPERATURE (°F)
P_KW = PUMPING ENERGY CONSUMPTION (KW) *SUM OF ENERGY CONSUMED BY PUMPS
STM_LBS = STEAM FLOW RATE (LBS/HR) *SUM OF CONDENSATE FLOW METERS
AHU-A, EF-A.1/A.2, AND GLYCOL RUNAROUND CONTROLS
OUTSIDE AIR
PREFILTER
PDAH
FINAL FILTER
CHWS
CHWR
SUPPLY AIR
FREEZESTAT
FIRE
ALARM
SYSTEM
BAS INPUT
FIRE ALARM
INPUT
TYPICAL FOR EACH
EXHAUST FAN
FILTER
PDAH
BYPASS AIR
TYPICAL FOR EACH
HEAT EXCHANGER
EXHAUST AIR
GLYCOL PREHEAT/ENERGY
RECOVERY COIL
SMOKE
ISOLATION
DAMPER
ZS
02
BDD
H
ER
TCV
01
LEAD HX
LAG HX
FCV
02
Architect
Payette Associates Architects, P.C.
290 Congress Street, Fifth Floor
Boston, MA 02210-1005
Tel: 617-895-1000
Fax: 617-895-1002
MEP/FP Engineer
Vanderweil
274 Summer Street
Boston, MA 02210
Tel: 617-423-7423
Structural Engineer
SGH
41 Seyong Street
Building 1, Suite 500
Waltham, MA 02453
Tel: 781-907-9000
Fax: 781-907-9009
Drawing Scale
Project Number
Date Issued
Renovation of Olin Hall for
Chemical and Biomolecular
Engineering - Phase 1
Code Consultant
Hastings Consulting Inc
142 Hanlon Road
Hollister, MA 01746
Tel: 508-397-8417
Lighting Designer
Available Light
10 Derby Square #3
Salem, MA 01970
Tel: 978-744-6800
N
Cost Consultant
Dharam Consulting
745 Atlantic Ave Fl 8
Boston, MA 02111
Tel: 617-913-4345
Abatement Specialist
Delta
860 Hooper Rd
Endwell, NY 13760
Tel: 607-231-6600
Civil Engineer
T.G. Miller, P.C.
203 N. Aurora Street
Ithaca, NY 14850
Tel: 607-272-6477
NTS
M8.20
29313.00
11/30/18
HVAC - CONTROLS
# DATE DESCRIPTION
1 11/30/18 ISSUED FOR CONSTRUCTION
DocuSign Envelope ID: D6CBE973-BBA9-4BE0-861E-C2F6DD72B539
12/10/2018