HomeMy WebLinkAboutM7.20HVAC - HYDRONIC_STEAM RISER DIAGRAMC
C
W
H
C
ER
GS2"HWS1
ET
3
HX
2
HX
1
HX 2-1/2"GS
2-1/2"GS
2-1/2"GR
2"HWS
(XM)2-1/2"HWR
2-1/2"LPR
(XM)2-1/2"HWR
4"LPS2-1/2"HWS2-1/2"HWR(XM)CBS(XM)CBR(XM)HWS(XM)HWR2-1/2"GR2-1/2"GR2-1/2"GR2-1/2"GR2"HWS
2"HWR
2"HWS
2"HWR
3"CBS
3"CBR
2"HWS
2"HWR
2"HWS
2"HWR
3"CBS
3"CBR
2"HWR2"HWS2-1/2"LPSBASEMENT
LEVEL 1
LEVEL 3
ROOF
LEVEL 2
RHW
1
GW
1
AHU
A
CHWS
BUILDING LOOP
FROM EXISTING
BUILDING LOOP
TO EXISTING
CHWR
FEEDER
CHEMICAL
LPS
BUILDING LOOP
FROM EXISTING
LPC
CONDENSATE RECEIVER
TO EXISTING
GLYCOL
FILL
SYSTEM
1"
TO/FROM EXISTING
PERIMETER HEATING
HWS/R
CBS/R
PROCESS COOLING CHILLERS
TO/FROM FAN COIL UNITS AND
HWS
PERIMETER HEATING
FROM EXISTING
PERIMETER HEATING
TO EXISTING
HWR
TO/FROM
REHEAT COILS
HWS/R
GHW PUMPS
CBS
BUILDING LOOP
FROM EXISTING
BUILDING LOOP
TO EXISTING
CBR
(P.O.S.)
(XM)TO FLOOR DRAIN
FEEDER
(XM)CHEMICAL
LPS
BUILDING LOOP
FROM EXISTING
LPC
CONDENSATE RECEIVER
TO EXISTING
(XM)P-3
(XM) AIR SEPARATOR
(XM)EXPANSION TANK
P-3A
(XM) HEAT EXCHANGER
REPLACE EXISTING
HWS/R PIPING IN
BASEMENT AND IN
SHAFT TO 3"
TO/FROM EXISTING
PERIMETER HEATING
HWS/R
CBS/R
PROCESS COOLING CHILLERS
TO/FROM FAN COIL UNITS AND
TO/FROM
REHEAT COILS
HWS/R
AIR SEPARATOR PROVIDE ISOLATION VALVE AND CAP
FOR MANUAL FILL AND 55 GALLON
DRUM TO RECEIVE RELIEF VALVE
DISCHARGE.
P
5
P
6
Architect
Payette Associates Architects, P.C.
290 Congress Street, Fifth Floor
Boston, MA 02210-1005
Tel: 617-895-1000
Fax: 617-895-1002
MEP/FP Engineer
Vanderweil
274 Summer Street
Boston, MA 02210
Tel: 617-423-7423
Structural Engineer
SGH
41 Seyong Street
Building 1, Suite 500
Waltham, MA 02453
Tel: 781-907-9000
Fax: 781-907-9009
Drawing Scale
Project Number
Date Issued
Renovation of Olin Hall for
Chemical and Biomolecular
Engineering - Phase 1
Code Consultant
Hastings Consulting Inc
142 Hanlon Road
Hollister, MA 01746
Tel: 508-397-8417
Lighting Designer
Available Light
10 Derby Square #3
Salem, MA 01970
Tel: 978-744-6800
N
Cost Consultant
Dharam Consulting
745 Atlantic Ave Fl 8
Boston, MA 02111
Tel: 617-913-4345
Abatement Specialist
Delta
860 Hooper Rd
Endwell, NY 13760
Tel: 607-231-6600
Civil Engineer
T.G. Miller, P.C.
203 N. Aurora Street
Ithaca, NY 14850
Tel: 607-272-6477
NTS
M7.20
29313.00
11/30/18
HVAC - HYDRONIC/STEAM
RISER DIAGRAM
# DATE DESCRIPTION
1 11/30/18 ISSUED FOR CONSTRUCTION
DocuSign Envelope ID: D6CBE973-BBA9-4BE0-861E-C2F6DD72B539
12/10/2018