HomeMy WebLinkAboutM0.10HVAC - NOTES AND ABREVIATIONSSQUARE FEET
ENTERING AIR TEMPERATURE
SQFT
EAT
VARIABLE FREQUENCY DRIVE
VARIABLE VOLUME EXHAUST AIR TERMINAL BOX
WET BULB TEMPERATURE
VARIABLE VOLUME SUPPLY AIR TERMINAL BOX
LAT
KW
IN
HX
HZ
HW
HWS
HWR
HRC
HR
HP
HPS
HPR
HD
LEAVING AIR TEMPERATURE
KILOWATT
INCHES
HEAT EXCHANGER
HERTZ
HEAT RECOVERY COIL - GLYCOL
HOT WATER SUPPLY
HOT WATER RETURN
HIGH PRESSURE STEAM (>15 psig)
HIGH PRESSURE CONDENSATE RETURN
HOT WATER
HOUR
HEAD
HORSEPOWER
GS
HB
GR
GALV
GA
FT
FTR
FPM
FLEX
FCV
FD
FA
FCU
F
EXH
EWT
ESP
ET
ER
ELEC
EF
EG
HOSE BIBB CONN W/CHAINED CAP
GLYCOL SUPPLY
GALVANIZED
GLYCOL RETURN
FINNED TUBE RADIATION
GAUGE
FEET
FEET PER MINUTE
WB
W/O
WG
WMS
W/
W
VFD
VVE
VV
VD
V
WITHOUT
WATER GAUGE
WIRE MESH SCREEN
WITH
WIDTH
VOLUME DAMPER
VENT
FLOW CONTROL VALVE
FIRE DAMPER (W/ ACCESS DOOR)
FLEXIBLE
FAN COIL UNIT
FREE AREA
FAN
EXTERNAL STATIC PRESSURE
ENTERING WATER TEMPERATURE
EXHAUST REGISTER
EXHAUST
EXPANSION TANK
EXHAUST FAN
ELECTRICAL
EXHAUST GRILLE
TEMPERATURETEMP
UV
TYP
UNIT VENTILATOR
TYPICAL
STM
SUP
STL
STDBY
SS
STANDBY
STEAM
STAINLESS STEEL
SUPPLY
STEEL
POUNDS PER CUBIC FOOT
REVOLUTIONS PER MINUTE
PROCESS CHILLED WATER
PROCESS CHILLED WATER RETURN
(REFER TO CONTROLS LEGEND ABBREVIATIONS FOR ADDITIONAL NOMENCLATURE)
COMBINATION AUTOMATIC SMOKE/FIRE DAMPER
POUNDS PER SQUARE INCH GAUGE
SOUND ATTENUATOR
PRESSURE REDUCING VALVE
PUMPED CONDENSATE
LEAVING WATER TEMPERATURE
LOW PRESSURE STEAM (0-15 psig)
LOW PRESSURE CONDENSATE RETURN
NUMBERNO.
EA
DOV
DN
DIM
DDCFP
DDC
CWS
D
DB
CWR
CP
CHWS
CLG
CHW
CHWR
CC
CFM
CD
CRAC
BOD
BHP
RETURNRET
DRAIN OFF VALVE
DIRECT DIGITAL CONTROL FIELD PANEL
DIRECT DIGITAL CONTROL
EACH
DOWN
DIMENSION
DRY BULB TEMPERATURE
CONDENSER WATER SUPPLY
CONDENSER WATER RETURN
DRAIN
SF
SQ
SPECS
SFD
SDET
SD
SCH
SATT
SUPPLY FAN
WITH ACCESS DOOR
SQUARE
SPECIFICATIONS
SMOKE DETECTOR
SMOKE DAMPER
SCHEDULE
RR
RPM
RM
RLF
RG
RHC
RH
RF
RETURN REGISTER
RELIEF
ROOM
RETURN FAN
REHEAT COIL
RELATIVE HUMIDITY
RETURN GRILLE
CHILLED WATER SUPPLY
CHILLED WATER RETURN
CONDENSATE PUMP
CHILLED WATER
CEILING
BOTTOM OF DUCT
CUBIC FEET PER MINUTE
COMPUTER ROOM AIR CONDITIONING UNIT
BRAKE HORSEPOWER
COOLING COIL
CEILING DIFFUSER
PRESSURE DROPPD
PROCHW
PROCHWR
PSIG
PRV
PLBG PLUMBING
