Loading...
HomeMy WebLinkAboutM2.20HVAC - LEVEL 221 3 4 6 7 8 5 Q P R S T O U 9 S1 R1 4A Q1 5.1 KEY NOTES: EXISITING CHILLED BEAMS TO BE RELOCATED TO WRITE-UP SPACE. REFERENCE DEMO DWGS M2.20 &M2.30 FOR EXISTING LOCATION. REFER TO SCHEDULES FOR BALANCING INFORMATION. ALL EXPOSED DUCT MAINS ARE TO BE ROUND OR OVAL DOUBLE WALL CONSTRUCTION. 8" ROUND DUCT DROP FOR 100CFM SNORKEL POINT EXHAUST. 12" ROUND EXHUAST DUCT DROP FOR CONNECTION TO 6' FUME HOOD. 8"x4" DUCT DROP DOWN TO G1 100CFM EXHUAST GRILLE. BOTTOM OF GRILLE SHALL BE 6" AFF. 4" ROUND DUCT DROP FOR 50 CFM VACUUM EXHUAST. REFER TO DETAIL FOR ADDITIONAL REQUIREMENTS. 4" ROUND DUCT DROP FOR 100 CFM VACUUM EXHUAST. REFER TO DETAIL FOR ADDITIONAL REQUIREMENTS. RE-CONNECT EXISTING SUPPLY DUCTWORK DROPPING DOWN FROM 2ND FLOOR TO 1ST FLOOR USING NEW ROUTING SHOWN. REFER TO SECTION FOR DETAILS. RE-BALANCE EXISTING SUPPLY DIFFUSERS ON THIS DUCT RUN TO EXISTING PRE-BALANCE VALUES AND RE-PROGRAM VSV-244 TO OPERATE AT 370CFM MAX 290CFM MIN 1 46"x22"26"ø26"ø5 M3.10 (XM)16x18 GEN EXH (XM)10x10 CB SUP (XM)26x20 SA (5' - 8") RCP 1.1 (5' - 8") RCP 1.1 (5' - 8") RCP 1.1 (5' - 8") RCP 1.1 (5' - 8") RCP 1.1 (5' - 8") RCP 1.1 (3' - 4") RCP 1.1 (5' - 6") RCP 1.1 (5' - 6") RCP 1.1 (5' - 6") RCP 1.1 (5' - 6") RCP 1.1 (3' - 4") RCP 1.1 (5' - 8") RCP 1.1 (5' - 8") RCP 1.1 (5' - 8") RCP 1.1 (XM)4"DN/3"UP CBS&R FCU 2 FCU 2 (XR)CB 265A-2 (XR)CB 265A-1 (XR)CB 278-1 (XR)CB 278-2 (XR)CB 265-1 (XR)CB 265-2 (XR)CB 258-1 (XR)CB 265-3 1 1/2" HWR1 1/2" HWS(17' - 1") RCP 1.1 (5' - 6") RCP 1.1 ? ? ? TISSUE CULTURE (MAMMALIAN) 276B TISSUE CULTURE (BACTERIAL) 276C GLASSWASH 276A LAB WRITE-UP 260 OPEN RESEARCH LAB 276 ? ? ? ? ? ? iCVD ROOM 276D Room 200SD Room 255A Room 252Room 254 Room 256 Room 267 CO2 CLOSET 200JA ELECTRICAL 200UA PLUMBING 200UB ACCESSIBLE RESTROOM 200TC ? ? ? EV 2.5 EV 2.2 EV 2.4 EV 2.6 EV 2.7 EV 2.8 EV 2.9 EV 2.10 EV 2.13 EV 2.12 EV 2.15 SV 2.2 SV 2.1 SV 2.4 SV 2.5 SV 2.8 SV 2.7 SV 2.10 24"x28"30"x20"28"x22"24"x26"28"ø26"/18"32"/18"14"ø14"ø 10"x10"8"ø10"x10"14"ø12"ø10"ø14"ø10"ø30"ø12"ø 16"x12" 26"ø T T T T T T T 2 22 2 2 2 3 3 3 4 4 4 4 4 4 44 1 1 1 1 1 1 1 126"/18"30"x32" 30"x20" EV 2.16 (XM)22x20 SA 1 1/2" HWS 1 1/2" HWR 1 1/2" PHWS 1 1/2" PHWR A3(475) A3(515)A3(515) A3(510)A3(510) A3(575) A3(575) A3(575)A3(575) A3(590) A3(590) A3(590) A3(590)B2 (2000)B2 (2000)B1 (1000)E2(900) C2(230) C2(215)E2(900) EV 2.1 EV 2.3 EV 2.11 EV 2.14 EV 2.17 SV 2.3 SV 2.6 SV 2.9 D1(950)D1(950) C5(950) C5(1065) FD FD (XM)VSV-200CA-2 14"ø 20"x14"14"ø 18"ø 12"ø 16"ø14"ø12"ø10"ø12"ø26"/18"16"x16"30"x30"12"ø26"x16"1 1/2" PHWS1 1/2" PHWR1" PHWR 1" PHWS 1 1/2" CBWR1 1/2" CBWS 3/4" CBWR 3/4" CBWS 1" HWS 1" HWR 16"øP P 13' - 6"F1 (100) 0.5 (XN)VSV-274 190/190 45 5 5 11' - 6"5' - 0"1" HWR 1" HWS 4 12"ø 3/4" PHWR 3/4" PHWS 6 7 6 7 (XM)PASSIVE CHILLED BEAM (TYP) 0.5 (XM)VSV-265 225/225 50 (XM)CHILLED BEAM RE-BALANCE TO 85 CFM (TYP. 4) (XM)EG(125) (XM)16x8 EA (XM)3/4" CBS/R (XM)10x10 SA (XM)EG (XM)CHILLED BEAM (TYP)(XM)CHILLED BEAM (TYP) (XM)CD(60) C6(100) (XM)3"CBS (XM)3"CBR 4 M3.10 32"/18"SFD SFD E 1 S 1 GW 1 RHW 1 8 8 8 8 (XM)SUPPLY DIFFUSER (TYP) 9 9 9 9 (XM)CD(60)(XM)CD(60) 9 SCOPE OF WORK C6(100) GENERAL NOTES: 1. DUCTWORK AND PIPING SUPPORT IN THE OPEN LABS SHALL BE COORDINATED WITH THE COMMON SUPPORT SYSTEM. REFER TO ARCHITECT PLANS FOR DETAILS. KEY NOTES (CONTINUED): RADIANT PANEL HEIGHT SHALL MATCH HEIGHT OF ADJACENT UTILITY SUPPORT SYSTEM. RADIANT PANEL SHALL BE INSTALLED AT THE TOP OF THE WINDOW, RIGHT BELOW THE HEADER. 10 11 3 11 311 3 11 3 11 3 11 3 10 3 10 3 10 3 10 3 10 3 10 3 10 3 10 3 11 3 11 3 11 3 11 3 Architect Payette Associates Architects, P.C. 290 Congress Street, Fifth Floor Boston, MA 02210-1005 Tel: 617-895-1000 Fax: 617-895-1002 MEP/FP Engineer Vanderweil 274 Summer Street Boston, MA 02210 Tel: 617-423-7423 Structural Engineer SGH 41 Seyong Street Building 1, Suite 500 Waltham, MA 02453 Tel: 781-907-9000 Fax: 781-907-9009 Drawing Scale Project Number Date Issued Renovation of Olin Hall for Chemical and Biomolecular Engineering - Phase 1 Code Consultant Hastings Consulting Inc 142 Hanlon Road Hollister, MA 01746 Tel: 508-397-8417 Lighting Designer Available Light 10 Derby Square #3 Salem, MA 01970 Tel: 978-744-6800 N Cost Consultant Dharam Consulting 745 Atlantic Ave Fl 8 Boston, MA 02111 Tel: 617-913-4345 Abatement Specialist Delta 860 Hooper Rd Endwell, NY 13760 Tel: 607-231-6600 Civil Engineer T.G. Miller, P.C. 203 N. Aurora Street Ithaca, NY 14850 Tel: 607-272-6477 1/4" = 1'-0" M2.20 29313.00 11/30/18 HVAC - LEVEL 2 # DATE DESCRIPTION 1 11/30/18 ISSUED FOR CONSTRUCTION 2 12/18/18 ADDENDUM 01 3 1/7/18 ADDENDUM 02 DocuSign Envelope ID: 495E9EAC-9F74-4159-ACA0-7B8831B044F5 1/4/2019