HomeMy WebLinkAboutFP6.01FIRE PROTECTION DETAILSSCALE:SCALE:SCALE:SCALE:UPRIGHT SPRINKLERSCALE: NONERETURN-BEND PIPING2NONEPIPING SUPPORT1NONE34 - INCH FLUSHING CONNECTION4NONEBRANCHLINE FLUSHING CONNECTION5NONESUPPORT HORIZONTALOFFSETS GREATER THAN 12"FROM STRUCTUREFINISH CEILINGSPRINKLER BRANCHPIPINGCONCENTRIC ONE-PIECEREDUCERPENDENT SPRINKLER**CONCEALED SHOWN FOR ILLUSTRATION ONLY, SEESPECIFICATIONS FOR PROJECT SPECIFIC REQUIREMENTSSTRUCTURE1" RETURN-BENDCONNECTED TO TOPOF BRANCH PIPINGNFPA 13 MINIMUM REQUIRED HANGER ROD SIZESPIPE SIZE DIAMETER OF RODUP TO AND INCLUDING 4" 3/8"5", 6", 8" 1/2"10", 12" 5/8"CONCRETE SLABATTACHMENT TOCONCRETE STRUCTUREPIPE HANGERS FORNPS 4" AND LARGERTHREADED RODTHREADED ROD CONCRETE ANCHORTHREADED RODATTACHMENT TOSTEEL STRUCTURESTRUCTURALSTEEL MEMBERBEAM CLAMP WITHRESTRAINING STRAPPIPE HANGERS FORNPS 3" AND SMALLERBAND HANGERTHREADED RODCLEVIS HANGERSURGE RESTRAINTPROVIDE SURGE RESTRAINT AT HANGER VIA RESTRAINTCLIP OR THREADED ROD EXTENSION TO PIPE SURFACE ASREQUIRED BY NFPA 13.1. END OF BRANCH PIPING WHERE MAXIMUM SYSTEMPRESSURE EXCEEDS 100 PSI.2. RETURN BEND OFFSETS GREATER THAN 12" WHEREMAXIMUM SYSTEM PRESSURE EXCEEDS 100 PSI.3. RETURN BEND OFFSETS GREATER THAN 24"SPRINKLER BRANCH PIPING1" SPRIG UP (PROVIDESUPPORT FOR SPRIG UPS 4FT OR LONGER)CONCENTRIC ONE-PIECEREDUCERUPRIGHT SPRINKLERPOSITION DEFLECTOR W/RESPECT TO STRUCTURALELEMENTS PER NFPA 13REQUIREMENTS FORCONSTRUCTION TYPEUNDERSIDE OF STRUCTUREPROVIDE TWO(2) 2 1/2" FULL PORTBALL VALVES AND PLUGS AT THEEND OF 4-INCH SPRINKLER PIPINGFOR FLUSHING ACCORDANCE WITHCORNELL STANDARDSPROVIDE LINE SIZE FULL-PORT BALLVALVE AND PLUG AT THE END OF ALLBRANCHLINES 2 1/2" AND SMALLER INACCORDANCE WITH CORNELLSTANDARDSArchitectPayette Associates Architects, P.C.290 Congress Street, Fifth FloorBoston, MA 02210-1005Tel: 617-895-1000Fax: 617-895-1002MEP/FP EngineerVanderweil274 Summer StreetBoston, MA 02210Tel: 617-423-7423Structural EngineerSGH41 Seyong StreetBuilding 1, Suite 500Waltham, MA 02453Tel: 781-907-9000Fax: 781-907-9009Drawing ScaleProject NumberDate IssuedRenovation of Olin Hall for Chemical and Biomolecular Engineering - Phase 1 Code ConsultantHastings Consulting Inc142 Hanlon RoadHollister, MA 01746Tel: 508-397-8417Lighting DesignerAvailable Light10 Derby Square #3Salem, MA 01970Tel: 978-744-6800NCost ConsultantDharam Consulting745 Atlantic Ave Fl 8Boston, MA 02111Tel: 617-913-4345Abatement SpecialistDelta860 Hooper RdEndwell, NY 13760Tel: 607-231-6600Civil EngineerT.G. Miller, P.C.203 N. Aurora StreetIthaca, NY 14850Tel: 607-272-6477 12" = 1'-0"FP6.0129313.0011/30/18FIRE PROTECTION -DETAILS# DATE DESCRIPTION1 11/30/18 ISSUED FOR CONSTRUCTIONDocuSign Envelope ID: 45F96879-714F-4669-B8A4-6F84201714F012/10/2018