Loading...
HomeMy WebLinkAboutG0.00DRAWING INDEX & LOCATION PLANArchitectPayette Associates Architects, P.C.290 Congress Street, Fifth FloorBoston, MA 02210-1005Tel: 617-895-1000Fax: 617-895-1002MEP/FP EngineerVanderweil274 Summer StreetBoston, MA 02210Tel: 617-423-7423Structural EngineerSGH41 Seyong StreetBuilding 1, Suite 500Waltham, MA 02453Tel: 781-907-9000Fax: 781-907-9009Drawing ScaleProject NumberDate IssuedRenovation of Olin Hall for Chemical and Biomolecular Engineering - Phase 1 Code ConsultantHastings Consulting Inc142 Hanlon RoadHollister, MA 01746Tel: 508-397-8417Lighting DesignerAvailable Light10 Derby Square #3Salem, MA 01970Tel: 978-744-6800NCost ConsultantDharam Consulting745 Atlantic Ave Fl 8Boston, MA 02111Tel: 617-913-4345Abatement SpecialistDelta860 Hooper RdEndwell, NY 13760Tel: 607-231-6600Civil EngineerT.G. Miller, P.C.203 N. Aurora StreetIthaca, NY 14850Tel: 607-272-6477G0.0020758.0011/30/2018DRAWING INDEX &LOCATION PLANDRAWING LIST14 - MECHANICALM0.10 HVAC - NOTES & ABBREVIATIONSM0.20 HVAC - LEGENDM1.00 HVAC - LEVEL 0 DEMOM1.20 HVAC - LEVEL 2 DEMOM1.30 HVAC - LEVEL 3 DEMOM2.00 HVAC - LEVEL 0M2.10 HVAC - LEVEL 1M2.20 HVAC - LEVEL 2M2.30 HVAC - LEVEL 3M2.40 HVAC - LEVEL 4M3.10 HVAC - SECTIONSM5.10 HVAC - DETAILSM5.20 HVAC - DETAILSM5.30 HVAC - DETAILSM5.40 HVAC - DETAILSM5.50 HVAC - DETAILSM6.10 HVAC - SCHEDULESM6.20 HVAC - SCHEDULESM6.30 HVAC - SCHEDULESM7.10 HVAC - AIR RISER DIAGRAMM7.20 HVAC - HYDRONIC / STEAM RISER DIAGRAMM8.10 HVAC - CONTROLSM8.20 HVAC - CONTROLSM8.30 HVAC - CONTROLSM8.40 HVAC - CONTROLSM8.50 HVAC - CONTROLSM8.60 HVAC - CONTROLSM8.70 HVAC - CONTROLSM8.80 HVAC - CONTROLS15 - ELECTRICALE0.01 ELECTRICAL LEGEND & GENERAL NOTESE0.02 ELECTRICAL GENERAL SCHEDULESE0.03 ELECTRICAL LAB EQUIPMENT SCHEDULESE0.04 ELECTRICAL PANELBOARD SCHEDULES - SHEET 1E0.05 ELECTRICAL PANELBOARD SCHEDULES - SHEET 2E1.00 LEVEL 0 - PHASE 1 ELECTRICAL DEMO PLANE1.10 LEVEL 1 - PHASE 1 ELECTRICAL DEMO PLANE1.20 LEVEL 2 - PHASE 1 ELECTRICAL DEMO PLANE1.30 LEVEL 3 - PHASE 1 ELECTRICAL DEMO PLANE1.40 LEVEL 4 - PHASE 1 ELECTRICAL DEMO PLANE2.10 LEVEL 0 - ELECTRICAL LIGHTING PLANE2.20 LEVEL 2 - ELECTRICAL LIGHTING PLANE2.30 LEVEL 3 - ELECTRICAL LIGHTING PLANE3.00 LEVEL 0 - ELECTRICAL POWER PLANE3.10 LEVEL 1 - ELECTRICAL