Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
E2.10LEVEL 0 - ELECTRICAL LIGHTING PLAN
T821 3 4 5 Q P R S T O U S1 R1 4A Q1 5.1 MECHANICAL B00UA Room B00SA Room B78 Room B00UB Room B00UC LS1 LS1 LS1 LS1 138 3838 LS1 1 REMOVE AND REINSTALL LIGHTING FIXTURES IN THIS AREA AS REQUIRED TO ACCOMMADATE WORK OF OTHER TRADES. ALL EXISTING LIGHTING TO REMAIN. HELP-B #1D4B #38 X1 31 Architect Payette Associates Architects, P.C. 290 Congress Street, Fifth Floor Boston, MA 02210-1005 Tel: 617-895-1000 Fax: 617-895-1002 MEP/FP Engineer Vanderweil 274 Summer Street Boston, MA 02210 Tel: 617-423-7423 Structural Engineer SGH 41 Seyong Street Building 1, Suite 500 Waltham, MA 02453 Tel: 781-907-9000 Fax: 781-907-9009 Drawing Scale Project Number Date Issued Renovation of Olin Hall for Chemical and Biomolecular Engineering - Phase 1 Code Consultant Hastings Consulting Inc 142 Hanlon Road Hollister, MA 01746 Tel: 508-397-8417 Lighting Designer Available Light 10 Derby Square #3 Salem, MA 01970 Tel: 978-744-6800 N Cost Consultant Dharam Consulting 745 Atlantic Ave Fl 8 Boston, MA 02111 Tel: 617-913-4345 Abatement Specialist Delta 860 Hooper Rd Endwell, NY 13760 Tel: 607-231-6600 Civil Engineer T.G. Miller, P.C. 203 N. Aurora Street Ithaca, NY 14850 Tel: 607-272-6477 1/4" = 1'-0" E2.10 29313.00 11/30/18 LEVEL 0 - ELECTRICAL LIGHTING PLAN 1/4" = 1'-0"1 ELECTRICAL LIGHTING PLAN-LEVEL 0 # DATE DESCRIPTION 1 11/30/18 ISSUED FOR CONSTRUCTION DocuSign Envelope ID: DAB23A5A-6B4E-4542-874F-F48E2BF76454 12/10/2018