PCF
PC
P
OED
OA
NTS
OPEN END DUCT
PUMP
OUTSIDE AIR
NOT TO SCALE
GENERIC HVAC ABBREVIATIONS
AS
AAV
ATV
ATC
ARCH
AHU
ACD
AF
AD
ACV
AUTOMATIC AIR VENT
ATMOSPHERIC VENT
AUTOMATIC TEMPERATURE CONTROL
AIR HANDLING UNIT
AIR SEPARATOR
ARCHITECT
AUTOMATIC CONTROL VALVE
AUTOMATIC CONTROL DAMPER
AIR FOIL
ACCESS DOOR
NO
NIC
NC
N/A
MTD
MAV
MIN
MFR
NORMALLY OPEN
NOT IN CONTRACT
NORMALLY CLOSED
NOT APPLICABLE MANUAL AIR VENT
MOUNTED
MINIMUM
MANUFACTURER
MECH
LWT
LPS
LPR
LF
MECHANICAL
LINEAR FEET
TEFC
VERT
TSP
GALLONS PER MINUTE
H
GPM
HEIGHT
VTR
GENERAL EXHAUSTGE
FPI FINS PER INCH
TDH
TE
TD
STD
SP
ENERGY MANAGEMENT SYSTEM
EQUIP
EMS
EQUIPMENT
TOTAL STATIC PRESSURE
VENT THROUGH ROOF
VERTICAL
TOTALLY ENCLOSED FAN COOLED
THERMODYNAMIC TRAP
TOILET EXHAUST
TOTAL DYNAMIC HEAD
STATIC PRESSURE
STANDARD
KVA
LAB
MBH
MAX
NPSH
OS&Y
POS
RA
LB
PH
BRITISH THERMAL UNIT
CG
BTU
CEILING GRILLE
OB
OC
OBD
NC
AVG AVERAGE
ADJ ADJUSTABLE
L
RETURN AIR
POUND
OUTSIDE STEM AND YOKE
PROVIDED BY OTHER SECTION(S)
PHASE
OCTAVE BAND
ON CENTER
OPPOSED BLADE DAMPER
NET POSITIVE SUCTION HEADNOISE CRITERIA
THOUSAND BRITISH THERMAL UNITS PER HOUR
LABORATORY
MAXIMUM
LENGTH
KILOVOLT AMPERE
BACKWARD INCLINEDBI
Ø DIAMETER
DEGREES FAHRENHEIT°F
--
FC FORWARD CURVED
FLTR FILTER
DWG DRAWING
HOT WATER REHEAT COILHWRHC
PROCESS CHILLED WATER SUPPLYPROCHWS
SA SUPPLY AIR
HYDRONIC SYSTEM SPECIFIC ABBREVIATIONS
AIR SYSTEM SPECIFIC ABBREVIATIONS
STEAM SYSTEM SPECIFIC ABBREVIATIONS
HEAT RECOVERY UNITHRU
BTUH BRITISH THERMAL UNIT PER HOUR
OPEN DRIP PROOFODP
MCA MINIMUM CIRCUIT AMPS
HEAT EXCHANGERHX
ST STEAM TRAP
ATD AIR TERMINAL DEVICE
HVAC GENERAL NOTES
GENERAL:
1. HVAC GENERAL NOTES, SYMBOLS LIST AND DETAILS ARE APPLICABLE TO ALL "M" SERIES DRAWINGS.
2. DRAWINGS ARE DIAGRAMMATIC AND ARE INTENDED TO INDICATE CAPACITY, SIZE, APPROXIMATE LOCATION AND GENERAL
ARRANGEMENT. DETERMINE EXACT LOCATION OF SYSTEMS AND COMPONENTS IN FIELD.
3. DRAWINGS CANNOT BE FULLY AND CORRECTLY INTERPRETED WITHOUT REFERENCE TO LEGENDS, DETAILS, SCHEDULES AND
SPECIFICATIONS. IT IS THE INTENT OF THE DRAWINGS TO SHOW THE INSTALLATION, AS DETAILED BY THE TYPICAL ARRANGEMENTS. ITEMS
SHOWN ONCE ON FLOOR PLANS, ELEVATIONS, DETAILS OR DIAGRAMS MAY NOT BE REPEATED IN FULL FOR OTHER TYPICAL INSTANCES.
