Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
M1.20HVAC - LEVEL 2 DEMO
21 3 4 6 7 8 5 Q P R S T O U 9 S1 R1 4A Q1 5.1 KEY NOTES: EXISTING CHILLED BEAM TO BE RE-USED IN WRITE UP SPACE. REFER TO NEW WORK PLAN FOR LOCATION. CLEAN AND PROTECT DURING RE-LOCATION. TYPICAL CHILLED BEAM PIPING SUPPLY AND RETURN EXAMPLE SHOWN FOR DRAWING CLARITY. ALL CHILLED BEAM ASSOCIATED PIPING WITHIN PHASE 1 SCOPE TO BE REMOVED. RELOCATE EXISTING VAV TO SERVE WRITE UP SPACE. REFER TO NEW WORK PLAN FOR LOCATION. CLEAN AND PROTECT DURING TRANSITION. WITHIN THE SCOPE OF WORK, DEMOLISH ALL EXISTING PERIMETER RADIATORS AND ASSOCIATED PIPING. ALL PERIMTER RADIATORS OUTSIDE OF SCOPE OF WORK SHALL REMAIN OPPERATIONAL. 1 (X)1-1/4" RHWR UP & 1-1/2" HWS DN (X)1-1/4" RHWS UP & 1-1/2" HWR DN (XM)4"DN/3"UP CBS&R (X)2" CBS (X)2" CBR 2 2 2 (X)CHILLED BEAM (TYP) (X)CB-276-1 (X)CHILLED BEAM (TYP) (XM)CHILLED BEAM (TYP. 4) (XM)26"x20"(XM)16"x10"(XM)16"x8" (X)10"x10" (X)26"x16" (X)22"x20" (X)10"x8" (XR)CB-258-1 (XR)CB-265-1 (XR)CB-265-2 (XR)CB-265-3 1 1 1 1 (X)CB-274-1 (XR)CB-278-21 (XR)CB-278-11 (X)CB-278A-1 (XR)CB-265A-11 (XR)CB-265A-2 1 (X)CHILLED BEAM (TYP) (X)CHILLED BEAM (TYP) (XM)SUPPLY AIR RISER (XM)10"x10" (XM)20"x12" (XM)2" CBS/R (X)3/4" CBS/R (X)3/4" CBS/R (XM)3/4" CBS/R ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? Room 200SD Room 255A Room 270A Room 275A Room 275 Room 265C Room 278A Room 258 Room 275B Room 260 Room 200SA Room 265A Room 252Room 254 Room 256 Room 260A Room 272 Room 276 Room 278 Room 274 Room 270 Room 267 Room 265B Room 265 Room 200JA Room 200UA Room 200UB 2 (XM) PASSIVE CHILLED BEAM (TYP) (XM) EXPOSED SUPPLY DIFFUSER (TYP) 3 (XR)VSV-274 3 (XM)VSV-265 (XM)VSV-200CA-2 (XM)RG (XM)EG (XM)16"x8" (XM)3"CBS (XM)3"CBR (XM)22x20 SA (XM)10x10 SA (X)CB-276-2 SCOPE OF WORK 4 2 (X)RADIANT PANEL (TYP)4 (X)RADIANT PANEL (TYP)4 (X)RADIANT PANEL (TYP)4 (X)RADIANT PANEL (TYP)4 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 Architect Payette Associates Architects, P.C. 290 Congress Street, Fifth Floor Boston, MA 02210-1005 Tel: 617-895-1000 Fax: 617-895-1002 MEP/FP Engineer Vanderweil 274 Summer Street Boston, MA 02210 Tel: 617-423-7423 Structural Engineer SGH 41 Seyong Street Building 1, Suite 500 Waltham, MA 02453 Tel: 781-907-9000 Fax: 781-907-9009 Drawing Scale Project Number Date Issued Renovation of Olin Hall for Chemical and Biomolecular Engineering - Phase 1 Code Consultant Hastings Consulting Inc 142 Hanlon Road Hollister, MA 01746 Tel: 508-397-8417 Lighting Designer Available Light 10 Derby Square #3 Salem, MA 01970 Tel: 978-744-6800 N Cost Consultant Dharam Consulting 745 Atlantic Ave Fl 8 Boston, MA 02111 Tel: 617-913-4345 Abatement Specialist Delta 860 Hooper Rd Endwell, NY 13760 Tel: 607-231-6600 Civil Engineer T.G. Miller, P.C. 203 N. Aurora Street Ithaca, NY 14850 Tel: 607-272-6477 1/4" = 1'-0" M1.20 29313.00 11/30/18 HVAC - LEVEL 2 DEMO # DATE DESCRIPTION 1 11/30/18 ISSUED FOR CONSTRUCTION 2 1/7/18 ADDENDUM 02 DocuSign Envelope ID: 495E9EAC-9F74-4159-ACA0-7B8831B044F5 1/4/2019