Loading...
HomeMy WebLinkAboutM7.20HVAC - HYDRONIC_STEAM RISER DIAGRAMC C W H C ER GS2"HWS1 ET 3 HX 2 HX 1 HX 2-1/2"GS 2-1/2"GS 2-1/2"GR 2"HWS (XM)2-1/2"HWR 2-1/2"LPR (XM)2-1/2"HWR 4"LPS2-1/2"HWS2-1/2"HWR(XM)CBS(XM)CBR(XM)HWS(XM)HWR2-1/2"GR2-1/2"GR2-1/2"GR2-1/2"GR2"HWS 2"HWR 2"HWS 2"HWR 3"CBS 3"CBR 2"HWS 2"HWR 2"HWS 2"HWR 3"CBS 3"CBR 2"HWR2"HWS2-1/2"LPSBASEMENT LEVEL 1 LEVEL 3 ROOF LEVEL 2 RHW 1 GW 1 AHU A CHWS BUILDING LOOP FROM EXISTING BUILDING LOOP TO EXISTING CHWR FEEDER CHEMICAL LPS BUILDING LOOP FROM EXISTING LPC CONDENSATE RECEIVER TO EXISTING GLYCOL FILL SYSTEM 1" TO/FROM EXISTING PERIMETER HEATING HWS/R CBS/R PROCESS COOLING CHILLERS TO/FROM FAN COIL UNITS AND HWS PERIMETER HEATING FROM EXISTING PERIMETER HEATING TO EXISTING HWR TO/FROM REHEAT COILS HWS/R GHW PUMPS CBS BUILDING LOOP FROM EXISTING BUILDING LOOP TO EXISTING CBR (P.O.S.) (XM)TO FLOOR DRAIN FEEDER (XM)CHEMICAL LPS BUILDING LOOP FROM EXISTING LPC CONDENSATE RECEIVER TO EXISTING (XM)P-3 (XM) AIR SEPARATOR (XM)EXPANSION TANK P-3A (XM) HEAT EXCHANGER REPLACE EXISTING HWS/R PIPING IN BASEMENT AND IN SHAFT TO 3" TO/FROM EXISTING PERIMETER HEATING HWS/R CBS/R PROCESS COOLING CHILLERS TO/FROM FAN COIL UNITS AND TO/FROM REHEAT COILS HWS/R AIR SEPARATOR PROVIDE ISOLATION VALVE AND CAP FOR MANUAL FILL AND 55 GALLON DRUM TO RECEIVE RELIEF VALVE DISCHARGE. P 5 P 6 Architect Payette Associates Architects, P.C. 290 Congress Street, Fifth Floor Boston, MA 02210-1005 Tel: 617-895-1000 Fax: 617-895-1002 MEP/FP Engineer Vanderweil 274 Summer Street Boston, MA 02210 Tel: 617-423-7423 Structural Engineer SGH 41 Seyong Street Building 1, Suite 500 Waltham, MA 02453 Tel: 781-907-9000 Fax: 781-907-9009 Drawing Scale Project Number Date Issued Renovation of Olin Hall for Chemical and Biomolecular Engineering - Phase 1 Code Consultant Hastings Consulting Inc 142 Hanlon Road Hollister, MA 01746 Tel: 508-397-8417 Lighting Designer Available Light 10 Derby Square #3 Salem, MA 01970 Tel: 978-744-6800 N Cost Consultant Dharam Consulting 745 Atlantic Ave Fl 8 Boston, MA 02111 Tel: 617-913-4345 Abatement Specialist Delta 860 Hooper Rd Endwell, NY 13760 Tel: 607-231-6600 Civil Engineer T.G. Miller, P.C. 203 N. Aurora Street Ithaca, NY 14850 Tel: 607-272-6477 NTS M7.20 29313.00 11/30/18 HVAC - HYDRONIC/STEAM RISER DIAGRAM # DATE DESCRIPTION 1 11/30/18 ISSUED FOR CONSTRUCTION DocuSign Envelope ID: D6CBE973-BBA9-4BE0-861E-C2F6DD72B539 12/10/2018