4. REFER TO SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
5. PROVIDE INFORMATION AND HARDWARE TO COORDINATE CONCRETE PADS AND STEEL PLATFORMS REQUIRED FOR MECHANICAL WORK.
6. COORDINATE ROOF AND WALL PENETRATIONS WITH WORK OF OTHER SECTIONS AND WITH FLASHING REQUIREMENTS.
7. RUN DUCTS AND PIPING CONCEALED, UNLESS SPECIFIED OTHERWISE, AND CLEAR OF CEILING INSERTS. ALL DUCTWORK SHALL BE
INSTALLED AS CLOSE AS POSSIBLE TO WALL AND UNDERSIDE OF BEAMS AND JOISTS.
8. INSTALL SENSORS (TEMPERATURE, HUMIDITY, CO2, THERMOSTATS) AT LOCATIONS SHOWN ON PLANS OR AS DIRECTED BY ARCHITECT.
MOUNTING HEIGHT AFF SHALL COMPLY WITH ADA AND SHALL BE MOUNTED LEVEL WITH ADJACENT SWITCHES (E.G. LIGHT SWITCHES).
9. COORDINATE WORK OF THIS SECTION WITH THAT OF OTHER SECTIONS. ALL WORK SHALL BE COORDINATED WITH ALL TRADES INVOLVED.
OFFSETS IN PIPING AND DUCTS (INCLUDING DIVIDED DUCTS) AND TRANSITIONS AROUND OBSTRUCTIONS SHALL BE PROVIDED AT NO
ADDITIONAL COST.
10. ACCESS PANELS SHALL BE PROVIDED TO CLEAN COILS AND SERVICE DAMPERS, HEATERS, VALVES AND ALL CONCEALED MECHANICAL
EQUIPMENT.
11. SUPPORT ALL EQUIPMENT, PIPING AND DUCTWORK FROM BUILDING STRUCTURE. PROVIDE VIBRATION ISOLATION. FOR ROTATING
EQUIPMENT, DUCTWORK AND PIPING IN ACCORDANCE WITH THE SPECIFICATIONS. PROVIDE TO THE CONSTRUCTION MANAGER OR
GENERAL CONTRACTOR A LIST OF ALL WEIGHTS AND METHODS OF SUPPORT FOR COORDINATION. REFER TO SPECIFICATIONS FOR
ADDITIONAL REQUIREMENTS.
12. ALL CONTROL WIRE AND CONDUIT SHALL COMPLY WITH NATIONAL ELECTRIC CODE AND DIVISION 26.
13. ALL MATERIAL AND EQUIPMENT SHALL BE NEW.
14. ELEMENTS OF THE WORK SHALL BE INSTALLED IN A MANNER SUCH THAT AT SUBSTANTIAL COMPLETION THE FOLLOWING ITEMS, NEW OR
EXISTING SHALL BE "FULLY AND REASONABLY ACCESSIBLE": HVAC CONTROL BOXES, JUNCTION BOXES, VALVES (OF EVERY SHAPE, SORT
AND FUNCTION), DDC CONTROL BOXES, ELECTRICAL PANELS, FILTERS, BELTS, WATER COILS, DISCONNECT SWITCHES, AND MAINTENANCE
ACCESS ELEMENTS INCLUDING PULL SPACE.
a. "FULLY AND REASONABLY ACCESSIBLE" SHALL BE DEFINED AS: NATIONAL ELECTRIC CODE REQUIRED CLEARANCE FOR POWERED
EQUIPMENT AND CAPABLE OF BEING ACCESSED FOR SERVICE, REPAIR OR REPLACEMENT BY AN AVERAGE SIZED INDIVIDUAL (ON A
LADDER IF NECESSARY) AND CAPABLE OF BEING SERVICED OR REMOVED WITHOUT REMOVING OR MODIFYING OR DISTORTING OTHER
COMPONENTS OF THE WORK. THE DESIGN INTENT PROVIDES A MINIMUM 2' x 2' x 2' ZONE FOR MAINTENANCE.
b. CONFLICT WITH MEETING THESE REQUIREMENTS SHALL BE BROUGHT TO THE ATTENTION OF THE OWNER'S REPRESENTATIVE IN A
TIMELY MANNER AND SHALL BE CORRECTED AT NO ADDITIONAL COST.
