HomeMy WebLinkAboutG1.11BASIS OF DESIGN OCCUPIED AREAS DURING CONSTRUCTIONLEGEND AND NOTESINDICATES AREAS OF THE PROJECT THAT REMAIN OCCUPIED DURING CONSTRUCTION. ALL CONSTRUCTION ACTIVITIES TO BE COORDINATED WITH THE CONTINUED OCCUPATION AND ACCESS TO THESE SPACES.MAINTAIN EXISTING EGRESSNOTES:1. SWING SPACE AREAS TO BE COMPLETED & OCCUPIED BEFORE WORK BEGINS ON LEVELS 2 & 3MATERIAL REMOVAL AND DEBRIS REMOVABLE PATHWORK AREAACCESSIBLEWORK AREAWORK AREA (SWING SPACE)(SWING SPACE)EXISTING LOADING DOCK30' x 50' CRANE LOCATION FOR ROOF TOP WORKTRACTOR TRAILER ACCESSFENCED STORAGE FOR DUMPSTERS. OVERHEAD DOOR TO REMAIN ACCESSIBLEFENCING FOR AREAWAY EXCAVATIONSIDEWALK CLOSURE FOR AREAWAY WORK. BARRICADES AND SIGNAGESIDEWALK CLOSURE FOR AREAWAY WORK. BARRICADES AND SIGNAGEWORK AREAWORK AREAWORK AREA (SWING SPACE)WORK AREAArchitectPayette Associates Architects, P.C.290 Congress Street, Fifth FloorBoston, MA 02210-1005Tel: 617-895-1000Fax: 617-895-1002MEP/FP EngineerVanderweil274 Summer StreetBoston, MA 02210Tel: 617-423-7423Structural EngineerSGH41 Seyong StreetBuilding 1, Suite 500Waltham, MA 02453Tel: 781-907-9000Fax: 781-907-9009Drawing ScaleProject NumberDate IssuedRenovation of Olin Hall for Chemical and Biomolecular Engineering - Phase 1 Code ConsultantHastings Consulting Inc142 Hanlon RoadHollister, MA 01746Tel: 508-397-8417Lighting DesignerAvailable Light10 Derby Square #3Salem, MA 01970Tel: 978-744-6800NCost ConsultantDharam Consulting745 Atlantic Ave Fl 8Boston, MA 02111Tel: 617-913-4345Abatement SpecialistDelta860 Hooper RdEndwell, NY 13760Tel: 607-231-6600Civil EngineerT.G. Miller, P.C.203 N. Aurora StreetIthaca, NY 14850Tel: 607-272-6477As indicatedG1.1120758.0011/30/2018BASIS OF DESIGN -OCCUPIED AREASDURING CONSTRUCTIONSCALE: 1/32" = 1'-0"1LEVEL 0 - Occupied AreaSCALE: 1/32" = 1'-0"2LEVEL 1 - Occupied AreaSCALE: 1/32" = 1'-0"3LEVEL 2 - Occupied AreaSCALE: 1/32" = 1'-0"4LEVEL 3 - Occupied AreaSCALE: 1/32" = 1'-0"5LEVEL 4 - Occupied Area# DATE DESCRIPTION1 11/30/18 ISSUED FOR CONSTRUCTION