POWER PLANE3.20 LEVEL 2 - ELECTRICAL POWER PLANE3.30 LEVEL 3 - ELECTRICAL POWER PLANE4.00 ELECTRICAL PART PLANS - SHEET 1E4.01 ELECTRICAL PART PLANS - SHEET 2E5.00 ELECTRICAL NORMAL POWER RISER DIAGRAMSE5.01 ELECTRICAL EMERGENCY POWER RISER DIAGRAMSE6.00 ELECTRICAL DETAILSE7.00 LIGHTING FIXTURE SCHEDULES & CONTROLS17 - FIRE ALARMFA0.01 FIRE ALARM - SYMBOLS & ABBREVIATIONSFA0.02 FIRE ALARM - NOTES & DESIGN CRITERIAFA1.00 FIRE ALARM - LEVEL 0 DEMOFA1.10 FIRE ALARM - LEVEL 1 DEMOFA1.20 FIRE ALARM - LEVEL 2 DEMOFA1.30 FIRE ALARM - LEVEL 3 DEMOFA2.00 FIRE ALARM - LEVEL 0FA2.10 FIRE ALARM - LEVEL 1FA2.20 FIRE ALARM - LEVEL 2FA2.30 FIRE ALARM - LEVEL 3FA6.01 FIRE ALARM - DETAILS18 - SECURITYSE0.01 SECURITY - LEGENDSE2.00 SECURITY - LEVEL 0SE2.10 SECURITY - LEVEL 1SE2.20 SECURITY - LEVEL 2SE2.30 SECURITY - LEVEL 319 - TELECOMMUNICATIONSTC0.01 TELECOM - LEGENDTC1.01 TELECOM - LEVEL 1 DEMO PLANTC1.02 TELECOM - LEVEL 2 DEMO PLANTC1.03 TELECOM - LEVEL 3 DEMO PLANTC1.04 TELECOM - LEVEL 4 DEMO PLANTC2.00 TELECOM - LEVEL 0TC2.10 TELECOM - LEVEL 1TC2.20 TELECOM - LEVEL 2TC2.30 TELECOM - LEVEL 3TC2.40 TELECOM - LEVEL 4TC4.00 TELECOM - IDF LAYOUT & PART PLANTC4.01 TELECOM - RISER DIAGRAM & DETAILSDRAWING LIST01 - GENERALG0.00 DRAWING INDEX & LOCATION PLANG0.01 GENERAL NOTES, ABBREVIATIONS, & GRAPHIC STANDARDSG0.02 INTERIOR VIEWS FOR REFERENCEG1.11 BASIS OF DESIGN - OCCUPIED AREAS DURING CONSTRUCTIONG1.20 CODE SUMMARYG1.21 CODE PLANSG2.00 MOUNTING HEIGHT SCHEDULE02 - CIVILC1.01 SITE CIVIL DRAWINGSC1.02 SITE CIVIL DRAWINGS03 - ABATEMENTAR1.00 LEVEL 0 - ASBESTOS ABATEMENTAR1.04 LEVEL 4 - ASBESTOS ABATEMENT04 - ARCHITECTURALA1.00 LEVEL 0 - PHASE 1 DEMOA1.10 LEVEL 1 - PHASE 1 DEMOA1.20 LEVEL 2 - PHASE 1 DEMOA1.30 LEVEL 3 - PHASE 1 DEMOA1.40 LEVEL 4 - PHASE 1 DEMOA2.00 LEVEL 0 - OVERALL PLANA2.10 LEVEL 1 - OVERALL PLANA2.20 LEVEL 2 - OVERALL PLANA2.30 LEVEL 3 - OVERALL PLANA2.40 LEVEL 4 - OVERALL PLANA4.00 LEVEL 0 - ENLARGED PLANA4.10 LEVEL 1 - ENLARGED PLANA4.20 LEVEL 2 - ENLARGED PLANA4.30 LEVEL 3 - ENLARGED PLANA4.40 LEVEL 4 - ENLARGED PLANA5.20 INTERIOR ELEVATIONS - LEVEL 2A5.21 INTERIOR ELEVATIONS - LEVEL 2A5.22 INTERIOR ELEVATIONS - LEVEL 2A5.23 INTERIOR ELEVATIONS - LEVEL 2A5.24 INTERIOR ELEVATIONS - LEVEL 2A5.30 INTERIOR ELEVATIONS - LEVEL 3A5.31 INTERIOR ELEVATIONS - LEVEL 3A5.32 INTERIOR ELEVATIONS - LEVEL 3A5.33 INTERIOR ELEVATIONS - LEVEL 3A6.20 LEVEL 2 - CEILING PLANA6.30 LEVEL 3 - CEILING PLANA8.00 EXTERIOR DETAILSA8.20 EXTERIOR ROOF DETAILSA9.00 PARTITION TYPESA9.01 PARTITION DETAILSA9.02 FLOOR TRANSITION AND BASE DETAILSA9.10 DOOR SCHEDULEA9.11 INTERIOR DETAILSA9.20 LAB CASEWORK DETAILSA9.21 LAB CASEWORK DETAILSA9.22 LAB CASEWORK DETAILSA9.40 EQUIPMENT LIST10 - STRUCTURALS0.00 GENERAL NOTESS0.10 CONCRETE TYPICAL DETAILSS0.20 STEEL TYPICAL DETAILSS1.01 AREAWAY PART PLANSS1.02 THIRD AND FOURTH LEVEL PART PLANSS4.00 DUNNAGE ELEVATIONS AND SECTIONSS6.00 SECTIONS AND DETAILSS6.01 SECTIONS AND DETAILS12 - FIRE PROTECTIONFP0.01 FIRE PROTECTION - SYMBOLS & ABBREVIATIONSFP0.02 FIRE PROTECTION - NOTES & DESIGN CRITERIAFP1.00 FIRE PROTECTION - LEVEL 0 DEMOFP1.10 FIRE PROTECTION - LEVEL 1 DEMOFP1.20 FIRE PROTECTION - LEVEL 2 DEMOFP1.30 FIRE PROTECTION - LEVEL 3 DEMOFP2.00 FIRE PROTECTION - LEVEL 0FP2.10 FIRE PROTECTION - LEVEL 1FP2.20 FIRE PROTECTION - LEVEL 2FP2.30 FIRE PROTECTION - LEVEL 3FP6.01 FIRE PROTECTION - DETAILSFP7.01 FIRE PROTECTION - RISER13 - PLUMBINGP0.01 PLUMBING LEGEND & GENERAL NOTESP0.02 PLUMBING LEGENDP0.03 PLUMBING LEGENDP1.00 PLUMBING - LEVEL 0 DEMOP1.10 PLUMBING - LEVEL 1 DEMOP1.20 PLUMBING - LEVEL 2 DEMOP1.30 PLUMBING - LEVEL 3 DEMOP2.00 PLUMBING - LEVEL 0P2.00U PLUMBING - UNDERGROUNDP2.10 PLUMBING - LEVEL 1P2.20 PLUMBING - LEVEL 2P2.30 PLUMBING - LEVEL 3P2.40 PLUMBING - LEVEL 4P4.10 PLUMBING - POTABLE RISER DIAGRAMP4.11 PLUMBING - LAB HOT WATER RISER DIAGRAMP4.20 PLUMBING - PURE WATER GENERATION DIAGRAMP4.21 PLUMBING - PURE WATER RISER DIAGRAMP4.30 PLUMBING - NITROGEN & COMPRESSED AIR GENERATIONDIAGRAMP4.31 PLUMBING - COMPRESSED DRY AIR RISER DIAGRAMP4.40 PLUMBING - VACUUM RISER DIAGRAMP4.50 PLUMBING - NITROGEN RISER DIAGRAMP4.60 PLUMBING - LAB WASTE & VENT RISER DIAGRAMP5.01 PLUMBING DETAILSP5.02 PLUMBING DETAILSP5.03 PLUMBING DETAILSP5.04 PLUMBING DETAILSP7.01 PLUMBING SCHEDULESOLIN HALLCARPENTER HALLDUFFIELD HALLPHILLIPS HALLCAMPUS ROADHOLLISTER HALLTHURSTON HALLBARD HALLKIMBALL HALLSNEE HALLUPSON HALLJOHNSON GRADUATE SCHOOL OF MANAGEMENTANABEL TAYLOR HALLLOCATION PLAN (N.T.S.)# DATE DESCRIPTION1 11/30/18 ISSUED FOR CONSTRUCTION