Loading...
HomeMy WebLinkAboutM2.10HVAC - LEVEL 121 3 4 6 7 8 5 Q P R S T O U 9 S1 R1 4A Q1 5.1 LAB WRITE-UP 162 LAB WRITE-UP 160 LAB WRITE-UP 158 OFFICE 158B LAB WRITE-UP 170 LAB WRITE-UP 170A LAB WRITE-UP 170B LAB WRITE-UP 169 OFFICE 168 OFFICE 167A CONFERENCE ROOM 167B OFFICE 167C OFFICE 167D OFFICE 167E Room 100CK Room 167F Room 100CG Room 100CJ Room 165B OFFICE 152 Room 100SA Room 165 Room 100UA Room 100JA Room 100UB CORRIDOR 100CH Room 100UF Room 167G OFFICE 156 COLLABORATION 167 GENERAL NOTES: 1. PORTIONS OF EXISTING HVAC DUCTWORK AND PIPING WILL NEED TO BE REMOVED AND REPLACED TO ACCOMODATE PLUMBING DRAINAGE PIPING. COORDINATE EXISTING CONDITIONS WITH NEW PLUMBING ROUTING.2 1/2" GR2 1/2" GRS 1 GW 1 RHW 1 GW 1 SCOPE OF WORK Architect Payette Associates Architects, P.C. 290 Congress Street, Fifth Floor Boston, MA 02210-1005 Tel: 617-895-1000 Fax: 617-895-1002 MEP/FP Engineer Vanderweil 274 Summer Street Boston, MA 02210 Tel: 617-423-7423 Structural Engineer SGH 41 Seyong Street Building 1, Suite 500 Waltham, MA 02453 Tel: 781-907-9000 Fax: 781-907-9009 Drawing Scale Project Number Date Issued Renovation of Olin Hall for Chemical and Biomolecular Engineering - Phase 1 Code Consultant Hastings Consulting Inc 142 Hanlon Road Hollister, MA 01746 Tel: 508-397-8417 Lighting Designer Available Light 10 Derby Square #3 Salem, MA 01970 Tel: 978-744-6800 N Cost Consultant Dharam Consulting 745 Atlantic Ave Fl 8 Boston, MA 02111 Tel: 617-913-4345 Abatement Specialist Delta 860 Hooper Rd Endwell, NY 13760 Tel: 607-231-6600 Civil Engineer T.G. Miller, P.C. 203 N. Aurora Street Ithaca, NY 14850 Tel: 607-272-6477 1/4" = 1'-0" M2.10 29313.00 11/30/18 HVAC - LEVEL 1 # DATE DESCRIPTION 1 11/30/18 ISSUED FOR CONSTRUCTION DocuSign Envelope ID: D6CBE973-BBA9-4BE0-861E-C2F6DD72B539 12/10/2018