Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
AR1.00 _30_2018EL 0 - ASBESTOS ABATEMENT
UPUPUPUPFE2066 SFB00UA10 SF12913 SFB00UG38 SFB00TB73 SFB00UR79 SFB00JB91 SFB00UJ129 SFB45138 SFB00UM118 SF138164 SFB78A178 SFB00CD159 SF141238 SFB00SB280 SFB08240 SFB00SA301 SFB59320 SFB54320 SFB50320 SFB52320 SFB48320 SFB461359 SFB49384 SFB00UL425 SFB40A477 SFB56514 SFB06521 SFB40672 SFB53666 SFB55684 SFB57799 SFB02812 SFB781100 SFB14NotEnclosedB00UN1093 SF1802332 SFB00CA51 SF182157 SF1831133 SFB011165 SFB051935 SFB40B993 SFRoomB776 SFB00UK82 SFB00EB14 SFB00UB14 SFB00UC45 SFB40CNotEnclosedB00UP384 SFB00UH214 SFB00UE475 SFB00UF328 SFB00UD341 SFB14A159 SFB14C154 SFB14B1092 SFB11MLKJIHG20'-3 1/2"20'-0"20'-0"20'-0"20'-0"20'-0"15'-2 1/2"9'-5"16'-9"9'-5"12'-2 1/2"20'-0"20'-3 1/2"FEDCBAN221133410'-10"15'-5 1/2"20'-0"15'-0"20'-0"20'-0"12'-0"12'-0"12'-0"12'-0"12'-0"20'-0"20'-0"6677885QPRSTO101315151616171710'-10"15'-5 1/2"25'-0"4'-0"19'-0"20'-0"20'-0"19'-0"1'-0"U1819202124252326911121420'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"20'-0"15'-3 1/2"20'-0"25'-3 1/2"5'-0"9'-8 1/2"10'-0"S12'-6"R15'-0"4A6'-2"Q110"225.123.126.1ArchitectPayette Associates Architects, P.C.290 Congress Street, Fifth FloorBoston, MA 02210-1005Tel: 617-895-1000Fax: 617-895-1002MEP/FP EngineerVanderweil274 Summer StreetBoston, MA 02210Tel: 617-423-7423Structural EngineerSGH41 Seyong StreetBuilding 1, Suite 500Waltham, MA 02453Tel: 781-907-9000Fax: 781-907-9009Drawing ScaleProject NumberDate IssuedCode ConsultantHastings Consulting Inc142 Hanlon RoadHollister, MA 01746Tel: 508-397-8417Lighting DesignerAvailable Light10 Derby Square #3Salem, MA 01970Tel: 978-744-6800Cost ConsultantDharam Consulting745 Atlantic Ave Fl 8Boston, MA 02111Tel: 617-913-4345 3/32" = 1'-0"AR1.0020758.0011/30/2018LEVEL 0 - ASBESTOSABATEMENT#DATEDESCRIPTIONDelta860 Hooper RoadEndwell, NY 13760Tel: 607-231-6600Abatement SpecialistCivil EngineerT.G. Miller, P.C.203 N. Aurora StreetIthaca, NY 14850Tel: 607-272-6477111/30/18ISSUED FOR CONSTRUCTIONNRenovation of Olin Hall forChemical and BiomolecularEngineering - Phase 1