AIR SYSTEM SPECIFIC NOTES:
1. VERIFY ALL EQUIPMENT CONNECTIONS WITH MANUFACTURER CERTIFIED DRAWINGS. VERIFY AND PROVIDE DUCT TRANSITIONS TO
FURNISHED EQUIPMENT. FIELD VERIFY AND COORDINATE ALL DIMENSIONS BEFORE FABRICATION.
2. SHEETMETAL FITTINGS SHOWN ARE TO BE PROVIDED. NO SUBSTITUTES SHALL BE ALLOWED WITHOUT PRIOR CONSENT FROM
ARCHITECT/ENGINEER.
3. REFER TO SPECIFICATIONS FOR DUCTWORK CONSTRUCTION CLASSES, SEAL, AND LEAKAGE CLASSES.
4. EXTERIOR LOUVERS ARE INDICATED FOR LOCATION ONLY.
5. SMOKE DETECTORS SHALL BE FURNISHED AND WIRED TO THE FIRE ALARM SYSTEM BY DIVISION 28. DIVISION 23 SHALL MOUNT THE
DETECTORS IN DUCTWORK, WHERE REQUIRED BY CODE AND DIVISION 23, DIVISION 23 SHALL WIRE THE DETECTORS TO THE BAS SYSTEM
AND FAN STARTERS FOR SHUTDOWN.
6. SMOKE DAMPERS SHALL BE UL555S LISTED. FIRE DAMPERS SHALL BE UL555 LISTED. PROVIDE FIRE DAMPERS, SMOKE DAMPERS AND
SMOKE/FIRE DAMPERS AND ASSOCIATED ACCESS PANELS WHERE DAMPERS ARE SHOWN ON DRAWINGS IN COMPLIANCE WITH
APPLICABLE BUILDING AND MECHANICAL CODES AND NFPA 90A. ACCESS DOOR DIMENSIONS SHALL MEET REQUIREMENTS OF NFPA 90A
AND NFPA 80.
7. REFER TO REFLECTED CEILING PLANS FOR EXACT LOCATIONS OF AIR TERMINAL DEVICES.
8. DIFFUSER SIZES SHOWN ARE NECK SIZES; REGISTER AND GRILLE SIZE ARE NOMINAL. REFER TO DIFFUSER SCHEDULE FOR DUCT RUN-OUT
SIZES.
9. PROVIDE FLEXIBLE CONNECTIONS ON ALL DUCTS CONNECTING TO FANS AND AIR HANDLING UNITS UNLESS INTERNALLY ISOLATED. ALL
DUCTS TO BE GROUNDED ACROSS FLEXIBLE CONNECTION WITH FLEXIBLE COPPER GROUNDING STRAPS.
10. THE INSIDE OF DUCTWORK AND ALL MECHANICAL COMPONENTS VISIBLE THROUGH A GRILLE OR DIFFUSER SHALL BE PAINTED FLAT BLACK.
11. ALL RETURN AIR OPENINGS ABOVE CEILING SHALL BE PROVIDED WITH A 1/2" MESH ALUMINUM SCREEN (80% FREE AREA MINIMUM).
12. INSULATE DUCTWORK: PERFORM TESTS BEFORE INSULATING.
13. ELBOWS IN DUCT SYSTEMS SHALL BE FULL RADIUS (CENTERLINE RADIUS = 1.5 DUCT WIDTH) WHERE SPACE PERMITS. WHERE LIMITED
CLEARANCE OCCURS, PROVIDE SHORT RADIUS ELBOW WITH FULL LENGTH SPLITTER VANES PER SMACNA. MITERED (SQUARE) ELBOWS
WITH TURNING VANES SHALL NOT BE USED.
14. MANUAL DAMPERS ARE NOT SHOWN ON THE DRAWINGS IN ORDER FOR DRAWING CLARITY. PROVIDE MANUAL ADJUSTABLE DAMPERS ON
EACH LOW PRESSURE SUPPLY RETURN AND EXHAUST DUCT TAKE OFF, AND AT EACH TAKE OFF TO REGISTERS, GRILLES AND DIFFUSERS.
