Loading...
HomeMy WebLinkAboutM2.00HVAC - LEVEL 021 3 4 6 7 8 5 Q P R S T O U 9 S1 R1 4A Q1 5.1 213"x54" 60% FREE AREA LOUVER POS KEY NOTES: AHU-A COOLING COIL SHALL BE CONNECTED TO EXISTING CHW LOOP LOCATED IN ADJACENT MECHANICAL ROOM. NEW HEAT EXCHANGERS SHALL CONNECT TO EXISITNG LPS LOOP LOCATED IN ADJACENT MECHANICAL ROOM. CONDENSATE SHALL BE RETURNED TO EXISTING RECIEVER. COORDINATE HEIGHT OF INSTALL TO ENSURE CONDENSATE CAN CONNECT TO TRAP AND COMPONENTS PER DETAIL THEN ROUTE TO EXISTING CONDENSATE PUMP AS SHOWN ON PLAN. RE-LOCATE DUCTWORK TO ACCOMODATE NEW SUPPLY DUCT RISER CONDENSATE DRAIN FROM FCU SHALL BE PIPED TO NEAREST FLOOR DRAIN AND TERMINATED ABOVE WITH INDIRECT CONNECTION. 2 1 2 3 222 (XM) P-1A (XM) P-1 (XM) HW RADIATION HX (XM) HW RADIATION HX (XM) PFHX-1 (XM)ET-2 (XM)ET-2 (XM)P-3 (XM)ET-3 (XM)P-4 (XM)GLYCOL FEED ASSEMBLY (XM)DUPLEX BASKET STRAINER (XM)AS (XM)AS (XM)HX-4 (XM)HX-3 (XM)P-2 (XM)CHEM BYPASS FEEDER TANK (XM)AERCO DWH (XM)ET-1 (XM)AS (XM) BMS AIR COMPRESSOR (XM) HW PUMP MECHANICAL B00UA Room B00SA Room B59 Room B54 Room B52 Room B56 Room B55 Room B57 Room B78 Room B00UB Room B00UC 2 1/2" HWS2 1/2" HWRRoom B00UB Room B00UC (XM)2" PHWS/R (XM)6" SCHWS/R (XM)3" PHWS/R (XM)5" CBS/R (XM)3" SCHWS/R (XM)CHWS/R TO/FROM CAMPUS LOOP (XM)LPS BLOW OFF (XM)CAMPUS STEAM (XM) HPS (XM)5" LPS (XM)CONDENSATE PUMP FCU 4 2"LPR HX 2 1 AHU A HX 1 HX 3 4" LPSP 3A4" CHWS4" CHWR2" HWS2" HWR3" LPC ET 1 GLYCOL FILL STATION CHEMICAL FEEDER P 5 P 6 (XM)10x6 (XM)10x6 (XM)CD(150)(XM)CD(100)(XM)CD(100)(XM)CD(100) (XM)VSV-B78 (XM)12x10 SA 12"x14" (XN)VEV-B49 3 48"x38" (XM)14x12EA 4 4 3 M3.10 2 1/2" GS2 1/2" GR4" CHWS 4" CHWR 1" CHWR1" CHWSS 1 RHW 1 GW 1 PUMP VFDS AIR SEPARATOR NEW CONTROL PANEL1" CHWS1" CHWRDSFD SCOPE OF WORK 2 Architect Payette Associates Architects, P.C. 290 Congress Street, Fifth Floor Boston, MA 02210-1005 Tel: 617-895-1000 Fax: 617-895-1002 MEP/FP Engineer Vanderweil 274 Summer Street Boston, MA 02210 Tel: 617-423-7423 Structural Engineer SGH 41 Seyong Street Building 1, Suite 500 Waltham, MA 02453 Tel: 781-907-9000 Fax: 781-907-9009 Drawing Scale Project Number Date Issued Renovation of Olin Hall for Chemical and Biomolecular Engineering - Phase 1 Code Consultant Hastings Consulting Inc 142 Hanlon Road Hollister, MA 01746 Tel: 508-397-8417 Lighting Designer Available Light 10 Derby Square #3 Salem, MA 01970 Tel: 978-744-6800 N Cost Consultant Dharam Consulting 745 Atlantic Ave Fl 8 Boston, MA 02111 Tel: 617-913-4345 Abatement Specialist Delta 860 Hooper Rd Endwell, NY 13760 Tel: 607-231-6600 Civil Engineer T.G. Miller, P.C. 203 N. Aurora Street Ithaca, NY 14850 Tel: 607-272-6477 1/4" = 1'-0" M2.00 29313.00 11/30/18 HVAC - LEVEL 0 # DATE DESCRIPTION 1 11/30/18 ISSUED FOR CONSTRUCTION 2 12/18/18 ADDENDUM 01 DocuSign Envelope ID: 934A8599-03FD-4A73-BE43-DDC4ED06E6FA 12/18/2018