Loading...
HomeMy WebLinkAboutA2.30LEVEL 3 - OVERALL PLANMLKJIHGFEDCBAN22113346677885QPRSTO1013151516161717U1819202124252326911121410' - 10"15' - 5 1/2"25' - 0"10' - 0"20' - 0"20' - 0"20' - 0"20' - 0"20' - 0"20' - 0"20' - 0"9' - 8 1/2"15' - 3 1/2"20' - 0"25' - 3 1/2"20' - 3 1/2"20' - 0"20' - 0"20' - 0"20' - 0"20' - 0"15' - 2 1/2"9' - 5"16' - 9"9' - 5"12' - 2 1/2"20' - 0"20' - 3 1/2"20' - 0"20' - 0"20' - 0"10' - 10"15' - 5 1/2"20' - 0"15' - 0"20' - 0"20' - 0"12' - 0"12' - 0"12' - 0"12' - 0"12' - 0"20' - 0"20' - 0"4' - 0"19' - 0"20' - 0"20' - 0"19' - 0"1' - 0"S1R14A225.123.126.1WORK AREA77 SF300UR87 SF300JC100 SF345B100 SF345C99 SF345A108 SF318B104 SF300CC118 SF318179 SF342168 SF300SC137 SF300T40 SF300TA234 SF300SB242 SF300SA269 SF318A298 SF314347 SF352347 SF350347 SF354347 SF356347 SF348347 SF346347 SF340366 SF312352 SF306371 SF308394 SF310511 SF316530 SF305528 SF309572 SF303573 SF307579 SF301565 SF311692 SF343384 SF345752 SF3041092 SF300CB21 SF300JA79 SF300EB16 SF300UA15 SF300UB14 SF300UD68 SF300EA26 SF300JB19 SF300UC207 SF343AA4.301169 SF358347 SF344249 SF342A2.01743 SF3621601 SF367167 SF367F264 SF367E156 SF367D158 SF367C87 SF367A99 SF367B156 SF360ArchitectPayette Associates Architects, P.C.290 Congress Street, Fifth FloorBoston, MA 02210-1005Tel: 617-895-1000Fax: 617-895-1002MEP/FP EngineerVanderweil274 Summer StreetBoston, MA 02210Tel: 617-423-7423Structural EngineerSGH41 Seyong StreetBuilding 1, Suite 500Waltham, MA 02453Tel: 781-907-9000Fax: 781-907-9009Drawing ScaleProject NumberDate IssuedRenovation of Olin Hall for Chemical and Biomolecular Engineering - Phase 1 Code ConsultantHastings Consulting Inc142 Hanlon RoadHollister, MA 01746Tel: 508-397-8417Lighting DesignerAvailable Light10 Derby Square #3Salem, MA 01970Tel: 978-744-6800NCost ConsultantDharam Consulting745 Atlantic Ave Fl 8Boston, MA 02111Tel: 617-913-4345Abatement SpecialistDelta860 Hooper RdEndwell, NY 13760Tel: 607-231-6600Civil EngineerT.G. Miller, P.C.203 N. Aurora StreetIthaca, NY 14850Tel: 607-272-6477 3/32" = 1'-0"A2.3020758.0011/30/2018LEVEL 3 - OVERALL PLAN FLOOR PLAN KEYNOTES2.01 INSTALL NEW ACCESSIBLE DRINKING FOUNTAIN. PATCH AND PAINT WALL TO MATCH EXISTING.# DATE DESCRIPTION1 11/30/18 ISSUED FOR CONSTRUCTION