15. UNLESS OTHERWISE NOTED, DUCTWORK CONNECTING TO DIFFUSERS OR VARIABLE VOLUME AIR TERMINAL UNITS SHALL BE SIZED PER
EQUIPMENT/DIFFUSER CONNECTION SIZE.
PIPING SPECIFIC NOTES:
1. VERIFY ALL EQUIPMENT CONNECTIONS WITH MANUFACTURER CERTIFIED DRAWINGS. VERIFY AND PROVIDE FITTINGS TO TRANSITION TO
FURNISHED EQUIPMENT CONNECTION SIZES. FIELD VERIFY AND COORDINATE ALL DIMENSIONS BEFORE FABRICATION.
2. ALL CONDENSATE DRAIN LINES SHALL BE PIPED FULL SIZE OF THE UNIT DRAIN OUTLET, WITH "P" TRAP, CONNECTED TO BUILDING
DRAINAGE SYSTEMS. SIZE DEPTH OF TRAP FOR ASSOCIATED AIR PRESSURE DIFFERENTIAL. REFER TO DETAIL ON DRAWINGS.
3. PERFORM TEST BEFORE INSULATING PIPING.
4. PROVIDE HANGERS, CLAMPS, OFFSETS, EXPANSION JOINTS, ANCHORS AND GUIDES TO PREVENT STRESS ON PIPING.
5. PROVIDE VENTS AT HIGH POINTS IN PIPING SYSTEMS AND DRAIN VALVES AT LOW POINTS.
6. PROVIDE AT LEAST THREE-ELBOW SWING FOR PIPE TAKE-OFFS TO TERMINAL EQUIPMENT AND RISERS.
7. ISOLATION VALVES IN PIPING SYSTEMS ARE NOT SHOWN ON PLANS (FOR CLARITY) BUT ARE REQUIRED AT ALL PIPE BRANCHES AND
CONNECTIONS TO EQUIPMENT REFER TO DETAIL SHEETS AND FLOW DIAGRAMS.
8. PITCH HYDRONIC (WATER) PIPING UPWARD IN DIRECTION OF FLOW. PITCH STEAM AND CONDENSATE PIPING DOWNWARD IN DIRECTION OF
FLOW. PITCH FUEL OIL PIPING TOWARD TANK. REFER TO SPECIFICATIONS FOR REQUIRED PITCH (I.E. GRADE OR SLOPE).
9. REFER TO EQUIPMENT SCHEDULES FOR PIPE RUN-OUT SIZES TO INDIVIDUAL PIECES OF EQUIPMENT.
10. UNLESS OTHERWISE NOTED, PIPING CONNECTING TO TERMINAL UNITS SHALL BE SIZED PER SCHEDULE.
EXISTING EQUIPMENT TO BE RELOCATEDXR
XN
XM
X
NEW LOCATION OF RELOCATED EQUIPMENT
EXISTING EQUIPMENT TO REMAIN
EXISTING EQUIPMENT TO BE REMOVED
1. SITE VISIT: BEFORE SUBMITTING BID, VISIT AND CAREFULLY EXAMINE SITE TO IDENTIFY EXISTING CONDITIONS
AND DIFFICULTIES THAT WILL AFFECT WORK OF THIS SECTION. NO EXTRA PAYMENT WILL BE ALLOWED FOR
ADDITIONAL WORK CAUSED BY UNFAMILIARITY WITH SITE CONDITIONS THAT ARE VISIBLE OR READILY
CONSTRUED BY EXPERIENCED OBSERVER. SITE VISIT IS PARTICULARLY IMPORTANT BECAUSE THIS IS
RENOVATION WORK.
2. EXISTING CONDITIONS AND PREPARATORY WORK: BEFORE STARTING WORK IN A PARTICULAR AREA OF THE
PROJECT, VISIT SITE AND EXAMINE CONDITIONS UNDER WHICH WORK MUST BE PERFORMED INCLUDING
PREPARATORY WORK DONE UNDER OTHER SECTIONS OR CONTRACTS BY OWNER. REPORT CONDITIONS THAT
MIGHT AFFECT WORK ADVERSELY IN WRITING TO ARCHITECT AND OWNER. DO NOT PROCEED WITH WORK UNTIL
DEFECTS HAVE BEEN CORRECTED AND CONDITIONS ARE SATISFACTORY. COMMENCEMENT OF WORK SHALL BE
CONSTRUED AS COMPLETE ACCEPTANCE OF EXISTING CONDITIONS AND PREPARATORY WORK.
