Loading...
HomeMy WebLinkAboutFP2.10FIRE PROTECTION LEVEL 1FFF F FFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFFHOSE ALLOWANCE(GPM)(SQ FT)MAX AREA PER SPRINKLER(SQ FT)CALCULATION AREADESIGN DENSITY(GPM/SQ FT)OCCUPANCY CLASSIFICATIONAREA DESCRIPTIONSPRINKLER SYSTEM DESIGN CRITERIA - NFPA 13LIGHT HAZARD/HC-1 MEETING ROOM, CONFERENCE ROOM0.10 1500 225 10021346785QPRSTOU9S1R14AQ15.121346785QPRSTOU9S1R14AQ15.1SUPPLY NEW SPRINKLERS FROM EXISTING BRANCHPIPING TO COORDINATE WITHARCHITECTURAL CHANGESEXISTING TO REMAINSTANDPIPE, FEEDAND VALVESLAB WRITE-UP162LAB WRITE-UP160LAB WRITE-UP158OFFICE158BLAB WRITE-UP170LAB WRITE-UP170ALAB WRITE-UP170BLAB WRITE-UP169OFFICE168OFFICE167ACONFERENCEROOM167BOFFICE167COFFICE167DOFFICE167ERoom100CKRoom167FRoom100CGRoom100CJRoom165BRoom100SARoom165Room100UARoom100JARoom100UBCORRIDOR100CHRoom100UFRoom167GOFFICE156COLLABORATION167WORK AREAWET PIPE SPRINKLER MAINS ARE EXISTING TO REMAIN. SUPPLY NEW SPRINKLERS FROM EXISTING SPRINKLER SYSTEM.3ArchitectPayette Associates Architects, P.C.290 Congress Street, Fifth FloorBoston, MA 02210-1005Tel: 617-895-1000Fax: 617-895-1002MEP/FP EngineerVanderweil274 Summer StreetBoston, MA 02210Tel: 617-423-7423Structural EngineerSGH41 Seyong StreetBuilding 1, Suite 500Waltham, MA 02453Tel: 781-907-9000Fax: 781-907-9009Drawing ScaleProject NumberDate IssuedRenovation of Olin Hall for Chemical and Biomolecular Engineering - Phase 1 Code ConsultantHastings Consulting Inc142 Hanlon RoadHollister, MA 01746Tel: 508-397-8417Lighting DesignerAvailable Light10 Derby Square #3Salem, MA 01970Tel: 978-744-6800NCost ConsultantDharam Consulting745 Atlantic Ave Fl 8Boston, MA 02111Tel: 617-913-4345Abatement SpecialistDelta860 Hooper RdEndwell, NY 13760Tel: 607-231-6600Civil EngineerT.G. Miller, P.C.203 N. Aurora StreetIthaca, NY 14850Tel: 607-272-6477As indicatedFP2.1029313.0011/30/18FIRE PROTECTION -LEVEL 1GENERAL NOTES:1.PROVIDE SPRINKLER PROTECTION THROUGHOUT IN ACCORDANCE WITH NFPA 13. IN AREAS WHERE FIRE SUPPRESSION OR ARCHITECTURAL DRAWINGS INDICATE SPRINKLER LOCATIONS, COMPLY WITH THE DESIGN INTENT INDICATED BY THE DRAWINGS AND NFPA 13. IN AREAS WHERE FIRE SUPPRESSION OR ARCHITECTURAL DRAWINGS DO NOT INDICATE SPRINKLER LOCATIONS, COMPLY WITH NFPA 13.2.REFER TO ARCHITECTURAL & STRUCTURAL SERIES DRAWINGS FOR STRUCTURAL FRAMING PLANS, DETAILED REFLECTED CEILING PLANS, ELEVATIONS, AND SECTIONS. 3.IN AREAS WITH FINISHED CEILINGS, LOCATE SPRINKLERS IN THE CENTER OF SUSPENDED CEILING TILES, ALONG THE CENTER-LINE OF CEILING FEATURES AND IN-LINE WITH ADJACENT CEILING FIXTURES. 4.IN AREAS OPEN TO STRUCTURE ABOVE, LOCATE SPRINKLERS WITHIN BEAM POCKETS AND MAINTAIN SPRINKLER CLEARANCE FROM STRUCTURAL MEMBERS IN ACCORDANCE WITH NFPA 13.5.LOCATE SPRINKLERS WITH RESPECT TO CEILING AND FLOOR MOUNTED OBSTRUCTIONS SIMILAR TO (BUT NOT LIMITED TO) SHELVING, ROOM DIVIDERS, LIGHT FIXTURES, EXIT SIGNS, SOFFITS AND CHANGES IN CEILING ELEVATION AND MAINTAIN CLEARANCE IN ACCORDANCE WITH NFPA 13.6.SHOP DRAWINGS INCLUSIVE OF SPRINKLER AND BRANCH PIPING LAYOUTS AND CORRESPONDING HYDRAULIC CALCULATIONS SHALL BE PREPARED BY THE INSTALLER'S QUALIFIED DESIGNER. SHOP DRAWINGS SHALL BE SUBMITTED FOR REVIEW AND SHALL BE USED FOR FIRE PROTECTION SYSTEM INSTALLATION PERMITS. P7.ROVIDE ALL NECESSARY FLUSHING VALVES IN ACCORDANCE WITH CORNELL UNIVERSITY FIRE PROTECTION SPECIFICATIONS. # DATE DESCRIPTION1 11/30/18 ISSUED FOR CONSTRUCTION2 12/18/18 ADDENDUM 013 1/7/18 ADDENDUM 02DocuSign Envelope ID: A68187EC-60AD-476B-AE6F-1852E70EE57E1/4/2019