3. DEMOLITION SHALL BE COORDINATED WITH OWNER, ARCHITECT, GENERAL CONTRACTOR, CONSTRUCTION
MANAGER AND ENGINEER.
4. PROVIDE MECHANICAL DEMOLITION TERMINATION; CUT, VALVE AND CAP. DROP MECHANICAL DISTRIBUTION TO
FLOOR. REMOVAL OF SYSTEM EQUIPMENT SHALL BE BY THE HVAC CONTRACTOR.
5. PROVIDE 2 WEEKS NOTICE TO OWNER OPERATIONS FOR SHUT DOWN OF ANY SERVICES AND/OR SYSTEMS.
6. REFER TO ALL DRAWINGS FOR GENERAL DESCRIPTION OF AREAS REQUIRING DEMOLITION.
7. REFER TO CONSTRUCTION MANAGER INSTRUCTIONS FOR ALL EXISTING EQUIPMENT AND MATERIALS THAT SHALL
REMAIN THE PROPERTY OF THE OWNER.
8. ITEMS OF VALUE WHICH ARE NOT DIRECTED TO BE RETURNED TO THE OWNER, SHALL BECOME THE PROPERTY
OF THE CONTRACTOR AND SHALL BE REMOVED FROM SITE AND LEGALLY DISPOSED OF. STORAGE OR SALE OF
ITEMS ON THE PROJECT SITE IS PROHIBITED.
9. PROTECTION: ENSURE THE SAFE PASSAGE OF PERSONS IN AND AROUND THE BUILDING DURING DEMOLITION.
PREVENT INJURY TO PERSONS AND DAMAGE TO PROPERTY. PROVIDE ADEQUATE SHORING AND BRACING TO
PREVENT COLLAPSE. IMMEDIATELY REPAIR DAMAGED PROPERTY TO THE CONDITION BEFORE BEING DAMAGED.
TAKE EFFECTIVE MEASURES TO PREVENT WINDBLOWN DUST.
10. UTILITIES: MAINTAIN ALL UTILITIES EXCEPT THOSE REQUIRING REMOVAL OR RELOCATION. KEEP UTILITIES IN
SERVICE AND PROTECT FROM DAMAGE. DO NOT INTERRUPT UTILITIES SERVING OCCUPIED AREAS WITHOUT FIRST
OBTAINING PERMISSION FROM THE CLINET IN WRITING. PROVIDE TEMPORARY SERVICES.
11. DRAWINGS ARE DIAGRAMMATIC ONLY AND REFLECT OVERALL SYSTEM REMOVAL. NOT EVERY ITEM OR
COMPONENT OF A SYSTEM IS SHOWN.
12. PROVIDE SHUT DOWN OF SERVICES (FANS, PUMPS, AHUS, ETC.) AND TRACING OF ALL RISERS WITHIN BASE BID.
13. CONFIRM SUPPLY AND EXHAUST SYSTEM AIRFLOW CAPACITY OF ALL SYSTEMS, INCLUDING SYSTEMS NOT
MODIFIED AS PART OF PHASE 1, IN BUILDING THROUGH PRE-CONSTRUCTION TESTING AND BALANCING REPORTS
OF SYSTEMS TO BE EXTENDED. REPORTS SHALL INCLUDE COMPLETE FAN INFORMATION, CFM, ESP, TSP, RPM,
VOLTS, AMPS AND VFD SPEEDS. PROVIDE AIRFLOW IN CFM AND DUCT STATIC PRESSURE MEASUREMENTS IN
DUCT SYSTEMS TO DOCUMENT PERFORMANCE AT ALL SPACES IN BUILDING INCLUDING SPACES NOT MODIFIED AS
PART OF PHASE 1.
14. CONFIRM HYDRONIC SYSTEM CAPACITY THROUGH PRE-CONSTRUCTION TESTING AND BALANCING REPORTS OF
SYSTEMS TO BE EXTENDED. REPORTS SHALL INCLUDE PIPE SIZE, FLOW RATE, SUPPLY PRESSURE AND RETURN
PRESSURE. PROVIDE HYDRONIC SYSTEM FLOW (GPM) AND PIPE SYSTEM PRESSURE (PSIG) MEASUREMENTS IN
PIPING SYSTEMS TO DOCUMENT PERFORMANCE AT ALL SPACES SERVED BY SYSTEM, BOTH WITHIN PROJECT
WORK SCOPE AREA AND BEYOND PROJECT WORK SCOPE AREA.
15. CONFIRM STEAM PIPING CAPACITY THROUGH PRE-CONSTRUCTION TESTING AND BALANCING REPORTS OF
SYSTEMS TO BE EXTENDED. REPORTS SHALL INCLUDE PIPE SIZE AND STEAM PRESSURE (PSIG) WITH ALL
EQUIPMENT OPERATIONAL TO DOCUMENT PERFORMANCE AT ALL SPACES SERVED BY SYSTEM, BOTH WITHIN
PROJECT WORK SCOPE AREA AND BEYOND PROJECT WORK SCOPE AREA.
RENOVATION PRE-BID SITE VISIT AND DEMOLITION NOTES
ADA AMERICANS WITH DISABILITIES ACT
CBR
CBS
CHILLED BEAM WATER RETURN
CHILLED BEAM WATER SUPPLY
AFF ABOVE FINISHED FLOOR
AHU-A SEPARATE PREHEAT/RECOVERY COIL ALTERNATE
1. LENGTHEN AHU TO ACCOMMODATE 2-ROW PRE-HEAT COIL BETWEEN ENERGY RECOVERY COIL AND COOLING COIL WITH
ADDITIONAL ACCESS ZONE. ADD ADDITIONAL VALVES AND PIPING COMPONENTS TO ACCOMMODATE NEW COIL.a
2. PROVIDE 50 GPM RE-CIRCULATING FREEZE PROTECTION PUMP FOR NEW HEATING COIL.
3. REMOVE P-6 SINCE ENERGY RECOVERY DOES NOT REQUIRE REDUNDANCY.
4. RE-CONFIGURE PIPING SO ENERGY RECOVERY LOOP DOES NOT GO THROUGH HEAT EXCHANGERS.
5. HX-2 BECOMES HX-4A AND HX-3 IS REMOVED FROM SCOPE. HX-4A WILL CONNECT TO EXISTING PRE-HEAT LOOP IN BASEMENT
TO PROVIDE ADDED CAPACITY FOR AHU PRE-HEAT. PUMP SIZING IS ADEQUATE BUT MAY NEED TO RUN BOTH
SIMULTANEOUSLY INSTEAD OF LEAD/LAG.
6. UPDATE CONTROLS TO ACCOMMODATE THIS CHANGE.
Architect
Payette Associates Architects, P.C.
290 Congress Street, Fifth Floor
Boston, MA 02210-1005
Tel: 617-895-1000
Fax: 617-895-1002
MEP/FP Engineer
Vanderweil
274 Summer Street
Boston, MA 02210
Tel: 617-423-7423
Structural Engineer
SGH
41 Seyong Street
Building 1, Suite 500
Waltham, MA 02453
Tel: 781-907-9000
Fax: 781-907-9009
Drawing Scale
Project Number
Date Issued
Renovation of Olin Hall for
Chemical and Biomolecular
Engineering - Phase 1
Code Consultant
Hastings Consulting Inc
142 Hanlon Road
Hollister, MA 01746
Tel: 508-397-8417
Lighting Designer
Available Light
10 Derby Square #3
Salem, MA 01970
Tel: 978-744-6800
N
Cost Consultant
Dharam Consulting
745 Atlantic Ave Fl 8
Boston, MA 02111
Tel: 617-913-4345
Abatement Specialist
Delta
860 Hooper Rd
Endwell, NY 13760
Tel: 607-231-6600
Civil Engineer
T.G. Miller, P.C.
203 N. Aurora Street
Ithaca, NY 14850
Tel: 607-272-6477
NTS
M0.10
29313.00
11/30/18
HVAC - NOTES AND
ABREVIATIONS
# DATE DESCRIPTION
1 11/30/18 ISSUED FOR CONSTRUCTION
DocuSign Envelope ID: D6CBE973-BBA9-4BE0-861E-C2F6DD72B539
12/10/2018